← Back
BuildNYC
Elevator cooperative
Trafalgar Tower Apartments
233 WEST 99TH STREET · BIN 1056459
💬 Discuss this project
1930Year Built
20Stories
D4Building Class
R9AZoning
94,674 sfGross Floor Area
91Units
LL97 CoveredRent Stabilized52 Active Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: 233 West 99th Street · 5,092 sf lot · 18.59 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofOrsid Realty CORP2p · 1 filing · 4 docs
Floor 20Unit 20B1p · 1 filing · 3 docs
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10Unit 10C, Unit 10AB3p · 1 filing · 6 docs
Floor 9
Floor 8
Floor 7Unit 7B, Unit 7D26p · 4 filings · 20 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exteriorMaterial storage sidewalk shed38p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
233_ West 99th St5903/22/2026
Spigro Managment404/09/2026
Lawrence Properties403/21/2026
Charter103/22/2026
Quantum Design103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rigid Structural Design906/19/2025
A. Giannopoulos Architects104/08/2025
Gregory T. Waugh AIA302/17/2025
Abby Suckle Architect204/04/2024
Melone Architects102/01/2024
Kristin Luks Architecture409/25/2023
Joel Phagoo P.E203/30/2022
Meszaros Engineering107/09/2021
MCRB Service111/08/2017
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Rigid Structural Design1503/21/2026
Synergy Building Consultants303/21/2026
Dao Studios803/21/2026
Socotec403/21/2026
Meszaros Engineering203/21/2026
A1 Expediting Service403/21/2026
Edward F Zevallos Architect603/21/2026
Boyd Consulting203/21/2026
Permit Services203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Rockledge ScaffoldScaffold707/08/2026
Intersystems Installation S&SScaffold607/08/2026
Home by MeGeneral Contractor303/21/2026
Sunrise RenovationGeneral Contractor307/08/2026
The Metro Group ElectricElectrical303/21/2026
M&A Projects Restoration*specialty_contractor207/08/2026
Shah Group EnterprisesScaffold204/09/2026
Go Greener PlumbingPlumbing107/08/2026
Polyphase ElectricElectrical103/21/2026
Hydrokinetic Plumbing & Heating IPlumbing107/08/2026
Anthony G FerryElectrical103/22/2026
K & G Electric CoElectrical103/21/2026
S.A.L. Electric CoElectrical103/22/2026
Coachmen ElectricElectrical103/21/2026
Diamond Era ConstructionGeneral Contractor107/08/2026
E & D RenovationGeneral Contractor104/09/2026
Linked Mechanicalspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A. Giannopoulos Architect2196104/08/2025
Edward F Zevallos Architects1025302/17/2025
KZ Engineering4665309/26/2024
MJ Engineering & Design5546103/19/2024
Melone Architects2944102/01/2024
Winton Group Architecture4343209/25/2023
Meszaros Engineering963107/09/2021
Building Lifecycle
All (184)Filed (27)Permit Issued (26)Signed Off (15)Facade (FISP) (12)Violation (60)Inspection (8)Objection (16)Special Inspection (20)
09/02/2026
Violation issued (ECB, open)
Construction
08/26/2026
Violation issued (HPD, open)
B
08/26/2026
Violation issued (HPD, open)
B
08/26/2026
Violation issued (HPD, open)
B
02/02/2026
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE
M00002099-I1
01/22/2026
Signed off — Alteration
M01018029-I1
01/14/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/16/2025
Signed off — Alteration
M01082077-I1
12/09/2025
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01025082-I1
12/09/2025
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01210405-I1
12/09/2025
Signed off — Alteration
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01218350-I1
12/01/2025
Signed off — Alteration
Installation of suspended scaffold for facade inspection/repair
M00984078-I1
11/12/2025
Signed off — Alteration
M00973553-I1
08/04/2025
Permit issued — Protection and Mechanical Methods
M01082077-I1-PMM
06/23/2025
Permit issued — General Construction
M01018029-I1-GC
06/19/2025
Filed — Alteration
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01218350-P2
06/18/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01210405-P2
06/12/2025
Filed — Alteration
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01218350-P1
05/06/2025
Permit issued — Protection and Mechanical Methods
M01218350-I1-PMM
05/05/2025
Filed — Alteration
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01218350-I1
05/05/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01210405-P1
04/17/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01210405-I1
