240 WEST 12 STREET
MANHATTAN · BIN 1011016
💬 Discuss this project
1859Year Built
3Stories
C0Building Class
R6Zoning
4,076 sfGross Floor Area
3Units
Rent Stabilized8 Open Violations ▸
Three families · 1,621 sf lot · 2.51 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof27p · 5 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 322p · 2 filings · 20 docs
Floor 222p · 2 filings · 20 docs
Floor 123p · 3 filings · 20 docs
Cellar27p · 5 filings · 20 docs
Basement19p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/15/2021$6.8M—Private party → Private party$1,681/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ME ENGINEERS1008/23/2024
ADITYA KARMARKAR407/12/2024
ROBERT SILMAN ASSOC STRUCT ENG DPC604/26/2024
MOHAMMAD AHEAD, PE106/19/2023
MICHAEL TORTORELLA, PE111/23/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
DVA Advisors2103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SIGNATURE AUDIO DESIGN LLCGeneral Contractor1907/08/2026
DYNAMIX SCAFFOLD GROUP LLGeneral Contractor403/21/2026
NEW YORK PARK PLBG&HTG COPlumbing307/08/2026
L.J.F. & SONS ELECL CONTSElectrical203/22/2026
VIP FIRE SPRINKLER INCFire Protection207/08/2026
HORBRIDGE PLUMBING & HEATINGPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS1061407/25/2024
GZA GEOENVIRONMENTAL OF N1179303/25/2024
Building Lifecycle
All (127)Filed (22)Permit Issued (21)Signed Off (8)Violation (11)Inspection (11)Objection (24)Special Inspection (30)
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
11/03/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/04/2025
Violation issued (HPD, open)
A
12/24/2024
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
11/22/2024
Violation issued (HPD, open)
I
10/18/2024
Signed off — Alteration
Foundation modifications as per plans filed herewith. No change in use, egress or occupancy under this application.
M00656920-I1
10/04/2024
Signed off — Alteration
Mechanical work as shown on the plans. No change in use, egress or occupancy.
M00657189-I1
10/04/2024
Signed off — Alteration
Structural modifications as per plans filed herewith. No change in use, egress or occupancy under this application.
M00656725-I1
09/10/2024
Signed off — Alteration
New plumbing piping and fixtures. No change in use, egress or occupancy.
M00657297-I1
09/10/2024
Signed off — Alteration
New sprinkler system. No change in use, egress or occupancy.
M00657344-I1
08/29/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/26/2024
Permit issued — Mechanical Systems
M00657189-I1-MS
08/26/2024
Permit issued — General Construction
M00622867-I1-GC
08/23/2024
Filed — Alteration
New plumbing piping and fixtures. No change in use, egress or occupancy.
M00657297-P4
07/30/2024
Special inspection requirement — Fire-Resistance Rated Construction
GEORGE GHEBRYAL
07/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
07/29/2024
Special inspection requirement — Mechanical Systems
GEORGE GHEBRYAL
07/29/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
07/25/2024
Filed — Alteration
Mechanical work as shown on the plans. No change in use, egress or occupancy.
M00657189-P2
07/25/2024
Filed — Alteration
New plumbing piping and fixtures. No change in use, egress or occupancy.
M00657297-P3
07/12/2024
Filed — Alteration CO
Conversion of multi-family to single family dwelling.
M00622867-P2
06/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
GEORGE GHEBRYAL
06/18/2024
Special inspection requirement — Fire-Resistance Rated Construction
GEORGE GHEBRYAL
05/16/2024
Signed off — Alteration
Plumbing work as shown on the plans.
M00630968-I1
05/16/2024
Inspection — Pass-Final SP - Up to 9 Requested Floors
Pass
View inspection ↗
05/15/2024
Signed off — Alteration
Interior demolition as shown on plans.
M00624568-I1
05/10/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/06/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/26/2024
Filed — Alteration
Structural modifications as per plans filed herewith. No change in use, egress or occupancy under this application.
