| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01126611 ↗ | 38-78 11TH STREET QUEENS | New Building | Permit Issued | 12/03/2024 | 09/30/2026 | Design ESKW/A Owner UBC Contractor LETTIRE CONSTRUCTION CORP Filer JM ZONING, LLC. | HUB CONSULTATION 12/3: FILING HEREWITH CONSTRUCTION OF NEW FAMILY SHELTER AS PER PLANS. |
| Q00674206 ↗ | 24-11 JACKSON AVENUE QUEENS | New Building | Permit Issued | 02/11/2022 | 09/29/2026 | Contractor BROADWAY CONSTRUCTION GRO Filer DVA Advisors | Temporary Dry Standpipe in conjunction with NB # Q00674206 |
| B00680917 ↗ | 225 3RD STREET BROOKLYN | New Building | Permit Issued | 03/01/2022 | 09/22/2026 | Contractor AMC BUILDERS LLC Filer DVA Advisors | SOE WORK AS SHOWN ON PLANS. |
| B00501107 ↗ | 176 WASHINGTON PARK BROOKLYN | Alteration | Permit Issued | 06/13/2022 | 09/18/2026 | Owner J&J Design NY LLC Contractor J&J DESIGNS INC Filer PWF | UNDERPINNING & FOUNDATION SYSTEM FOR ALT I JOB #321598847: EXISTING FOUR STORY AND BASEMENT, THREE (3) FAMILY RESIDENTIAL BUILDING, CONVERS… |
| M01231645 ↗ | 473 WEST 165 STREET MANHATTAN | New Building | Permit Issued | 10/10/2025 | 09/17/2026 | Design GEA CONSULTING ENGINEERS Contractor TITANIUM CONSTRUCTION SER | UNDERGROUND PLUMBING FOR NEW BUILDING |
| B00621061 ↗ | 251 DOUGLAS STREET BROOKLYN | New Building | Permit Issued | 11/16/2021 | 07/28/2026 | Owner Tavros Contractor BROADWAY CONSTRUCTION GRO Filer DVA Advisors | Temporary standpipe work as shown on plans in conjunction with NB # B00621061-I1. |
| Name | Projects together | Most recent |
|---|---|---|
| GEOTECHNICAL ENGINEERING SERVICES | 13 | 09/14/2026 |
| ETTINGER ENGINEERING ASSOCIATES | 5 | 09/14/2026 |
| FOGARTY FINGER ARCHITECTURE PLLC | 3 | 09/14/2026 |
| GILSANZ MURRAY STEFICEK LLP | 3 | 08/19/2026 |
| TITAN ENGINEERS PC | 3 | 06/09/2026 |
| DESIMONE CONSULTING ENGINEERS | 2 | 09/14/2026 |
| PHILIP HABIB & ASSOCIATES | 2 | 06/09/2026 |
| RODNEY D. GIBBLE CONSULTING ENGINEE | 2 | 07/13/2026 |
| SKYLINE ENGINEERING, LLC | 2 | 07/16/2026 |
| ADG ENGINEERING | 1 | 03/15/2023 |
| AGE ENGINEERING, LLC | 1 | 03/02/2026 |
| ANCORA ENGINEERING, PLLC | 1 | 06/09/2026 |
| BKSK ARCHITECTS, LLP | 1 | 06/08/2026 |
| CAPLAN COLAKU ARCHITECTURE DPC | 1 | 07/13/2026 |
| CIVIL DESIGN PROFESSIONALS | 1 | 04/08/2024 |
| DENCITYWORKS ARCHITECTURE PLLC. | 1 | 04/10/2026 |
| DHD ARCHITECTURE DESIGN PLLC | 1 | 06/17/2026 |
| DORIC CONSULTANTS PC | 1 | 07/13/2023 |
| ENGINEERING GROUP ASSOCIATES, PC | 1 | 04/25/2024 |
| ESKW/A | 1 | 06/24/2026 |
| FMC ENGINEERING | 1 | 06/23/2026 |
| FXCOLLABORATIVE ARCHITECTS LLP | 1 | 08/19/2026 |
| GACE DPC | 1 | 06/08/2026 |
| GEA CONSULTING ENGINEERS | 1 | 06/08/2026 |
| IP GROUP | 1 | 07/13/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| BROADWAY CONSTRUCTION GRO | 7 | 09/14/2026 |
| LETTIRE CONSTRUCTION CORP | 4 | 07/16/2026 |
