24 WEST 55TH STREET · BIN 1080441
💬 Discuss this project
1937Year Built
12Stories
D4Building Class
C5-PZoning
200,000 sfGross Floor Area
211Units
LL97 CoveredRent Stabilized5 Active Violations 3 likely answered ▸FISP: SAFE
Elevator cooperative · Owner of record: 17 24 Corp · 25,104 sf lot · 7.97 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofLeonard OpticiansUnder Construction15p · 4 filings · 20 docs
Floor 13Sacks Real Estate Management CORP.1p · 1 filing · 9 docs
Floor 12Unit PHC6p · 1 filing · 20 docs
Floor 11Unit 11B, Unit 11C3p · 2 filings · 9 docs
Floor 10Unit 10B, Unit 10C, Unit 10FUnder Construction39p · 4 filings · 20 docs
Floor 9Unit 9DE15p · 1 filing · 16 docs
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4Unit 4B, Unit 4C, Unit 4EUnder Construction6p · 3 filings · 20 docs
Floor 3
Floor 2Unit 2E5p · 2 filings · 20 docs
Floor 1Leonard Opticians, Unit 1GUnder Construction8p · 2 filings · 20 docs
CellarLeonard OpticiansUnder Construction7p · 2 filings · 11 docs
Site & exteriorSacks Real Estate Management CORP.Under Construction11p · 2 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
17 and 243303/22/2026
17 24 Corporation Rockefeller AP1103/21/2026
100 United Nations Plaza Condominiu407/08/2026
17 24 Owners203/21/2026
Grumley Haft203/21/2026
55th 5th203/21/2026
Coleman103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Maryclare Nepogoda603/21/2026
DJL Architect103/21/2026
DI Dio Architecture803/21/2026
Socotec603/21/2026
Salvus Group203/21/2026
Enigma Expediting403/21/2026
J A Expediting203/21/2026
Maryclare Nepogoda Expediter203/21/2026
Vincent J. Liotta P.E103/21/2026
Vincent J. Liotta P. E103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Golden HVACspecialty_contractor1007/08/2026
Amsterdam RestorationScaffold407/08/2026
Bednarz ConstructionGeneral Contractor407/08/2026
Blue City ConstructionGeneral Contractor303/21/2026
Think ConstructionGeneral Contractor204/09/2026
Syed-Naqvi AltafElectrical203/21/2026
Hanjo ContractorsGeneral Contractor203/21/2026
Macreddin Plumbing & HeatingPlumbing207/08/2026
Air Depot Commercial RefrigerationGeneral Contractor203/21/2026
Alson Electrical ContractingElectrical203/21/2026
Liebhaber CompanyGeneral Contractor203/21/2026
Vma ElectricalElectrical103/22/2026
4IR IdealGeneral Contractor108/20/2026
Amato VincentElectrical103/21/2026
Egnatia ConstructionGeneral Contractor107/08/2026
Honey HammerGeneral Contractor107/08/2026
King Rose of NYGeneral Contractor104/09/2026
Raka Paintingspecialty_contractor104/09/2026
Stanley Ruth CoGeneral Contractor107/08/2026
Arcon Plumbing SolutionsPlumbing107/08/2026
Delta-Sigma MechanicalPlumbing107/08/2026
Avalair CoolingGeneral Contractor107/08/2026
Avalon ElectricElectrical103/22/2026
Essex ElectricElectrical103/21/2026
Power-Tech Installation ElectricElectrical103/21/2026
Katco ElectricElectrical103/21/2026
Lens ElectricElectrical103/22/2026
Finesse ElectricElectrical103/21/2026
Nash Electric ServicesElectrical103/21/2026
The Metro Group ElectricElectrical103/22/2026
Vma ElectricalElectrical103/21/2026
Super Charged ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New Age Engineering7746110/20/2026
Obaid Mian849108/07/2026
Jack Green Associates422207/15/2026
Sarah Gordon Drake Architects4744407/14/2026
Jspecs9429110/15/2025
Dario Architecture & Desig6878109/12/2025
Piro Studio7503405/16/2025
Steel Core Engineering PL1098304/05/2024
David Turner Architect3829111/19/2023
Cortney Walleston Architects3881107/21/2021
P.a.collins Inspections P2168205/19/2021
Alnour Consulting Engineering607103/15/2021
Vincent J. Liotta P. E1974102/06/2020
Building Lifecycle
All (220)Filed (30)Permit Issued (25)Signed Off (13)Facade (FISP) (6)Violation (56)Inspection (12)Objection (48)Special Inspection (30)
10/20/2026
Filed — Alteration
INSTALL NEW VACUUM PUMP SYSTEM AS PER PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
M01466702-I1
10/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stephen Shishko
09/28/2026
Special inspection requirement — Final
Stephen Shishko
09/28/2026
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
09/28/2026
Special inspection requirement — Mechanical Systems
Stephen Shishko
08/19/2026
Permit issued — Mechanical Systems
M01419061-I1-MS
08/12/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/07/2026
Filed — Alteration
Replacement of air conditioning units. No change in use egress and occupancy.