M00656725-P2
04/25/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
04/25/2024
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
04/25/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
04/25/2024
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
04/25/2024
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
04/25/2024
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
04/22/2024
Signed off — Alteration
Installation of heavy duty sidewalk shed and pipe scaffold as per chapter 33 of NYCBC. No change in use, egress, or occupancy
M00890647-I1
04/16/2024
Objection resolved — Addressed
04/15/2024
Objection raised — Scope
04/03/2024
Filed — Alteration CO
Conversion of multi-family to single family dwelling.
M00622867-P1
04/01/2024
Violation issued (HPD, open)
A
03/26/2024
Filed — Alteration
Mechanical work as shown on the plans. No change in use, egress or occupancy.
M00657189-P1
03/26/2024
Special inspection requirement — Subgrade Inspections
Douglas Roy
03/26/2024
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
03/26/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Douglas Roy
03/26/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
03/26/2024
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
03/25/2024
Filed — Alteration
Foundation modifications as per plans filed herewith. No change in use, egress or occupancy under this application.
M00656920-P2
03/25/2024
Filed — Alteration
Structural modifications as per plans filed herewith. No change in use, egress or occupancy under this application.
M00656725-P1
03/22/2024
Filed — Alteration
New plumbing piping and fixtures. No change in use, egress or occupancy.
M00657297-P2
03/19/2024
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
03/19/2024
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
03/19/2024
Special inspection requirement — Subgrade Inspections
Muktar Khatari
03/19/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Muktar Khatari
03/19/2024
Special inspection requirement — Final
GEORGE GHEBRYAL
03/19/2024
Special inspection requirement — Footing and Foundation
GEORGE GHEBRYAL
03/19/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
03/19/2024
Special inspection requirement — Structural Steel - Details
GEORGE GHEBRYAL
03/19/2024
Special inspection requirement — Structural Steel - High Strength Bolting
GEORGE GHEBRYAL
03/19/2024
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offSIGNATURE AUDIO DESIGN LL08/26/2024
DOB NOWGeneral ConstructionPermit IssuedSIGNATURE AUDIO DESIGN LL08/26/2024
DOB NOWPlumbingSigned-offNEW YORK PARK PLBG&HTG CO01/02/2024
DOB NOWGeneral ConstructionPermit IssuedSIGNATURE AUDIO DESIGN LL08/09/2023
DOB NOWFoundationSigned-offSIGNATURE AUDIO DESIGN LL08/09/2023
DOB NOWStructuralSigned-offSIGNATURE AUDIO DESIGN LL08/09/2023
DOB NOWSprinklersSigned-offVIP FIRE SPRINKLER INC07/27/2023
DOB NOWSidewalk ShedSigned-offDYNAMIX SCAFFOLD GROUP LL06/19/2023
DOB NOWSidewalk ShedSigned-offDYNAMIX SCAFFOLD GROUP LL06/19/2023
DOB NOWMechanical SystemsSigned-offSIGNATURE AUDIO DESIGN LL05/18/2023
DOB NOWGeneral ConstructionSigned-offSIGNATURE AUDIO DESIGN LL05/18/2023
DOB NOWPlumbingSigned-offNEW YORK PARK PLBG&HTG CO12/30/2022
DOB NOWPlumbingSigned-offNEW YORK PARK PLBG&HTG CO12/30/2022
DOB NOWSprinklersSigned-offVIP FIRE SPRINKLER INC08/26/2022
DOB NOWFoundationSigned-offSIGNATURE AUDIO DESIGN LL07/19/2022
DOB NOWStructuralSigned-offSIGNATURE AUDIO DESIGN LL07/13/2022
DOB NOWGeneral ConstructionPermit IssuedSIGNATURE AUDIO DESIGN LL07/01/2022
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT05/14/2022
DOB NOWPlumbingSigned-offHORBRIDGE PLUMBING & HEAT05/13/2022
DOB NOWGeneral ConstructionSigned-offSIGNATURE AUDIO DESIGN LL05/02/2022
DOB NOWMechanical SystemsSigned-offSIGNATURE AUDIO DESIGN LL04/28/2022
2 projects · most recent 07/22/2024
General Wiring
FiledStatusContractorScope
07/22/2024CompleteL.J.F. & SONS ELECL CONTSGeneral Wiring