| A M B MECHANICAL INC | 2 | 09/14/2026 |
| CALLAHAN CONTRACTING LLC | 2 | 04/04/2023 |
| RAF GENERAL CONTRACTING C | 2 | 06/17/2026 |
| SAFETY FIRE SPRINKLER COR | 2 | 06/09/2026 |
| TRI CONTRACTING INC | 2 | 08/09/2023 |
| VAI CONSTRUCTION INC | 2 | 04/04/2023 |
| ALBA SERVICES INC | 1 | 08/19/2026 |
| ALMAR PLUMBING & HTG CORP | 1 | 04/25/2024 |
| ALPHA SCAFFOLDING INC | 1 | 06/23/2026 |
| AMC BUILDERS LLC | 1 | 04/10/2026 |
| BAYPORT CONSTRUCTION CORP | 1 | 06/23/2026 |
| BIG APPLE PLBG CORP | 1 | 06/17/2026 |
| BUCHANAN BUILDERS CORP | 1 | 03/23/2022 |
| CARA PLUMBING GROUP INC | 1 | 06/09/2026 |
| CELTIC SERVICES NYC INC | 1 | 03/02/2026 |
| DEMAR MECHANICAL INC | 1 | 07/16/2026 |
| ENER-CON TECHNICAL SERVIC | 1 | 06/23/2026 |
| ETHOS PLUMBING CORP | 1 | 07/13/2026 |
| G.N.T. MECHANICAL LLC | 1 | 08/19/2026 |
| J&J DESIGNS INC | 1 | 08/17/2026 |
| LENNIE CONSTRUCTION CORP | 1 | 07/13/2026 |
| LIS PIPING SOLUTION INC | 1 | 06/23/2026 |
| LRL CONSTRUCTION INC | 1 | 07/31/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| UBC | 4 | 07/16/2026 |
| Tavros | 3 | 06/09/2026 |
| Coppermine Construction Inc. | 2 | 04/04/2023 |
| OPUS INTERIORS LLC | 2 | 06/17/2026 |
| 83 APOLLO OWNER LLC | 1 | 03/23/2022 |
| APG | 1 | 03/02/2026 |
| CELTIC SERVICES NYC INC | 1 | 03/02/2026 |
| HAUSSMANN DEVELOPMENT LLC | 1 | 04/25/2024 |
| J&J Design NY LLC | 1 | 08/17/2026 |
| LAFAYETTE | 1 | 08/17/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| DVA Advisors | 6 | 09/14/2026 |
| JM ZONING, LLC. | 6 | 07/13/2026 |
| WILLIAM VITACCO ASSOCIATES | 5 | 09/14/2026 |
| DOMANI CONSULTING | 3 | 07/16/2026 |
| J. CALLAHAN CONSULTING, INC. | 2 | 06/17/2026 |
| ARCHI PRO GROUP | 1 | 03/02/2026 |
| BIG ORANGE EXPEDITING, INC | 1 | 07/31/2024 |
| CONVERSANO ASSOCIATES, INC. | 1 | 06/08/2026 |
| JENNY FLORES EXPEDITING | 1 | 08/09/2023 |
| OUTSOURCE CONSULTANTS, INC. | 1 | 03/23/2022 |
| PWF | 1 | 08/17/2026 |
| SATWIN ARCHITECT, PC | 1 | 06/20/2024 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01126611 ↗ | 38-78 11TH STREET QUEENS | New Building | Permit Issued | 12/03/2024 | 09/30/2026 | Design ESKW/A Owner UBC Contractor LETTIRE CONSTRUCTION CORP Filer JM ZONING, LLC. | HUB CONSULTATION 12/3: FILING HEREWITH CONSTRUCTION OF NEW FAMILY SHELTER AS PER PLANS. |
| Q00674206 ↗ | 24-11 JACKSON AVENUE QUEENS | New Building | Permit Issued | 02/11/2022 | 09/29/2026 | Contractor BROADWAY CONSTRUCTION GRO Filer DVA Advisors | Temporary Dry Standpipe in conjunction with NB # Q00674206 |
| B00680917 ↗ | 225 3RD STREET BROOKLYN | New Building | Permit Issued | 03/01/2022 | 09/22/2026 | Contractor AMC BUILDERS LLC Filer DVA Advisors | SOE WORK AS SHOWN ON PLANS. |
| B00501107 ↗ | 176 WASHINGTON PARK BROOKLYN | Alteration | Permit Issued | 06/13/2022 | 09/18/2026 | Owner J&J Design NY LLC Contractor J&J DESIGNS INC Filer PWF | UNDERPINNING & FOUNDATION SYSTEM FOR ALT I JOB #321598847: EXISTING FOUR STORY AND BASEMENT, THREE (3) FAMILY RESIDENTIAL BUILDING, CONVERS… |
