| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/05/2026 | Signed-off | BLACK SQUARE BUILDERS COR | Heating and Air Conditioning Systems | Heat / Cool Mitsubishi Electric mxz-3c30nahz4-u1 28,600 BTU · Condensing Unit ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/05/2026 | Signed-off | FLUID MECHANICS CORP | Sprinkler System |
| 03/24/2026 | Permit Issued | AMERICAN STANDARD PLUMBIN | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/05/2026 | Signed-off | SUPERB PLUMBING & HEATING | Gas, Water/Sanitary |
| 06/05/2026 | Signed-off | P.S.I. MECHANICAL | Gas, Water/Sanitary |
| 03/27/2026 | Permit Issued | R.J.C. MECHANICAL CORP | Gas, Water/Sanitary |
| 03/24/2026 | Permit Issued | JOHN FITZGERALD PLBG &HTG | Gas, Water/Sanitary |
| 04/13/2020 | Signed-off | WATSON'S PLBG, HTG, & BDG | Water/Sanitary |
| 11/15/2019 | Signed-off | S.O.S. PLBG & HTG LTD | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/20/2026 | Permit Issued | HAC ELECTRIC INC | General Wiring |
| 09/02/2026 | Permit Issued | DESUZE ELECTRIC CORP | General Wiring |
| 07/29/2026 | Permit Issued | OPTIMAL ELECTRIC, INC | General Wiring |
| 06/15/2026 | Complete | GLENDALE ELECTL CONTNG IN | General Wiring |
| 10/08/2025 | Permit Issued | HIGH QUALITY ELEC.OF NYC | — |
| 04/01/2024 | Complete | AMBER ELECTL CONTNG INC | General Wiring |
| 03/28/2024 | Complete | LUME ELECTRIC INC | General Wiring |
| 02/09/2024 | Complete | STELLMANN ELECTRICAL CORP | General Wiring |
| 05/30/2023 | Complete | THE METRO GROUP ELECTRIC | General Wiring |
| 06/27/2022 | Permit Issued | PRECISION ELECL CONT CORP | General Wiring |
| 05/24/2022 | Complete | A&E ELECTRICAL SYSTEMS CO | General Wiring |
| 05/02/2022 | Complete | LINTECH ELECTRIC, INC | General Wiring |
| 04/25/2022 | Complete | ECNY ELEC'L CONTR'S, INC | General Wiring |
| 09/23/2021 | Complete | DEMAND ELECTRIC INC | General Wiring |
| 08/23/2021 | Complete | A.L. ELECTRICAL CORP. | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/05/2026 | Signed-off | BLACK SQUARE BUILDERS COR | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/07/2025 | Signed-off | KINGS GROUP NY CORP | Sidewalk Shed |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/12/2025 | Signed-off | CITILINE RESTORATION LLC | Suspended Scaffold |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/29/2026 | Permit Issued | CITILINE RESTORATION LLC | — |
| 09/12/2025 | Signed-off | CITILINE RESTORATION LLC | Suspended Scaffold (SC) |
| Owner | Filings | Most Recent |
|---|---|---|
| TRUMP ORGANIZATION | 55 | 07/08/2026 |
| KINGS GROUP NY | 4 | 04/08/2026 |
| HERITAGE AT TRUMP PLAC CONDO | 23 | 03/22/2026 |
| HUDSON WATERFRONT COMPANY A | 86 | 03/22/2026 |
| H R H CONSTRUCTION | 3 | 03/22/2026 |
| HRN CONSTRUCTION CORP | 1 | 03/22/2026 |
| RAY ROMANO CONTRACTING | 1 | 03/22/2026 |
| ONE ONLY REALTY | 4 | 03/21/2026 |
| RSB240LLCC OWILLKIEFARRGALLA | 23 | 03/21/2026 |
| TRUMP | 18 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| STRATA ARCHITECTURE + DESIGN, PLLC | 13 | 06/05/2026 |
| MSA CONSULTING GROUP LLC | 4 | 06/05/2026 |
| BASIC GROUPS CORP | 2 | 03/27/2026 |
| KIYOMI K. TROEMNER | 1 | 03/24/2026 |
| YORKOS ENGINEERING DESIGN CONSULT | 1 | 03/24/2026 |
| OM CONSULTING ENGINEERS GROUP | 2 | 03/05/2026 |