M01419061-I1
08/03/2026
Special inspection requirement — Final
LAWRENCE GREEN
08/03/2026
Special inspection requirement — Mechanical Systems
LAWRENCE GREEN
07/15/2026
Filed — Alteration
Combine Apts. 10B&10C (per TPPN 3/97), removing and replacing wall,, ceiling and floor finishes, removing and adding non load bearing partitions, replacing kitchen cabinets and appliances. Sub Docs to be filed for MS & PL
M01286832-P3
07/15/2026
Filed — Alteration
Combine Apts. 10B&10C (per TPPN 3/97), removing and replacing wall,, ceiling and floor finishes, removing and adding non load bearing partitions, replacing kitchen cabinets and appliances. Sub Docs to be filed for MS & PL
M01286832-P2
07/14/2026
Filed — Alteration
Combine Apts. 10B&10C (per TPPN 3/97), removing and replacing wall,, ceiling and floor finishes, removing and adding non load bearing partitions, replacing kitchen cabinets and appliances. Sub Docs to be filed for MS & PL
M01286832-P1
07/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
Sarah Drake
07/09/2026
Special inspection requirement — Final
Sarah Drake
07/09/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sarah Drake
06/18/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Obaid Mian
06/18/2026
Special inspection requirement — HVAC-R and service water heating system controls
Obaid Mian
06/18/2026
Special inspection requirement — HVAC-R and service water heating equipment
Obaid Mian
06/18/2026
Special inspection requirement — Maintenance information
Obaid Mian
06/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
Obaid Mian
06/18/2026
Special inspection requirement — Mechanical Systems
Obaid Mian
06/18/2026
Special inspection requirement — Final
Obaid Mian
06/11/2026
Permit issued — General Construction
M01287012-I1-GC
06/09/2026
Special inspection requirement — Final
ALLEN STRASEN
06/09/2026
Special inspection requirement — Lighting in dwelling units
ALLEN STRASEN
06/04/2026
Filed — Alteration
INTERIOR RENOVATION OF APT. 4E ON THE 4TH FLOOR.
M01287012-P1
06/02/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/02/2026
Special inspection requirement — Lighting in dwelling units
ALLEN STRASEN
06/02/2026
Special inspection requirement — Final
ALLEN STRASEN
05/26/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/18/2026
Signed off — Alteration
PROPOSED MERGING TWO DWELLING UNITS INTO ONE AS PER TPP NOTICE #3/97.INTERIOR RENOVATION OF KITCHEN/BAR AREA AND BATHROOM IN 11B UNIT.MINOR NON -BEARING WALL DEMOLITION.NEW FLOORING AND LIGHTING.
M01262080-I1
05/05/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
04/13/2026
Signed off — Alteration
MECHANICAL WORK FOR RENOVATIONS OF APT 9DE AS PER PLANS FILED HEREWITH.