| M01231645 ↗ | 473 WEST 165 STREET MANHATTAN | New Building | Permit Issued | 10/10/2025 | 09/17/2026 | Design GEA CONSULTING ENGINEERS Contractor TITANIUM CONSTRUCTION SER | UNDERGROUND PLUMBING FOR NEW BUILDING |
| B00621061 ↗ | 251 DOUGLAS STREET BROOKLYN | New Building | Permit Issued | 11/16/2021 | 07/28/2026 | Owner Tavros Contractor BROADWAY CONSTRUCTION GRO Filer DVA Advisors | Temporary standpipe work as shown on plans in conjunction with NB # B00621061-I1. |
| M01226501 ↗ | 43 CROSBY STREET MANHATTAN | Alteration CO | Permit Issued | 10/22/2025 | 07/27/2026 | Design P.A. COLLINS PE Owner OPUS INTERIORS LLC Contractor RAF GENERAL CONTRACTING C | Relocate and install sprinkler heads on the cellar level, 1st floor through 5th floor, and penthouse as per plans submitted herewith. There … |
| B00948534 ↗ | 95 ROCKWELL PLACE BROOKLYN | New Building | Permit Issued | 10/20/2023 | 06/27/2026 | Contractor BROADWAY CONSTRUCTION GRO Filer DVA Advisors | Underground, cellar, and 1st floor plumbing work in conjunction with NB |
| X00588660 ↗ | 580 GERARD AVENUE BRONX | New Building | Permit Issued | 09/15/2021 | 05/22/2026 | Contractor OMNIBUILD CONSTRUCTION IN Filer JM ZONING, LLC. | To install support scaffold for construction of new building. |
| X01276369 ↗ | 6067 BROADWAY BRONX | Alteration | Permit Issued | 09/29/2025 | 05/05/2026 | Owner APG Contractor CELTIC SERVICES NYC INC Filer ARCHI PRO GROUP | SOLDIER PILES AND TIMBER LAGGING IN CONJUNCTION WITH INSTALLATION OF A RETAINING WALL |
| M00898895 ↗ | 39 COMMERCE STREET MANHATTAN | Alteration | Permit Issued | 07/28/2023 | 03/16/2026 | Contractor M&A PROJECTS RESTORATION* Filer JM ZONING, LLC. | FILING HEREWITH STRUCTURAL AND FOUNDATION WORK IN CONJUNCTION WITH BUILDING RENOVATIONS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY… |
| M01294485 ↗ | 43 CROSBY STREET MANHATTAN | Alteration | Permit Issued | 11/03/2025 | 03/04/2026 | Owner OPUS INTERIORS LLC Contractor RAF GENERAL CONTRACTING C | Underpinning for the construction of a new elevator in cellar. No change to use egress or occupancy. |
| X00791429 ↗ | 3118 WEBSTER AVENUE BRONX | New Building | Permit Issued | 09/20/2022 | 12/11/2025 | Design MARK E. GINSBERG Owner UBC Contractor LETTIRE CONSTRUCTION CORP Filer DOMANI CONSULTING | Propose foundation work for 11 story building. |
| X00987279 ↗ | 3118 WEBSTER AVENUE BRONX | Alteration | Signed-off | 01/10/2024 | 06/11/2025 | Design CIVIL DESIGN PROFESSIONALS Owner UBC Contractor LETTIRE CONSTRUCTION CORP Filer DOMANI CONSULTING | Installing a prefabricated modular block retaining wall along the northeast property line and 10-foot inward from the southeast property lin… |
