← Back
BuildNYC
Elevator apt, fireproof with stores
239 PARK AVENUE SOUTH
MANHATTAN · Gramercy · BIN 1017907
💬 Discuss this project
1911Year Built
12Stories
D6Building Class
C6-4AZoning
51,122 sfGross Floor Area
46Units
LL97 CoveredRent Stabilized2 Active Violations 2 old, status unconfirmed ▸FISP: SAFE
Elevator apt, fireproof with stores · Owner of record: Abington Holding · 4,600 sf lot · 11.11 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof6 filings
Floor 12 filings
Cellar1 filing
Site & exterior3 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Abington Holdings2203/22/2026
Medusa403/21/2026
Chan60203/21/2026
Royal T&E203/21/2026
Chango203/21/2026
New Safeway Contracting Com103/21/2026
Azuki103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Neville Engineering Group305/11/2023
KMB Design Group110/20/2022
Mohammad Ahead, PE109/21/2022
Richard Koenigsberg109/19/2022
Paul J Hessel PE310/22/2021
NB&C112/03/2019
Dewberry Engineers111/26/2018
Tectonic Engineering104/24/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CCM Services Group303/21/2026
Scarano Architect1203/21/2026
Municipal Building Consultants103/21/2026
Construction Permit Services103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Overland ContractingGeneral Contractor707/08/2026
Metrotech MechanicalPlumbing307/08/2026
DK BuildersGeneral Contractor303/21/2026
Edge RenovationGeneral Contractor303/21/2026
Ramapo CommunicationGeneral Contractor303/21/2026
Sac WirelessGeneral Contractor207/08/2026
Caputek Electrical ServicesElectrical203/21/2026
J & G Construction ServicesScaffold107/08/2026
Elpo Electrical ContgElectrical103/21/2026
Kim MichaelElectrical103/21/2026
Champion ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
International Geotehcnica1795211/16/2022
KMB Design Group513110/20/2022
Koenigsberg Engineering2247109/19/2022
R Marsac Consulting329111/26/2018
Tectonic Engineering Cons106104/24/2018
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
08/21/2026
Boiler inspection report filed
Initial · no defects · Accepted
10/16/2025
Elevator Category 1 inspection report filed
10/06/2025
Boiler inspection report filed
Initial · no defects · Accepted
12/05/2024
Boiler inspection report filed
Initial · no defects · Accepted
166 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Metrotech Mechanical—
DOB NOW—Overland Contracting—
DOB NOW—DK Builders—
DOB NOW—Edge Renovation—
DOB NOW—J & G Construction Services—
DOB NOW—Metrotech Mechanical—
DOB NOW—Metrotech Mechanical—
DOB NOW—Overland Contracting—
DOB NOW—Overland Contracting—
DOB NOW—Sac Wireless—
DOB NOW—Sac Wireless—
DOB NOW—Ramapo Communication—
BIS—Edge Renovation—
BIS—Edge Renovation—
BIS—Celtic Services NYC—
BIS—Consolidated Scaffold & Bridge—
BIS—Consolidated Scaffold & Bridge—
BIS—New Safeway Contracting—
BIS—Allied Telecom—
BIS—Allied Telecom—
BIS—Allied Telecom—
BIS—Azcc Builders—
BIS—Azcc Builders—
BIS—Azcc Builders—
BIS—Arsenal Scaffold—
BIS—NY Fire—
BIS—Tower Construction NY—
BIS—Tower Construction NY—
BIS—NY Busin. Fire System—
BIS—Rockledge Scaffold—
BIS—New York Buss Fire System—
BIS—Conti Commercial—
BIS—Complete Construction—
BIS—H Lieblich—
BIS—Active Fire Extinguisher Co—
BIS—Active Fire Extinguisher Co—
BIS—Chinatown Plumbing & Heating—
BIS—Hiroyuki Kusrashima—
BIS—Magor Plumbing & Heating—
BIS—Active Fire Extinguisher—
+ 5 more permits on file
Nothing on file for this building.
Nothing on file for this building.
224 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account