Elevator cooperative
24 WEST 69 STREET
MANHATTAN · BIN 1028463
💬 Discuss this project
1922Year Built
9Stories
D4Building Class
R8BZoning
28,168 sfGross Floor Area
18Units
LL97 CoveredRent Stabilized7 Open Violations ▸FISP: SWARMP
Elevator cooperative · Owner of record: 22 24 WEST 69TH ST CORP · 4,218 sf lot · 6.68 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalEquipment
Bulkhead1p · 1 filing · 6 docs
Floor 65p · 1 filing · 4 docs
Floor 5
Floor 4
Floor 31p · 1 filing · 12 docs
Floor 21p · 1 filing · 3 docs
Floor 1
9 jobs · most recent 05/29/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
05/29/2026Permit IssuedINTELOGIC ELECTRIC, INC.HVAC Wiring
06/13/2025CompleteRICHARD NEU—
12/15/2022CompleteGEMINI ELECTRIC CO., INC.General Wiring
10/13/2022Permit IssuedGEMINI ELECTRIC CO., INC.General Wiring
11/11/2021CompleteASTER ELECTRIC, INCGeneral Wiring
11/16/2020CompleteVLASHAVA ELEC CONTR'G COR—
06/12/2020CompleteCMY ELECTRICAL CORPGeneral Wiring
09/17/2019CompleteCMY ELECTRICAL CORPGeneral Wiring
05/30/2018CompleteELPO ELECTRICAL CONTG INC—
1 job · most recent 06/10/2025
Sidewalk Shed
FiledStatusContractorScope
06/10/2025Signed-offEXO INDUSTRIES CORPSidewalk Shed
1 job · most recent 06/19/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
06/19/2025Signed-offEXO INDUSTRIES CORPSuspended Scaffold (SC)
Building Lifecycle
All (154)Filed (22)Permit Issued (23)Signed Off (13)Facade (FISP) (12)Violation (31)Inspection (9)Objection (20)Special Inspection (24)
08/07/2026
Filed — Alteration
EXTERIOR REPAIRS TO INCLUDE SILL AND LINTEL REPLACEMENT, BRICKWORK, SEALANT AND STUCCO REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01174039-P1
08/06/2026
Special inspection requirement — Masonry
Douglas Lane
08/06/2026
Special inspection requirement — Air barrier - visual inspection
Douglas Lane
08/06/2026
Special inspection requirement — Final
Douglas Lane
08/06/2026
Special inspection requirement — Energy Code Compliance Inspections
Douglas Lane
08/06/2026
Special inspection requirement — Tenant Protection Plan Compliance
Douglas Lane
08/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Douglas Lane
07/28/2026
Signed off — Alteration
Installation of suspended scaffold for facade work or inspection
M01242526-I1
06/08/2026
Permit issued — Sidewalk Shed
M01230953-I1-SH
06/01/2026
Permit issued — General Construction
M01174039-I1-GC
03/16/2026
Permit issued — Sidewalk Shed
M01230953-I1-SH
07/31/2025
Permit issued — Suspended Scaffold
M01242526-I1-SC
07/11/2025
Objection resolved — Addressed
07/10/2025
Objection raised — Other
06/19/2025
Filed — Alteration
Installation of suspended scaffold for facade work or inspection
M01242526-I1
06/17/2025
Special inspection requirement — Post-installed Anchors
MOHAMMAD AHEAD
06/17/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
MOHAMMAD AHEAD
06/11/2025
Permit issued — Sidewalk Shed
M01230953-I1-SH
06/10/2025
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01230953-I1
03/12/2025
Objection resolved — Addressed
02/05/2025
Objection raised — Structural
02/03/2025
Filed — Alteration
EXTERIOR REPAIRS TO INCLUDE SILL AND LINTEL REPLACEMENT, BRICKWORK, SEALANT AND STUCCO REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY
M01174039-I1
02/03/2025
Special inspection requirement — Energy Code Compliance Inspections
Douglas Lane
02/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Douglas Lane
02/03/2025
Special inspection requirement — Masonry
Douglas Lane
02/03/2025
Special inspection requirement — Air barrier - visual inspection
Douglas Lane
01/30/2025
Special inspection requirement — Final
Douglas Lane
01/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
Douglas Lane
11/21/2023
Signed off — Alteration
Interior renovation of Apt. 2A and installation of HVAC equipment on secondary facade as per plans. No change in egress, occupancy or bulk.
