← Back
BuildNYC
Predominantly retail with other uses
235 EAST 58TH STREET
MANHATTAN · BIN 1038630
💬 Discuss this project
1900Year Built
3Stories
K4Building Class
R8BZoning
4,005 sfGross Floor Area
3Units
1 Active Violation 0 unresolved · 1 paperwork only ▸
Predominantly retail with other uses · Owner of record: SBG USA · 1,674 sf lot · 2.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction3p · 1 filing · 17 docs
Floor 3Proposed alterations and structural repairsUnder Construction22p · 4 filings · 20 docs
Floor 2Proposed alterations and structural repairsUnder Construction21p · 4 filings · 20 docs
Floor 1Unit 1AUnder Construction23p · 4 filings · 20 docs
CellarProposed alterations and structural repairsUnder Construction15p · 3 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed installationUnder Construction1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Silk Surplus Realty Co103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/27/2026$3.0M—SBG USA, CORP. → MODERN ABSTRACTION GALLERY LLC$749/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Always Fast Services109/15/2026
Amarchitecture1108/16/2026
Martos Engineering105/29/2026
Adal Engineering103/19/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Marchese BuildersGeneral Contractor308/08/2026
Europol ConstructionGeneral Contractor107/08/2026
Phoenix Sutton STRScaffold109/16/2026
Cosme Plumbing & HeatingPlumbing107/08/2026
Orbit Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Alyssa Manfredonia Architects8466308/16/2026
Christian L. Martos Engineering5965105/29/2026
Adal Engineering4205103/19/2026
Building Lifecycle
All (57)Filed (14)Permit Issued (7)Signed Off (1)Violation (1)Inspection (3)Objection (4)Special Inspection (27)
09/15/2026
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01458622-I1
09/15/2026
Permit issued — Sidewalk Shed
M01458622-I1-SH
09/11/2026
Signed off — Alteration
STRUCTURAL REPAIR/ ALT. -FIRST FLOOR, SECOND FLOOR AND THIRD FLOOR PER ATTACHED PLANS NO CHANGE TO USE, OCCUPANCY, OR MEANS OF EGRESS IS PROPOSED.
M01407316-I1
08/16/2026
Filed — Alteration
RENO. OF EXISTING DUPLEX APARTMENT/ GROUND COMMERCIAL NEW PARITIONS-RECONSTRUCTION STAIRS IN EXISTING OPENING- FINISHES-FIXTURES-BATHROOMS- NEW KITCHEN LAYOUT/ APPLIANCES-WINDOWS-ACCESSORY ROOF TERR. -NEW LIGHTING-NO CHANGE TO EGRESS USE OR OCCUPANCY
M01376995-P2
08/07/2026
Permit issued — Structural
M01407316-I1-ST
07/16/2026
Objection resolved — Resolved
07/13/2026
Objection resolved — Resolved
07/09/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/07/2026
Objection raised — Scope
07/07/2026
Objection raised — Other
07/06/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/05/2026
Filed — Alteration
(CELLAR/ 1ST/ 2ND/3RD FLOOR) REPLACE / INSTALL PLUMBING FIXTURES-AS PER PLANS -NO CHANGE TO EGRESS USE
M01385126-P3
06/15/2026
Special inspection requirement — Final
Alyssa Manfredonia
06/11/2026
Filed — Alteration
EXISTING GROUND FLOOR COMMERCIAL AREA AND ONE FAMILY DWELLING UNIT ABOVE. REMOVAL OF NON-BEARING WALLS, STAIRS FINISHES, RAILINGS, DOORS, TRIM, AND BATHROOM AS PER PLANS-DEMOLITION WORK ONLY- NO CHANGE USE EGRESS, USE OR OCCUPANCY
M01367091-P1
06/11/2026
Special inspection requirement — Fire-Resistance Rated Construction
Alyssa Manfredonia
06/11/2026
Special inspection requirement — Energy Code Compliance Inspections
Alyssa Manfredonia
06/11/2026
Special inspection requirement — Final
Alyssa Manfredonia
06/11/2026
Special inspection requirement — Lighting controls
Alyssa Manfredonia
06/11/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alyssa Manfredonia
06/11/2026
Special inspection requirement — Air barrier - visual inspection
Alyssa Manfredonia
06/11/2026
Special inspection requirement — Lighting in dwelling units
Alyssa Manfredonia
06/11/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Alyssa Manfredonia
06/11/2026
Special inspection requirement — Insulation placement and R values
Alyssa Manfredonia
06/07/2026
Filed — Alteration
(CELLAR/ 1ST/ 2ND/3RD FLOOR) REPLACE / INSTALL PLUMBING FIXTURES-AS PER PLANS -NO CHANGE TO EGRESS USE
M01385126-P2
05/29/2026
Filed — Alteration
STRUCTURAL REPAIR/ ALT. -FIRST FLOOR, SECOND FLOOR AND THIRD FLOOR PER ATTACHED PLANS NO CHANGE TO USE, OCCUPANCY, OR MEANS OF EGRESS IS PROPOSED.
