Telephone utility
2417 TRATMAN AVENUE
BRONX · BIN 2041748
💬 Discuss this project
0Year Built
—Stories
U4Building Class
R5AZoning
0 sfGross Floor Area
0Units
1 Open Violation ▸FDNY Report ↗
Telephone utility · Owner of record: VERIZON NEW YORK INC · 37,089 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction15p · 5 filings · 20 docs
Floor 4Under Construction11p · 2 filings · 9 docs
Floor 3Under Construction12p · 5 filings · 20 docs
Floor 2Under Construction11p · 2 filings · 9 docs
Floor 1Under Construction11p · 3 filings · 16 docs
Cellar13p · 6 filings · 20 docs
Basement1p · 1 filing · 7 docs
Sub-BasementUnder Construction9p · 2 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VERIZON3507/08/2026
GRE - FACILITY MANAGEMENT507/08/2026
VERIZON CORPORATE REAL ESTATE307/08/2026
VERIZON WIRELESS303/22/2026
NYNEX303/22/2026
N Y TELEPHONE CO203/22/2026
N Y N E X RM 802103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JAM CONSULTANTS, INC.1403/21/2026
A E C PERMITS603/21/2026
ANGELA RIVERA503/21/2026
EUROCELT EXPEDITING, INC603/21/2026
LOUIS STRIAR203/21/2026
UNITED SAFETY CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TISHMAN INTERIORS CORPGeneral Contractor3009/30/2026
PLATFORM SOLUTIONS, INCGeneral Contractor407/08/2026
JAMES E FITZGERALD INCGeneral Contractor307/08/2026
ASHLAR MECHANICAL CORPFire Protection207/08/2026
ASHLAR MECHANICALPlumbing203/22/2026
MACKLER MASTER FIRE INCPlumbing107/08/2026
HATZEL AND BUEHLER, INCElectrical103/22/2026
SIGNSTAR NYCScaffold107/08/2026
HEMSING, ROBERTElectrical103/21/2026
JOSEPH RAMPINOElectrical103/21/2026
SHORT, HENRYElectrical103/21/2026
SPRING SCAFFOLDING LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER5441111/07/2024
Building Lifecycle
All (145)Filed (20)Permit Issued (32)Signed Off (12)Violation (39)Inspection (14)Special Inspection (28)
09/29/2026
Permit issued — Mechanical Systems
X01025677-I1-MS
09/29/2026
Permit issued — General Construction
X01049091-I1-GC-CX
07/13/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/09/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/24/2025
Violation issued (FDNY_ORDER, closed)
10/03/2025
Permit issued — Mechanical Systems
X01025677-I1-MS
10/03/2025
Permit issued — Construction Fence
X01027119-I1-FN
10/03/2025
Permit issued — Structural
X01049091-I1-GC-CX
09/25/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PIPE SCAFFOLD IN THE COURTYARD AT THE SOUTH ELEVATION, THE RISER FROM THE GROUND PAST THE TOP OF THE BUILDING.
X01200780-I1
07/30/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/30/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/08/2025
Permit issued — Supported Scaffold
X01200780-I1-SF
04/07/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PIPE SCAFFOLD IN THE COURTYARD AT THE SOUTH ELEVATION, THE RISER FROM THE GROUND PAST THE TOP OF THE BUILDING.
X01200780-I1
04/03/2025
Violation issued (FDNY_ORDER, closed)
03/27/2025
Signed off — Alteration
X08033977-I1
12/31/2024
Signed off — Alteration
X00681503-I1
11/26/2024
Permit issued — Structural
X01049091-I1-GC-CX
11/26/2024
Permit issued — Mechanical Systems
X01025677-I1-MS
11/26/2024
Permit issued — Construction Fence
X01027119-I1-FN
11/12/2024
Permit issued — General Construction
X00681503-I1-GC
11/07/2024
Filed — Alteration
Hereby filing removal of chiller plant farm with associated piping basement up to roof. Installation of new HVAC system with associated piping and ductwork and 3 new adiabatic coolers on roof with associated piping
X01025677-I1
11/06/2024
Filed — Alteration
X01049091-I1
11/06/2024
Filed — Alteration
X01027119-I1
11/04/2024
Special inspection requirement — Energy Code Compliance Inspections
EUGENE BIFULCO
11/04/2024
Special inspection requirement — Maintenance information
EUGENE BIFULCO
11/04/2024
Special inspection requirement — Lighting controls
EUGENE BIFULCO
11/04/2024
Special inspection requirement — HVAC-R and service water heating system controls
EUGENE BIFULCO
11/04/2024
Special inspection requirement — HVAC-R and service water heating equipment
EUGENE BIFULCO
11/04/2024
Special inspection requirement — Interior lighting power
EUGENE BIFULCO
11/04/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
EUGENE BIFULCO
11/04/2024
Special inspection requirement — Exterior lighting power
EUGENE BIFULCO
10/17/2024
Signed off — Alteration
STEEL FRAMING PLATFORMS FOR ROOF MOUNTED EQUIPMENT. EXTERIOR MASONRY SHAFT. FRAMING FOR SUPPORT OF EXTERIOR WALL MOUNTED CONDUITS.