04/17/2025
Permit issued — Supported Scaffold
M01210405-I1-SF
04/08/2025
Filed — Alteration
M01018029-I1
03/25/2025
Signed off — Alteration
INTERIOR KITCHEN RENOVATION OF APT. 7D. REMOVE AND INSTALL INTERIOR PARTITIONS, DOORS AND FINISHES. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01084552-I1
03/25/2025
Signed off — Alteration
Kitchen renovation in apt. 7D. Relocate plumbing fixtures. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01084553-I1
03/19/2025
Permit issued — Sidewalk Shed
M01025082-I1-SH
03/17/2025
Permit issued — General Construction
M00973553-I1-GC
03/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/17/2025
Filed — Alteration
Kitchen renovation in apt. 7D. Relocate plumbing fixtures. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01084553-P1
02/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/03/2025
Permit issued — Suspended Scaffold
M00984078-I1-SC
10/31/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/07/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/07/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/04/2024
Permit issued — Suspended Scaffold
M00984078-P2-SC
10/04/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
10/04/2024
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
10/02/2024
Objection raised — Other
10/02/2024
Objection resolved — Addressed
09/26/2024
Filed — Alteration
Installation of suspended scaffold for facade inspection/repair
M00984078-P2
09/26/2024
Special inspection requirement — Post-installed Anchors
Karol Zdancewicz
09/26/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Karol Zdancewicz
09/18/2024
Permit issued — Plumbing
M01084553-I1-PL
09/11/2024
Permit issued — General Construction
M01084552-I1-GC
08/27/2024
Objection raised — Other
08/27/2024
Objection resolved — Addressed
08/20/2024
Filed — Alteration
INTERIOR KITCHEN RENOVATION OF APT. 7D. REMOVE AND INSTALL INTERIOR PARTITIONS, DOORS AND FINISHES. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01084552-I1
08/20/2024
Filed — Alteration
Kitchen renovation in apt. 7D. Relocate plumbing fixtures. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01084553-I1
08/15/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Edward Zevallos
08/15/2024
Special inspection requirement — Final
gregory waugh
08/15/2024
Special inspection requirement — Lighting in dwelling units
gregory waugh
08/02/2024
Signed off — Alteration
M01013414-I1
07/22/2024
Filed — Alteration
M01082077-I1
07/22/2024
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M01025082-P1
07/22/2024
Permit issued — Protection and Mechanical Methods
M01082077-I1-PMM
06/25/2024
Permit issued — Suspended Scaffold
M00984078-P1-SC
06/25/2024
Cycle 9 facade report signed — SWARMP
06/17/2024
Filed — Alteration
Installation of suspended scaffold for facade inspection/repair
M00984078-P1
05/01/2024
Permit issued — General Construction
M00973553-I1-GC
Latest 60 of 184 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWProtection and Mechanical MethodsSigned-offIntersystems Installation S&S08/04/2025
DOB NOWGeneral ConstructionSigned-offE & D Renovation06/23/2025
DOB NOWProtection and Mechanical MethodsSigned-offIntersystems Installation S&S05/06/2025
DOB NOWSupported ScaffoldSigned-offIntersystems Installation S&S04/17/2025
DOB NOWSidewalk ShedSigned-offIntersystems Installation S&S03/19/2025
DOB NOWGeneral ConstructionSigned-offM&A Projects Restoration*03/17/2025
DOB NOWSuspended ScaffoldSigned-offM & A Projects01/03/2025
DOB NOWSuspended ScaffoldPermit IssuedM & A Projects10/04/2024
DOB NOWPlumbingSigned-offHydrokinetic Plumbing & Heating I09/18/2024
DOB NOWGeneral ConstructionSigned-offHome by Me09/11/2024
DOB NOWProtection and Mechanical MethodsSigned-offIntersystems Installation S&S07/22/2024
DOB NOWSuspended ScaffoldPermit IssuedM & A Projects06/25/2024
DOB NOWGeneral ConstructionSigned-offM&A Projects Restoration*05/01/2024
DOB NOWGeneral ConstructionSigned-offDiamond Era Construction04/22/2024
DOB NOWSidewalk ShedSigned-offIntersystems Installation S&S03/26/2024
DOB NOWSuspended ScaffoldSigned-offM & A Projects01/18/2024
DOB NOWGeneral ConstructionSigned-offSunrise Renovation10/13/2023
DOB NOWPlumbingSigned-offGo Greener Plumbing03/01/2023
DOB NOWGeneral ConstructionSigned-offSunrise Renovation02/24/2023
