Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneralOther
Roof9p · 2 filings · 20 docs
Floor 145p · 5 filings · 20 docs
Mezzanine25p · 2 filings · 20 docs
Site & exterior23p · 2 filings · 20 docs
Filed — no permit issued1p · 2 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LARGAVISTA COMPANIES3209/13/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RAMPULLA ASSOCIATES ARCHITECTS1203/21/2026
A TECH ENGINEERING NYC203/21/2026
METROPOLIS GROUP INC603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MAMMOTH INCGeneral Contractor1307/08/2026
FIVE BOROUGH NYC LLCFire Protection107/08/2026
MPC PLUMBING & HEATING INCPlumbing107/08/2026
R&M PIPING & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738708/07/2026
VERTICAL V-NORTHEAST, INC1794503/18/2026
Building Lifecycle
All (127)Filed (16)Permit Issued (11)Signed Off (6)Inspection (18)Objection (46)Special Inspection (30)
08/07/2026
Filed — New Building
Structural steel plans for commercial building
S00607199-P7
08/06/2026
Special inspection requirement — Shutoff dampers
anthony santoro
08/06/2026
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
08/06/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
08/06/2026
Special inspection requirement — Maintenance information
anthony santoro
08/06/2026
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
08/06/2026
Special inspection requirement — Final
anthony santoro
08/06/2026
Special inspection requirement — Mechanical Systems
anthony santoro
05/19/2026
Objection resolved — Addressed
04/28/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/18/2026
Filed — New Building
Structural steel plans for commercial building
S00607199-P6
03/17/2026
Special inspection requirement — Insulation placement and R values
BRIAN ARONE
03/17/2026
Special inspection requirement — Fenestration air leakage
BRIAN ARONE
03/17/2026
Special inspection requirement — Air barrier - visual inspection
BRIAN ARONE
03/17/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
BRIAN ARONE
03/17/2026
Special inspection requirement — Exterior lighting power
BRIAN ARONE
03/17/2026
Special inspection requirement — Interior lighting power
BRIAN ARONE
03/17/2026
Special inspection requirement — Fenestration areas
BRIAN ARONE
03/17/2026
Special inspection requirement — Lighting controls
BRIAN ARONE
03/17/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
BRIAN ARONE
03/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BRIAN ARONE
03/17/2026
Special inspection requirement — Subgrade Inspections
BRIAN ARONE
03/17/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
GREGORY BIESIADECKI
03/17/2026
Special inspection requirement — Energy Code Compliance Inspections
BRIAN ARONE
03/17/2026
Special inspection requirement — Lowest Floor Elevation
BRIAN ARONE
02/21/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/25/2024
Objection raised — Scope
10/10/2024
Filed — New Building
Structural steel plans for commercial building
S00607199-P5
09/06/2024
Signed off — Alteration
Hereby filing curb cut restoration per plans file herewith
S00687960-I1
09/06/2024
Signed off — Alteration
Hereby filing curb cut restoration per plans file herewith
S00984696-I1
09/06/2024
Special inspection requirement — Maintenance information
anthony santoro
09/06/2024
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
09/06/2024
Special inspection requirement — Shutoff dampers
anthony santoro
09/06/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
09/06/2024
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
09/06/2024
Special inspection requirement — Final
anthony santoro
09/06/2024
Special inspection requirement — Mechanical Systems
anthony santoro
08/20/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/19/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/25/2024
Filed — New Building
Structural steel plans for commercial building
S00607199-P4
07/25/2024
Objection raised — Scope
07/25/2024
Objection resolved — Addressed
07/24/2024
Special inspection requirement — Insulation placement and R values
BRIAN ARONE
07/24/2024
Special inspection requirement — Lighting controls
BRIAN ARONE
07/23/2024
Filed — New Building
Structural steel plans for commercial building
S00607199-P3
07/03/2024
Signed off — Alteration
proposed sprinkler application in conjunction with a New building
S00878098-I1
06/28/2024
Signed off — New Building
Structural steel plans for commercial building
S00607199-S4
06/28/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/26/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/24/2024
Signed off — New Building
Structural steel plans for commercial building
S00607199-S2
06/24/2024
Signed off — New Building
Structural steel plans for commercial building
S00607199-S6