| Q08019734 ↗ | 23-14 45TH AVENUE QUEENS | Alteration | Permit Issued | 10/28/2022 | 05/22/2025 | Design GILSANZ MURRAY STEFICEK LLP Owner Tavros Contractor BROADWAY CONSTRUCTION GRO Filer DVA Advisors | Support of excavation in conjunction with NB # 420667120. |
| B00781280 ↗ | 44 MONTGOMERY PLACE BROOKLYN | Alteration | Signed-off | 08/03/2022 | 02/27/2025 | Contractor LRL CONSTRUCTION INC | SUPPORT OF EXCAVATION WORK IN CONJUNCTION WITH BUILDING RENOVATION. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| X00891267 ↗ | 3118 WEBSTER AVENUE BRONX | Alteration | Signed-off | 11/16/2023 | 02/05/2025 | Owner UBC Contractor LETTIRE CONSTRUCTION CORP Filer DOMANI CONSULTING | Herewith filing SOE in conjunction with NB#X00791429-I1 |
| B00621076 ↗ | 585 UNION STREET BROOKLYN | New Building | Permit Issued | 11/16/2021 | 01/07/2025 | Owner Tavros Contractor BROADWAY CONSTRUCTION GRO | Temporary standpipe work as shown on plans in conjunction with NB # B00621076-I1. |
| B00805007 ↗ | 584 SACKETT STREET BROOKLYN | Alteration | Permit Issued | 02/23/2023 | 11/06/2024 | Design TITAN ENGINEERS PC Contractor BROADWAY CONSTRUCTION GRO | Application filed for repair and remediation of existing foundation elements of 584 Sackett Street as shown on plans filed herewith. |
| M00830797 ↗ | 50 EAST 81 STREET MANHATTAN | Alteration | Signed-off | 08/25/2023 | 07/29/2024 | Contractor RTR CONSTRUCTION CO INC Filer SATWIN ARCHITECT, PC | Foundation related work at the cellar level and rear of property. Proposed work filed in conjunction with Alt. 1 Application # M08046639, Su… |
| B00454415 ↗ | 93 APOLLO STREET BROOKLYN | Alteration | Signed-off | 02/25/2021 | 06/20/2024 | Owner 83 APOLLO OWNER LLC Contractor BUCHANAN BUILDERS CORP | HEREWITH FILING SUPPORT OF EXCAVATION AS PER PLAN, WORK IS IN CONJUNCTION WITH CONSTRUCTION OF A 4-STORY NEW BUILDING. |
| M00897579 ↗ | 60 WEST 91 STREET MANHATTAN | Alteration | Signed-off | 08/09/2023 | 03/18/2024 | Contractor TRI CONTRACTING INC Filer JENNY FLORES EXPEDITING | Hereby filing support of excavation, no change to use occupancy or egress. |
| M00551052 ↗ | 521 WEST 134 STREET MANHATTAN | New Building | Permit Issued | 07/13/2021 | 11/20/2023 | Design NDKAZALAS ARCHITECTURE P.C. Contractor PROMETHEAN BUILDERS LLC Filer JM ZONING, LLC. | Structural work as per plans filed. Filed subsequent to NB #M00551052. |
| M00888864 ↗ | 60 WEST 91 STREET MANHATTAN | Alteration | Signed-off | 07/13/2023 | 08/21/2023 | Design DORIC CONSULTANTS PC Contractor TRI CONTRACTING INC | AT THE REAR OF THE BUILDING, APPROXIMATELY 7'x9' HORIZONTALLY EXTENSION, SHOWN ON THE PLAN. |
| M00767005 ↗ | 224 WEST 20 STREET MANHATTAN | Alteration | Signed-off | 08/15/2022 | 01/26/2023 | Design ADG ENGINEERING Contractor CALLAHAN CONTRACTING LLC Filer JM ZONING, LLC. | Foundation filed in conjunction with Alt-CO Application. |
