BuildNYC
Elevator apt, miscellaneous
Taino Towers
2385 2ND AVENUE · BIN 1054628
💬 Discuss this project
1974Year Built
35Stories
D9Building Class
R9Zoning
297,425 sfGross Floor Area
216Units
LL97 CoveredRent Stabilized97 Active Violations 96 unresolved · 1 paperwork only ▸FISP: SAFE
Elevator apt, miscellaneous · Owner of record: East Harlem Pilot, HDFC · 26,865 sf lot · 11.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsApartment and Lobby Renovations, Tower 4Under Construction5 filings
RoofIndustrial rope accessUnder Construction1p · 1 filing
Floor 1Taino Towers plaza waterproofing phase 12p · 3 filings
CellarTaino Towers locker room renovation2p · 1 filing · 13 docs
Site & exteriorSidewalk shed installationUnder Construction2 filings
Filed — no permit issuedTemporary scaffold for facade inspection and repair1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Sheltering Arms Properties1503/21/2026
East Harlen Pilo Block Housing1003/21/2026
East Harlem Pilot HDFC103/22/2026
NYC Department of Housing Preservation and Development103/21/2026
Structural Preservation Systems103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Kma Designs106/10/2026
MG Engineering303/04/2026
Terjesen Associates Architects502/26/2026
Dibari Engineering512/12/2025
Wiss, Janney, Elstner Associates305/27/2025
Ecoplusdesign111/09/2021
Syed Engineering101/08/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Somma Design Consulting2203/21/2026
Empire City Consultants603/21/2026
EB Studio Exp203/21/2026
W J Professional Expediting Company403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Structural Preserv SystemGeneral Contractor809/22/2026
Kings Group NYScaffold709/09/2026
Nan Tong Jin YI ConstructionGeneral Contractor407/08/2026
Satellite PlumbingPlumbing307/08/2026
Liberty Mechanical ContPlumbing207/03/2026
Titan Electrical & Elev ContractingElectrical203/21/2026
SlscoGeneral Contractor104/08/2026
Bobtek ElectricalElectrical103/21/2026
Delco ElectricalElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Socotec Engineering4983309/22/2026
Concessi Engineering540601/13/2026
AK Engineering678305/27/2025
Ecoplusdesign2887111/09/2021
Building Lifecycle
All (169)Filed (21)Permit Issued (22)Signed Off (2)Facade (FISP) (16)Violation (60)Objection (18)Special Inspection (30)
09/22/2026
Filed — Alteration
TEMPORARY INSTALLATION OF ADJUSTABLE SUSPENDED SCAFFOLD FOR FACADE INSPECTION & REPAIR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. Designated Primary Site Supervisor: Tomasz Gawkowksi
M01460422-I1
09/21/2026
Permit issued — General Construction
M01228903-I1-GC
09/21/2026
Permit issued — Mechanical Systems
M01078763-I1-MS
09/21/2026
Permit issued — General Construction
M00915366-I1-GC
09/17/2026
Violation issued (ECB, open)
Elevators
09/15/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
ALEXIS SCHLESSINGERMAN
09/15/2026
Special inspection requirement — Post-installed Anchors
ALEXIS SCHLESSINGERMAN
09/08/2026
Permit issued — Sidewalk Shed
M01414799-I1-SH
08/26/2026
Violation issued (HPD, open)
A
08/26/2026
Violation issued (HPD, open)
A
08/26/2026
Violation issued (HPD, open)
B
08/26/2026
Violation issued (HPD, open)
B
08/26/2026
Violation issued (HPD, open)
B
08/26/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
C
08/20/2026
Violation issued (HPD, open)
B
08/20/2026
Violation issued (HPD, open)
A
08/20/2026
Violation issued (HPD, open)
C
08/20/2026
Violation issued (HPD, open)
C
08/15/2026
Violation issued (HPD, open)
A
08/15/2026
Violation issued (HPD, open)
A
08/12/2026
Permit issued — Suspended Scaffold
M01435588-I1-SC
08/07/2026
Objection resolved — Addressed
08/06/2026
Objection raised — Other
07/30/2026
Filed — Alteration
FACADE INSPECTION Designated Primary Site supervisor: Jesus Decola
M01435588-I1
07/17/2026
Violation issued (HPD, open)
B
07/17/2026
Violation issued (HPD, open)
B
07/17/2026
Violation issued (HPD, open)
B
07/17/2026
Violation issued (HPD, open)
B
07/17/2026
Violation issued (HPD, open)
B
07/06/2026
Permit issued — General Construction
M01228903-I1-GC
07/01/2026
Permit issued — Plumbing
M01084662-I1-PL
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
C
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/24/2026
Violation issued (HPD, open)
B
06/15/2026
Violation issued (HPD, open)
B
06/15/2026
Violation issued (HPD, closed)
C
06/15/2026
Violation issued (HPD, closed)
C
06/15/2026
Violation issued (HPD, closed)
C
06/15/2026
Violation issued (HPD, closed)
B
06/10/2026
Filed — Alteration
installation of sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
M01414799-I1
06/10/2026
Permit issued — Sidewalk Shed
M01414799-I1-SH
Latest 60 of 169 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedStructural Preserv System09/21/2026
DOB NOWMechanical SystemsPermit IssuedStructural Preserv System09/21/2026
DOB NOWGeneral ConstructionPermit IssuedStructural Preserv System09/21/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY09/08/2026
