| Owner | Filings | Most Recent |
|---|---|---|
| RXR | 50 | 09/13/2026 |
| RXR REALTY | 60 | 07/08/2026 |
| NEW YORK PRESBYTERIAN HOSPITAL | 22 | 07/08/2026 |
| RXR PROPERTY MANAGEMENT LLC A A F 2 | 7 | 03/22/2026 |
| PLATINUM SERVICES NY | 5 | 03/22/2026 |
| OWNER OF 466 LEXINGTON AV | 2 | 03/22/2026 |
| THE OWNER OF | 2 | 03/22/2026 |
| 237 PARK AVE OWNERS LP | 29 | 03/22/2026 |
| MONDAY PROPERTIES | 64 | 03/22/2026 |
| 237 MAX PARK AVENUE | 140 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| LORING CONSULTING ENGINEERS, INC. | 3 | 05/07/2026 |
| SOCOTEC, INC. | 1 | 04/17/2026 |
| TPG ARCHITECTURE, LLP | 3 | 04/09/2026 |
| WRNS STUDIO | 2 | 01/12/2026 |
| NEWTEC ENGINEERING | 2 | 12/24/2025 |
| NAPACH DESIGN GROUP | 1 | 12/08/2025 |
| TAN ENGINEERING PC | 7 | 07/23/2025 |
| THORNTON TOMASETTI | 3 | 05/19/2025 |
| SMITH ENGINEERING | 1 | 05/19/2025 |
| W.E. III ENGINEERS, PLLC | 1 | 04/29/2025 |
| RICHARD WAINER ARCHITECT, PLLC | 2 | 01/15/2025 |
| WB ENGINEERS & CONSULTANTS PLLC | 2 | 12/02/2024 |
| LAURA RACHLIN | 1 | 11/18/2024 |
| ROBERT DERECTOR ASSOCIATES | 10 | 08/19/2024 |
| APPLIED DESIGN INITIATIVE, LLC | 3 | 04/11/2024 |
| ASHRAF CORP | 1 | 10/31/2023 |
| CBK ENGINEERING | 6 | 10/16/2023 |
| SHAABAN ENGINEERING, LLC | 1 | 02/10/2023 |
| VINCENT J. LIOTTA P.E. | 1 | 02/01/2023 |
| DE LA GARZA ARCHITECTURE LLC | 1 | 07/22/2022 |
| DON PENN CONSULTING ENGINEER | 3 | 05/23/2022 |
| CARRY D. MCLAIN - ARCHITECT | 2 | 05/23/2022 |
| NEW AGE ENGINEERING PLLC | 1 | 05/20/2022 |
| MG ENGINEERING D.P.C. | 2 | 02/09/2021 |
| LEON SKVIRSKY PE | 2 | 07/22/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| CAESAR BUSTAMANTE AIA | 20 | 03/21/2026 |
| NATIONAL MAINTENANCE | 2 | 03/21/2026 |
| MUNICIPAL EXPEDITING | 10 | 03/21/2026 |
| RIZZO GROUP | 9 | 03/21/2026 |
| D R BROWN | 4 | 03/21/2026 |
| WILLIAM VITACCO ASSOCIATES | 2 | 03/21/2026 |
| A1 EXPEDITING SERVICE CORP. | 16 | 03/21/2026 |
| ANZALONE ARCHITECTURE | 14 | 03/21/2026 |
| SATO CONSTRUCTION | 4 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| JAMES E FITZGERALD INC | General Contractor | 10 | 07/08/2026 |
| COYLE CONTRACTING CORP | General Contractor | 8 | 07/08/2026 |
| VERUS INC | General Contractor | 4 | 07/08/2026 |
| STANDARD FIRE PROTECT LLC | Fire Protection | 3 | 07/08/2026 |
| JDP MECHANICAL INC | General Contractor | 3 | 07/08/2026 |
| DONNELLY MECHANICAL CORP | General Contractor | 3 | 04/09/2026 |
| LAKEVIEW CONSTRUCTION INC. | General Contractor | 3 | 07/08/2026 |
| SIRINA FIRE PROT CORP | Fire Protection | 3 | 07/08/2026 |
| PLATINUM SERVICES NY LLC | General Contractor | 3 | 03/21/2026 |
| NATIONAL MAINTENANCE | Scaffold | 2 | 07/08/2026 |
| ELTON ZYKA | Electrical | 2 | 03/21/2026 |
| ABCO-PEERLESS SPRKLR CORP | Fire Protection | 2 | 07/08/2026 |
| BENCHMARK BUILDERS LLC | General Contractor | 2 | 03/21/2026 |
| COOPER WORKS INC | General Contractor | 2 | 07/08/2026 |
| HELLMAN CONSTRUCTION CO | General Contractor | 2 | 07/08/2026 |
| HENEGAN CONSTRUCTION CO., | General Contractor | 2 | 07/08/2026 |
| LANE REFRIGERATION CO.,IN | General Contractor | 2 | 03/21/2026 |
| L&K PARTNERS, INC | General Contractor | 2 | 07/08/2026 |
