← Back
Three families
233A CLINTON STREET
BROOKLYN · BIN 3003153
💬 Discuss this project
1889Year Built
3Stories
C0Building Class
R6Zoning
2,320 sfGross Floor Area
3Units
1 Open Violation ▸FDNY Report ↗
Three families · 1,125 sf lot · 2.06 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction17p · 2 filings · 20 docs
Floor 3Under Construction25p · 4 filings · 20 docs
Floor 2Under Construction25p · 4 filings · 20 docs
Floor 1Under Construction25p · 4 filings · 20 docs
CellarUnder Construction17p · 2 filings · 20 docs
BasementUnder Construction1p · 1 filing · 15 docs
Sub-BasementUnder Construction15p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RICKY SONS CONSTRUCTION403/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SOL BUILDING CONSULTING SERVICES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MONELLO ENTERPRISES INCGeneral Contractor407/08/2026
FLOW-RIGHT PLBG & HTG CORPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
D'ANTONIO CONSULTING ENGI931608/12/2026
BARRY STRUCTURAL ENGINEER749201/12/2026
Building Lifecycle
All (77)Filed (9)Permit Issued (5)Violation (1)Inspection (9)Objection (35)Special Inspection (18)
08/26/2026
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/12/2026
Filed — Alteration
INSTALLATION/MODIFICATION OF MECH EQUIPMENT AS INDICATED IN THE PLANS FILED HEREWITH. INSTALLATION OF NEW HEAT PUMP FORCED AIR HEATING SYSTEM, NEW HEAT PUMP SYSTEM FOR FORCED AIR COOLING, AND EXHAUST FANS/SYSTEMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01278166-P1
08/07/2026
Objection resolved — Resolved
08/07/2026
Objection resolved — Resolved
08/07/2026
Objection resolved — Resolved
08/03/2026
Objection resolved — Resolved
07/31/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/21/2026
Objection raised — Zoning
07/21/2026
Objection raised — Scope
07/21/2026
Objection raised — Cost
07/21/2026
Objection raised — Scope
07/17/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/07/2026
Filed — Alteration
PROPOSED PLUMBING WORK IN CONNECTION WITH RENOVATION OF AN EXISTING (1) FAMILY, (4) STORY TOWNHOUSE WITH CELLAR. NO CHANGE TO USE, OCCUPANCY, OR EGRESS IS PROPOSED UNDER THIS APPLICATION.
B01278167-P1
07/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GAETANO D'ANTONIO
07/07/2026
Special inspection requirement — Final
ELLEN MARTIN
06/26/2026
Filed — Alteration
RENOVATION INCLUDING NEW KITCHEN AND BATHROOM FINISHES, NEW FLOORING, PAINTING. RELOCATION OF NON-STRUCTURAL PARTITIONS AND DOORS. EXTERIOR RENOVATION INCLUDING NEW DOORS AND WINDOW, REMOVAL OF PAINT AND FIRE ESCAPE. NO CHANGE IN USE, EGRESS, OCCUPANCY.