| M00768909 ↗ | 224 WEST 20 STREET MANHATTAN | Alteration | Signed-off | 08/15/2022 | 01/26/2023 | Contractor CALLAHAN CONTRACTING LLC Filer JM ZONING, LLC. | SOE filed in conjunction with Alt-CO application. |
| Building | Filings | Most Recent |
|---|---|---|
| 225 3RD STREET ↗ | 2 | 03/09/2026 |
| 95 ROCKWELL PLACE ↗ | 5 | 03/05/2026 |
| 473 WEST 165 STREET ↗ | 1 | 02/17/2026 |
| 251 DOUGLAS STREET ↗ | 11 | 01/26/2026 |
| 43 CROSBY STREET ↗ | 3 | 12/02/2025 |
| 6067 BROADWAY ↗ | 2 | 09/29/2025 |
| 38-78 11TH STREET ↗ | 2 | 07/08/2025 |
| 3118 WEBSTER AVENUE ↗ | 8 | 05/28/2025 |
| 585 UNION STREET ↗ | 6 | 10/31/2024 |
| 44 MONTGOMERY PLACE ↗ | 3 | 07/31/2024 |
| 50 EAST 81 STREET ↗ | 2 | 06/20/2024 |
| 39 COMMERCE STREET ↗ | 1 | 02/16/2024 |
| 60 WEST 91 STREET ↗ | 2 | 08/09/2023 |
| 224 WEST 20 STREET ↗ | 3 | 04/04/2023 |
| 584 SACKETT STREET ↗ | 1 | 02/23/2023 |
| 23-14 45TH AVENUE ↗ | 2 | 01/11/2023 |
| 176 WASHINGTON PARK ↗ | 2 | 11/04/2022 |
| 24-11 JACKSON AVENUE ↗ | 4 | 11/01/2022 |
| 580 GERARD AVENUE ↗ | 1 | 08/31/2022 |
| 93 APOLLO STREET ↗ | 4 | 03/23/2022 |
| 521 WEST 134 STREET ↗ | 2 | 08/03/2021 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 07/16/2026 | Masonry | 39 COMMERCE STREET | SAMI HAJJAR P.E | special |
| 07/16/2026 | Structural Steel - Welding | 39 COMMERCE STREET | SAMI HAJJAR P.E | special |
| 07/16/2026 | Subgrade Inspections | 39 COMMERCE STREET | Ziad Maad | special |
| 07/16/2026 | Structural Wood Frame | 39 COMMERCE STREET | SAMI HAJJAR P.E | progress |
| 07/16/2026 | Footing and Foundation | 39 COMMERCE STREET | SAMI HAJJAR P.E | progress |
| 07/16/2026 | Final | 39 COMMERCE STREET | SAMI HAJJAR P.E | progress |
| 07/16/2026 | Structural Steel - High Strength Bolting | 39 COMMERCE STREET | SAMI HAJJAR P.E | special |
| 07/16/2026 | Concrete - Cast-In-Place | 39 COMMERCE STREET | SAMI HAJJAR P.E | special |
| 07/16/2026 | Structural Stability – Alterations of existing buildings | 39 COMMERCE STREET | SAMI HAJJAR P.E | special |
| 07/16/2026 | Structural Steel - Details | 39 COMMERCE STREET | SAMI HAJJAR P.E | special |
| 07/16/2026 | Post-installed Anchors | 39 COMMERCE STREET | SAMI HAJJAR P.E | special |
| 07/16/2026 | Alternative Materials - OTCR Buildings Bulletin Number | 39 COMMERCE STREET | SAMI HAJJAR P.E | special |
| 03/31/2026 | Subsurface Investigations (Borings/Test Pits) | 95 ROCKWELL PLACE | Ziad Maad | special |
| 03/31/2026 | Footing and Foundation | 95 ROCKWELL PLACE | Waldir Alvarez | progress |
| 03/31/2026 | Final | 95 ROCKWELL PLACE | Waldir Alvarez | progress |
| 03/31/2026 | Concrete - Cast-In-Place | 95 ROCKWELL PLACE | Waldir Alvarez | special |
| 03/31/2026 | Subgrade Inspections | 95 ROCKWELL PLACE | Ziad Maad | special |
| 03/31/2026 | Deep Foundation Elements | 95 ROCKWELL PLACE | Ziad Maad | special |
| 03/31/2026 | Post-installed Anchors | 95 ROCKWELL PLACE | Waldir Alvarez | special |