M01407316-I1
05/27/2026
Filed — Alteration
RENO. OF EXISTING DUPLEX APARTMENT/ GROUND COMMERCIAL NEW PARITIONS-RECONSTRUCTION STAIRS IN EXISTING OPENING- FINISHES-FIXTURES-BATHROOMS- NEW KITCHEN LAYOUT/ APPLIANCES-WINDOWS-ACCESSORY ROOF TERR. -NEW LIGHTING-NO CHANGE TO EGRESS USE OR OCCUPANCY
M01376995-P1
05/27/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Alyssa Manfredonia
05/27/2026
Special inspection requirement — Air barrier - visual inspection
Alyssa Manfredonia
05/21/2026
Special inspection requirement — Lighting in dwelling units
Alyssa Manfredonia
05/21/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alyssa Manfredonia
05/21/2026
Special inspection requirement — Energy Code Compliance Inspections
Alyssa Manfredonia
05/21/2026
Special inspection requirement — Final
Alyssa Manfredonia
05/21/2026
Special inspection requirement — Fire-Resistance Rated Construction
Alyssa Manfredonia
05/21/2026
Special inspection requirement — Insulation placement and R values
Alyssa Manfredonia
05/21/2026
Special inspection requirement — Lighting controls
Alyssa Manfredonia
05/14/2026
Permit issued — Mechanical Systems
M01367091-S2-MS
04/16/2026
Permit issued — General Construction
M01376995-I1-GC
04/10/2026
Filed — Alteration
(CELLAR/ 1ST/ 2ND/3RD FLOOR) REPLACE / INSTALL PLUMBING FIXTURES-AS PER PLANS -NO CHANGE TO EGRESS USE
M01385126-P1
04/10/2026
Permit issued — Plumbing
M01385126-I1-PL
04/09/2026
Filed — Alteration
(CELLAR/ 1ST/ 2ND/3RD FLOOR) REPLACE / INSTALL PLUMBING FIXTURES-AS PER PLANS -NO CHANGE TO EGRESS USE
M01385126-I1
03/26/2026
Filed — Alteration
RENO. OF EXISTING DUPLEX APARTMENT/ GROUND COMMERCIAL NEW PARITIONS-RECONSTRUCTION STAIRS IN EXISTING OPENING- FINISHES-FIXTURES-BATHROOMS- NEW KITCHEN LAYOUT/ APPLIANCES-WINDOWS-ACCESSORY ROOF TERR. -NEW LIGHTING-NO CHANGE TO EGRESS USE OR OCCUPANCY
M01376995-S1
03/24/2026
Filed — Alteration
RENO. OF EXISTING DUPLEX APARTMENT/ GROUND COMMERCIAL NEW PARITIONS-RECONSTRUCTION STAIRS IN EXISTING OPENING- FINISHES-FIXTURES-BATHROOMS- NEW KITCHEN LAYOUT/ APPLIANCES-WINDOWS-ACCESSORY ROOF TERR. -NEW LIGHTING-NO CHANGE TO EGRESS USE OR OCCUPANCY
M01376995-I1
03/23/2026
Permit issued — Plumbing
M01367091-S1-PL
03/19/2026
Filed — Alteration
EXISTING GROUND FLOOR COMMERCIAL AREA AND ONE FAMILY DWELLING UNIT ABOVE. REMOVAL OF NON-BEARING WALLS, STAIRS FINISHES, RAILINGS, DOORS, TRIM, AND BATHROOM AS PER PLANS-DEMOLITION WORK ONLY- NO CHANGE USE EGRESS, USE OR OCCUPANCY
M01367091-S2
03/19/2026
Special inspection requirement — Shutoff dampers
Dariusz Makara
03/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Dariusz Makara
03/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Dariusz Makara
03/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
Dariusz Makara
03/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
Dariusz Makara
03/16/2026
Special inspection requirement — Maintenance information
Dariusz Makara
03/10/2026
Special inspection requirement — Mechanical Systems
Dariusz Makara
03/10/2026
Special inspection requirement — Final
Dariusz Makara
03/06/2026
Filed — Alteration
EXISTING GROUND FLOOR COMMERCIAL AREA AND ONE FAMILY DWELLING UNIT ABOVE. REMOVAL OF NON-BEARING WALLS, STAIRS FINISHES, RAILINGS, DOORS, TRIM, AND BATHROOM AS PER PLANS-DEMOLITION WORK ONLY- NO CHANGE USE EGRESS, USE OR OCCUPANCY
M01367091-S1
03/06/2026
Permit issued — General Construction
M01367091-I1-GC
03/04/2026
Filed — Alteration
EXISTING GROUND FLOOR COMMERCIAL AREA AND ONE FAMILY DWELLING UNIT ABOVE. REMOVAL OF NON-BEARING WALLS, STAIRS FINISHES, RAILINGS, DOORS, TRIM, AND BATHROOM AS PER PLANS-DEMOLITION WORK ONLY- NO CHANGE USE EGRESS, USE OR OCCUPANCY
M01367091-I1
03/06/1990
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedPhoenix Sutton STR09/15/2026
DOB NOWStructuralSigned-offMarchese Builders08/07/2026
DOB NOWMechanical SystemsPermit IssuedEuropol Construction05/14/2026
DOB NOWGeneral ConstructionPermit IssuedMarchese Builders04/16/2026
DOB NOWPlumbingPermit IssuedOrbit Plumbing & Heating04/10/2026
DOB NOWPlumbingPermit IssuedCosme Plumbing & Heating03/23/2026
DOB NOWGeneral ConstructionPermit IssuedMarchese Builders03/06/2026