B01278165-P1
06/24/2026
Special inspection requirement — Energy Code Compliance Inspections
ELLEN MARTIN
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GAETANO D'ANTONIO
06/24/2026
Special inspection requirement — Final
ELLEN MARTIN
06/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GAETANO D'ANTONIO
06/01/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/20/2026
Permit issued — Mechanical Systems
B01278166-I1-MS
04/14/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/03/2026
Objection resolved — Addressed
04/03/2026
Objection resolved — Addressed
03/31/2026
Objection raised — Energy
03/23/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
03/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/12/2026
Objection resolved — Addressed
03/09/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
02/12/2026
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
02/11/2026
Objection resolved — Addressed
02/09/2026
Objection resolved — Addressed
02/02/2026
Objection resolved — Addressed
02/02/2026
Objection resolved — Addressed
02/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
GAETANO D'ANTONIO
01/28/2026
Permit issued — Plumbing
B01278167-I1-PL
01/27/2026
Objection raised — Zoning
01/27/2026
Objection raised — Fire_Protection
01/27/2026
Objection raised — Fire_Protection
01/27/2026
Objection raised — Mechanical
01/27/2026
Objection raised — Plumbing
01/27/2026
Objection raised — Inspections
01/27/2026
Objection raised — Scope
01/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
01/14/2026
Permit issued — Structural
B01278169-I1-ST
01/13/2026
Objection resolved — Addressed
01/12/2026
Filed — Alteration
INSTALLATION/MODIFICATION OF MECH EQUIPMENT AS INDICATED IN THE PLANS FILED HEREWITH. INSTALLATION OF NEW HEAT PUMP FORCED AIR HEATING SYSTEM, NEW HEAT PUMP SYSTEM FOR FORCED AIR COOLING, AND EXHAUST FANS/SYSTEMS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
B01278166-I1
01/12/2026
Filed — Alteration
INSTALLATION OF NEW ROOFTOP STEEL DUNNAGE AND BASEMENT FRAMING TO SUPPORT A NEW MECHANICAL UNIT, AND REINFORCEMENT OF NEW DUCT PENETRATIONS.NO CHANGE TO EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01278169-P1
01/09/2026
Objection resolved — Addressed
12/29/2025
Special inspection requirement — Concrete - Cast-In-Place
MICHAEL BARRY
12/29/2025
Special inspection requirement — Structural Cold-Formed Steel
MICHAEL BARRY
12/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MICHAEL BARRY
12/29/2025
Special inspection requirement — Structural Steel - Details
MICHAEL BARRY
12/29/2025
Special inspection requirement — Structural Steel - High Strength Bolting
MICHAEL BARRY
12/29/2025
Special inspection requirement — Final
MICHAEL BARRY
12/29/2025
Special inspection requirement — Structural Steel - Welding
MICHAEL BARRY
12/23/2025
Objection resolved — Addressed
12/11/2025
Filed — Alteration
INSTALLATION OF NEW ROOFTOP STEEL DUNNAGE AND BASEMENT FRAMING TO SUPPORT A NEW MECHANICAL UNIT, AND REINFORCEMENT OF NEW DUCT PENETRATIONS.NO CHANGE TO EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01278169-I1
12/10/2025
Objection resolved — Addressed
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedMONELLO ENTERPRISES INC05/20/2026
DOB NOWPlumbingPermit IssuedFLOW-RIGHT PLBG & HTG COR01/28/2026
DOB NOWStructuralPermit IssuedMONELLO ENTERPRISES INC01/14/2026
DOB NOWConstruction FencePermit IssuedMONELLO ENTERPRISES INC11/26/2025
DOB NOWGeneral ConstructionPermit IssuedMONELLO ENTERPRISES INC10/23/2025
BISOTISSUEDRICKY & SONS CONSTRUCTION07/23/2014
1 project · most recent 08/12/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/12/2026Permit IssuedMONELLO ENTERPRISES INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Tosot TWH12AT19D6D1 12,000 BTU · Exhaust Fan ×10
TM48D6MO 48,000 BTU · Heat Pump Outdoor ×4
TM24D6HDI 24,000 BTU · Vrf Indoor ×2
TU36-32AH2GDU 36,000 BTU · Ahu ×2
TU36-32GDU 36,000 BTU · Heat Pump Outdoor ×2
TWH09AT19D6DI 9,000 BTU · Fan Coil Indoor ×2
Mitsubishi Electric MXZ-3D24NLHZ 22,000 BTU · Vrf Outdoor ×1
Ventilation
Panasonic FV-0501VSCL1 110 CFM · Exhaust Fan ×1
1 project · most recent 07/07/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/07/2026Permit IssuedFLOW-RIGHT PLBG & HTG CORGas, Storm, Water/Sanitary
