2316 GRAND AVENUE
BRONX · BIN 2014244
💬 Discuss this project
1901Year Built
5Stories
C1Building Class
R7-1Zoning
7,561 sfGross Floor Area
15Units
Rent Stabilized0 Open Violations
Over six families without stores · Owner of record: 2316 GRAND HOLDINGS LLC · 3,000 sf lot · 2.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingFire ProtectionGeneral
Roof15p · 1 filing · 20 docs
Penthouse17p · 1 filing · 20 docs
Floor 414p · 1 filing · 20 docs
Floor 316p · 1 filing · 20 docs
Floor 214p · 1 filing · 20 docs
Floor 116p · 1 filing · 20 docs
Cellar20p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2316 GRAND HOLDINGS LLC103/22/2026
BUILDERS GROUP USA703/22/2026
BUILDERS GROUP103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/01/2022$690K—— → —$91/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC2203/21/2026
EMPIRE EXPEDITING1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BUILDERS GROUP USA INCGeneral Contractor707/08/2026
CHAIM GOLDRINGElectrical303/21/2026
STELLAR INDUSTRIES INCGeneral Contractor303/21/2026
PRIME PIPING & HEATING INFire Protection207/08/2026
DYNAMIX SCAFFOLD GROUP LLGeneral Contractor107/08/2026
A. M. PLUMBING COMPANYPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161408/21/2024
M. INT'L ENGINEERING PLLC3129303/22/2023
Building Lifecycle
All (155)Filed (22)Permit Issued (10)Signed Off (7)Violation (12)Inspection (12)Objection (62)Special Inspection (30)
07/01/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/25/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO PROPOSE THE FOLLOWING: HORIZONTAL ENLARGEMENT AT THE SECOND FLOOR. 2 STORY VERTICAL ENLARGEMENT WITH A PENTHOUSE AND BULKHEAD. INCREASE DWELLING UNITS TO 15. OBTAIN NEW CERTIFICATE OF OCCUPANCY
X00681146-S4
03/11/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO PROPOSE THE FOLLOWING: HORIZONTAL ENLARGEMENT AT THE SECOND FLOOR. 2 STORY VERTICAL ENLARGEMENT WITH A PENTHOUSE AND BULKHEAD. INCREASE DWELLING UNITS TO 15. OBTAIN NEW CERTIFICATE OF OCCUPANCY
X00681146-Z3
10/28/2024
Objection resolved — Addressed
08/28/2024
Objection raised — Other
08/21/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO PROPOSE THE FOLLOWING: HORIZONTAL ENLARGEMENT AT THE SECOND FLOOR. 2 STORY VERTICAL ENLARGEMENT WITH A PENTHOUSE AND BULKHEAD. INCREASE DWELLING UNITS TO 15. OBTAIN NEW CERTIFICATE OF OCCUPANCY
X00681146-A5
08/07/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
08/07/2024
Special inspection requirement — Interior lighting power
FAHAD FATEH
08/07/2024
Special inspection requirement — Preliminary
FAHAD FATEH
08/07/2024
Special inspection requirement — Protection of exposed foundation insulation
FAHAD FATEH
08/07/2024
Special inspection requirement — Lighting controls
FAHAD FATEH
08/07/2024
Special inspection requirement — Metering
FAHAD FATEH
08/07/2024
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
08/07/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
08/07/2024
Special inspection requirement — Fenestration areas
FAHAD FATEH
08/07/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
08/07/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
08/07/2024
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
08/07/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
08/07/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
08/07/2024
Special inspection requirement — Exterior lighting power
FAHAD FATEH
08/07/2024
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
05/16/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO PROPOSE THE FOLLOWING: HORIZONTAL ENLARGEMENT AT THE SECOND FLOOR. 2 STORY VERTICAL ENLARGEMENT WITH A PENTHOUSE AND BULKHEAD. INCREASE DWELLING UNITS TO 15. OBTAIN NEW CERTIFICATE OF OCCUPANCY
X00681146-S2
05/14/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/10/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/05/2024
Permit issued — Sprinklers
X00681146-S4-EW-SP
02/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
02/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
02/23/2024
Special inspection requirement — Shutoff dampers
FAHAD FATEH
02/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
02/23/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/23/2024
Special inspection requirement — Final
FAHAD FATEH
02/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
02/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
02/23/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
02/23/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
02/20/2024
Objection raised — Other
02/20/2024
Objection resolved — Addressed
02/19/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO PROPOSE THE FOLLOWING: HORIZONTAL ENLARGEMENT AT THE SECOND FLOOR. 2 STORY VERTICAL ENLARGEMENT WITH A PENTHOUSE AND BULKHEAD. INCREASE DWELLING UNITS TO 15. OBTAIN NEW CERTIFICATE OF OCCUPANCY
X00681146-A4
02/05/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/30/2024
Special inspection requirement — Mechanical Systems
FAHAD FATEH
01/30/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
01/30/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/30/2024
Special inspection requirement — Final
