← Back
Elevator cooperative
Trafalgar Towers
233 WEST 99 STREET · Name © OpenStreetMap contributors · Upper West Side-Manhattan Valley · BIN 1056459
💬 Discuss this project
1930Year Built
20Stories
D4Building Class
R9AZoning
94,674 sfGross Floor Area
91Units
LL97 CoveredRent Stabilized49 Open Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: 233 WEST 99TH STREET, INC. · 5,092 sf lot · 18.59 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ORSID REALTY3707/08/2026
233 WEST 99TH STREET5303/22/2026
233 W. 99 ST INC203/22/2026
ORSID REALEY CO.103/22/2026
CHARTER103/22/2026
QUANTUM DESIGN103/21/2026
233 WEST 99 STREET603/21/2026
233 WEST 99TH INC C O ORSID403/21/2026
223 WEST 99TH STREE303/21/2026
LAWRENCE PROPERTIES403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design, LLC1503/21/2026
SYNERGY BUILDING CONSULTANTS303/21/2026
DAO STUDIOS803/21/2026
CONVERSANO ASSOCIATES, INC.403/21/2026
MESZAROS ENGINEERING PLLC203/21/2026
A1 EXPEDITING SERVICE403/21/2026
EDWARD F ZEVALLOS ARCHITECT603/21/2026
BOYD CONSULTING203/21/2026
PERMIT SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCKLEDGE SCAFFOLD CORPGeneral Contractor707/08/2026
INTERSYSTEMS INSTAL S&SGeneral Contractor607/08/2026
FRIEDMAN, LASZLOElectrical303/21/2026
BARMOR REHAB INCElectrical303/21/2026
REAZ MOHAMMEDElectrical303/21/2026
HOME BY ME INCGeneral Contractor303/21/2026
SUNRISE RENOVATION INCGeneral Contractor307/08/2026
M&A PROJECTS RESTORATION*General Contractor207/08/2026
SHAH GROUP ENTERPRISES INGeneral Contractor204/09/2026
ALBERT STIEFELElectrical103/21/2026
HYDROKINETIC PLBG & HTG IPlumbing107/08/2026
ANTHONY G FERRY INCElectrical103/22/2026
JEROME KRITZElectrical103/21/2026
S.A.L. ELECTRIC CO INC.Electrical103/22/2026
STEPHEN TATEElectrical103/21/2026
DIAMOND ERA CONSTR. INCGeneral Contractor107/08/2026
E & D RENOVATION INCGeneral Contractor104/09/2026
LINKED MECHANICAL LLCGeneral Contractor107/08/2026
GO GREENER PLUMBING LLCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A. GIANNOPOULOS ARCHITECT2196104/08/2025
EDWARD F ZEVALLOS ARCHITE1025302/17/2025
KZ ENGINEERING, P.C.4665309/26/2024
MJ ENGINEERING & DESIGN5546103/19/2024
MELONE ARCHITECTS2944102/01/2024
WINTON GROUP ARCHITECTURE4343209/25/2023
MESZAROS ENGINEERING PLLC963107/09/2021
Building Lifecycle
All (184)Filed (27)Permit Issued (26)Signed Off (15)Facade (FISP) (12)Violation (60)Inspection (8)Objection (16)Special Inspection (20)
08/26/2026
Violation issued (HPD, open)
B
08/26/2026
Violation issued (HPD, open)
B
08/26/2026
Violation issued (HPD, open)
B
02/02/2026
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE
M00002099-I1
01/22/2026
Signed off — Alteration
M01018029-I1
01/14/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/16/2025
Signed off — Alteration
M01082077-I1
12/09/2025
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01210405-I1
12/09/2025
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01025082-I1
12/09/2025
Signed off — Alteration
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01218350-I1
12/01/2025
Signed off — Alteration
Installation of suspended scaffold for facade inspection/repair
M00984078-I1
11/12/2025
Signed off — Alteration
M00973553-I1
08/04/2025
Permit issued — Protection and Mechanical Methods
M01082077-I1-PMM
06/23/2025
Permit issued — General Construction
M01018029-I1-GC
06/19/2025
Filed — Alteration
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01218350-P2
06/18/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01210405-P2
06/12/2025
Filed — Alteration
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01218350-P1
05/06/2025
Permit issued — Protection and Mechanical Methods
M01218350-I1-PMM
05/05/2025
Filed — Alteration
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01218350-I1
05/05/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01210405-P1
04/17/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01210405-I1
04/17/2025
Permit issued — Supported Scaffold
M01210405-I1-SF
04/08/2025
Filed — Alteration
M01018029-I1
03/25/2025
Signed off — Alteration
Kitchen renovation in apt. 7D. Relocate plumbing fixtures. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01084553-I1