M01019964-S2
03/27/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/26/2026
Signed off — Alteration
MECHANICAL WORK FOR RENOVATIONS OF APT 9DE AS PER PLANS FILED HEREWITH.
M01019964-S1
01/21/2026
Permit issued — Plumbing
M01286832-S1-PL
01/20/2026
Permit issued — Mechanical Systems
M01286832-S2-MS
01/20/2026
Permit issued — General Construction
M01286832-I1-GC
12/31/2025
Objection raised — Inspections
12/31/2025
Objection resolved — Addressed
12/31/2025
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
12/17/2025
Objection resolved — Addressed
12/12/2025
Objection resolved — Addressed
12/12/2025
Objection resolved — Addressed
12/12/2025
Objection resolved — Addressed
12/12/2025
Objection resolved — Addressed
12/12/2025
Objection resolved — Addressed
11/14/2025
Permit issued — General Construction
M01303211-I1-GC
11/12/2025
Objection raised — Scope
11/12/2025
Objection raised — Cost
11/12/2025
Objection raised — Scope
11/12/2025
Objection raised — Inspections
11/12/2025
Objection raised — Admin
11/12/2025
Objection raised — Zoning
11/10/2025
Objection raised — Scope
11/10/2025
Objection raised — Energy
Latest 60 of 220 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit Issued4IR Ideal08/19/2026
DOB NOWGeneral ConstructionPermit IssuedHoney Hammer06/11/2026
DOB NOWPlumbingPermit IssuedArcon Plumbing Solutions01/21/2026
DOB NOWMechanical SystemsPermit IssuedThink Construction01/20/2026
DOB NOWGeneral ConstructionPermit IssuedThink Construction01/20/2026
DOB NOWGeneral ConstructionPermit IssuedKing Rose of NY11/14/2025
DOB NOWGeneral ConstructionSigned-offRaka Painting10/03/2025
DOB NOWPlumbingSigned-offMacreddin Plumbing & Heating06/27/2025
DOB NOWMechanical SystemsSigned-offBednarz Construction06/17/2025
DOB NOWMechanical SystemsSigned-offStanley Ruth Co12/13/2024
DOB NOWGeneral ConstructionSigned-offHanjo Contractors06/21/2024
DOB NOWPlumbingSigned-offDelta-Sigma Mechanical06/21/2024
DOB NOWPlumbingSigned-offMacreddin Plumbing & Heating06/04/2024
DOB NOWGeneral ConstructionSigned-offBednarz Construction06/03/2024
DOB NOWGeneral ConstructionSigned-offLiebhaber Company07/18/2023
DOB NOWGeneral ConstructionSigned-offEgnatia Construction04/21/2022
DOB NOWGeneral ConstructionSigned-offBlue City Construction08/05/2021
DOB NOWMechanical SystemsSigned-offAir Depot Commercial Refrigeration06/24/2021
DOB NOWMechanical SystemsSigned-offAvalair Cooling05/18/2021
DOB NOWMechanical SystemsSigned-offGolden HVAC03/03/2021
DOB NOWMechanical SystemsSigned-offGolden HVAC09/14/2020
DOB NOWMechanical SystemsSigned-offGolden HVAC07/29/2020
DOB NOWMechanical SystemsSigned-offGolden HVAC02/10/2020
DOB NOWSidewalk ShedSigned-offAmsterdam Restoration08/02/2019
DOB NOWSupported ScaffoldSigned-offAmsterdam Restoration08/02/2019
BISOTISSUEDAmsterdam Restoration02/05/2021
BISPLISSUEDZone Plumbing & Heating12/01/2020
BISOTISSUEDBuild Now NYC10/20/2020
BISOTISSUEDAmsterdam Restoration06/04/2020
BISOTISSUEDAmsterdam Restoration09/18/2019
BISPLISSUEDZone Plumbing & Heating05/10/2019
BISOTISSUEDBuild Now NYC05/08/2019
BISOTISSUEDLiebhaber Company04/23/2019
BISMHISSUEDStanley Ruth Co09/28/2018
BISOTISSUEDEast Side Interiors05/23/2017
BISPLISSUEDSuperb Plumbing & Heating04/27/2017
BISOTISSUEDPH Custom Home Improvemen04/25/2017
BISMHISSUEDStanley Ruth Co12/23/2016
BISPLISSUEDP.S.I. Mechanical08/19/2016
BISMHISSUEDEast Side Interiors08/19/2016
+ 35 more permits on file
3 projects · most recent 10/20/2026
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