M00850217-I1
11/21/2023
Signed off — Alteration
M00779289-I1
09/12/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/08/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/18/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/18/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/16/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/05/2023
Permit issued — General Construction
M00850217-I1-GC
03/31/2023
Filed — Alteration
Interior renovation of Apt. 2A and installation of HVAC equipment on secondary facade as per plans. No change in egress, occupancy or bulk.
M00850217-I1
02/01/2023
Cycle 9 facade report submitted
01/30/2023
Cycle 9 facade report signed — SWARMP
01/12/2023
Permit issued — General Construction
M00779289-I1-GC
12/13/2022
Cycle 9 facade inspection completed
12/02/2022
Permit issued — Plumbing
M00765197-I1-PL
09/26/2022
Permit issued — Mechanical Systems
M00765245-I1-GC
09/13/2022
Filed — Alteration
M00765245-I1
09/13/2022
Filed — Alteration
M00765197-I1
09/01/2022
Permit issued — General Construction
M00779289-I1-GC
08/24/2022
Filed — Alteration
M00779289-I1
07/28/2022
Signed off — Alteration
Installation of split system on the roof to serve indoor wall-mounted air handling units for duplex apartment 9B.
M00264247-I1
07/28/2022
Signed off — Alteration
Relocating 1 lav, 1 wc and replacing tub with shower at 8th floor bathroom. Relocating 1 sink, 1 dw and 1 gas range at 9th floor kitchen.
M00504200-I1
07/12/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/23/2022
Permit issued — Plumbing
M00504200-I1-PL
11/18/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/15/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/12/2021
Signed off — Alteration
Application filed for 1 exterior compressor @ back yard to obtain a certificate of compliance which was not indicated under recent application filed under M00396820. No work under this application.
M00549969-I1
10/07/2021
Permit issued — Mechanical Systems
M00549969-I1-MS
07/12/2021
Filed — Alteration
Application filed for 1 exterior compressor @ back yard to obtain a certificate of compliance which was not indicated under recent application filed under M00396820. No work under this application.
M00549969-I1
06/30/2021
Special inspection requirement — Final
STEFANIE WERNER
06/30/2021
Special inspection requirement — Mechanical Systems
STEFANIE WERNER
06/09/2021
Signed off — Alteration
2 ductless indoor AC units and 1 exterior compressor outside backyard
M00396820-I1
06/04/2021
Signed off — Alteration
REPLACE FUEL OIL TANK.
M00426492-I1
Latest 60 of 154 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EXO INDUSTRIES607/08/2026
22-24 WEST 69TH STREET2207/08/2026
PHOENIX SUTTON STR INC703/22/2026
CANIDO BASONAS CONSTRUCTION503/22/2026
PUMA CONSTRUCTION103/22/2026
ADVANCED MANAGEMENT SE203/22/2026
GEISHMAN103/22/2026
22-24 W 69 ST603/21/2026
C O ADVANCED MGMT SERVICES203/21/2026
R A COHEN ASSOC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JC CONSULTING & MANAGEMENTGeneral Contractor903/21/2026
L.A.G CPONSTRUCTION INCGeneral Contractor603/21/2026
PHOENIX SUTTON STR INCGeneral Contractor403/21/2026
EXO INDUSTRIES CORPGeneral Contractor407/08/2026
CANIDO BASONAS CONSTRUCTIGeneral Contractor303/21/2026
NICE PLUMBING CORPPlumbing207/08/2026
DI MARTINI INCGeneral Contractor203/21/2026
A101 CONSTRUCTION+DESIGNGeneral Contractor107/08/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing107/08/2026
NY CITY PLUMBER CORPPlumbing107/08/2026
ORBIT PLBG & HTG INCPlumbing107/08/2026
BURKE, OWENElectrical103/21/2026
PREMIER FLOW PLBG AND HTGPlumbing107/08/2026
GEMINI ELECTRIC CO., INC.Electrical103/22/2026
INOA, VICTORElectrical103/21/2026
JEONG YUNGElectrical103/21/2026