06/21/2023CompleteHIGH QUALITY ELECTRIC OF—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
11/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/24/2024Fail-Final CND-Occupancy InspectionFailView ↗
08/29/2024Pass-Final CND-Occupancy InspectionPassView ↗
05/16/2024Pass-Final SP - Up to 9 Requested FloorsPassView ↗
05/10/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/06/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/25/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/10/2023Pass-Final PL - UndergroundPassView ↗
01/27/2023Pass-Final PL - UndergroundPassView ↗
01/25/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
07/30/2024Fire-Resistance Rated ConstructionGEORGE GHEBRYALprogress
07/30/2024Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
07/29/2024Mechanical SystemsGEORGE GHEBRYALspecial
07/29/2024FinalGEORGE GHEBRYALprogress
06/18/2024Fire-Resistant Penetrations and JointsGEORGE GHEBRYALspecial
06/18/2024Fire-Resistance Rated ConstructionGEORGE GHEBRYALprogress
04/25/2024FinalGEORGE GHEBRYALprogress
04/25/2024Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
04/25/2024Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
04/25/2024Structural Steel - DetailsGEORGE GHEBRYALspecial
04/25/2024Structural Steel - High Strength BoltingGEORGE GHEBRYALspecial
04/25/2024Structural Steel - WeldingGEORGE GHEBRYALspecial
03/26/2024Subgrade InspectionsDouglas Royspecial
03/26/2024Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
03/26/2024Subsurface Investigations (Borings/Test Pits)Douglas Royspecial
03/26/2024FinalGEORGE GHEBRYALprogress
03/26/2024Footing and FoundationGEORGE GHEBRYALprogress
03/19/2024Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
03/19/2024Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
03/19/2024Subgrade InspectionsMuktar Khatarispecial
03/19/2024Subsurface Investigations (Borings/Test Pits)Muktar Khatarispecial
03/19/2024FinalGEORGE GHEBRYALprogress
03/19/2024Footing and FoundationGEORGE GHEBRYALprogress
03/19/2024Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
03/19/2024Structural Steel - DetailsGEORGE GHEBRYALspecial
Latest 25 of 33.
▾Documents — 123 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
09/03/2026M00624568-I1Request digital key ↗
09/03/2026M00630968-I1Request digital key ↗
09/02/2026M00656920-P2Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits18
▸DOB NOWLPC Approval/Permit18
09/03/2026M00630968-I1Open ↗
09/02/2026M00656725-P1Open ↗
09/02/2026M00656725-I1Open ↗
Showing 3 of 18 on file for this type
▸Seals & Professional Certifications54
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/03/2026M00630968-I1Open ↗
09/02/2026M00656920-P2Open ↗
09/02/2026M00656920-I1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature20
09/23/2026M00622867-P2Open ↗
09/01/2026M00622867-I1Open ↗
09/01/2026M00657189-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026M00622867-P2Open ↗
09/01/2026M00622867-I1Open ↗
09/01/2026M00657189-I1Open ↗
Showing 3 of 12 on file for this type
▸Safety & Tenant Protection4
▸DOB NOWStreet Tree Checklist3
08/13/2026M00622867-P1Open ↗
08/13/2026M00622867-P2Open ↗
08/13/2026M00622867-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M00622867-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
09/03/2026M00630968-I1Open ↗
09/02/2026M00656920-I1Open ↗
09/02/2026M00657344-I1Open ↗
Showing 3 of 8 on file for this type
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026M00656920-P1Open ↗
08/13/2026M00656920-P2Open ↗
08/13/2026M00656920-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026M00656920-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026M00656920-I1Open ↗
▸Other Documents12
▸DOB NOWProof of Historic Building9
09/03/2026M00630968-I1Open ↗
08/26/2026M00657297-I1Open ↗
08/26/2026M00657297-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProperty Ownership Certification3
08/26/2026M00622867-P2Open ↗
08/15/2026M00622867-I1Open ↗
08/14/2026M00622867-P1Open ↗