← Back
BuildNYC
Two family converted from one family
238-39 149TH AVENUE
QUEENS · BIN 4291867
💬 Discuss this project
1950Year Built
2Stories
B3Building Class
R3XZoning
2,291 sfGross Floor Area
2Units
Two family converted from one family · 4,000 sf lot · 0.57 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProposed photovoltaic power system3p · 2 filings · 20 docs
Floor 2Interior Renovation, New Plumbing, Convert 1 Family to 2 Fam10p · 2 filings · 20 docs
Floor 1Interior Renovation, New Plumbing, Convert 1 Family to 2 Fam25p · 2 filings · 20 docs
CellarInterior Renovation, New Plumbing, Convert 1 Family to 2 Fam20p · 2 filings · 20 docs
BasementInterior Renovation, New Plumbing, Convert 1 Family to 2 Fam3p · 1 filing · 20 docs
Site & exteriorFence project1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
135-223 Street2407/08/2026
Building Design Consultancy407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/11/2024$1.4M—— → —$606/sf building
08/24/2023$560K—— → —$244/sf building
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Sion Consulting Engineering P803/21/2026
Ace-NYC Zoning and Code Consultants203/21/2026
NY State Solar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
B36 ServicesGeneral Contractor407/08/2026
NYSSGeneral Contractor303/21/2026
Yafe MeodScaffold303/21/2026
Seva Property DevlopmentGeneral Contractor107/08/2026
Yafe MeodGeneral Contractor107/08/2026
All Pro Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Green River Environmental7841111/21/2024
Sion Consulting Engineering1108504/10/2024
Building Lifecycle
All (100)Filed (9)Permit Issued (7)Signed Off (4)Inspection (10)Objection (40)Special Inspection (30)
07/28/2025
Signed off — Alteration
Q01146014-I1
11/27/2024
Permit issued — Solar
Q01146014-I1-SL
11/21/2024
Filed — Alteration
Q01146014-I1
11/21/2024
Special inspection requirement — Final
ROBERT MASONE
11/21/2024
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
11/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
11/21/2024
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
11/21/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
08/19/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
THIS APPLICATION IS FILED TO ADD NEW 10 FEET CURB CUT
Q00913969-S3
08/16/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/12/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
08/07/2024
Permit issued — General Construction
Q00913969-I1-MS
07/29/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
07/23/2024
Signed off — Alteration
ADD NEW 8' HT CONSTRUCTION FENCE
Q00925341-I1
07/23/2024
Permit issued — Curb Cut
Q00913969-S3-CC
05/14/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
THIS APPLICATION IS FILED TO ADD NEW 10 FEET CURB CUT
Q00913969-S1
05/01/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
sion hourizadeh
04/17/2024
Special inspection requirement — Metering
sion hourizadeh
04/17/2024
Special inspection requirement — Energy Code Compliance Inspections
sion hourizadeh
04/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
04/17/2024
Special inspection requirement — Permanent certificate
sion hourizadeh
04/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
sion hourizadeh
04/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
sion hourizadeh
04/17/2024
Special inspection requirement — Maintenance information
sion hourizadeh
04/16/2024
Special inspection requirement — Air barrier — testing
SERGEY BOLOTOV
04/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
sion hourizadeh
04/16/2024
Special inspection requirement — Duct leakage testing, insulation and design
sion hourizadeh
04/16/2024
Special inspection requirement — Footing and Foundation
sion hourizadeh
04/16/2024
Special inspection requirement — Energy Code Compliance Inspections
sion hourizadeh
04/16/2024
Special inspection requirement — Air barrier - visual inspection
sion hourizadeh
04/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
sion hourizadeh
04/16/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
sion hourizadeh
04/16/2024
Special inspection requirement — Concrete - Cast-In-Place
sion hourizadeh
04/16/2024
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
sion hourizadeh
04/16/2024
Special inspection requirement — Final
sion hourizadeh
04/16/2024
Special inspection requirement — Fire-Resistance Rated Construction
sion hourizadeh
04/16/2024
Special inspection requirement — Structural Wood Frame
sion hourizadeh
04/16/2024
Special inspection requirement — Insulation placement and R values
sion hourizadeh
04/16/2024
Special inspection requirement — Protection of exposed foundation insulation
sion hourizadeh
04/16/2024
Special inspection requirement — Permanent certificate
sion hourizadeh
04/16/2024
Special inspection requirement — Heating Systems
sion hourizadeh
04/12/2024
Objection resolved — Addressed
04/12/2024
Objection resolved — Addressed
04/10/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
THIS APPLICATION IS FILED TO ADD NEW 10 FEET CURB CUT
Q00913969-P3
04/03/2024
Objection raised — Scope
04/03/2024
Objection raised — Energy
03/19/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
THIS APPLICATION IS FILED TO ADD NEW 10 FEET CURB CUT
Q00913969-P2
03/07/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
THIS APPLICATION IS FILED TO ADD NEW 10 FEET CURB CUT
Q00913969-P1
03/06/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
01/22/2024
Objection raised — Zoning
01/22/2024
Objection resolved — Addressed
01/22/2024
Objection raised — Structural
01/22/2024
Objection resolved — Addressed
01/22/2024
Objection raised — Scope
01/22/2024
Objection resolved — Addressed
01/18/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
01/18/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/11/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/11/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS11/27/2024
DOB NOWGeneral ConstructionSigned-offB36 Services08/07/2024
DOB NOWCurb CutSigned-offYafe Meod07/23/2024