| 03/13/2026 | Excavations - Sheeting, Shoring, and Bracing | 225 3RD STREET | Alan Poeppel | special |
| 03/13/2026 | Construction Operations Influencing Adjacent Structures | 225 3RD STREET | — | special |
| 03/13/2026 | Subsurface Conditions – Fill Placement & In-Place Density | 225 3RD STREET | Ziad Maad | special |
| 03/06/2026 | Structural Stability – Alterations of existing buildings | 473 WEST 165 STREET | JOHN MCMONAGLE | special |
| 03/06/2026 | Excavations - Sheeting, Shoring, and Bracing | 473 WEST 165 STREET | Ziad Maad | special |
| 03/06/2026 | Concrete - Cast-In-Place | 473 WEST 165 STREET | JOHN MCMONAGLE | special |
| 01/14/2026 | Footing and Foundation | 251 DOUGLAS STREET | SOORJBALLY HARILALL | progress |
| 01/14/2026 | Final | 251 DOUGLAS STREET | SOORJBALLY HARILALL | progress |
| 01/14/2026 | Excavations - Sheeting, Shoring, and Bracing | 251 DOUGLAS STREET | Ziad Maad | special |
| 01/14/2026 | Concrete - Cast-In-Place | 251 DOUGLAS STREET | SOORJBALLY HARILALL | special |
| 01/14/2026 | Subsurface Investigations (Borings/Test Pits) | 251 DOUGLAS STREET | Ziad Maad | special |
| 01/14/2026 | Deep Foundation Elements | 251 DOUGLAS STREET | Ziad Maad | special |
| 01/06/2026 | Excavations - Sheeting, Shoring, and Bracing | 251 DOUGLAS STREET | Ziad Maad | special |
| 01/06/2026 | Concrete - Cast-In-Place | 251 DOUGLAS STREET | SOORJBALLY HARILALL | special |
| 01/06/2026 | Footing and Foundation | 251 DOUGLAS STREET | SOORJBALLY HARILALL | progress |
| 01/06/2026 | Final | 251 DOUGLAS STREET | Soorjbally Harilall | progress |
| 01/06/2026 | Subsurface Investigations (Borings/Test Pits) | 251 DOUGLAS STREET | Ziad Maad | special |
| 01/06/2026 | Subsurface Conditions – Fill Placement & In-Place Density | 251 DOUGLAS STREET | Ziad Maad | special |
| 01/06/2026 | Subgrade Inspections | 251 DOUGLAS STREET | Ziad Maad | special |
| 11/20/2025 | Underpinning | 43 CROSBY STREET | Ziad Maad | special |
| 11/20/2025 | Structural Stability – Alterations of existing buildings | 43 CROSBY STREET | Gary Steficek | special |
| 11/19/2025 | Final | 43 CROSBY STREET | Ziad Maad | progress |
| 11/19/2025 | Footing and Foundation | 43 CROSBY STREET | Ziad Maad | progress |
| 11/17/2025 | Concrete - Cast-In-Place | 95 ROCKWELL PLACE | Waldir Alvarez | special |
| 11/17/2025 | Deep Foundation Elements | 95 ROCKWELL PLACE | Ziad Maad | special |
| 11/17/2025 | Post-installed Anchors | 95 ROCKWELL PLACE | Waldir Alvarez | special |
| 11/17/2025 | Subgrade Inspections | 95 ROCKWELL PLACE | Ziad Maad | special |
| 11/17/2025 | Subsurface Investigations (Borings/Test Pits) | 95 ROCKWELL PLACE | Ziad Maad | special |
| 11/17/2025 | Final | 95 ROCKWELL PLACE | Waldir Alvarez | progress |
| 11/17/2025 | Footing and Foundation | 95 ROCKWELL PLACE | Waldir Alvarez | progress |
| 11/06/2025 | Subgrade Inspections | 43 CROSBY STREET | Ziad Maad | special |