Elevator apt, fireproof with stores
Parc East Tower Apartments
240 EAST 27 STREET · BIN 1019855
💬 Discuss this project
1977Year Built
26Stories
D6Building Class
C1-8AZoning
348,386 sfGross Floor Area
327Units
LL97 CoveredRent Stabilized18 Open Violations 14 unresolved · 4 paperwork only ▸FISP: SWARMP
Elevator apt, fireproof with stores · Owner of record: EQR-EAST 27TH STREET APARTMENTS, LLC · 24,687 sf lot · 14.11 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 1 filing · 2 docs
Bulkhead1p · 1 filing · 3 docs
Cellar1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
EQUITY RESIDENTIAL3509/29/2026
EQR- EAST 27TH STREET2403/22/2026
EQR EAST 27 STREET APARTM103/22/2026
WARDS CONDTRUCTION CO2303/22/2026
GEIGER CONST CORP INC.103/22/2026
WARDS CONST CO.203/22/2026
EQR- EAST 24 ST APTS LLC103/22/2026
ICON PARKING HOLDINGS103/22/2026
C O EQUITY RESIDENTIAL303/21/2026
EQUITY RESIDENTIAL MANAGEMENT1303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE DESIGN SOLUTION803/21/2026
D R BROWN1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PRC CONSTRUCTION LLCGeneral Contractor603/21/2026
ULTIMATE SIGNS DESIGNSScaffold507/08/2026
PROTO RESTORATION CONSTRUCTIONGeneral Contractor303/21/2026
STRUCTURAL PRESERV SYSTEMGeneral Contractor203/21/2026
DERRICK RAMDEENElectrical103/21/2026
SNB ELECTRICAL CONTNG CORElectrical103/22/2026
ANDREW CHARNOWElectrical103/21/2026
ALEXANDER EUGENEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMKA & ASSOCIATES LLC8239101/13/2025
LEO Y LEE ASSOCIATES2481210/18/2024
NY RESTORATION TECHNOLOGY6187104/16/2024
Building Lifecycle
All (119)Filed (12)Permit Issued (14)Signed Off (8)Facade (FISP) (13)Violation (60)Objection (2)Special Inspection (10)
09/28/2026
Permit issued — Suspended Scaffold
M01398368-I1-SC
08/31/2026
Violation issued (ECB, open)
Elevators
08/22/2026
Violation issued (HPD, open)
A
08/07/2026
Violation issued (ECB, open)
Elevators
07/02/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01035687-I1
06/12/2026
Signed off — Alteration
Installation of suspended scaffold for facade work and/or inspection. Amend #1,change in scaffold drop, tieback lifeline legend and outrigger details
M01038381-I1
06/01/2026
Violation issued (ECB, open)
Elevators
05/14/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01398368-I1
01/13/2026
Violation issued (ECB, open)
Elevators
12/31/2025
Violation issued (ECB, open)
Elevators
11/17/2025
Violation issued (HPD, closed)
I
09/28/2025
Violation issued (HPD, open)
B
09/28/2025
Violation issued (HPD, open)
B
09/12/2025
Violation issued (HPD, open)
C
09/11/2025
Violation issued (HPD, open)
A
09/10/2025
Violation issued (HPD, open)
C
09/10/2025
Violation issued (HPD, open)
C
09/08/2025
Violation issued (ECB, closed)
Construction
09/08/2025
Violation issued (ECB, open)
Unknown
09/08/2025
Violation issued (ECB, closed)
Unknown
06/17/2025
Permit issued — Suspended Scaffold
M01038381-I1-SC
05/09/2025
Signed off — Alteration
Garage repairs as per plans; no change to use, occupancy, or egress. No change to number of parking spaces.
M01149977-I1
05/06/2025
Permit issued — Sidewalk Shed
M01035687-I1-SH
04/24/2025
Permit issued — Suspended Scaffold
M01038381-I1-SC
02/18/2025
Permit issued — General Construction
M01149977-I1-GC-CX
01/27/2025
Objection raised — Scope
01/27/2025
Objection resolved — Addressed
01/13/2025
Filed — Alteration
Garage repairs as per plans; no change to use, occupancy, or egress. No change to number of parking spaces.