DOB NOWSuspended ScaffoldPermit IssuedStructural Preservation System08/12/2026
DOB NOWGeneral ConstructionPermit IssuedStructural Preserv System07/06/2026
DOB NOWPlumbingPermit IssuedLiberty Mechanical Cont07/01/2026
DOB NOWSidewalk ShedPermit IssuedKings Group NY06/10/2026
DOB NOWMechanical SystemsPermit IssuedStructural Preserv System09/24/2025
DOB NOWGeneral ConstructionPermit IssuedStructural Preserv System09/23/2025
DOB NOWGeneral ConstructionPermit IssuedStructural Preserv System09/23/2025
DOB NOWMechanical SystemsPermit IssuedSlsco07/21/2025
DOB NOWPlumbingPermit IssuedLiberty Mechanical Cont06/30/2025
DOB NOWGeneral ConstructionSigned-offStructural Preserv System09/09/2024
DOB NOWSidewalk ShedSigned-offKings Group NY12/23/2022
DOB NOWGeneral ConstructionPermit IssuedNan Tong Jin YI Construction08/12/2022
DOB NOWSidewalk ShedSigned-offKings Group NY12/20/2021
DOB NOWGeneral ConstructionPermit IssuedNan Tong Jin YI Construction12/03/2021
DOB NOWPlumbingPermit IssuedSatellite Plumbing02/02/2021
DOB NOWSidewalk ShedSigned-offKings Group NY01/08/2021
DOB NOWPlumbingPermit IssuedSatellite Plumbing05/04/2020
DOB NOWPlumbingPermit IssuedSatellite Plumbing01/08/2020
BISOTISSUEDStructural Preserv System06/28/2023
BISOTISSUEDStructural Preserv System06/28/2022
BISOTISSUEDStructural Preserv System06/30/2021
BISOTISSUEDStructural Preserv System06/19/2020
BISOTISSUEDStructural Preserv System06/27/2019
BISEQISSUEDAdvanced Construction Equipment07/23/2018
BISOTISSUEDStructural Preserv System06/28/2018
BISEQISSUEDAdvanced Construction Equipment07/27/2017
BISOTISSUEDStructural Preserv System06/28/2017
BISOTISSUEDStructural Preserv System12/05/2016
BISEQISSUEDAdvanced Construction Equipment08/09/2016
BISEQISSUEDAdvanced Construction Equipment10/27/2015
BISEQISSUEDAdvanced Construction Equipment11/05/2014
BISEQISSUEDAdvanced Construction Equipment11/06/2013
BISEQISSUEDAdvanced Construction Equipment11/03/2012
BISEQISSUEDAdvanced Construction Equipment07/30/2012
BISEQISSUEDEverest Scaffolding04/04/2007
BISOTISSUEDJade Restoration02/12/2007
+ 10 more permits on file
1 project · most recent 03/04/2026
Sprinkler System
FiledStatusContractorScope
03/04/2026——Sprinkler System
3 projects · most recent 03/04/2026
Water/Sanitary Storm Gas
FiledStatusContractorScope
03/04/2026——Water/Sanitary
12/12/2025Permit IssuedLiberty Mechanical ContStorm, Water/Sanitary
09/22/2020Permit IssuedSatellite PlumbingGas
7 projects · most recent 05/28/2026
General Wiring
FiledStatusContractorScope
05/28/2026Permit IssuedHigh Quality Electric of NYC—
07/15/2025Permit IssuedDelco ElectricalGeneral Wiring
06/10/2025CompleteNGM Electric—
12/10/2021Permit IssuedPremium ElectricGeneral Wiring
01/12/2021CompleteHigh Quality Electric of—
09/16/2020Permit IssuedC.T.C. Electrical ContractorsGeneral Wiring
12/21/2019CompleteC.T.C. Electrical ContractorsGeneral Wiring
2 projects · most recent 07/30/2026
FiledStatusContractorScope
07/30/2026Permit IssuedStructural Preservation System1 scope_items
03/04/2026——1 scope_items
1 project · most recent 06/10/2026
Sidewalk Shed
FiledStatusContractorScope
06/10/2026Permit IssuedKings Group NYSidewalk Shed
2 projects · most recent 09/22/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
09/22/2026——Suspended Scaffold (SC)
07/30/2026Permit IssuedStructural Preservation System—
▾Special Inspection Requirements (DOB NOW) — 74
DateRequirementInspectorRole
09/15/2026Alternative Materials - OTCR Buildings Bulletin NumberALEXIS SCHLESSINGERMANspecial
09/15/2026Post-installed AnchorsALEXIS SCHLESSINGERMANspecial
03/04/2026Tenant Protection Plan Compliance—special
03/04/2026Tenant Protection Plan Compliance—special
02/10/2026Interior lighting power—energy_progress
02/10/2026Lighting controls—energy_progress
02/09/2026Fire-Resistant Penetrations and Joints—special
02/09/2026Fire-Resistant Penetrations and Joints—special
02/09/2026Post-installed Anchors—special
02/09/2026Post-installed Anchors—special
02/06/2026Tenant Protection Plan ComplianceRobert Concessispecial
02/06/2026HVAC-R and service water heating system controls—energy_progress
02/06/2026Metering—energy_progress
02/06/2026Duct leakage testing, insulation and design—energy_progress
02/06/2026Lighting controlsRobert Concessienergy_progress
02/06/2026Interior lighting powerRobert Concessienergy_progress
02/06/2026Electrical motors and elevators—energy_progress
02/06/2026Structural Stability – Alterations of existing buildingsRobert Concessispecial
02/06/2026Insulation placement and R valuesRobert Concessienergy_progress
02/06/2026FinalRobert Concessiprogress
02/06/2026Fire-Resistance Rated ConstructionRobert Concessiprogress
02/06/2026Fire-Resistant Penetrations and JointsRobert Concessispecial
02/06/2026Post-installed Anchors—special
02/06/2026Tenant Protection Plan Compliance—special
02/06/2026Energy Code Compliance Inspections—progress
Latest 25 of 74.