06/24/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/23/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/17/2024
Filed — New Building
Structural steel plans for commercial building
S00607199-P2
04/08/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/01/2024
Permit issued — Mechanical Systems
S00607199-S5-MS
03/22/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/19/2024
Permit issued — Structural
S00607199-S2-ST
03/19/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/28/2024
Objection resolved — Addressed
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMAMMOTH INC04/01/2024
DOB NOWStructuralSigned-offMAMMOTH INC03/19/2024
DOB NOWCurb CutSigned-offMAMMOTH INC02/12/2024
DOB NOWCurb CutSigned-offMAMMOTH INC02/12/2024
DOB NOWStructuralSigned-offMAMMOTH INC11/28/2023
DOB NOWPlumbingSigned-offR&M PIPING & HTG INC11/27/2023
DOB NOWSprinklersSigned-offFIVE BOROUGH NYC LLC11/20/2023
DOB NOWPlumbingSigned-offMPC PLUMBING & HEATING IN08/30/2023
DOB NOWGeneral ConstructionPermit IssuedMAMMOTH INC07/10/2023
DOB NOWFoundationSigned-offMAMMOTH INC07/10/2023
DOB NOWGeneral ConstructionPermit IssuedMAMMOTH INC07/07/2023
1 project · most recent 08/07/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/07/2026Signed-offMAMMOTH INCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric Model#:PUZA18NKA7 200 BTU · Condensing Unit ×1
Heating
Reznor Model#:REZUDX100 87,150 BTU · Unit Heater ×4
Model # - REZUDX100 87,150 BTU · Unit Heater ×2
Mitsubishi Electric Model#:PUZA18NKA7 2,200 BTU · Condensing Unit ×2
Ventilation
Mitsubishi Electric Model#:PUZA18NKA7 2,200 BTU · Condensing Unit ×1
__Junk__ . 2,200 BTU · Condensing Unit ×1
1 project · most recent 08/07/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/07/2026Signed-offMPC PLUMBING & HEATING INGas, Storm, Water/Sanitary
1 project · most recent 06/13/2024
General Wiring
FiledStatusContractorScope
06/13/2024CompleteJ.P.E. ELEC'L CONTR'S INCGeneral Wiring
1 project · most recent 08/07/2026
Steel
FiledStatusContractorScope
08/07/2026Signed-offMAMMOTH INCSteel
▾Field Inspections (DOB CAP) — 18
DateTypeResultReport
04/28/2026Pass-Final CND-Occupancy InspectionPassView ↗
02/21/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/20/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
08/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/28/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/24/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/23/2024Pass-Final General Construction Non-Directive 14PassView ↗
04/08/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/22/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/12/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/22/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/20/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/16/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/29/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/29/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/18/2023Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
08/06/2026Shutoff dampersanthony santoroenergy_progress
08/06/2026HVAC-R and service water heating system controlsanthony santoroenergy_progress
08/06/2026HVAC-R and service water piping design and insulationanthony santoroenergy_progress
08/06/2026Maintenance informationanthony santoroenergy_progress
08/06/2026HVAC-R and service water heating equipmentanthony santoroenergy_progress
08/06/2026Finalanthony santoroprogress
08/06/2026Mechanical Systemsanthony santorospecial
03/17/2026Insulation placement and R valuesBRIAN ARONEenergy_progress
03/17/2026Fenestration air leakageBRIAN ARONEenergy_progress
03/17/2026Air barrier - visual inspectionBRIAN ARONEenergy_progress
03/17/2026Fenestration and door U-factor and product ratingsBRIAN ARONEenergy_progress
03/17/2026Exterior lighting powerBRIAN ARONEenergy_progress
03/17/2026Interior lighting powerBRIAN ARONEenergy_progress
03/17/2026Fenestration areasBRIAN ARONEenergy_progress
03/17/2026Lighting controlsBRIAN ARONEenergy_progress
03/17/2026Excavations - Sheeting, Shoring, and BracingBRIAN ARONEspecial
03/17/2026Fire-Resistant Penetrations and JointsBRIAN ARONEspecial
03/17/2026Subgrade InspectionsBRIAN ARONEspecial
03/17/2026Subsurface Investigations (Borings/Test Pits)GREGORY BIESIADECKIspecial
03/17/2026Energy Code Compliance InspectionsBRIAN ARONEprogress
03/17/2026Lowest Floor ElevationBRIAN ARONEprogress
09/06/2024Maintenance informationanthony santoroenergy_progress
09/06/2024HVAC-R and service water heating equipmentanthony santoroenergy_progress
09/06/2024Shutoff dampersanthony santoroenergy_progress
09/06/2024HVAC-R and service water piping design and insulationanthony santoroenergy_progress
Latest 25 of 49.