M01149977-I1
12/03/2024
Special inspection requirement — Concrete - Cast-In-Place
AHMAD KHANZADA
12/03/2024
Special inspection requirement — Masonry
AHMAD KHANZADA
12/03/2024
Special inspection requirement — Final
AHMAD KHANZADA
12/03/2024
Special inspection requirement — Tenant Protection Plan Compliance
AHMAD KHANZADA
12/03/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
AHMAD KHANZADA
10/30/2024
Permit issued — Suspended Scaffold
M01038381-P1-SC
10/23/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01035687-P1
10/18/2024
Filed — Alteration
Installation of suspended scaffold for facade work and/or inspection. Amend #1,change in scaffold drop, tieback lifeline legend and outrigger details
M01038381-P1
10/18/2024
Special inspection requirement — Post-installed Anchors
Leo Lee
10/18/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Leo Lee
10/16/2024
Violation issued (ECB, closed)
Construction
10/16/2024
Violation issued (ECB, closed)
Construction
10/16/2024
Violation issued (ECB, closed)
Construction
09/30/2024
Violation issued (HPD, open)
B
08/28/2024
Permit issued — General Construction
M01016444-I1-GC
07/11/2024
Violation issued (HPD, closed)
C
07/11/2024
Violation issued (HPD, closed)
C
05/15/2024
Permit issued — Suspended Scaffold
M01038381-I1-SC
05/07/2024
Permit issued — Sidewalk Shed
M01035687-I1-SH
05/06/2024
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01035687-I1
04/26/2024
Filed — Alteration
Installation of suspended scaffold for facade work and/or inspection. Amend #1,change in scaffold drop, tieback lifeline legend and outrigger details
M01038381-I1
04/16/2024
Filed — Alteration
M01016444-I1
06/09/2023
Violation issued (HPD, closed)
C
03/07/2023
Violation issued (HPD, closed)
C
03/07/2023
Violation issued (HPD, closed)
B
03/07/2023
Violation issued (HPD, closed)
B
02/22/2023
Cycle 9 facade report signed — SWARMP
02/21/2023
Cycle 9 facade report submitted
02/17/2023
Cycle 9 facade inspection completed
02/11/2023
Violation issued (HPD, closed)
C
11/15/2022
Violation issued (HPD, closed)
C
08/04/2021
Violation issued (HPD, closed)
A
Latest 60 of 119 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTURAL PRESERVATION S09/28/2026
DOB NOWSuspended ScaffoldSigned-offPROTO RESTORATION CONSTRU06/17/2025
DOB NOWSidewalk ShedSigned-offPRC CONSTRUCTION LLC05/06/2025
DOB NOWSuspended ScaffoldSigned-offPROTO RESTORATION CONSTRU04/24/2025
DOB NOWGeneral ConstructionSigned-offSTRUCTURAL PRESERV SYSTEM02/18/2025
DOB NOWSuspended ScaffoldPermit IssuedPROTO RESTORATION CONSTRU10/30/2024
DOB NOWGeneral ConstructionPermit IssuedPROTO RESTORATION CONSTRU08/28/2024
DOB NOWSuspended ScaffoldSigned-offPROTO RESTORATION CONSTRU05/15/2024
DOB NOWSidewalk ShedSigned-offPRC CONSTRUCTION LLC05/07/2024
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO06/22/2020
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO06/22/2020
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO06/22/2020
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO06/22/2020
DOB NOWSignSigned-offULTIMATE SIGNS&DESIGNS CO06/22/2020
BISMHISSUEDAFGO MECHANICAL SVCS INC05/30/2019
BISPLISSUEDRAPTOR MECHANICAL,INC04/26/2016
BISPLISSUEDCC CONTROLLED PLBG CO INC09/25/2015
BISPLISSUEDRAPTOR MECHANICAL,INC01/15/2015
BISOTISSUEDAEGIS ENERGY SERVICES LLC12/17/2014
BISFBISSUEDC C CONTROLLED COMBUSTION09/19/2014
BISPLISSUEDCC CONTROLLED PLBG CO INC09/19/2014
BISOTISSUEDCANIDO BASONAS CONSTRUCTI05/02/2014
BISOTISSUEDCANIDO BASONAS CONSTRUCTI04/16/2013
BISEQISSUEDROCKLEDGE SCAFFOLD CORP12/06/2012
BISOTISSUEDCANIDO BASONAS CONSTRUCTI09/17/2012
BISPLISSUEDORION PLUMBING & HTG CORP03/27/2012
BISEQISSUEDROCKLEDGE SCAFFOLD CORP12/16/2011
BISOTISSUEDCENTRAL CONSTRUCTION MANAGEMENT06/09/2011