| PRIMARY BUILT LLC | General Contractor | 2 | 07/08/2026 |
| SATO CONSTRUCTION CO.INC | General Contractor | 2 | 03/21/2026 |
| STRUCTURE TONE, LLC | General Contractor | 2 | 03/21/2026 |
| PAR PLUMBING CO., INC | Plumbing | 2 | 07/08/2026 |
| TRISTATE PLBG SVCS CORP | Plumbing | 2 | 07/08/2026 |
| A M A HOLDINGS | Scaffold | 2 | 07/08/2026 |
| KREMER, WILLIAM | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| TECTONIC ENGINEERING CONS | 106 | 4 | 05/07/2026 |
| SOCOTEC, INC. | 301 | 1 | 04/17/2026 |
| OBAID MIAN | 849 | 2 | 12/24/2025 |
| TAN ENGINEERING, P.C. | 1291 | 6 | 07/23/2025 |
| CONSULTING AND TESTING SE | 6152 | 4 | 05/19/2025 |
| AK ENGINEERING PC | 678 | 2 | 12/02/2024 |
| METROSPEC SIA | 6420 | 1 | 09/30/2024 |
| MILROSE CONSULTANTS LLC | 2003 | 12 | 08/19/2024 |
| FRAMEWORK ENGINEERING PC | 8217 | 2 | 07/31/2024 |
| CROSSCHECK INSPECTION SER | 544 | 7 | 10/16/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | RXR CONSTRUCTION SERV LLC | 04/29/2026 |
| DOB NOW | Structural | Permit Issued | JDP MECHANICAL INC | 04/02/2026 |
| DOB NOW | General Construction | Permit Issued | L&K PARTNERS, INC | 02/24/2026 |
| DOB NOW | Plumbing | Signed-off | STANDARD FIRE SUPP CORP | 02/19/2026 |
| DOB NOW | Structural | Permit Issued | JDP MECHANICAL INC | 01/26/2026 |
| DOB NOW | Mechanical Systems | Signed-off | DONNELLY MECHANICAL CORP | 12/24/2025 |
| DOB NOW | Plumbing | Signed-off | PARKVIEW P&H INC | 12/16/2025 |
| DOB NOW | General Construction | Signed-off | HELLMAN CONSTRUCTION CO | 12/12/2025 |
| DOB NOW | Mechanical Systems | Signed-off | HELLMAN CONSTRUCTION CO | 12/12/2025 |
| DOB NOW | Plumbing | Signed-off | FULL CAPACITY FIRE CORP | 12/12/2025 |
| DOB NOW | General Construction | Signed-off | BENCHMARK BUILDERS LLC | 10/10/2025 |
| DOB NOW | Structural | Permit Issued | JDP MECHANICAL INC | 09/24/2025 |
| DOB NOW | General Construction | Signed-off | L&K PARTNERS, INC | 07/14/2025 |
| DOB NOW | Plumbing | Signed-off | PAR PLUMBING CO., INC | 05/08/2025 |
| DOB NOW | Sign | Permit Issued | A.M.A HOLDINGS INC | 01/17/2025 |
| DOB NOW | Sign | Permit Issued | A.M.A HOLDINGS INC | 01/17/2025 |
| DOB NOW | Plumbing | Signed-off | S.B.A. PLUMBING CORP | 12/10/2024 |
| DOB NOW | Mechanical Systems | Signed-off | PRIMARY BUILT LLC | 12/04/2024 |
| DOB NOW | General Construction | Signed-off | PRIMARY BUILT LLC | 11/27/2024 |
| DOB NOW | Sprinklers | Signed-off | ACCURATE MECHANICAL INC | 10/22/2024 |
| DOB NOW | Plumbing | Signed-off | ANTHONY DISABATO | 10/21/2024 |
| DOB NOW | Mechanical Systems | Signed-off | COOPER WORKS | 10/17/2024 |
| DOB NOW | General Construction | Signed-off | COOPER WORKS | 10/17/2024 |
| DOB NOW | Sprinklers | Permit Issued | STANDARD FIRE SUPP CORP | 10/11/2024 |
| DOB NOW | General Construction | Signed-off | VERUS INC | 04/15/2024 |
| DOB NOW | Sprinklers | Signed-off | LAWRENCE J. LEVINE | 04/12/2024 |
| DOB NOW | Mechanical Systems | Signed-off | VERUS INC | 04/12/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | SATO CONSTRUCTION CO. INC | 12/08/2023 |
| DOB NOW | Sidewalk Shed | Permit Issued | PLATINUM SERVICES NY LLC | 10/31/2023 |
| DOB NOW | General Construction | Signed-off | SATO CONSTRUCTION CO.INC | 10/23/2023 |