| NTA DESIGN GROUP, LLC | 1 | 12/23/2025 |
| KMA DESIGNS LLC | 1 | 10/07/2025 |
| RIMKUS | 2 | 10/01/2025 |
| KN3 ENGINEERING LLC | 1 | 09/12/2025 |
| RIMKUS NEW YORK PLLC | 1 | 09/09/2025 |
| NAZZARENO CALLIPO P.E. | 4 | 08/26/2025 |
| A2 ARCHITECT, PC | 13 | 01/30/2024 |
| PVE ENGINEERING | 1 | 05/17/2023 |
| MN DESIGN PROFESSIONAL CORPORATION | 4 | 02/22/2023 |
| CURTIS DESIGN GROUP LLC | 1 | 05/15/2022 |
| I.M. ROBBINS, P.C. | 2 | 11/09/2020 |
| PONDOSA DESIGN INC | 1 | 04/13/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| GZ NC CODE PLANNING ENGINEERING | 9 | 03/21/2026 |
| AE DESIGN SOLUTION | 4 | 03/21/2026 |
| J A EXPEDITING | 32 | 03/21/2026 |
| RIMKUS NEW YORK PLLC | 6 | 03/21/2026 |
| SKYLINE ACCESS | 1 | 03/21/2026 |
| DOMANI CONSULTING | 1 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 1 | 03/21/2026 |
| SYNCHRON EXPEDITING | 8 | 03/21/2026 |
| JS ARCHITECTURE DESIGN | 2 | 03/21/2026 |
| KMA DESIGNS LLC | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| GREENTREE CONSTRUCTION IN | General Contractor | 4 | 07/08/2026 |
| PRIME CONSTRUCTION & REST | General Contractor | 4 | 07/08/2026 |
| TOTAL HOME IMPROVEMENT SE | General Contractor | 3 | 03/21/2026 |
| BLACK SQUARE BUILDERS CORP | General Contractor | 3 | 07/08/2026 |
| NORTHEAST SPECIALIST GROUP | General Contractor | 3 | 07/08/2026 |
| LUMITECH CONTRACTING CORP | General Contractor | 2 | 03/21/2026 |
| CITILINE RESTORATION LLC | General Contractor | 2 | 07/08/2026 |
| SUPERB PLUMBING & HEATING | Plumbing | 2 | 07/08/2026 |
| TOP DOG PLBG & HTG CORP | Plumbing | 2 | 07/08/2026 |
| AUTHENTIC PLBG CORP | Plumbing | 2 | 07/08/2026 |
| TOMASZ PUZA | Electrical | 1 | 03/21/2026 |
| VINCENT AMATO | Electrical | 1 | 03/21/2026 |
| AMERICAN STANDARD PLUMBING & | Fire Protection | 1 | 07/08/2026 |
| FLUID MECHANICS CORP | Fire Protection | 1 | 05/29/2026 |
| PHOENIX PLMBG & MECH CORP | Fire Protection | 1 | 06/28/2026 |
| ANTAR GROUP LLC | General Contractor | 1 | 04/09/2026 |
| HAMILTON AIR COMPANY, INC. | General Contractor | 1 | 07/08/2026 |
| INTERIOR BUILDING SERVICE | General Contractor | 1 | 04/09/2026 |
| KINGS GROUP NY CORP | General Contractor | 1 | 04/08/2026 |
| OMADA CONSTRUCTION CORP | General Contractor | 1 | 07/08/2026 |
| PROFESSIONAL INTERIOR CON | General Contractor | 1 | 07/08/2026 |
| WE WORK GROUP INC | General Contractor | 1 | 07/08/2026 |
| A&H EXPRESS PLBG&HTG CORP | Plumbing | 1 | 07/08/2026 |
| B&B MECH PLBG & HTG LLC | Plumbing | 1 | 07/08/2026 |
| D.D.S. MECH PBG&HTG CORP | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| AA BUILDING & INSPECTION | 1519 | 6 | 06/05/2026 |
| BEALIN GROUPS CORP | 9869 | 2 | 03/27/2026 |
| YORKOS ENGINEERING, DESIG | 6991 | 2 | 03/24/2026 |
| CROSSCHECK INSPECTION SER | 544 | 1 | 12/23/2025 |
| RIMKUS NEW YORK, PLLC | 8123 | 3 | 10/01/2025 |
| MOHAMMAD AHEAD - PROFESSI | 9286 | 1 | 09/12/2025 |
| GZ & NC CODE CONSULTING P | 7492 | 4 | 08/26/2025 |
| A2 ARCHITECT, PC | 2504 | 6 | 10/18/2023 |
| PARTRIDGE VENTURE ENGINEE | 7690 | 1 | 05/17/2023 |
| ADS SPECIAL INSPECTIONS | 1270 | 5 | 09/23/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | R.J.C. MECHANICAL CORP | 05/22/2026 |
| DOB NOW | Structural | Signed-off | BLACK SQUARE BUILDERS CORP | 05/12/2026 |