BISOTISSUEDEASTERN WATERPROOFING&CON03/12/2009
BISOTISSUEDNORTHEASTERN_CONSTUCTION GROUP09/11/2008
BISMHISSUEDNORTHEASTERN_CONSTUCTION GROUP09/11/2008
BISOTISSUEDA.G.C CONTRACTORS INC05/22/2007
BISOTISSUEDA.G.C CONTRACTORS INC05/22/2007
BISEQISSUEDGEIGER CONSTRUCTION CO06/20/2006
BISOTISSUEDWARDS CONSTRUCTION04/06/2006
BISMHISSUEDSHEFF AIR CONDITIONING INC01/13/2006
BISOTISSUEDGEIGER CONSTR. CO INC.02/16/2005
BISOTISSUEDGEIGER CONSTR. CO INC.08/31/2004
BISEQISSUEDCOLGATE SCAFR. EAU.06/21/2004
BISMHISSUEDARISTA AIR CONDITIONING CORP04/16/2001
+ 7 more permits on file
8 projects · most recent 10/27/2025
General Wiring
FiledStatusContractorScope
10/27/2025CompleteUPTOWN ELECTRICAL INCGeneral Wiring
06/16/2025Permit IssuedSNB ELECTRICAL CONTNG CORGeneral Wiring
04/30/2024Permit IssuedHIGH QUALITY ELECTRIC OF—
12/18/2020CancelledACCURATE ELEC'L CONTR'S CGeneral Wiring
08/07/2020CompleteULTIMATE SIGNS & ELEC COR—
08/07/2020CompleteULTIMATE SIGNS & ELEC COR—
08/07/2020CompleteULTIMATE SIGNS & ELEC COR—
08/07/2020CompleteULTIMATE SIGNS & ELEC COR—
1 project · most recent 10/23/2024
Sidewalk Shed
FiledStatusContractorScope
10/23/2024Signed-offPRC CONSTRUCTION LLCSidewalk Shed
2 projects · most recent 05/14/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
05/14/2026Permit IssuedSTRUCTURAL PRESERVATION S—
10/18/2024Signed-offPROTO RESTORATION CONSTRUSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
12/03/2024Concrete - Cast-In-PlaceAHMAD KHANZADAspecial
12/03/2024MasonryAHMAD KHANZADAspecial
12/03/2024FinalAHMAD KHANZADAprogress
12/03/2024Tenant Protection Plan ComplianceAHMAD KHANZADAspecial
12/03/2024Structural Stability – Alterations of existing buildingsAHMAD KHANZADAspecial
10/18/2024Post-installed AnchorsLeo Leespecial
10/18/2024Alternative Materials - OTCR Buildings Bulletin NumberLeo Leespecial
06/04/2020FinalRichard Wainerprogress
06/04/2020FinalRichard Wainerprogress
06/04/2020FinalRichard Wainerprogress
▾Documents — 206 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch7
08/27/2026M01016444-I1Request digital key ↗
08/26/2026M01038381-P1Request digital key ↗
08/26/2026M01038381-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Sign5
09/04/2026M00354367-I1Request digital key ↗
09/04/2026M00354349-I1Request digital key ↗
09/04/2026M00354379-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits32
▸BISPLAN / WORK APPROVAL APPLICATION17
07/18/2025102828834Open ↗
01/31/2025102538121Open ↗
01/31/2025102538121Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION15
08/23/2019123709004Open ↗
05/29/2019140846119Open ↗
01/28/2015122126591Open ↗
Showing 3 of 15 on file for this type
▸Seals & Professional Certifications55
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
11/21/2019123709004Open ↗
08/23/2019123709004Open ↗
08/13/2019140846119Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/04/2026M00354367-I1Open ↗
09/04/2026M00354379-I1Open ↗
09/04/2026M00354371-I1Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST6
08/23/2019123709004Open ↗
07/22/2019123709004Open ↗
12/19/2014122126591Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/27/2026M01038381-P1Open ↗
08/27/2026M01038381-P1Open ↗
08/24/2026M01149977-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
12/19/2014122126591Open ↗
12/19/2014122126591Open ↗
12/19/2014122126591Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
08/23/2019123709004Open ↗
07/22/2019123709004Open ↗
05/29/2019140846119Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/26/2026M00354349-I1Open ↗
08/26/2026M00354379-I1Open ↗
08/26/2026M00354361-I1Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/29/2019140846119Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/29/2019140846119Open ↗
▸Trade Schedules & Equipment14