DOB NOWSidewalk ShedSigned-offRockledge Scaffold07/12/2022
DOB NOWMechanical SystemsSigned-offLinked Mechanical07/19/2021
DOB NOWSidewalk ShedSigned-offRockledge Scaffold07/14/2021
DOB NOWSidewalk ShedSigned-offRockledge Scaffold07/16/2020
DOB NOWSidewalk ShedSigned-offRockledge Scaffold08/16/2019
DOB NOWSidewalk ShedSigned-offShah Group Enterprises01/18/2018
DOB NOWSidewalk ShedSigned-offShah Group Enterprises11/09/2017
BISOTISSUEDM&A Projects Restoration*05/20/2022
BISOTISSUEDM&A Projects Restoration*03/09/2021
BISPLISSUEDAdriatic Plumbing & Heating04/23/2018
BISOTISSUEDGJR Construction Co04/17/2018
BISPLISSUEDBell Fuel Oil03/11/2016
BISOTISSUEDAccura Rest. & Waterproof02/23/2016
BISOTISSUEDAccura Rest. & Waterproof02/03/2016
BISOTISSUEDAccura Rest. & Waterproof01/15/2016
BISEQISSUEDSpring Scaffolding09/03/2015
BISPLISSUEDGenesis Plumbing and Heating08/03/2015
BISOTISSUEDMinch Construction07/31/2015
BISOTISSUEDAccura Rest. & Waterproof07/06/2015
BISOTISSUEDAccura Rest. & Waterproof03/18/2015
BISPLISSUEDBell Fuel Oil02/17/2015
+ 36 more permits on file
18 projects · most recent 06/30/2026
General Wiring
FiledStatusContractorScope
06/30/2026CompleteCresco Electrical—
12/01/2025Permit IssuedThe Metro Group ElectricGeneral Wiring
08/05/2025CompleteAlltech Electrical ContngGeneral Wiring
07/28/2025CompleteThe Metro Group ElectricGeneral Wiring
09/11/2024CompleteKet ElectricGeneral Wiring
05/24/2024Permit IssuedAurora Electrical Contg—
04/24/2024CompletePeter J. CatanzaroGeneral Wiring
03/01/2024CompleteA+ Electric of Greater NYGeneral Wiring
02/23/2024CompleteGS Electric—
02/23/2024CompleteSupreme ElectricGeneral Wiring
03/01/2023CompleteSupreme ElectricGeneral Wiring
02/13/2023CompleteCentennial Elevator IndustriesGeneral Wiring
07/14/2021CompleteGsa Electric—
01/20/2021CompleteLeone Electric CoGeneral Wiring
02/19/2020CompleteS.A.L. Electric Co—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
01/14/2026Pass-Final General Construction Non-Directive 14PassView ↗
03/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/31/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/07/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/30/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
10/04/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
10/04/2024Post-installed AnchorsKarol Zdancewiczspecial
09/26/2024Post-installed AnchorsKarol Zdancewiczspecial
09/26/2024Alternative Materials - OTCR Buildings Bulletin NumberKarol Zdancewiczspecial
08/15/2024Fire-Resistant Penetrations and JointsEdward Zevallosspecial
08/15/2024Finalgregory waughprogress
08/15/2024Lighting in dwelling unitsgregory waughenergy_progress
03/29/2024Fire-Resistant Penetrations and Joints—special
03/29/2024Final—progress
03/29/2024Fire-Resistance Rated Construction—progress
12/07/2023MasonryNicholas Melonespecial
12/07/2023FinalNicholas Meloneprogress
12/07/2023Tenant Protection Plan ComplianceNicholas Melonespecial
09/25/2023FinalKRISTIN LUKSprogress
09/25/2023Fire-Resistant Penetrations and JointsVladimir Kaushanskyspecial
09/25/2023Lighting in dwelling unitsKRISTIN LUKSenergy_progress
09/20/2023Lighting in dwelling unitsKRISTIN LUKSenergy_progress
09/20/2023Fire-Resistant Penetrations and JointsVladimir Kaushanskyspecial
09/20/2023FinalKRISTIN LUKSprogress
03/31/2022FinalJOEL PHAGOOprogress
▾Documents — 387 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch25
09/06/2026M00002099-I1Request digital key ↗
09/03/2026M00521682-I1Request digital key ↗
09/01/2026M00662713-P1Request digital key ↗
Showing 3 of 25 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00208567-I1Request digital key ↗
09/05/2026M00208567-P1Request digital key ↗
▸Applications & Permits58
▸BISPLAN / WORK APPROVAL APPLICATION31
03/23/2022140997606Open ↗
03/21/2022140997606Open ↗
04/28/2021140997606Open ↗
Showing 3 of 31 on file for this type
▸BISWORK PERMIT APPLICATION27
05/13/2021140990621Open ↗
04/15/2019104099789Open ↗
04/24/2018123443960Open ↗
Showing 3 of 27 on file for this type
▸Seals & Professional Certifications99
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION33
04/23/2019123443960Open ↗
04/15/2019104099789Open ↗
06/08/2018122263754Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature24
09/06/2026M00002099-I1Open ↗
09/01/2026M00667266-P1Open ↗
09/01/2026M00667266-I1Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