BISPLISSUEDDC Building Services11/06/1997
BISEQISSUEDRegional Scaffold & Hoisting09/16/1997
BIS—ISSUEDGJF Construction08/22/1997
1 project · most recent 06/11/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/11/2026Permit IssuedEuropol ConstructionHeating and Air Conditioning Systems
Heat / Cool
Lg ZRUM060GSS0 5 tons · Vrf Outdoor ×3
3 projects · most recent 08/16/2026
Water/Sanitary Gas
FiledStatusContractorScope
08/16/2026——Gas, Water/Sanitary
07/05/2026Permit IssuedOrbit Plumbing & HeatingGas, Water/Sanitary
06/11/2026Permit IssuedCosme Plumbing & HeatingWater/Sanitary
3 projects · most recent 09/14/2026
General Wiring
FiledStatusContractorScope
09/14/2026Permit IssuedRichard Neu—
05/18/2026Permit IssuedL.J.F. & Sons Electrical ContsGeneral Wiring
03/09/2026Permit IssuedElpo Electrical Contg—
1 project · most recent 05/29/2026
Steel Wood
FiledStatusContractorScope
05/29/2026Signed-offMarchese BuildersSteel, Wood
1 project · most recent 09/15/2026
Sidewalk Shed
FiledStatusContractorScope
09/15/2026Permit IssuedPhoenix Sutton STRSidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/09/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/09/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/06/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 27
DateRequirementInspectorRole
06/15/2026FinalAlyssa Manfredoniaprogress
06/11/2026Fire-Resistance Rated ConstructionAlyssa Manfredoniaprogress
06/11/2026Energy Code Compliance InspectionsAlyssa Manfredoniaprogress
06/11/2026FinalAlyssa Manfredoniaprogress
06/11/2026Lighting controlsAlyssa Manfredoniaenergy_progress
06/11/2026Fire-Resistant Penetrations and JointsAlyssa Manfredoniaspecial
06/11/2026Air barrier - visual inspectionAlyssa Manfredoniaenergy_progress
06/11/2026Lighting in dwelling unitsAlyssa Manfredoniaenergy_progress
06/11/2026Fenestration and door U-factor and product ratingsAlyssa Manfredoniaenergy_progress
06/11/2026Insulation placement and R valuesAlyssa Manfredoniaenergy_progress
05/27/2026Fenestration and door U-factor and product ratingsAlyssa Manfredoniaenergy_progress
05/27/2026Air barrier - visual inspectionAlyssa Manfredoniaenergy_progress
05/21/2026Lighting in dwelling unitsAlyssa Manfredoniaenergy_progress
05/21/2026Fire-Resistant Penetrations and JointsAlyssa Manfredoniaspecial
05/21/2026Energy Code Compliance InspectionsAlyssa Manfredoniaprogress
05/21/2026FinalAlyssa Manfredoniaprogress
05/21/2026Fire-Resistance Rated ConstructionAlyssa Manfredoniaprogress
05/21/2026Insulation placement and R valuesAlyssa Manfredoniaenergy_progress
05/21/2026Lighting controlsAlyssa Manfredoniaenergy_progress
03/19/2026Shutoff dampersDariusz Makaraenergy_progress
03/16/2026HVAC-R and service water piping design and insulationDariusz Makaraenergy_progress
03/16/2026Fire-Resistant Penetrations and JointsDariusz Makaraspecial
03/16/2026HVAC-R and service water heating system controlsDariusz Makaraenergy_progress
03/16/2026HVAC-R and service water heating equipmentDariusz Makaraenergy_progress
03/16/2026Maintenance informationDariusz Makaraenergy_progress
Latest 25 of 27.
▾Documents — 63 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch15
10/13/2026M01458622-I1Request digital key ↗
08/18/2026M01367091-I1Request digital key ↗
08/18/2026M01367091-S1Request digital key ↗
Showing 3 of 15 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
08/13/2025100085177Open ↗
08/13/2025101583396Open ↗
▸Seals & Professional Certifications32
▸DOB NOWProgress Inspector Seal & Signature15
09/25/2026M01367091-I1Open ↗
09/04/2026M01376995-P1Open ↗
09/04/2026M01376995-P1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/17/2026M01458622-I1Open ↗
08/18/2026M01367091-P1Open ↗
08/18/2026M01367091-S2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/04/2026M01376995-P1Open ↗
08/23/2026M01376995-I1Open ↗
08/23/2026M01367091-S2Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report13
08/18/2026M01367091-S2Open ↗
08/18/2026M01367091-P1Open ↗
08/17/2026M01376995-P1Open ↗
Showing 3 of 13 on file for this type
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
08/12/2025101583396Open ↗