▸BISEQUIPMENT USE APPLICATION/PERMIT3
09/30/2025102828834Open ↗
07/14/2025102828834Open ↗
09/17/2019140846119Open ↗
▸BISEQUIPMENT USE PERMITS3
09/30/2025102828834Open ↗
07/14/2025102828834Open ↗
09/17/2019140846119Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
10/30/2015122136848Open ↗
05/27/2015122126591Open ↗
05/23/2012120674822Open ↗
▸BISSCHEDULE B - PLUMBING2
12/19/2014122126591Open ↗
05/02/2011120674822Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
09/23/2014122136848Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
09/23/2014122136848Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
10/30/2015122136848Open ↗
▸Safety & Tenant Protection8
▸DOB NOWTenant Protection Plan5
09/04/2026M00354379-I1Open ↗
08/13/2026M00354361-I1Open ↗
08/13/2026M00354367-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTenant Protection Plan and Notes3
08/23/2019123709004Open ↗
07/22/2019123709004Open ↗
05/29/2019140846119Open ↗
▸Environmental & Asbestos13
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/04/2026M00354367-I1Open ↗
09/04/2026M00354379-I1Open ↗
09/04/2026M00354371-I1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
05/02/2011120674822Open ↗
03/10/2009110437849Open ↗
05/24/2012121085743Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/23/2014122136848Open ↗
12/19/2014122126591Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
08/23/2019123709004Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
01/22/2009110437849Open ↗
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS7
11/21/2019123709004Open ↗
08/23/2019123709004Open ↗
08/13/2019140846119Open ↗
Showing 3 of 7 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
11/21/2019123709004Open ↗
08/13/2019140846119Open ↗
10/21/2016122126591Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/29/2019140846119Open ↗
▸BISTR8: Energy Code Progress Inspections1
12/19/2014122126591Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/29/2019140846119Open ↗
▸Inspections & Test Reports7
▸BISTECHNICAL REPORT: RESPONSIBILITY6
07/14/2025102828834Open ↗
07/14/2025102828834Open ↗
01/29/2025102538121Open ↗
Showing 3 of 6 on file for this type
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19751
09/23/2025102828834Open ↗
▸Approvals, Objections & Sign-offs16
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
09/23/2025102828834Open ↗
11/21/2019123709004Open ↗
08/13/2019140846119Open ↗
Showing 3 of 7 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
05/24/2012121085743Open ↗
12/19/2011120921173Open ↗
05/02/2011120674822Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
08/13/2019140846119Open ↗
10/21/2016122126591Open ↗
01/12/2016122136848Open ↗
▸BISCCD1-Construction Code Determination1
10/04/2012121085743Open ↗
▸BISSHED LETTER1
12/10/2012120921173Open ↗
▸Cost, Insurance & Ownership16
▸BISCOST AFFIDAVIT14
07/14/2025102828834Open ↗
11/21/2019123709004Open ↗
08/13/2019140846119Open ↗
Showing 3 of 14 on file for this type
▸BISWELDERS AFFIDAVIT2
10/30/2015122136848Open ↗
10/30/2015122136848Open ↗
▸Filing & Intake Forms13
▸BISEFILING COVER SHEET8
08/23/2019123709004Open ↗
07/22/2019123709004Open ↗
12/19/2014122126591Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION2
09/23/2025102828834Open ↗
05/12/2015121085743Open ↗
▸BISBOROUGH INTAKE FORM2
11/21/2019123709004Open ↗
08/13/2019140846119Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/29/2019140846119Open ↗
▸Other Documents6
▸DOB NOWManufacturer's Specifications2
08/13/2026M01038381-P1Open ↗
08/13/2026M01038381-I1Open ↗
▸DOB NOWCalculations2
08/13/2026M01038381-I1Open ↗
08/13/2026M01038381-P1Open ↗
▸BIS* VENT. SYS.-ENGINEER/INSTALLER 27-136,7791
09/23/2025102828834Open ↗
▸DOB NOWIRA Certification1
08/17/2026M01398368-I1Open ↗