08/29/2026M00662713-P1Open ↗
08/29/2026M00973553-I1Open ↗
08/29/2026M00973553-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
08/31/2026M00208567-I1Open ↗
08/29/2026M00662713-P1Open ↗
08/29/2026M00662713-P1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT7
01/22/2021140997606Open ↗
12/22/2020140990621Open ↗
04/16/2018123443960Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
02/09/2021140990621Open ↗
04/16/2018123443960Open ↗
03/06/2015122263754Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
01/22/2021140997606Open ↗
12/22/2020140990621Open ↗
10/27/2014140268724Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
01/22/2021140997606Open ↗
12/22/2020140990621Open ↗
10/27/2014140268724Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Trade Schedules & Equipment25
▸BISSELF-CERT PLUMBING NOTICE13
01/04/2016122437309Open ↗
11/04/2015122263754Open ↗
10/29/2015122263754Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
04/15/2019104099789Open ↗
04/16/2018123443960Open ↗
08/27/2015122263754Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan2
08/13/2026M00208567-P1Open ↗
08/13/2026M00208567-I1Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
03/09/2021140990621Open ↗
▸BISTenant Protection Plan and Notes1
04/16/2018123443960Open ↗
▸Environmental & Asbestos33
▸BISASBESTOS: CERTIFICATION (DEP ACP5)16
12/22/2020140990621Open ↗
04/15/2019104099789Open ↗
04/20/2018123503379Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/01/2026M00667266-P1Open ↗
08/28/2026M00973553-I1Open ↗
08/27/2026M01013414-P1Open ↗
Showing 3 of 12 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Energy Compliance36
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS18
04/23/2019123443960Open ↗
06/08/2018122263754Open ↗
04/20/2018123503379Open ↗
Showing 3 of 18 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
12/16/2022140990621Open ↗
04/23/2019123443960Open ↗
06/08/2018122263754Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
12/16/2022140990621Open ↗
12/22/2020140990621Open ↗
10/07/2014140264498Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
12/22/2020140990621Open ↗
10/07/2014140264498Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/09/2021140990621Open ↗
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
09/17/2014140254766Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00521682-I1Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY5
12/22/2022140990621Open ↗
12/16/2022140990621Open ↗
12/22/2020140990621Open ↗
Showing 3 of 5 on file for this type
▸Approvals, Objections & Sign-offs32
▸BISLETTERS - SUPPORTING DOCUMENTATION10
06/08/2018122263754Open ↗
01/07/2016122437309Open ↗
10/29/2015122263754Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST10
12/22/2022140990621Open ↗
04/23/2019123443960Open ↗
06/08/2018122263754Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSUPERSEDING LETTER2
05/13/2021140990621Open ↗
03/01/2016122040905Open ↗
▸BISLANDMARKS APPROVAL2
10/29/2015122263754Open ↗
09/24/2013121758197Open ↗
▸BISFINAL1
03/09/2021140990621Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
12/11/2014122040905Open ↗
▸Cost, Insurance & Ownership26
▸BISCOST AFFIDAVIT26
12/16/2022140990621Open ↗
01/22/2021140997606Open ↗
12/22/2020140990621Open ↗
Showing 3 of 26 on file for this type
▸Filing & Intake Forms32
▸BISEFILING COVER SHEET13
04/20/2018123503379Open ↗
04/16/2018123443960Open ↗
12/01/2015122606117Open ↗
Showing 3 of 13 on file for this type
▸BISADDITIONAL INFORMATION10
03/23/2022140997606Open ↗
04/28/2021140997606Open ↗
07/07/2015140254766Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET5
01/22/2021140997606Open ↗
12/22/2020140990621Open ↗
10/27/2014140268724Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM3
05/13/2021140990621Open ↗
04/23/2019123443960Open ↗
06/08/2018122263754Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026M00667266-P1Open ↗
▸Other Documents10
▸DOB NOWManufacturer's Specifications3
08/27/2026M00984078-I1Open ↗
08/27/2026M00984078-P1Open ↗
08/13/2026M00984078-P2Open ↗
▸DOB NOWCalculations3
08/27/2026M00984078-P1Open ↗
08/27/2026M00984078-I1Open ↗
08/13/2026M00984078-P2Open ↗
▸BISSupporting Document: Fee Deferment1
10/20/2016140254766Open ↗
▸BISDHCR DOCUMENT1
01/22/2021140997606Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
10/02/2015140254766Open ↗