03/25/2025
Signed off — Alteration
INTERIOR KITCHEN RENOVATION OF APT. 7D. REMOVE AND INSTALL INTERIOR PARTITIONS, DOORS AND FINISHES. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01084552-I1
03/19/2025
Permit issued — Sidewalk Shed
M01025082-I1-SH
03/17/2025
Permit issued — General Construction
M00973553-I1-GC
03/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/17/2025
Filed — Alteration
Kitchen renovation in apt. 7D. Relocate plumbing fixtures. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01084553-P1
02/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/03/2025
Permit issued — Suspended Scaffold
M00984078-I1-SC
10/31/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/07/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/07/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/04/2024
Permit issued — Suspended Scaffold
M00984078-P2-SC
10/04/2024
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
10/04/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
10/02/2024
Objection raised — Other
10/02/2024
Objection resolved — Addressed
09/26/2024
Filed — Alteration
Installation of suspended scaffold for facade inspection/repair
M00984078-P2
09/26/2024
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
09/26/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
09/18/2024
Permit issued — Plumbing
M01084553-I1-PL
09/11/2024
Permit issued — General Construction
M01084552-I1-GC
08/27/2024
Objection raised — Other
08/27/2024
Objection resolved — Addressed
08/20/2024
Filed — Alteration
Kitchen renovation in apt. 7D. Relocate plumbing fixtures. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01084553-I1
08/20/2024
Filed — Alteration
INTERIOR KITCHEN RENOVATION OF APT. 7D. REMOVE AND INSTALL INTERIOR PARTITIONS, DOORS AND FINISHES. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01084552-I1
08/15/2024
Special inspection requirement — Lighting in dwelling units
gregory waugh
08/15/2024
Special inspection requirement — Final
gregory waugh
08/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Edward Zevallos
08/02/2024
Signed off — Alteration
M01013414-I1
07/22/2024
Filed — Alteration
M01082077-I1
07/22/2024
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01025082-P1
07/22/2024
Permit issued — Protection and Mechanical Methods
M01082077-I1-PMM
06/25/2024
Permit issued — Suspended Scaffold
M00984078-P1-SC
06/25/2024
Cycle 9 facade report signed — SWARMP
06/17/2024
Filed — Alteration
Installation of suspended scaffold for facade inspection/repair
M00984078-P1
05/01/2024
Permit issued — General Construction
M00973553-I1-GC
04/22/2024
Permit issued — General Construction
M01013414-I1-GC
Latest 60 of 184 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsSigned-offINTERSYSTEMS INSTAL S&S08/04/2025
DOB NOWGeneral ConstructionSigned-offE & D RENOVATION INC06/23/2025
DOB NOWProtection and Mechanical MethodsSigned-offINTERSYSTEMS INSTAL S&S05/06/2025
DOB NOWSupported ScaffoldSigned-offINTERSYSTEMS INSTAL S&S04/17/2025
DOB NOWSidewalk ShedSigned-offINTERSYSTEMS INSTAL S&S03/19/2025
DOB NOWGeneral ConstructionSigned-offM&A PROJECTS RESTORATION*03/17/2025
DOB NOWSuspended ScaffoldSigned-offM & A PROJECTS INC01/03/2025
DOB NOWSuspended ScaffoldPermit IssuedM & A PROJECTS INC10/04/2024
DOB NOWPlumbingSigned-offHYDROKINETIC PLBG & HTG I09/18/2024
DOB NOWGeneral ConstructionSigned-offHOME BY ME INC09/11/2024
DOB NOWProtection and Mechanical MethodsSigned-offINTERSYSTEMS INSTAL S&S07/22/2024
DOB NOWSuspended ScaffoldPermit IssuedM & A PROJECTS INC06/25/2024
DOB NOWGeneral ConstructionSigned-offM&A PROJECTS RESTORATION*05/01/2024
DOB NOWGeneral ConstructionSigned-offDIAMOND ERA CONSTR04/22/2024
DOB NOWSidewalk ShedSigned-offINTERSYSTEMS INSTAL S&S03/26/2024
DOB NOWSuspended ScaffoldSigned-offM & A PROJECTS INC01/18/2024
DOB NOWGeneral ConstructionSigned-offSUNRISE RENOVATION INC10/13/2023
DOB NOWPlumbingSigned-offGO GREENER PLUMBING LLC03/01/2023
DOB NOWGeneral ConstructionSigned-offSUNRISE RENOVATION INC02/24/2023
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP07/12/2022
DOB NOWMechanical SystemsSigned-offLINKED MECHANICAL07/19/2021