FAHAD FATEH
01/22/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/09/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/05/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO PROPOSE THE FOLLOWING: HORIZONTAL ENLARGEMENT AT THE SECOND FLOOR. 2 STORY VERTICAL ENLARGEMENT WITH A PENTHOUSE AND BULKHEAD. INCREASE DWELLING UNITS TO 15. OBTAIN NEW CERTIFICATE OF OCCUPANCY
X00681146-S1
01/02/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO PROPOSE THE FOLLOWING: HORIZONTAL ENLARGEMENT AT THE SECOND FLOOR. 2 STORY VERTICAL ENLARGEMENT WITH A PENTHOUSE AND BULKHEAD. INCREASE DWELLING UNITS TO 15. OBTAIN NEW CERTIFICATE OF OCCUPANCY
X00681146-S8
12/29/2023
Objection resolved — Addressed
12/28/2023
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
12/26/2023
Objection raised — Other
12/21/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO PROPOSE THE FOLLOWING: HORIZONTAL ENLARGEMENT AT THE SECOND FLOOR. 2 STORY VERTICAL ENLARGEMENT WITH A PENTHOUSE AND BULKHEAD. INCREASE DWELLING UNITS TO 15. OBTAIN NEW CERTIFICATE OF OCCUPANCY
X00681146-A3
12/20/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO PROPOSE THE FOLLOWING: HORIZONTAL ENLARGEMENT AT THE SECOND FLOOR. 2 STORY VERTICAL ENLARGEMENT WITH A PENTHOUSE AND BULKHEAD. INCREASE DWELLING UNITS TO 15. OBTAIN NEW CERTIFICATE OF OCCUPANCY
X00681146-P9
12/12/2023
Signed off — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO PROPOSE THE FOLLOWING: HORIZONTAL ENLARGEMENT AT THE SECOND FLOOR. 2 STORY VERTICAL ENLARGEMENT WITH A PENTHOUSE AND BULKHEAD. INCREASE DWELLING UNITS TO 15. OBTAIN NEW CERTIFICATE OF OCCUPANCY
X00681146-Z2
12/11/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO PROPOSE THE FOLLOWING: HORIZONTAL ENLARGEMENT AT THE SECOND FLOOR. 2 STORY VERTICAL ENLARGEMENT WITH A PENTHOUSE AND BULKHEAD. INCREASE DWELLING UNITS TO 15. OBTAIN NEW CERTIFICATE OF OCCUPANCY
X00681146-A2
12/04/2023
Objection resolved — Addressed
11/27/2023
Objection raised — Other
11/23/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HEREWITH TO PROPOSE THE FOLLOWING: HORIZONTAL ENLARGEMENT AT THE SECOND FLOOR. 2 STORY VERTICAL ENLARGEMENT WITH A PENTHOUSE AND BULKHEAD. INCREASE DWELLING UNITS TO 15. OBTAIN NEW CERTIFICATE OF OCCUPANCY
X00681146-A1
11/13/2023
Signed off — Alteration
Installation of heavy duty sidewalk shed as per chapter 33 of NYCBC. No change in use egress or occupancy
X00849598-I1
10/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 155 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offA M B MECHANICAL INC04/05/2024
DOB NOWPlumbingSigned-offA. M. PLUMBING COMPANY08/29/2023
DOB NOWGeneral ConstructionPermit IssuedBUILDERS GROUP USA04/26/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC04/05/2023
DOB NOWSidewalk ShedSigned-offDYNAMIX SCAFFOLD GROUP LL04/03/2023
DOB NOWGeneral ConstructionPermit IssuedBUILDERS GROUP USA03/09/2023
DOB NOWStructuralSigned-offBUILDERS GROUP USA03/06/2023
DOB NOWFoundationSigned-offBUILDERS GROUP USA02/24/2023
DOB NOWConstruction FenceSigned-offBUILDERS GROUP USA02/14/2023
DOB NOWFoundationSigned-offSTELLAR INDUSTRIES INC05/20/2022
BISEQISSUEDCHESAKL ENTERPRISES INC07/27/2023
1 project · most recent 08/21/2024
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/21/2024Permit IssuedBUILDERS GROUP USA INCHeating and Air Conditioning Systems
Heat / Cool
Daikin 2MXS18NMVJU 18,500 BTU · Condensing Unit ×11
FTXB12AXVJU 11,300 BTU · Condensing Unit ×4
RX12BXVJU 13,500 BTU · Condensing Unit ×24
3MXS24WMVJU9 36,000 BTU · Condensing Unit ×6
1 project · most recent 08/21/2024
Sprinkler System
FiledStatusContractorScope
08/21/2024Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 08/21/2024
Storm Water/Sanitary
FiledStatusContractorScope
08/21/2024Signed-offA. M. PLUMBING COMPANYStorm, Water/Sanitary
3 projects · most recent 04/20/2023
General Wiring
FiledStatusContractorScope
04/20/2023CompletePLATINUM PWR ELECTL CONTGeneral Wiring
04/20/2023CompletePLATINUM PWR ELECTL CONT—
04/11/2023CompleteHIGH QUALITY ELECTRIC OF—
1 project · most recent 08/21/2024
Steel
FiledStatusContractorScope
08/21/2024Signed-offA M B MECHANICAL INCSteel
1 project · most recent 08/21/2024
Fence
FiledStatusContractorScope
08/21/2024Signed-offA M B MECHANICAL INCFence
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
07/01/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/14/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/10/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/05/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/22/2024Fail-Final CND-Occupancy InspectionFailView ↗
01/09/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/28/2023Pass-Final PL - UndergroundPassView ↗
10/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/13/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/27/2023Pass-Final PL - UndergroundPassView ↗
09/08/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/15/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 111
DateRequirementInspectorRole
08/07/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
08/07/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
