← Back
BuildNYC
Elevator apt, semi-fireproof with stores
Union Channel
240 3RD AVENUE · BIN 3429819
💬 Discuss this project
2023Year Built
9Stories
D7Building Class
M1-4/R7AZoning
246,316 sfGross Floor Area
216Units
LL97 CoveredRent Stabilized0 Active ViolationsFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: Gowanus Union Street · 33,550 sf lot · 7.34 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsTavros Holdings3 filings
RoofRoof protection installation1p · 1 filing
Floor 5Needle beam installation1p · 1 filing
Floor 4Needle beam installation1p · 1 filing
Floor 3Needle beam installation1p · 1 filing
Floor 2
Floor 1Wilner Laroche Common Circuit Cafe, Veterinary Wellness CentUnder Construction5p · 4 filings · 20 docs
Site & exteriorCharney Construction & Development7 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SBC Realty Group in403/21/2026
Gowanus Union Street303/22/2026
Tavros303/21/2026
Mepa Realty203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/17/2019$32.7M—SBC REALTY GROUP, INC → GOWANUS UNION STREET LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
William Vitacco Associates4203/21/2026
AE Design Solution3003/21/2026
Expedite Dem203/21/2026
DVA Advisors103/21/2026
Professional Design Consultants403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Core Scaffold SystemsScaffold2807/08/2026
Broadway Construction GroupGeneral Contractor2207/08/2026
Broadway Construction GroupScaffold507/08/2026
Safety Fire SprinklerFire Protection407/08/2026
Prime Piping & HeatingPlumbing307/08/2026
Christopher FogartyElectrical103/21/2026
Superior Fire ControlGeneral Contractor110/09/2026
Xolle DemoScaffold107/08/2026
Philip Habib AssociatesGeneral Contractor103/22/2026
Lens ElectricElectrical103/21/2026
M.R. Electrical ServiceElectrical103/22/2026
Est RemodelingGeneral Contractor104/09/2026
Mercury Building AssociatesGeneral Contractor110/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bitopi Consultants7036105/26/2026
Wei Studio7998204/29/2026
The Vilnits Group1223204/07/2026
Big Apple Group NY A Rma91681906/25/2025
Geotechnical Engineering734610/31/2024
Advanced Engineering &1224210/15/2024
Leo Y Lee Associates2481107/17/2023
Building Lifecycle
All (247)Filed (45)Permit Issued (45)Signed Off (21)Violation (6)Inspection (17)Objection (80)Special Inspection (30)Tax Incentive (3)
10/08/2026
Permit issued — Mechanical Systems
B01377465-I1-MS
10/01/2026
Permit issued — General Construction
B01373219-I1-GC
06/15/2026
421-a(16) construction completed
05/26/2026
Filed — Alteration
Filing to install first floor Cafe store kitchen hood, make up air and ductwork as per plans. No change in use, egress or occupancy.
B01377465-I1
05/08/2026
Permit issued — Plumbing
B01373219-S1-PL
04/29/2026
Filed — Alteration
1ST FLOOR INTERIOR RENOVATION. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01373219-I1
04/29/2026
Filed — Alteration
1ST FLOOR INTERIOR RENOVATION. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01373219-S1
04/28/2026
Signed off — Alteration
PARTITION WORK AT GROUND FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. PRIOR DESIGNATION OF UG 6 TO REMAIN, ALTERATION-CO NOT REQUIRED PER BB 2025-002 AND AC 28-118.3 EXCEPTION.
B01306303-I1
04/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ILYA VILNITS
04/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
ILYA VILNITS
04/16/2026
Special inspection requirement — Energy Code Compliance Inspections
ILYA VILNITS
04/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
ILYA VILNITS
04/16/2026
Special inspection requirement — Final
ILYA VILNITS
04/16/2026
Special inspection requirement — Interior lighting power
ILYA VILNITS
04/14/2026
Signed off — New Building
Application to be assigned to HUB per Consultation meeting with SPV on 9/28/2021, 25% inclusionary housing. Application filed in order to erect 9 story mixed use new building.
B00621076-I1
04/07/2026
Filed — Alteration
PARTITION WORK AT GROUND FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. PRIOR DESIGNATION OF UG 6 TO REMAIN, ALTERATION-CO NOT REQUIRED PER BB 2025-002 AND AC 28-118.3 EXCEPTION.