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP07/14/2021
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP07/16/2020
DOB NOWSidewalk ShedSigned-offROCKLEDGE SCAFFOLD CORP08/16/2019
DOB NOWSidewalk ShedSigned-offSHAH GROUP ENTERPRISES IN01/18/2018
DOB NOWSidewalk ShedSigned-offSHAH GROUP ENTERPRISES IN11/09/2017
BISOTISSUEDM&A PROJECTS RESTORATION*05/20/2022
BISOTISSUEDM&A PROJECTS RESTORATION*03/09/2021
BISPLISSUEDADRIATIC PLBG & HTG CORP04/23/2018
BISOTISSUEDGJR CONSTRUCTION CO04/17/2018
BISPLISSUEDBELL FUEL OIL, LLC03/11/2016
BISOTISSUEDACCURA REST.& WATERPROOF02/23/2016
BISOTISSUEDACCURA REST.& WATERPROOF02/03/2016
BISOTISSUEDACCURA REST.& WATERPROOF01/15/2016
BISEQISSUEDSPRING SCAFFOLDING LLC09/03/2015
BISPLISSUEDGENESIS PLBG AND HTG CORP08/03/2015
BISOTISSUEDMINCH CONSTRUCTION CORP07/31/2015
BISOTISSUEDACCURA REST.& WATERPROOF07/06/2015
BISOTISSUEDACCURA REST.& WATERPROOF03/18/2015
BISPLISSUEDBELL FUEL OIL, LLC02/17/2015
+ 36 more permits on file
18 projects · most recent 06/30/2026
General Wiring
FiledStatusContractorScope
06/30/2026CompleteCRESCO ELECTRICAL CORP—
12/01/2025Permit IssuedTHE METRO GROUP ELECTRICGeneral Wiring
08/05/2025CompleteALLTECH ELECL CONTNG CORPGeneral Wiring
07/28/2025CompleteTHE METRO GROUP ELECTRICGeneral Wiring
09/11/2024CompleteKET ELECTRIC LLCGeneral Wiring
05/24/2024Permit IssuedAURORA ELECL CONTG INC—
04/24/2024CompletePETER J. CATANZARO, INC.General Wiring
03/01/2024CompleteA+ ELECTRIC OF GREATER NYGeneral Wiring
02/23/2024CompleteGS ELECTRIC INC—
02/23/2024CompleteSUPREME ELECTRIC CORPGeneral Wiring
03/01/2023CompleteSUPREME ELECTRIC CORPGeneral Wiring
02/13/2023CompleteCENTENNIAL ELEVATOR INDUSGeneral Wiring
07/14/2021CompleteGSA ELECTRIC CORP.—
01/20/2021CompleteLEONE ELECTRIC CO. INCGeneral Wiring
02/19/2020CompleteS.A.L. ELECTRIC CO INC.—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/14/2026Pass-Final General Construction Non-Directive 14PassView ↗
03/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/07/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
10/04/2024Post-installed AnchorsKarol Zdancewiczspecial
10/04/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
09/26/2024Post-installed AnchorsKarol Zdancewiczspecial
09/26/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
08/15/2024Lighting in dwelling unitsgregory waughenergy_progress
08/15/2024Finalgregory waughprogress
08/15/2024Fire-Resistant Penetrations and JointsEdward Zevallosspecial
03/29/2024Fire-Resistant Penetrations and Joints—special
03/29/2024Final—progress
03/29/2024Fire-Resistance Rated Construction—progress
12/07/2023FinalNicholas Meloneprogress
12/07/2023Tenant Protection Plan ComplianceNicholas Melonespecial
12/07/2023MasonryNicholas Melonespecial
09/25/2023Lighting in dwelling unitsKRISTIN LUKSenergy_progress
09/25/2023Fire-Resistant Penetrations and JointsVladimir Kaushanskyspecial
09/25/2023FinalKRISTIN LUKSprogress
09/20/2023Lighting in dwelling unitsKRISTIN LUKSenergy_progress
09/20/2023Fire-Resistant Penetrations and JointsVladimir Kaushanskyspecial
09/20/2023FinalKRISTIN LUKSprogress
03/31/2022FinalJOEL PHAGOOprogress
▾Documents — 387 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch25
09/06/2026M00002099-I1Request digital key ↗
09/03/2026M00521682-I1Request digital key ↗
09/01/2026M00662713-P1Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00208567-P1Request digital key ↗
09/05/2026M00208567-I1Request digital key ↗
▸Applications & Permits58
▸BISPLAN / WORK APPROVAL APPLICATION31
03/23/2022140997606Open ↗
03/21/2022140997606Open ↗
04/28/2021140997606Open ↗
Showing 3 of 31 on file for this type
▸BISWORK PERMIT APPLICATION27
05/13/2021140990621Open ↗
04/15/2019104099789Open ↗
04/24/2018123443960Open ↗
Showing 3 of 27 on file for this type
▸Seals & Professional Certifications99
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION33
04/23/2019123443960Open ↗
04/15/2019104099789Open ↗
06/08/2018122263754Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/06/2026M00002099-I1Open ↗
09/01/2026M00667266-I1Open ↗
09/01/2026M00667266-P1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/29/2026M00662713-P1Open ↗
08/29/2026M00973553-I1Open ↗