10/20/2026——Heating Systems
Heating
Mepco ×1
Taco ×1
08/07/2026Permit Issued4IR IdealAir Conditioning Systems
Cooling
Daikin FXZA07AAVJU 300 CFM · Vrf Indoor ×7
FXMA48AAVJU 1,377 CFM · Vrf Indoor ×1
RXYA96AATJA 96,000 BTU · Vrf Outdoor ×1
Mitsubishi Electric PLFY-EL24NEMU-A 812 CFM · Vrf Indoor ×2
MXZ-SM48NL 48,000 BTU · Condensing Unit ×1
07/15/2026Permit IssuedThink ConstructionAir Conditioning Systems
Cooling
Mitsubishi Electric PEFY-P12MNSU-ER2 12,000 BTU · Vrf Indoor ×4
MXZ-SM60NAM2-U1 60,000 BTU · Condensing Unit ×2
PUY-AK12NL 12,200 BTU · Condensing Unit ×2
PUY-AL12NL 12,000 BTU · Heat Pump Outdoor ×2
PVFY-P36NAMU-E1 36,000 BTU · Vrf Indoor ×2
1 project · most recent 07/15/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/15/2026Permit IssuedArcon Plumbing SolutionsGas, Water/Sanitary
25 projects · most recent 05/18/2026
General Wiring Lighting
FiledStatusContractorScope
05/18/2026Permit IssuedThe Metro Group ElectricGeneral Wiring
04/16/2026CompleteE & M Electrical NYGeneral Wiring
04/09/2026CompleteAujla Electric—
01/23/2026Permit IssuedFinesse ElectricGeneral Wiring
12/15/2025Permit IssuedEssex ElectricGeneral Wiring
10/14/2025CompleteSource ElectricGeneral Wiring, Lighting
08/23/2025Permit IssuedVma ElectricalGeneral Wiring
06/02/2025CompleteMarks ElectricGeneral Wiring
05/26/2025CompleteJumper ElectricGeneral Wiring
05/21/2025CompleteIP2 ElectricGeneral Wiring
05/01/2025CompleteThe Metro Group ElectricGeneral Wiring
02/06/2025CompleteThe Metro Group ElectricGeneral Wiring
11/07/2024CompleteThe Metro Group ElectricGeneral Wiring
04/10/2024CompleteThe Metro Group ElectricGeneral Wiring
03/14/2024CompleteAujla Electric—
2 projects · most recent 07/15/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
07/15/2026Permit IssuedArcon Plumbing SolutionsTenant Protection Plan 72 Hour
09/12/2025Signed-offRaka PaintingTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
08/12/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/02/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/26/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/05/2026Pass-Final General Construction Non-Directive 14PassView ↗
03/27/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/13/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
05/08/2025Fail-Final PL - Up to 9 Requested FloorsFailView ↗
11/07/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/06/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/01/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/13/2022Pass-Final General Construction Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 72
DateRequirementInspectorRole
10/20/2026Fire-Resistant Penetrations and JointsStephen Shishkospecial
09/28/2026Mechanical SystemsStephen Shishkospecial
09/28/2026FinalStephen Shishkoprogress
09/28/2026Tenant Protection Plan ComplianceStephen Shishkospecial
08/03/2026FinalLAWRENCE GREENprogress
08/03/2026Mechanical SystemsLAWRENCE GREENspecial
07/09/2026Fire-Resistant Penetrations and JointsSarah Drakespecial
07/09/2026Fire-Resistance Rated ConstructionSarah Drakeprogress
07/09/2026FinalSarah Drakeprogress
06/18/2026FinalObaid Mianprogress
06/18/2026Maintenance informationObaid Mianenergy_progress
06/18/2026Tenant Protection Plan ComplianceObaid Mianspecial
06/18/2026Mechanical SystemsObaid Mianspecial
06/18/2026HVAC-R and service water heating system controlsObaid Mianenergy_progress
06/18/2026HVAC-R and service water heating equipmentObaid Mianenergy_progress