JEROME KRITZElectrical103/21/2026
REYES ENTERPRISE, INCElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
LANE ENGINEERING CONSULTI2967208/07/2026
MOHAMMAD AHEAD - PROFESSI9286106/19/2025
S&S CONCRETE & SOIL TESTI1008203/31/2023
NIKOLAI KATZ ARCHITECT3482209/13/2022
DESIGN AND SOLTUIONS STUD7953107/12/2021
PIRO STUDIO LLC7503204/26/2021
NEW YORK ENGINEERING ASSO851112/04/2020
LEO Y LEE ASSOCIATES2481109/29/2020
RYBAK ARCHITECTS, P.C.4044109/04/2019
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offEXO INDUSTRIES CORP06/08/2026
DOB NOWGeneral ConstructionSigned-offEXO INDUSTRIES CORP06/01/2026
DOB NOWSidewalk ShedSigned-offEXO INDUSTRIES CORP03/16/2026
DOB NOWSuspended ScaffoldSigned-offEXO INDUSTRIES CORP07/31/2025
DOB NOWSidewalk ShedSigned-offEXO INDUSTRIES CORP06/11/2025
DOB NOWGeneral ConstructionSigned-offJC CONSULTING & MANAGEME*04/05/2023
DOB NOWGeneral ConstructionSigned-offJC CONSULTING & MANAGEME*01/12/2023
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT12/02/2022
DOB NOWMechanical SystemsPermit IssuedDI MARTINI09/26/2022
DOB NOWGeneral ConstructionSigned-offJC CONSULTING & MANAGEME*09/01/2022
DOB NOWPlumbingSigned-offORBIT PLBG & HTG INC06/23/2022
DOB NOWMechanical SystemsSigned-offL.A.G CPONSTRUCTION INC10/07/2021
DOB NOWMechanical SystemsSigned-offA101 CONSTRUCTION+DESIGN05/14/2021
DOB NOWPlumbingSigned-offGALICJA PLBG AND HTG.CORP05/04/2021
DOB NOWBoiler EquipmentSigned-offDOUGLAS SIMMONS12/09/2020
DOB NOWMechanical SystemsSigned-offL.A.G CPONSTRUCTION INC12/07/2020
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP11/13/2020
DOB NOWPlumbingSigned-offNY CITY PLUMBER CORP09/30/2020
DOB NOWPlumbingSigned-offNICE PLUMBING CORP03/17/2020
DOB NOWPlumbingSigned-offNICE PLUMBING CORP09/12/2019
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC10/29/2018
DOB NOWSupported ScaffoldPermit IssuedCANIDO BASONAS CONSTRUCTI06/26/2018
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC06/06/2018
BISOTISSUEDA101 CONSTRUCTION+DESIGN03/24/2021
BISOTISSUEDL.A.G CPONSTRUCTION INC11/30/2020
BISOTISSUEDJ. CHRISTOPHER INTERIORS10/30/2020
BISOTISSUEDJ. CHRISTOPHER INTERIORS09/29/2020
BISOTISSUEDPUMA CONSTRUCTION CORP06/15/2020
BISOTISSUEDPUMA CONSTRUCTION CORP03/02/2020
BISOTISSUEDPUMA CONSTRUCTION CORP02/13/2020
BISOTISSUEDCANIDO BASONAS CONST SVC07/30/2018
BISOTISSUEDPUMA CONSTRUCTION CORP02/15/2017
BISOTISSUEDPUMA CONSTRUCTION CORP02/15/2017
BISPLRE-ISSUEDGREGG NY PLUMBING, INC09/28/2016
BISOTISSUEDPUMA CONSTRUCTION CORP09/01/2016
BISOTISSUEDPUMA CONSTRUCTION CORP09/01/2016
BISOTISSUEDCANIDO BASONAS CONSTRUCTI06/29/2015
BISOTISSUEDCONSTRUCTION BY REGALIS I02/27/2015
BISPLISSUEDSKINNER PLUMBING & HEATING01/15/2015
BISOTISSUEDM.C. GEROSA, LLC01/13/2015
+ 14 more permits on file
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
09/12/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/08/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/18/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/16/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/18/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/15/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/20/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 24
DateRequirementInspectorRole
08/06/2026MasonryDouglas Lanespecial
08/06/2026Air barrier - visual inspectionDouglas Laneenergy_progress
08/06/2026FinalDouglas Laneprogress
08/06/2026Energy Code Compliance InspectionsDouglas Laneprogress
08/06/2026Tenant Protection Plan ComplianceDouglas Lanespecial
08/06/2026Structural Stability – Alterations of existing buildingsDouglas Lanespecial
06/17/2025Post-installed AnchorsMOHAMMAD AHEADspecial
06/17/2025Alternative Materials - OTCR Buildings Bulletin NumberMOHAMMAD AHEADspecial