08/29/2026M00973553-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026M00208567-I1Open ↗
08/29/2026M00662713-P1Open ↗
08/29/2026M00662713-P1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
01/22/2021140997606Open ↗
12/22/2020140990621Open ↗
04/16/2018123443960Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
02/09/2021140990621Open ↗
04/16/2018123443960Open ↗
03/06/2015122263754Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
01/22/2021140997606Open ↗
12/22/2020140990621Open ↗
10/27/2014140268724Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
01/22/2021140997606Open ↗
12/22/2020140990621Open ↗
10/27/2014140268724Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment25
▸BISSELF-CERT PLUMBING NOTICE13
01/04/2016122437309Open ↗
11/04/2015122263754Open ↗
10/29/2015122263754Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
04/15/2019104099789Open ↗
04/16/2018123443960Open ↗
08/27/2015122263754Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan2
08/13/2026M00208567-P1Open ↗
08/13/2026M00208567-I1Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
03/09/2021140990621Open ↗
▸BISTenant Protection Plan and Notes1
04/16/2018123443960Open ↗
▸Environmental & Asbestos33
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
12/22/2020140990621Open ↗
04/15/2019104099789Open ↗
04/20/2018123503379Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/01/2026M00667266-P1Open ↗
08/28/2026M00973553-I1Open ↗
08/27/2026M01013414-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Energy Compliance36
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
04/23/2019123443960Open ↗
06/08/2018122263754Open ↗
04/20/2018123503379Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
12/16/2022140990621Open ↗
04/23/2019123443960Open ↗
06/08/2018122263754Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/16/2022140990621Open ↗
12/22/2020140990621Open ↗
10/07/2014140264498Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/22/2020140990621Open ↗
10/07/2014140264498Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/09/2021140990621Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
09/17/2014140254766Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00521682-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
12/22/2022140990621Open ↗
12/16/2022140990621Open ↗
12/22/2020140990621Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs32
▸BISLETTERS - SUPPORTING DOCUMENTATION10
06/08/2018122263754Open ↗
01/07/2016122437309Open ↗
10/29/2015122263754Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
12/22/2022140990621Open ↗
04/23/2019123443960Open ↗
06/08/2018122263754Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSUPERSEDING LETTER2
05/13/2021140990621Open ↗
03/01/2016122040905Open ↗
▸BISLANDMARKS APPROVAL2
10/29/2015122263754Open ↗
09/24/2013121758197Open ↗
▸BISFINAL1
03/09/2021140990621Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
12/11/2014122040905Open ↗
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT26
12/16/2022140990621Open ↗
01/22/2021140997606Open ↗
12/22/2020140990621Open ↗
Showing 3 of 26 on file for this type
▸Filing & Intake Forms32
▸BISEFILING COVER SHEET13
04/20/2018123503379Open ↗
04/16/2018123443960Open ↗
12/01/2015122606117Open ↗
Showing 3 of 13 on file for this type
▸BISADDITIONAL INFORMATION10
03/23/2022140997606Open ↗
04/28/2021140997606Open ↗
07/07/2015140254766Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
01/22/2021140997606Open ↗
12/22/2020140990621Open ↗
10/27/2014140268724Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
05/13/2021140990621Open ↗
04/23/2019123443960Open ↗
06/08/2018122263754Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M00667266-P1Open ↗
▸Other Documents10
▸DOB NOWManufacturer's Specifications3
08/27/2026M00984078-I1Open ↗
08/27/2026M00984078-P1Open ↗
08/13/2026M00984078-P2Open ↗
▸DOB NOWCalculations3
08/27/2026M00984078-P1Open ↗
08/27/2026M00984078-I1Open ↗
08/13/2026M00984078-P2Open ↗
▸BISSupporting Document: Fee Deferment1
10/20/2016140254766Open ↗
▸BISDHCR DOCUMENT1
01/22/2021140997606Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
10/02/2015140254766Open ↗