06/18/2026HVAC-R and service water piping design and insulationObaid Mianenergy_progress
06/09/2026Lighting in dwelling unitsALLEN STRASENenergy_progress
06/09/2026FinalALLEN STRASENprogress
06/02/2026Lighting in dwelling unitsALLEN STRASENenergy_progress
06/02/2026FinalALLEN STRASENprogress
07/27/2025Lighting in dwelling unitsDario Pasquarielloenergy_progress
07/27/2025Fire-Resistant Penetrations and JointsDario Pasquariellospecial
05/29/2025Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
05/12/2025Fire-Resistant Penetrations and JointsPIETRO ROSATOspecial
06/05/2024Energy Code Compliance InspectionsVitaly Sonkinprogress
Latest 25 of 72.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Leonard OpticiansRetailCellar, Floor 1, Roof
Project M01419061 Alteration · Permit Entire · 08/07/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 706 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch23
09/03/2026M00534042-I1Request digital key ↗
08/28/2026M00945916-P1Request digital key ↗
08/28/2026M00945916-P2Request digital key ↗
Showing 3 of 23 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems4
09/05/2026M00231864-I1Request digital key ↗
09/04/2026M00473385-I1Request digital key ↗
08/15/2026M00219465-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Supported Scaffold2
09/05/2026M00194677-I1Request digital key ↗
08/15/2026M00194677-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/05/2026M00194677-I1Request digital key ↗
08/15/2026M00194677-P1Request digital key ↗
▸Applications & Permits124
▸BISPLAN / WORK APPROVAL APPLICATION54
05/01/2023103040549Open ↗
04/26/2023104114192Open ↗
04/17/2023104114192Open ↗
Showing 3 of 54 on file for this type
▸BISWORK PERMIT APPLICATION41
11/19/2019123869457Open ↗
09/18/2019123546074Open ↗
08/27/2019123690693Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWLPC Approval/Permit27
08/28/2026M00945916-P1Open ↗
08/28/2026M00945916-I1Open ↗
08/21/2026M01286832-P3Open ↗
Showing 3 of 27 on file for this type
▸BISPLACE OF ASSEMBLY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Seals & Professional Certifications178
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION63
03/27/2020123690693Open ↗
12/04/2019123836411Open ↗
09/18/2019123546074Open ↗
Showing 3 of 63 on file for this type
▸DOB NOWProgress Inspector Seal & Signature44
10/22/2026M01466702-I1Open ↗
09/23/2026M01286832-S2Open ↗
09/02/2026M01262080-I1Open ↗
Showing 3 of 44 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature29
09/05/2026M00194677-I1Open ↗
09/05/2026M00219465-I1Open ↗
09/03/2026M00548580-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
10/22/2026M01466702-I1Open ↗
10/22/2026M01466702-I1Open ↗
10/22/2026M01466702-I1Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment45
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE15
12/04/2019123836411Open ↗
12/03/2019123836411Open ↗
04/16/2019123869457Open ↗
Showing 3 of 15 on file for this type
▸BISSELF-CERT PLUMBING NOTICE14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSCHEDULE B - PLUMBING11
02/16/2021123836411Open ↗
Showing 1 of 11 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISEQUIPMENT USE PERMITS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection17
▸BISTenant Protection Plan and Notes10
12/04/2019123836411Open ↗
07/29/2019123690693Open ↗
07/16/2019123812204Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWTenant Protection Plan5
09/05/2026M00194677-I1Open ↗
08/15/2026M00219465-I1Open ↗
08/13/2026M00219465-P1Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