02/03/2025Energy Code Compliance InspectionsDouglas Laneprogress
02/03/2025Structural Stability – Alterations of existing buildingsDouglas Lanespecial
02/03/2025MasonryDouglas Lanespecial
02/03/2025Air barrier - visual inspectionDouglas Laneenergy_progress
01/30/2025FinalDouglas Laneprogress
01/30/2025Tenant Protection Plan ComplianceDouglas Lanespecial
06/30/2021FinalSTEFANIE WERNERprogress
06/30/2021Mechanical SystemsSTEFANIE WERNERspecial
11/10/2020Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
09/25/2020Maintenance informationSTEFANIE WERNERenergy_progress
09/25/2020HVAC and service water heating system controls STEFANIE WERNERenergy_progress
09/25/2020HVAC and service water heating equipment STEFANIE WERNERenergy_progress
09/25/2020HVAC insulation and sealing STEFANIE WERNERenergy_progress
09/09/2020Mechanical SystemsLeo Leespecial
09/09/2020FinalSTEFANIE WERNERprogress
07/18/2019Fire-Resistant Penetrations and JointsYevgeniy Rybakspecial
▾Documents — 420 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch12
09/06/2026M00049758-I1Request digital key ↗
09/06/2026M00056498-I1Request digital key ↗
09/03/2026M00504200-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Plumbing7
09/05/2026M00194068-I1Request digital key ↗
09/05/2026M00195881-I1Request digital key ↗
09/04/2026M00243649-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/15/2026M00396820-I1Request digital key ↗
08/15/2026M00264247-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Boiler Equipment1
09/04/2026M00426492-I1Request digital key ↗
▸Applications & Permits66
▸BISPLAN / WORK APPROVAL APPLICATION24
06/27/2022140933881Open ↗
12/02/2020140933881Open ↗
11/10/2020140933881Open ↗
Showing 3 of 24 on file for this type
▸BISWORK PERMIT APPLICATION22
03/24/2021140933881Open ↗
09/30/2020123799844Open ↗
06/15/2020140883792Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWLPC Approval/Permit17
09/05/2026M00194068-I1Open ↗
09/05/2026M00195881-I1Open ↗
09/04/2026M00243649-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWState DEC Permit2
09/05/2026M00194068-I1Open ↗
08/13/2026M00194068-P1Open ↗
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications81
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
03/05/2020123772649Open ↗
03/05/2020123772649Open ↗
11/07/2019123772649Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/06/2026M00049758-I1Open ↗
09/06/2026M00056498-I1Open ↗
09/05/2026M00194068-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/25/2026M00549969-I1Open ↗
09/01/2026M00396820-I1Open ↗
09/01/2026M00396820-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/25/2026M00549969-I1Open ↗
09/23/2026M00426492-I1Open ↗
09/01/2026M00396820-I1Open ↗
Showing 3 of 12 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
10/05/2020140933881Open ↗
09/25/2020140954242Open ↗
01/22/2020140883792Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
09/25/2020140954242Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment12
▸BISSELF-CERT PLUMBING NOTICE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
05/20/2016122736307Open ↗
Showing 1 of 4 on file for this type
▸BISSCHEDULE B - PLUMBING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection20
▸DOB NOWTenant Protection Plan10
09/05/2026M00194068-I1Open ↗
09/05/2026M00195881-I1Open ↗
09/04/2026M00243649-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTenant Protection Plan and Notes8
10/05/2020140933881Open ↗
11/07/2019123772649Open ↗
08/08/2019122792781Open ↗
Showing 3 of 8 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
03/19/2021140933881Open ↗
04/27/2018123354164Open ↗
▸Environmental & Asbestos34
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