B01306303-P1
04/07/2026
Special inspection requirement — Final
ILYA VILNITS
04/07/2026
Special inspection requirement — Interior lighting power
ILYA VILNITS
04/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ILYA VILNITS
04/07/2026
Special inspection requirement — Fire-Resistance Rated Construction
ILYA VILNITS
04/07/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/07/2026
Special inspection requirement — Energy Code Compliance Inspections
ILYA VILNITS
03/25/2026
Special inspection requirement — Tenant Protection Plan Compliance
KAMRUL AHSAN
03/24/2026
Special inspection requirement — Mechanical Systems
KAMRUL AHSAN
03/24/2026
Special inspection requirement — Final
KAMRUL AHSAN
03/17/2026
Special inspection requirement — Final
Ruoyu Wei
03/17/2026
Special inspection requirement — Energy Code Compliance Inspections
Ruoyu Wei
03/17/2026
Special inspection requirement — Tenant Protection Plan Compliance
Ruoyu Wei
03/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Ruoyu Wei
03/17/2026
Special inspection requirement — Fire-Resistance Rated Construction
Ruoyu Wei
11/25/2025
Permit issued — General Construction
B01306303-I1-GC
11/11/2025
Objection resolved — Addressed
11/11/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
11/10/2025
Objection resolved — Addressed
10/29/2025
Objection resolved — Addressed
10/28/2025
Objection raised — Fire_Protection
10/28/2025
Objection raised — Scope
10/28/2025
Objection raised — Zoning
10/28/2025
Objection raised — Fire_Protection
10/28/2025
Objection raised — Cost
10/22/2025
Filed — Alteration
PARTITION WORK AT GROUND FLOOR COMMERCIAL SPACE. NO CHANGE TO USE, EGRESS OR OCCUPANCY. PRIOR DESIGNATION OF UG 6 TO REMAIN, ALTERATION-CO NOT REQUIRED PER BB 2025-002 AND AC 28-118.3 EXCEPTION.
B01306303-I1
08/18/2025
Signed off — New Building
Application to be assigned to HUB per Consultation meeting with SPV on 9/28/2021, 25% inclusionary housing. Application filed in order to erect 9 story mixed use new building.
B00621076-S4
08/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
Waldir Alvarez
08/06/2025
Special inspection requirement — Maintenance information
Waldir Alvarez
08/06/2025
Special inspection requirement — Metering
Waldir Alvarez
08/06/2025
Special inspection requirement — Final
Soorjbally Harilall
08/06/2025
Special inspection requirement — Electrical motors and elevators
Waldir Alvarez
08/06/2025
Special inspection requirement — Duct leakage testing, insulation and design
Waldir Alvarez
08/06/2025
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
08/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
Waldir Alvarez
08/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Waldir Alvarez
08/06/2025
Special inspection requirement — Shutoff dampers
Waldir Alvarez
07/16/2025
Objection resolved — Addressed
07/15/2025
Objection raised — Other
06/25/2025
Filed — New Building
Application to be assigned to HUB per Consultation meeting with SPV on 9/28/2021, 25% inclusionary housing. Application filed in order to erect 9 story mixed use new building.
B00621076-A6
06/16/2025
Violation issued (HPD, closed)
A
06/10/2025
Signed off — Alteration
FLOOR NUMBERS UPDATED, 1ST FLOOR IS NOW 2ND FLOOR AND 7TH IS NOW 10TH FLOOR
B01114326-I1
05/22/2025
Signed off — New Building
Application to be assigned to HUB per Consultation meeting with SPV on 9/28/2021, 25% inclusionary housing. Application filed in order to erect 9 story mixed use new building.