| DOB NOW | Sign | Signed-off | NATIONAL MAINTENANCE, INC | 02/14/2023 |
| DOB NOW | Mechanical Systems | Signed-off | LANE REFRIGERATION CO.,IN | 02/01/2023 |
| DOB NOW | Mechanical Systems | Signed-off | COYLE CONTRACTING CORP | 11/02/2022 |
| DOB NOW | General Construction | Signed-off | COYLE CONTRACTING CORP | 11/02/2022 |
| DOB NOW | Mechanical Systems | Signed-off | COYLE CONTRACTING CORP | 08/25/2022 |
| DOB NOW | Plumbing | Signed-off | RRP PLUMBING CORP | 08/16/2022 |
| DOB NOW | Plumbing | Signed-off | RALPH W. LANDOLFI JR. | 08/16/2022 |
| DOB NOW | General Construction | Signed-off | COYLE CONTRACTING CORP | 08/03/2022 |
| DOB NOW | Sprinklers | Signed-off | STANDARD FIRE SUPP CORP | 05/20/2022 |
| DOB NOW | Sprinklers | Signed-off | TRISTATE PLBG SVCS CORP | 04/26/2022 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/07/2026 | Signed-off | HELLMAN CONSTRUCTION CO | Ventilation Systems | Ventilation Anemostat n/a 1 BTU · Exhaust Fan ×2 |
| 12/24/2025 | Signed-off | DONNELLY MECHANICAL CORP | Air Conditioning Systems | Cooling Heat Controller MCL018AEC30C0PS 18,000 BTU · Furnace ×1 |
| 05/11/2020 | — | — | Air Conditioning Systems, Associated Ducts and Piping | Cooling United Cool Air Envision Vertical VFD (WA5) 360 8,000 CFM · Wshp ×1 VERSATEC VV036 1,220 CFM · Rooftop Unit ×1 Ducts & Piping __Junk__ Ductwork 1 CFM · Ductwork ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/07/2026 | Signed-off | STANDARD FIRE PROTECT LLC | — |
| 08/19/2024 | Permit Issued | STANDARD FIRE PROTECT LLC | — |
| 05/11/2020 | — | — | 90 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/07/2026 | Signed-off | PARKVIEW P&H INC | Water/Sanitary |
| 04/29/2025 | Signed-off | PAR PLUMBING CO., INC | Water/Sanitary |
| 05/11/2020 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/08/2026 | Complete | SCHLESINGER ELECT'L CONTR | General Wiring |
| 04/05/2025 | Complete | GREEN APPLE ELECL SVCS LL | — |
| 03/04/2025 | Permit Issued | ALLSTATE ELEC'L CONT INC | General Wiring |
| 01/27/2025 | Complete | GREEN APPLE ELECL SVCS LL | General Wiring |
| 10/01/2024 | Complete | UNITY ELECTRIC CO. INC | General Wiring |
| 12/07/2023 | Complete | FOREST ELECTRIC CORP. | General Wiring |
| 11/09/2023 | Complete | S & D ELECTRIC NY CORP | General Wiring |
| 10/18/2023 | Permit Issued | ILLUMINOUS ELECTRIC CORP. | General Wiring |
| 07/18/2023 | Permit Issued | AE ELECTRIC INC | General Wiring |
| 01/17/2023 | Permit Issued | ALL WAYS ELECTRIC CORP.W | General Wiring |
| 06/16/2022 | Permit Issued | MAN ELECTRIC, INC | General Wiring |
| 08/04/2021 | Complete | P.E. STONE INC | General Wiring |
| 07/31/2020 | Permit Issued | RAINBOW ELECTRIC CO., INC | — |
| 11/07/2019 | Complete | ROBERT B. SAMUELS, INC. | General Wiring |
| 06/26/2019 | Complete | AMC ELEC'L SERVICES, INC. | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/31/2023 | Permit Issued | PLATINUM SERVICES NY LLC | Sidewalk Shed |
| Date | Type | Result | Report |
|---|---|---|---|