09/05/2026M00194068-I1Open ↗
09/05/2026M00195881-I1Open ↗
09/04/2026M00243649-I1Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)13
09/25/2020140954242Open ↗
02/21/2020140883792Open ↗
02/04/2020140883792Open ↗
Showing 3 of 13 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
11/25/2020140933881Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance47
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS17
11/07/2019123772649Open ↗
09/10/2019122792781Open ↗
08/29/2019123799844Open ↗
Showing 3 of 17 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS11
12/09/2022140933881Open ↗
12/08/2022140933881Open ↗
06/09/2021123799844Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
06/09/2021123799844Open ↗
12/23/2020123772649Open ↗
10/05/2020140933881Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)3
07/20/2021140954242Open ↗
02/22/2021140883792Open ↗
08/26/2020122792781Open ↗
▸BISLIGHTING IN DWELLING UNITS2
10/04/2022140933881Open ↗
06/29/2021140954242Open ↗
▸BISTECHNICAL REPORT: ENERGY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
09/25/2020140954242Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
10/04/2022140933881Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
10/04/2022140933881Open ↗
▸BISFENESTRATION AIR LEAKAGE1
10/04/2022140933881Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00264247-I1Open ↗
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY12
12/09/2022140933881Open ↗
12/08/2022140933881Open ↗
06/29/2021140954242Open ↗
Showing 3 of 12 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
10/04/2022140933881Open ↗
06/29/2021140954242Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
10/04/2022140933881Open ↗
▸Approvals, Objections & Sign-offs50
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST18
12/09/2022140933881Open ↗
07/20/2021140954242Open ↗
06/09/2021123799844Open ↗
Showing 3 of 18 on file for this type
▸BISLANDMARKS APPROVAL16
12/09/2022140933881Open ↗
10/30/2020140954242Open ↗
10/23/2020140933881Open ↗
Showing 3 of 16 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
11/05/2022140933881Open ↗
03/24/2021140933881Open ↗
03/24/2021140933881Open ↗
Showing 3 of 8 on file for this type
▸BISLANDMARKS SIGNOFF5
10/06/2022140933881Open ↗
06/29/2021140954242Open ↗
06/09/2021123799844Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL1
06/29/2021140954242Open ↗
▸Cost, Insurance & Ownership30
▸BISCOST AFFIDAVIT27
12/09/2022140933881Open ↗
12/08/2022140933881Open ↗
06/09/2021123799844Open ↗
Showing 3 of 27 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
07/20/2021140954242Open ↗
08/26/2020122792781Open ↗
▸BISHIC LICENSE OR AFFIDAVIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms33
▸BISADDITIONAL INFORMATION15
11/05/2022140933881Open ↗
11/05/2022140933881Open ↗
08/04/2022140933881Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING COVER SHEET11
11/07/2019123772649Open ↗
08/08/2019122792781Open ↗
07/16/2019123799844Open ↗
Showing 3 of 11 on file for this type
▸BISBOROUGH INTAKE FORM4
02/11/2019123354164Open ↗
02/11/2019123354164Open ↗
02/04/2019123354164Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
10/05/2020140933881Open ↗
09/25/2020140954242Open ↗
01/22/2020140883792Open ↗
▸Other Documents10
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
09/10/2019122792781Open ↗
Showing 1 of 3 on file for this type
▸BISDepartment of Consumer Affairs (DCA) Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDHCR Document2
09/05/2026M00195881-I1Open ↗
08/13/2026M00779289-I1Open ↗
▸DOB NOWBSA Meeting Minutes/BSA Resolution1
09/06/2026M00049758-I1Open ↗
▸DOB NOWCalculations1
08/13/2026M01242526-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01242526-I1Open ↗