10/11/2017122742540Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos50
▸DOB NOWDEP ACP-5: Asbestos Assessment Report19
08/28/2026M00945916-I1Open ↗
08/28/2026M00945916-P1Open ↗
08/21/2026M01286832-P2Open ↗
Showing 3 of 19 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)14
04/16/2019123869457Open ↗
04/04/2019123836411Open ↗
09/14/2018123548973Open ↗
Showing 3 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form4
08/27/2026M01019964-S1Open ↗
08/27/2026M01019964-I1Open ↗
08/27/2026M01019964-S2Open ↗
Showing 3 of 4 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM2
07/13/2021123546074Open ↗
Showing 1 of 2 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
03/27/2020123690693Open ↗
09/14/2018123548973Open ↗
▸BISDEP FORM V5 - ASBESTOS VARIANCE2
09/18/2019123546074Open ↗
08/27/2019123690693Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance54
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS32
03/27/2020123690693Open ↗
12/04/2019123836411Open ↗
09/18/2019123546074Open ↗
Showing 3 of 32 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS15
01/07/2022123869457Open ↗
07/13/2021123546074Open ↗
03/31/2021123836411Open ↗
Showing 3 of 15 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
01/07/2022123869457Open ↗
07/13/2021123546074Open ↗
03/31/2021123836411Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026M00473385-I1Open ↗
08/13/2026M00534042-I1Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY11
05/08/2023104114192Open ↗
05/08/2023104114192Open ↗
05/08/2023104114192Open ↗
Showing 3 of 11 on file for this type
▸Approvals, Objections & Sign-offs71
▸BISLANDMARKS APPROVAL25
03/27/2020123690693Open ↗
02/27/2020123690693Open ↗
08/08/2019123690693Open ↗
Showing 3 of 25 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST21
05/08/2023104114192Open ↗
01/10/2022123869457Open ↗
07/13/2021123546074Open ↗
Showing 3 of 21 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
03/27/2020123690693Open ↗
08/27/2019123690693Open ↗
04/04/2019123548973Open ↗
Showing 3 of 5 on file for this type
▸BISLANDMARKS SIGNOFF4
05/08/2023104114192Open ↗
09/23/2021120017114Open ↗
03/31/2021123836411Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION1
07/16/2019123812204Open ↗
▸DOB NOWLandmark Approval1
08/13/2026M01019964-I1Open ↗
▸Cost, Insurance & Ownership47
▸BISCOST AFFIDAVIT45
01/07/2022123869457Open ↗
07/13/2021123546074Open ↗
03/31/2021123836411Open ↗
Showing 3 of 45 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
05/01/2023104114192Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms63
▸BISEFILING COVER SHEET26
07/29/2019123690693Open ↗
07/16/2019123812204Open ↗
04/16/2019123869457Open ↗
Showing 3 of 26 on file for this type
▸BISADDITIONAL INFORMATION25
05/03/2021123546074Open ↗
05/03/2021123546074Open ↗
03/01/2021123836411Open ↗
Showing 3 of 25 on file for this type
▸BISBOROUGH INTAKE FORM10
03/27/2020123690693Open ↗
12/04/2019123836411Open ↗
12/03/2019123836411Open ↗
Showing 3 of 10 on file for this type
▸BISHPD-3 - SRO MD ANTI-HARASSEMENT CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents15
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸DOB NOWProof of Historic Building4
08/21/2026M01286832-P1Open ↗
08/13/2026M01303211-I1Open ↗
08/13/2026M00850008-I1Open ↗
Showing 3 of 4 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSupporting Document: Fee Exempt1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWWaiver Document1
08/13/2026M00534042-I1Open ↗