B00621076-S2
05/16/2025
Permit issued — Suspended Scaffold
B01114326-I1-SC
Latest 60 of 247 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedSuperior Fire Control10/08/2026
DOB NOWGeneral ConstructionPermit IssuedMercury Building Associates10/01/2026
DOB NOWPlumbingPermit IssuedPrime Piping & Heating05/08/2026
DOB NOWGeneral ConstructionSigned-offEst Remodeling11/25/2025
DOB NOWSuspended ScaffoldSigned-offBig Apple Renovation & RE05/16/2025
DOB NOWCurb CutSigned-offBroadway Construction Group01/07/2025
DOB NOWConstruction FenceSigned-offBroadway Construction Group12/24/2024
DOB NOWGeneral ConstructionPermit IssuedBroadway Construction Group12/23/2024
DOB NOWSuspended ScaffoldPermit IssuedBig Apple Renovation & RE10/25/2024
DOB NOWSuspended ScaffoldSigned-offBig Apple Renovation & RE09/30/2024
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems07/24/2024
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems07/24/2024
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems07/12/2024
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems06/28/2024
DOB NOWStandpipeSigned-offSafety Fire Sprinkler05/23/2024
DOB NOWSprinklersSigned-offSafety Fire Sprinkler02/21/2024
DOB NOWStandpipeSigned-offSafety Fire Sprinkler02/21/2024
DOB NOWPlumbingSigned-offPrime Piping & Heating02/14/2024
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems01/30/2024
DOB NOWStructuralSigned-offBroadway Construction Group01/26/2024
DOB NOWGeneral ConstructionPermit IssuedBroadway Construction Group12/29/2023
DOB NOWMechanical SystemsSigned-offBroadway Construction Group12/26/2023
DOB NOWFoundationSigned-offBroadway Construction Group12/22/2023
DOB NOWFoundationSigned-offBroadway Construction Group12/22/2023
DOB NOWFoundationSigned-offBroadway Construction Group12/22/2023
DOB NOWSupport of ExcavationSigned-offBroadway Construction Group12/22/2023
DOB NOWConstruction FenceSigned-offBroadway Construction Group12/22/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems08/04/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems08/01/2023
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems07/27/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems07/17/2023
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems07/07/2023
DOB NOWStructuralSigned-offBroadway Construction Group03/29/2023
DOB NOWGeneral ConstructionPermit IssuedBroadway Construction Group03/21/2023
DOB NOWFoundationSigned-offBroadway Construction Group03/11/2023
DOB NOWStandpipeSigned-offSafety Fire Sprinkler03/10/2023
DOB NOWPlumbingSigned-offPrime Piping & Heating02/14/2023
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems02/04/2023
DOB NOWConstruction FenceSigned-offBroadway Construction Group01/10/2023
DOB NOWSupport of ExcavationSigned-offBroadway Construction Group01/10/2023
+ 7 more permits on file
2 projects · most recent 05/26/2026
Ventilation Systems Air Conditioning Systems Associated Ducts and Piping
FiledStatusContractorScopeMake / Model / Capacity
05/26/2026Permit IssuedSuperior Fire ControlVentilation Systems
Ventilation
Canarm 210 4,600 CFM · Kitchen Exhaust ×1
06/25/2025Signed-offBroadway Construction GroupAir Conditioning Systems, Associated Ducts and Piping, Ventilation Systems
Cooling
Mitsubishi Electric PUHY-EP168YNU-A Y Series, PUHY-EP168YNU-A Y Series, PUHY-EP168YNU-A Y Series 168,000 BTU · Vrf Outdoor ×24
PUHY-EP120YNU-A Y Series, PUHY-EP120YNU-A Y Series, PUHY-EP120YNU-A Y Series 168,000 BTU · Vrf Outdoor ×18
PUHY-EP144YNU-A Y Series, PUHY-EP144YNU-A Y Series, PUHY-EP144YNU-A Y Series 144,000 BTU · Vrf Outdoor ×12
PKA-A12LA.TH, PKA-A12LA.TH, PKA-A12LA.TH 12,000 BTU · Vrf Indoor ×6
PUHY-EP72YNU-A Y Series 72,000 BTU · Vrf Outdoor ×6
PUHY-EP96YNU-A Y Series, PUHY-EP96YNU-A Y Series, PUHY-EP96YNU-A Y Series 96,000 BTU · Vrf Outdoor ×6
PUZ-A12NKA7 P Series, PUZ-A12NKA7 P Series, PUZ-A12NKA7 P Series 12,000 BTU · Vrf Outdoor ×6
PUZ-HA36NKA P Series, PUZ-HA36NKA P Series, PUZ-HA36NKA P Series 36,000 BTU · Condensing Unit ×6
PEAD-A36AA7 36,000 BTU · Vrf Indoor ×4
PEFY-P48NMAU-E4, PEFY-P48NMAU-E4 48,000 BTU · Vrf Indoor ×4
PUHY-EP144YNU-A Y Series, PUHY-EP144YNU-A Y Series 144,000 BTU · Vrf Outdoor ×4
PVFY-P12NAMU-E1 12,000 BTU · Vrf Indoor ×4
Ventilation
Captiveaire RARTU1-E.304-13-5T-ERV 1,200 CFM · Erv ×2
RARTU3-E 604-18-12.5T-ERV 2,350 CFM · Erv ×2
Aldes H650-Fi-EC-N 350 CFM · Erv ×2
Ducts & Piping
N/A n/a Ductwork ×2
1 project · most recent 06/25/2025
Sprinkler System
FiledStatusContractorScope
06/25/2025Signed-offSafety Fire SprinklerSprinkler System
2 projects · most recent 04/29/2026
Water/Sanitary Storm
FiledStatusContractorScope
04/29/2026Permit IssuedAmb MechanicalWater/Sanitary
06/25/2025Signed-offAmb MechanicalStorm, Water/Sanitary
14 projects · most recent 08/02/2026
General Wiring