DOB NOWPlumbingSigned-offAll Pro Plumbing & Heating12/29/2023
DOB NOWFoundationPermit IssuedB36 Services11/22/2023
DOB NOWConstruction FenceSigned-offYafe Meod08/29/2023
DOB NOWGeneral ConstructionPermit IssuedSeva Property Devlopment04/05/2022
BISPLISSUEDPaul Commdore & Sons07/27/2004
1 project · most recent 04/10/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/10/2024Signed-offB36 ServicesHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Goodman GMVIM97 3 tons · Furnace ×4
Ventilation
Panasonic FV-0811RQ1 150 CFM · Exhaust Fan ×6
1 project · most recent 04/10/2024
Water/Sanitary
FiledStatusContractorScope
04/10/2024Signed-offAll Pro Plumbing & HeatingWater/Sanitary
2 projects · most recent 09/11/2024
General Wiring
FiledStatusContractorScope
09/11/2024CompleteNY Solar Electrical—
12/16/2023CompleteSupreme ElectricGeneral Wiring
1 project · most recent 04/10/2024
Wood
FiledStatusContractorScope
04/10/2024Signed-offB36 ServicesWood
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/16/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
08/12/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
07/29/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
05/01/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/06/2024Fail-Final CND-Occupancy InspectionFailView ↗
01/18/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/18/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/11/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/11/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/11/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 90
DateRequirementInspectorRole
11/21/2024Energy Code Compliance InspectionsROBERT MASONEprogress
11/21/2024Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
11/21/2024Fire-Resistant Penetrations and JointsROBERT MASONEspecial
11/21/2024Air barrier - visual inspectionROBERT MASONEenergy_progress
11/21/2024FinalROBERT MASONEprogress
04/17/2024HVAC-R and service water heating equipmentsion hourizadehenergy_progress
04/17/2024HVAC-R and service water heating system controlssion hourizadehenergy_progress
04/17/2024Fire-Resistant Penetrations and Jointssion hourizadehspecial
04/17/2024Energy Code Compliance Inspectionssion hourizadehprogress
04/17/2024HVAC-R and service water piping design and insulationsion hourizadehenergy_progress
04/17/2024Maintenance informationsion hourizadehenergy_progress
04/17/2024Permanent certificatesion hourizadehenergy_progress
04/17/2024Meteringsion hourizadehenergy_progress
04/16/2024Meteringsion hourizadehenergy_progress
04/16/2024Fire-Resistant Penetrations and Jointssion hourizadehspecial
04/16/2024Subsurface Investigations (Borings/Test Pits)Soorjbally Harilallspecial
04/16/2024Concrete - Cast-In-Placesion hourizadehspecial
04/16/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installationsion hourizadehspecial
04/16/2024Heating Systemssion hourizadehspecial
04/16/2024Structural Stability – Alterations of existing buildingssion hourizadehspecial
04/16/2024Mechanical Systemssion hourizadehspecial
04/16/2024Excavations - Sheeting, Shoring, and Bracingsion hourizadehspecial
04/16/2024Finalsion hourizadehprogress
04/16/2024Energy Code Compliance Inspectionssion hourizadehprogress
04/16/2024Fire-Resistance Rated Constructionsion hourizadehprogress
Latest 25 of 90.
▾Documents — 82 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/26/2026Q00647202-I1Request digital key ↗
08/24/2026Q00925341-I1Request digital key ↗
08/23/2026Q00913969-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
05/21/2024440811490Open ↗
12/14/2023440811490Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
12/14/2023440811490Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q00913969-P2Open ↗
08/13/2026Q00913969-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00913969-I1Open ↗
▸Seals & Professional Certifications36
▸DOB NOWProgress Inspector Seal & Signature17
08/30/2026Q00913969-S1Open ↗
08/30/2026Q00913969-S1Open ↗
08/26/2026Q00913969-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/26/2026Q00647202-I1Open ↗
08/23/2026Q00913969-P3Open ↗
08/23/2026Q00913969-P2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
08/30/2026Q00913969-S1Open ↗
08/26/2026Q00913969-I1Open ↗
08/26/2026Q00913969-I1Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/14/2023440811490Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/14/2023440811490Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/14/2023440811490Open ↗
▸BISBPP: STREET TREES SITE PLAN1
02/06/2024440811490Open ↗
▸BISSTREET TREE CHECKLIST1
12/14/2023440811490Open ↗
▸BISSTREET TREE SIGNOFF1
08/19/2024440811490Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00913969-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00913969-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00913969-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/23/2026Q00913969-P3Open ↗
08/23/2026Q00913969-P1Open ↗
08/23/2026Q00913969-S1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT2
08/13/2026Q00913969-I1Open ↗
08/13/2026Q00913969-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00913969-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q00913969-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCURB CUT (CC) SIGNOFF1
08/19/2024440811490Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01146014-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
12/14/2023440811490Open ↗
▸Other Documents12
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00913969-I1Open ↗
08/13/2026Q00647202-I1Open ↗
08/13/2026Q00913969-P2Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
12/14/2023440811490Open ↗
12/14/2023440811490Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q00913969-I1Open ↗
08/13/2026Q00913969-P2Open ↗
▸DOB NOWProperty Ownership Certification2
08/23/2026Q00913969-I1Open ↗
08/14/2026Q00913969-P2Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
02/06/2024440811490Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00913969-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00913969-I1Open ↗