▾Documents — 137 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
08/26/2026S00862215-I1Request digital key ↗
08/25/2026S00607199-S5Request digital key ↗
08/25/2026S00607199-P1Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
01/16/2024540216522Open ↗
08/15/2022540216522Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
03/29/2023540216522Open ↗
▸Zoning, Tax Lot & Property Records9
▸DOB NOWZD1: DOB Zoning Diagram4
08/25/2026S00607199-P6Open ↗
08/25/2026S00607199-P1Open ↗
08/15/2026S00607199-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/25/2026S00607199-P6Open ↗
08/25/2026S00607199-P1Open ↗
08/15/2026S00607199-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/15/2026S00607199-I1Open ↗
▸Seals & Professional Certifications58
▸DOB NOWProgress Inspector Seal & Signature26
09/02/2026S00607199-P6Open ↗
09/02/2026S00607199-P6Open ↗
09/02/2026S00607199-P6Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
08/25/2026S00607199-P1Open ↗
08/25/2026S00607199-S2Open ↗
08/25/2026S00607199-P7Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026S00607199-P6Open ↗
09/02/2026S00607199-P6Open ↗
09/02/2026S00607199-P6Open ↗
Showing 3 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/15/2022540216522Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/15/2022540216522Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
08/25/2026S00607199-P6Open ↗
08/25/2026S00607199-P1Open ↗
08/15/2026S00607199-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist4
08/25/2026S00607199-P6Open ↗
08/25/2026S00607199-P1Open ↗
08/15/2026S00607199-I1Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
08/15/2022540216522Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/15/2026S00607199-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/15/2026S00607199-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/15/2026S00607199-I1Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026S00607199-S4Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/15/2026S00607199-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT4
08/25/2026S00607199-P6Open ↗
08/25/2026S00607199-P1Open ↗
08/15/2026S00607199-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
08/15/2022540216522Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/15/2026S00607199-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISNYS DEC TIDAL WETLANDS APPROVAL1
08/15/2022540216522Open ↗
▸BISDOT RAMP UNIT APPROVAL1
02/24/2023540216522Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
03/29/2023540216522Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
01/29/2024540216522Open ↗
02/24/2023540216522Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/15/2022540216522Open ↗
▸Other Documents23
▸BISBPP - SUPPORTING DOCUMENTATION4
02/24/2023540216522Open ↗
08/15/2022540216522Open ↗
08/15/2022540216522Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
08/25/2026S00607199-P6Open ↗
08/25/2026S00607199-P1Open ↗
08/15/2026S00607199-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/25/2026S00607199-P6Open ↗
08/25/2026S00607199-P1Open ↗
08/15/2026S00607199-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/25/2026S00607199-P6Open ↗
08/25/2026S00607199-P1Open ↗
08/15/2026S00607199-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
03/21/2023540216522Open ↗
▸BISWAIVER OF ALL IMPROVEMENT IN NICHOLAS AVE1
03/21/2023540216522Open ↗
▸BISWAIVER OF LEGAL GRADE1
08/18/2025540216522Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
03/21/2023540216522Open ↗
▸DOB NOWFinal Survey1
08/15/2026S00607199-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/15/2026S00607199-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/15/2026S00607199-I1Open ↗