08/07/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
08/07/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
08/07/2024MeteringFAHAD FATEHenergy_progress
08/07/2024Interior lighting powerFAHAD FATEHenergy_progress
08/07/2024Lighting in dwelling unitsFAHAD FATEHenergy_progress
08/07/2024Fenestration areasFAHAD FATEHenergy_progress
08/07/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
08/07/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
08/07/2024PreliminaryFAHAD FATEHprogress
08/07/2024Fenestration air leakageFAHAD FATEHenergy_progress
08/07/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
08/07/2024Protection of exposed foundation insulationFAHAD FATEHenergy_progress
08/07/2024Lighting controlsFAHAD FATEHenergy_progress
08/07/2024Exterior lighting powerFAHAD FATEHenergy_progress
02/23/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
02/23/2024Maintenance informationFAHAD FATEHenergy_progress
02/23/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
02/23/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
02/23/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
02/23/2024Shutoff dampersFAHAD FATEHenergy_progress
02/23/2024FinalFAHAD FATEHprogress
02/23/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
02/23/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
Latest 25 of 111.
▾Documents — 156 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch23
08/23/2026X00681146-P9Request digital key ↗
08/23/2026X00681146-P3Request digital key ↗
08/23/2026X00681146-S8Request digital key ↗
Showing 3 of 23 on file for this type
▸Applications & Permits4
▸BISBPP-5 - Authorization to the Department of Transportation1
05/01/2023240317670Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
04/26/2022240317670Open ↗
▸BISWORK PERMIT APPLICATION1
07/27/2023240350142Open ↗
▸DOB NOWHPD - Permit Notice1
08/13/2026X00681146-I1Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026X00681146-A1Open ↗
08/13/2026X00681146-I1Open ↗
08/13/2026X00681146-A2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026X00681146-A5Open ↗
08/13/2026X00681146-A2Open ↗
08/13/2026X00681146-A1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00681146-I1Open ↗
▸Seals & Professional Certifications63
▸DOB NOWDPL-1: Design Professional Seal & Signature23
08/23/2026X00681146-Z3Open ↗
08/23/2026X00681146-A1Open ↗
08/23/2026X00681146-A5Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWProgress Inspector Seal & Signature19
09/02/2026X00681146-A1Open ↗
09/02/2026X00681146-A1Open ↗
09/02/2026X00681146-A2Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/02/2026X00681146-A1Open ↗
09/02/2026X00681146-A2Open ↗
09/01/2026X00681146-S4Open ↗
Showing 3 of 18 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
07/11/2023240350142Open ↗
04/26/2022240317670Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/26/2022240317670Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/13/2026X00681146-A2Open ↗
08/13/2026X00681146-A1Open ↗
08/13/2026X00681146-A5Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection7
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
09/13/2024240317670Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/01/2023240317670Open ↗
▸BISSTREET TREE CHECKLIST1
05/01/2023240317670Open ↗
▸BISSTREET TREES SITE PLAN1
09/13/2024240317670Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00681146-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00681146-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00681146-I1Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report14
08/23/2026X00681146-P3Open ↗
08/23/2026X00681146-A2Open ↗
08/23/2026X00681146-Z2Open ↗
Showing 3 of 14 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026X00681146-I1Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/11/2023240350142Open ↗
04/26/2022240317670Open ↗
▸Approvals, Objections & Sign-offs4
▸BISLETTERS - SUPPORTING DOCUMENTATION2
07/11/2023240350142Open ↗
05/01/2023240317670Open ↗
▸BISFINAL1
11/29/2023240350142Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
12/01/2023240350142Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
07/11/2023240350142Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
11/29/2023240350142Open ↗
▸Filing & Intake Forms6
▸BISADDITIONAL INFORMATION3
07/11/2023240350142Open ↗
05/02/2023240317670Open ↗
05/01/2023240317670Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
06/27/2023240350142Open ↗
04/26/2022240317670Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
04/26/2022240317670Open ↗
▸Other Documents17
▸DOB NOWProperty Ownership Certification6
08/23/2026X00681146-A2Open ↗
08/23/2026X00681146-P2Open ↗
08/23/2026X00681146-P3Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/13/2026X00681146-A1Open ↗
08/13/2026X00681146-I1Open ↗
08/13/2026X00681146-A5Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/13/2026X00681146-I1Open ↗
08/13/2026X00681146-A1Open ↗
08/13/2026X00681146-A2Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
04/26/2022240317670Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026X00681146-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00681146-I1Open ↗