| DOB NOW | General Construction | Permit Issued | OMADA CONSTRUCTION CORP | 05/04/2026 |
| DOB NOW | General Construction | Permit Issued | CITILINE RESTORATION LLC | 05/01/2026 |
| DOB NOW | Sprinklers | Permit Issued | JOHN FITZGERALD PLBG &HTG | 05/01/2026 |
| DOB NOW | Plumbing | Permit Issued | AMERICAN STANDARD PLUMBING & | 05/01/2026 |
| DOB NOW | General Construction | Permit Issued | WE WORK GROUP INC | 04/24/2026 |
| DOB NOW | Sprinklers | Signed-off | FLUID MECHANICS CORP | 03/13/2026 |
| DOB NOW | General Construction | Signed-off | INTERIOR BUILDING SERVICE | 01/14/2026 |
| DOB NOW | Sidewalk Shed | Signed-off | KINGS GROUP NY CORP | 10/07/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | CITILINE RESTORATION LLC | 09/29/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | CITILINE RESTORATION LLC | 07/10/2025 |
| DOB NOW | Plumbing | Signed-off | P.S.I. MECHANICAL | 07/07/2025 |
| DOB NOW | General Construction | Signed-off | ANTAR GROUP LLC | 07/01/2025 |
| DOB NOW | Mechanical Systems | Signed-off | BLACK SQUARE BUILDERS COR | 03/27/2025 |
| DOB NOW | Plumbing | Signed-off | SUPERB PLUMBING & HEATING | 03/17/2025 |
| DOB NOW | Sprinklers | Signed-off | GW MECHANICAL CORP | 03/10/2025 |
| DOB NOW | General Construction | Signed-off | CITILINE RESTORATION LLC | 02/27/2025 |
| DOB NOW | Plumbing | Permit Issued | SIMPLE CHOICE PLBG AND HT | 01/16/2025 |
| DOB NOW | General Construction | Signed-off | BLACK SQUARE BUILDERS COR | 10/24/2024 |
| DOB NOW | Plumbing | Signed-off | SUPERB PLUMBING & HEATING | 10/24/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | SKYLINE RESTORATION INC | 12/21/2023 |
| DOB NOW | General Construction | Signed-off | GREENTREE CONSTRUCTION IN | 08/28/2023 |
| DOB NOW | Mechanical Systems | Signed-off | HAMILTON AIR COMPANY, INC. | 06/16/2023 |
| DOB NOW | Plumbing | Signed-off | D.D.S. MECH PBG&HTG CORP | 04/05/2023 |
| DOB NOW | General Construction | Signed-off | GREENTREE CONSTRUCTION IN | 03/21/2023 |
| DOB NOW | General Construction | Signed-off | NORTHEAST SPECIALIST GROUP | 09/23/2022 |
| DOB NOW | General Construction | Signed-off | NORTHEAST SPECIALIST GROUP | 08/25/2022 |
| DOB NOW | General Construction | Signed-off | PRIME CONSTRUCTION & REST | 07/27/2022 |
| DOB NOW | General Construction | Signed-off | PROFESSIONAL INTERIOR CON | 06/06/2022 |
| DOB NOW | Plumbing | Signed-off | TARGET PIPING NY LLC | 05/27/2022 |
| DOB NOW | General Construction | Signed-off | TOTAL HOME IMPROVEMENT SE | 05/27/2022 |
| DOB NOW | General Construction | Signed-off | LUMITECH CONTRACTING CORP | 05/26/2022 |
| DOB NOW | Plumbing | Signed-off | A&H EXPRESS PLBG&HTG CORP | 05/25/2022 |
| DOB NOW | Plumbing | Signed-off | TOP DOG PLBG & HTG CORP | 04/07/2022 |
| DOB NOW | Plumbing | Signed-off | TOP DOG PLBG & HTG CORP | 07/28/2021 |
| DOB NOW | General Construction | Signed-off | PRIME CONSTRUCTION & REST | 07/26/2021 |
| DOB NOW | Plumbing | Signed-off | AUTHENTIC PLBG CORP | 05/21/2021 |
| DOB NOW | Plumbing | Signed-off | WATSON'S PLBG, HTG, & BDG | 06/16/2020 |
| DOB NOW | Plumbing | Signed-off | AUTHENTIC PLBG CORP | 11/19/2019 |
| Date | Type | Result | Report |
|---|---|---|---|