▾Documents — 171 on file (BIS + DOB NOW)
▸Plans & Drawings21
▸DOB NOWPlans/Sketch18
10/04/2026M01460422-I1Request digital key ↗
09/03/2026M00621376-I1Request digital key ↗
08/26/2026M01078763-I1Request digital key ↗
Showing 3 of 18 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00282312-I1Request digital key ↗
08/15/2026M00282312-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/04/2026M00441871-I1Request digital key ↗
▸Applications & Permits20
▸BISWORK PERMIT APPLICATION11
11/06/2019122805642Open ↗
06/28/2019122805642Open ↗
06/24/2019121147106Open ↗
Showing 3 of 11 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION9
01/24/2024122805642Open ↗
09/15/2020123677734Open ↗
09/03/2020123677734Open ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications69
▸DOB NOWProgress Inspector Seal & Signature25
09/01/2026M00621376-I1Open ↗
09/01/2026M00621376-I1Open ↗
09/01/2026M00621376-I1Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
09/04/2026M00282312-P1Open ↗
09/04/2026M00282312-I1Open ↗
09/03/2026M00621376-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
10/05/2026M01460422-I1Open ↗
10/05/2026M01460422-I1Open ↗
09/01/2026M00621376-I1Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
05/23/2017121283869Open ↗
10/28/2016122805642Open ↗
10/14/2016122805642Open ↗
Showing 3 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/19/2016140536597Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
08/19/2016140536597Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/02/2012121147106Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/19/2016140536597Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/02/2012121147106Open ↗
▸Safety & Tenant Protection4
▸DOB NOWTenant Protection Plan2
08/13/2026M00282312-P1Open ↗
08/13/2026M00282312-I1Open ↗
▸BISTenant Protection Plan and Notes1
07/14/2016122805642Open ↗
▸BISSTREET TREE CHECKLIST1
05/23/2017121283869Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/04/2026M00282312-P1Open ↗
09/04/2026M00282312-I1Open ↗
09/03/2026M00621376-I1Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/28/2016122805642Open ↗
10/14/2016122805642Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M01054447-I1Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
05/23/2017121283869Open ↗
07/14/2016122805642Open ↗
▸Approvals, Objections & Sign-offs22
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter12
08/16/2026M01414799-I1Open ↗
08/13/2026M00915366-P2Open ↗
08/13/2026M00915366-I1Open ↗
Showing 3 of 12 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
11/06/2019122805642Open ↗
06/28/2019122805642Open ↗
12/13/2016122805642Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/13/2026M01084662-I1Open ↗
08/13/2026M01078763-I1Open ↗
08/13/2026M00915366-I1Open ↗
▸BISSUPERSEDING LETTER1
08/12/2016121147106Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
08/02/2012121147106Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT5
02/15/2019123677734Open ↗
05/23/2017121283869Open ↗
10/28/2016122805642Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET5
02/15/2019123677734Open ↗
05/23/2017121283869Open ↗
05/23/2017121283869Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION2
04/10/2018121147106Open ↗
12/13/2016122805642Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/19/2016140536597Open ↗
▸Other Documents9
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
05/23/2017121283869Open ↗
07/14/2016122805642Open ↗
08/02/2012121147106Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
12/13/2016122805642Open ↗
▸BISPLOT DIAGRAM1
05/23/2017121283869Open ↗
▸DOB NOWIRA Certification1
08/15/2026M01435588-I1Open ↗
▸DOB NOWCalculations1
10/04/2026M01460422-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026M01054447-I1Open ↗
▸DOB NOWManufacturer's Specifications1
10/04/2026M01460422-I1Open ↗