| 03/13/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/11/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/02/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/05/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 08/01/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/30/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/26/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/05/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 02/21/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/18/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/03/2025 | Certified Storm Drainage-ST-Fixtures-Finish | Certified | View ↗ |
| 01/30/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 01/22/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 01/10/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/27/2024 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 12/27/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/13/2024 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 08/14/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 08/06/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 07/25/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 07/17/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 03/17/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/10/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 12/01/2022 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/16/2022 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/08/2026 | Maintenance information | GEORGE GHEBRYAL | energy_progress |
| 05/08/2026 | HVAC-R and service water piping design and insulation | GEORGE GHEBRYAL | energy_progress |
| 05/08/2026 | Final | GEORGE GHEBRYAL | progress |
| 05/08/2026 | Mechanical Systems | GEORGE GHEBRYAL | special |
| 04/10/2026 | Final | Michael Hayes | progress |
| 03/31/2026 | Final | GEORGE GHEBRYAL | progress |
| 03/31/2026 | Maintenance information | GEORGE GHEBRYAL | energy_progress |
| 03/31/2026 | HVAC-R and service water piping design and insulation | GEORGE GHEBRYAL | energy_progress |
| 03/31/2026 | Mechanical Systems | GEORGE GHEBRYAL | special |
| 03/20/2026 | Final | Michael Hayes | progress |
| 01/06/2026 | Final | KYLE ELLIOTT | progress |
| 12/08/2025 | Fire-Resistant Penetrations and Joints | GEORGE GHEBRYAL | special |
| 12/05/2025 | Lighting controls | GEORGE GHEBRYAL | energy_progress |
| 12/05/2025 | Fire-Resistant Penetrations and Joints | GEORGE GHEBRYAL | special |
| 12/05/2025 | Interior lighting power | GEORGE GHEBRYAL | energy_progress |
| 12/03/2025 | Final | Obaid Mian | progress |
| 12/03/2025 | HVAC-R and service water heating equipment | Obaid Mian | energy_progress |
| 12/03/2025 | Mechanical Systems | Obaid Mian | special |
| 12/03/2025 | HVAC-R and service water heating system controls | Obaid Mian | energy_progress |
| 12/03/2025 | Ventilation and air distribution system | Obaid Mian | energy_progress |
| 12/03/2025 | Maintenance information | Obaid Mian | energy_progress |
| 12/01/2025 | Sprinkler Systems | GEORGE GHEBRYAL | special |
| 12/01/2025 | Final | GEORGE GHEBRYAL | progress |
| 05/16/2025 | HVAC-R and service water heating system controls | DANIEL CREIGHTON | energy_progress |
| 05/16/2025 | HVAC-R and service water piping design and insulation | DANIEL CREIGHTON | energy_progress |