FiledStatusContractorScope
08/02/2026Permit IssuedGT Electrical CompanyGeneral Wiring
11/25/2025CompleteLens ElectricGeneral Wiring
05/07/2025CompleteH. & L. ElectricGeneral Wiring
10/20/2023CompleteM.R. Electrical ServiceGeneral Wiring
09/06/2023CompleteM.R. Electrical Service1 meters, 1 new_meters
07/26/2023CompleteSolas Electrical—
07/19/2023CompleteSolas Electrical—
11/03/2022CompleteTuxedo Electrical Contracting—
08/03/2022CompleteSolas Electrical—
03/16/2022CancelledNova Electric—
02/09/2022CompleteV. Vass Electric—
02/01/2022CompleteV. Vass Electric—
08/19/2020CompleteAntonio Ceriello Electric—
08/18/2020CompleteAntonio Ceriello Electric—
1 project · most recent 06/25/2025
Steel Concrete Masonry
FiledStatusContractorScope
06/25/2025Signed-offBroadway Construction GroupSteel, Concrete, Masonry
1 project · most recent 04/07/2026
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
04/07/2026Signed-offEst RemodelingTenant Protection Plan 72 Hour
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
05/13/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/30/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
01/15/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/19/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/17/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
12/17/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/17/2024Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
12/17/2024Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
12/12/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
12/10/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
09/08/2023Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
09/08/2023Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
06/26/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/08/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/08/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/08/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/03/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 147
DateRequirementInspectorRole
04/16/2026Interior lighting powerILYA VILNITSenergy_progress
04/16/2026Tenant Protection Plan ComplianceILYA VILNITSspecial
04/16/2026Fire-Resistant Penetrations and JointsILYA VILNITSspecial
04/16/2026Energy Code Compliance InspectionsILYA VILNITSprogress
04/16/2026Fire-Resistance Rated ConstructionILYA VILNITSprogress
04/16/2026FinalILYA VILNITSprogress
04/07/2026Fire-Resistance Rated ConstructionILYA VILNITSprogress
04/07/2026Energy Code Compliance InspectionsILYA VILNITSprogress
04/07/2026FinalILYA VILNITSprogress
04/07/2026Interior lighting powerILYA VILNITSenergy_progress
04/07/2026Fire-Resistant Penetrations and JointsILYA VILNITSspecial
04/07/2026Tenant Protection Plan Compliance—special
03/25/2026Tenant Protection Plan ComplianceKAMRUL AHSANspecial
03/24/2026Mechanical SystemsKAMRUL AHSANspecial
03/24/2026FinalKAMRUL AHSANprogress
03/17/2026FinalRuoyu Weiprogress
03/17/2026Fire-Resistant Penetrations and JointsRuoyu Weispecial
03/17/2026Tenant Protection Plan ComplianceRuoyu Weispecial
03/17/2026Fire-Resistance Rated ConstructionRuoyu Weiprogress
03/17/2026Energy Code Compliance InspectionsRuoyu Weiprogress
08/06/2025Duct leakage testing, insulation and designWaldir Alvarezenergy_progress
08/06/2025Mechanical SystemsSOORJBALLY HARILALLspecial
08/06/2025HVAC-R and service water heating system controlsWaldir Alvarezenergy_progress
08/06/2025HVAC-R and service water piping design and insulationWaldir Alvarezenergy_progress
08/06/2025Shutoff dampersWaldir Alvarezenergy_progress
Latest 25 of 147.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Wilner Laroche Common Circuit CafeRestaurant / Food ServiceFloor 1
Project B01373219 Alteration · Permit Entire · 04/29/2026
Veterinary Wellness Center of Boerum HillMedical / HealthcareFloor 1
Project B01306303 Alteration · LOC Issued · 10/22/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 347 on file (BIS + DOB NOW)
▸Plans & Drawings45
▸DOB NOWPlans/Sketch45
08/31/2026B00648850-I1Request digital key ↗
08/31/2026B00671969-I1Request digital key ↗
08/31/2026B00671960-I1Request digital key ↗
Showing 3 of 45 on file for this type
▸Applications & Permits16
▸BISPLAN / WORK APPROVAL APPLICATION8
04/23/2025340870114Open ↗
02/21/2025320205853Open ↗
02/21/2025320202927Open ↗
Showing 3 of 8 on file for this type
▸BISWORK PERMIT APPLICATION5
10/28/2010320205853Open ↗
10/28/2010320211098Open ↗
09/15/2010320202927Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHPD - Permit Notice3
08/23/2026B00621076-I1Open ↗
08/13/2026B00621076-I1Open ↗
08/13/2026B00621076-P5Open ↗
▸Zoning, Tax Lot & Property Records33
▸DOB NOWRestrictive Declaration/Easement 211
08/13/2026B00621076-A1Open ↗
08/13/2026B00621076-S6Open ↗