3 projects · most recent 09/29/2026
General Wiring
FiledStatusContractorScope
09/29/2026Permit IssuedVOLTAGE ELECTRIC CORP1 meters, 1 new_meters
04/20/2026Permit IssuedVOLTAGE ELECTRIC CORPGeneral Wiring
10/22/2025CompleteVOLTAGE ELECTRIC CORP—
1 project · most recent 01/12/2026
Steel Concrete
FiledStatusContractorScope
01/12/2026Permit IssuedMONELLO ENTERPRISES INCSteel, Concrete
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/31/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/17/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
06/01/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/14/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/23/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
03/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/09/2026Pass-Final PL - UndergroundPassView ↗
02/12/2026Pass-Final PL - Up to 9 Requested FloorsPassView ↗
01/16/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
07/07/2026Fire-Resistant Penetrations and JointsGAETANO D'ANTONIOspecial
07/07/2026FinalELLEN MARTINprogress
06/24/2026Energy Code Compliance InspectionsELLEN MARTINprogress
06/24/2026Fire-Resistant Penetrations and JointsGAETANO D'ANTONIOspecial
06/24/2026FinalELLEN MARTINprogress
06/24/2026Fire-Resistant Penetrations and JointsGAETANO D'ANTONIOspecial
02/02/2026Fire-Resistant Penetrations and JointsGAETANO D'ANTONIOspecial
12/29/2025Concrete - Cast-In-PlaceMICHAEL BARRYspecial
12/29/2025Structural Cold-Formed SteelMICHAEL BARRYspecial
12/29/2025Structural Stability – Alterations of existing buildingsMICHAEL BARRYspecial
12/29/2025Structural Steel - DetailsMICHAEL BARRYspecial
12/29/2025Structural Steel - High Strength BoltingMICHAEL BARRYspecial
12/29/2025FinalMICHAEL BARRYprogress
12/29/2025Structural Steel - WeldingMICHAEL BARRYspecial
11/05/2025Fire-Resistant Penetrations and JointsGAETANO D'ANTONIOspecial
11/05/2025Energy Code Compliance InspectionsELLEN MARTINprogress
08/27/2025Mechanical SystemsGAETANO D'ANTONIOspecial
08/27/2025FinalGAETANO D'ANTONIOprogress
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/20/2026B01278165-P1Request digital key ↗
08/20/2026B01278165-I1Request digital key ↗
08/19/2026B01278167-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits9
▸DOB NOWLPC Approval/Permit7
08/20/2026B01278165-P1Open ↗
08/19/2026B01278166-P1Open ↗
08/19/2026B01278169-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION1
07/22/2014340165396Open ↗
▸BISWORK PERMIT APPLICATION1
07/22/2014340165396Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWRestrictive Declaration/Easement 11
08/15/2026B01278167-P1Open ↗
▸Seals & Professional Certifications32
▸DOB NOWSpecial Inspector Seal & Signature12
09/02/2026B01278167-P1Open ↗
08/30/2026B01278166-I1Open ↗
08/30/2026B01278166-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/20/2026B01278165-P1Open ↗
08/20/2026B01278165-I1Open ↗
08/19/2026B01278167-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026B01278167-P1Open ↗
08/30/2026B01278166-I1Open ↗
08/25/2026B01278165-I1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
07/22/2014340165396Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
07/22/2014340165396Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/22/2014340165396Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/16/2015340165396Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/20/2026B01278165-P1Open ↗
08/19/2026B01278167-I1Open ↗
08/19/2026B01278166-I1Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance3
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
07/22/2014340165396Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/16/2015340165396Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
07/22/2014340165396Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/22/2014340165396Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
10/16/2015340165396Open ↗
▸BISLANDMARKS APPROVAL1
07/22/2014340165396Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
10/16/2015340165396Open ↗
07/22/2014340165396Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/22/2014340165396Open ↗
▸Other Documents5
▸DOB NOWProof of Historic Building5
08/20/2026B01278165-P1Open ↗
08/19/2026B01278166-P1Open ↗
08/15/2026B01278167-P1Open ↗
Showing 3 of 5 on file for this type