| 08/03/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/31/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/29/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/21/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/07/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/01/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/25/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/22/2026 | Pass-Final Curb Cut Non-Directive 14 | Pass | View ↗ |
| 03/26/2026 | Fail-Final Curb Cut Non-Directive 14 | Fail | View ↗ |
| 03/19/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 03/16/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/16/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 01/12/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 01/12/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 12/09/2025 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 07/10/2025 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/23/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 01/16/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 12/22/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 07/20/2023 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 07/20/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/13/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/01/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/01/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 08/25/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 05/08/2026 | Post-installed Anchors | Younes Abouyaala | special |
| 05/08/2026 | Fire-Resistant Penetrations and Joints | Younes Abouyaala | special |
| 05/08/2026 | Sprinkler Systems | Younes Abouyaala | special |
| 03/27/2026 | Energy Code Compliance Inspections | ANDREW GOODRICH | progress |
| 03/27/2026 | Fire-Resistant Penetrations and Joints | ANDREW GOODRICH | special |
| 03/26/2026 | Post-installed Anchors | Younes Abouyaala | special |
| 03/26/2026 | Structural Stability – Alterations of existing buildings | Younes Abouyaala | special |
| 03/26/2026 | Structural Steel - Details | Younes Abouyaala | special |
| 03/26/2026 | Final | NAVEEN KUMAR | progress |
| 03/26/2026 | Concrete - Cast-In-Place | Younes Abouyaala | special |
| 03/17/2026 | Fire-Resistant Penetrations and Joints | ANDREW GOODRICH | special |
| 03/17/2026 | Fire-Resistance Rated Construction | ANDREW GOODRICH | progress |
| 03/17/2026 | Energy Code Compliance Inspections | ANDREW GOODRICH | progress |
| 03/12/2026 | Interior lighting power | Kiyomi Troemner | energy_progress |
| 03/12/2026 | Maintenance information | Kiyomi Troemner | energy_progress |
| 03/12/2026 | Energy Code Compliance Inspections | Kiyomi Troemner | progress |
| 03/12/2026 | Final | Kiyomi Troemner | progress |
| 03/12/2026 | Fire-Resistant Penetrations and Joints | BALTU YORKOS | special |
| 10/08/2025 | Final | WILLIAM DAVIS | progress |
| 10/08/2025 | Tenant Protection Plan Compliance | WILLIAM DAVIS | special |
| 10/08/2025 | Fire-Resistant Penetrations and Joints | WILLIAM DAVIS | special |
| 09/30/2025 | Lighting in dwelling units | Nazzareno Callipo | energy_progress |
| 09/30/2025 | Fire-Resistant Penetrations and Joints | Nazzareno Callipo | special |
| 09/30/2025 | Energy Code Compliance Inspections | Nazzareno Callipo | progress |
| 09/30/2025 | Final | Nazzareno Callipo | progress |