08/13/2026B00621076-P9Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWRestrictive Declaration/Easement 111
08/13/2026B00621076-A1Open ↗
08/13/2026B00621076-A6Open ↗
08/13/2026B00621076-A7Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram5
08/13/2026B00621076-A7Open ↗
08/13/2026B00621076-I1Open ↗
08/13/2026B00621076-P9Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/13/2026B00621076-A5Open ↗
08/13/2026B00621076-A7Open ↗
08/13/2026B00621076-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications124
▸DOB NOWDPL-1: Design Professional Seal & Signature43
08/31/2026B00648850-I1Open ↗
08/31/2026B00671969-I1Open ↗
08/31/2026B00671960-I1Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature41
09/02/2026B00621076-I1Open ↗
09/01/2026B01306303-I1Open ↗
09/01/2026B01306303-I1Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWProgress Inspector Seal & Signature31
09/02/2026B00621076-I1Open ↗
09/02/2026B00621076-I1Open ↗
09/01/2026B01306303-I1Open ↗
Showing 3 of 31 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
09/02/2010320202927Open ↗
08/26/2010320211098Open ↗
08/24/2010320205853Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
08/26/2010320211098Open ↗
08/24/2010320205853Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
08/26/2010320211098Open ↗
08/24/2010320205853Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/27/2022340870114Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
10/27/2022340870114Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/23/2026B00621076-I1—
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist5
08/23/2026B00621076-I1Open ↗
08/23/2026B00621076-A5Open ↗
08/14/2026B00621076-P5Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST1
09/02/2010320202927Open ↗
▸BISSTREET TREES SITE PLAN1
12/19/2023340870114Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/19/2023340870114Open ↗
▸BISSITE SAFETY PLAN: BEST APPROVAL REQUIRED1
10/06/2025340870114Open ↗
▸DOB NOWStreet Tree Sign Off1
08/23/2026B00621076-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
08/23/2026B00621076-I1Open ↗
▸Environmental & Asbestos46
▸DOB NOWOER: Notice to Proceed28
08/17/2026B01306303-P1Open ↗
08/17/2026B01306303-I1Open ↗
Showing 2 of 28 on file for this type
▸DOB NOWOER: Notice of Satisfaction14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
09/02/2010320202927Open ↗
08/26/2010320211098Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
10/27/2022340870114Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
08/24/2010320205853Open ↗
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification3
08/23/2026B00621076-I1Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports8
▸DOB NOWSOIL REPORT4
08/13/2026B00621076-S8Open ↗
08/13/2026B00621076-P1Open ↗
Showing 2 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026B00621076-S8Open ↗
08/13/2026B00621076-S1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026B00621076-S8Open ↗
▸DOB NOWTR5 Test Report1
08/13/2026B00621076-S1Open ↗
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS3
09/02/2010320202927Open ↗
08/26/2010320211098Open ↗
08/24/2010320205853Open ↗
▸BISCURB CUT (CC) SIGNOFF1
10/06/2025340870114Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
09/02/2010320202927Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
12/08/2025340870114Open ↗
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET3
09/02/2010320202927Open ↗
08/26/2010320211098Open ↗
08/24/2010320205853Open ↗
▸BISADDITIONAL INFORMATION2
05/05/2025340870114Open ↗
12/19/2023340870114Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
10/27/2022340870114Open ↗
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026B00906822-P1Open ↗
▸Other Documents40
▸DOB NOWProperty Ownership Certification9
08/23/2026B00621076-S7Open ↗
08/23/2026B00621076-I1Open ↗
08/23/2026B00621076-P9Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)6
08/23/2026B00621076-I1Open ↗
08/13/2026B00621076-S1Open ↗
08/13/2026B00621076-S3Open ↗
Showing 3 of 6 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION5
05/29/2025340870114Open ↗
05/29/2025340870114Open ↗
05/05/2025340870114Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial5
08/13/2026B00621076-P9Open ↗
08/13/2026B00621076-P5Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸DOB NOWCalculations2
08/23/2026B01114326-I1Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWManufacturer's Specifications2
08/23/2026B01114326-I1Open ↗
Showing 1 of 2 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
05/05/2025340870114Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
12/19/2023340870114Open ↗
▸DOB NOWHPD - Completion Notice1
08/13/2026B00621076-I1Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00621076-S2Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type