X08033244-I1
09/27/2024
Signed off — Alteration
General Construction work realted to new roof top emergency generator & associated equipment.
X08033246-I1
09/24/2024
Signed off — Alteration
New generator & associated fuel piping
X08033245-I1
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/05/2024
Violation issued (FDNY_NOV, closed)
06/05/2024
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED INSTALLED IN ACCORDANCE WITH 2022 NYC BUILDING CODE, CHAPTER 33.
X00893132-I1
04/11/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/08/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/02/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/28/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/26/2024
Special inspection requirement — Mechanical Systems
EUGENE BIFULCO
03/26/2024
Special inspection requirement — Final
EUGENE BIFULCO
03/07/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/07/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/08/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SCAFFOLD TO COMPLY WITH CHAPTER 33 OF NYC BUILDING CODE.
X00822710-I1
12/19/2023
Permit issued — Mechanical Systems
X08033245-I1-MS
12/18/2023
Permit issued — Structural
X08033244-I1-ST
12/18/2023
Permit issued — General Construction
X08033246-I1-GC
12/15/2023
Permit issued — General Construction
X00681503-I1-GC
12/07/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
11/16/2023
Filed — Alteration
X08033977-P1
11/16/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
EUGENE BIFULCO
11/03/2023
Signed off — Alteration
Removal of Four Dry coolers on roof with associated pipes. Installation of one Adiabatic cooler snd associated pipes
X00621246-I1
11/02/2023
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
EUGENE BIFULCO
10/30/2023
Signed off — Alteration
General Construction work related to the removal of 4 dry coolers on the roof and installation of adiabatic coolers. Scope includes installation of rooftop crossover walkway
X00621245-I1
10/18/2023
Permit issued — Boiler Equipment
X08033977-I1-BE
Latest 60 of 145 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedTISHMAN INTERIORS CORP09/29/2026
DOB NOWGeneral ConstructionPermit IssuedTISHMAN INTERIORS CORP09/29/2026
DOB NOWMechanical SystemsPermit IssuedTISHMAN INTERIORS CORP10/03/2025
DOB NOWConstruction FenceSigned-offTISHMAN INTERIORS CORP10/03/2025
DOB NOWStructuralPermit IssuedTISHMAN INTERIORS CORP10/03/2025
DOB NOWSupported ScaffoldSigned-offSPRING SCAFFOLDING LLC04/08/2025
DOB NOWStructuralPermit IssuedTISHMAN INTERIORS CORP11/26/2024
DOB NOWMechanical SystemsPermit IssuedTISHMAN INTERIORS CORP11/26/2024
DOB NOWConstruction FenceSigned-offTISHMAN INTERIORS CORP11/26/2024
DOB NOWGeneral ConstructionSigned-offTISHMAN INTERIORS CORP11/12/2024
DOB NOWMechanical SystemsSigned-offTISHMAN INTERIORS CORP12/19/2023
DOB NOWStructuralSigned-offTISHMAN INTERIORS CORP12/18/2023
DOB NOWGeneral ConstructionSigned-offTISHMAN INTERIORS CORP12/18/2023
DOB NOWGeneral ConstructionSigned-offTISHMAN INTERIORS CORP12/15/2023
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP10/18/2023
DOB NOWSprinklersPermit IssuedASHLAR MECHANICAL CORP10/05/2023
DOB NOWGeneral ConstructionSigned-offTISHMAN INTERIORS CORP09/20/2023
DOB NOWMechanical SystemsSigned-offTISHMAN INTERIORS CORP09/20/2023
DOB NOWStructuralSigned-offTISHMAN INTERIORS CORP09/20/2023
DOB NOWGeneral ConstructionSigned-offTISHMAN INTERIORS CORP07/06/2023
DOB NOWSidewalk ShedSigned-offPLATFORM SOLUTIONS, INC06/20/2023
DOB NOWSupported ScaffoldSigned-offPLATFORM SOLUTIONS, INC02/07/2023
DOB NOWSprinklersPermit IssuedASHLAR MECHANICAL CORP01/27/2023
DOB NOWBoiler EquipmentSigned-offCHAMPION COMBUSTION CORP12/16/2022
DOB NOWMechanical SystemsSigned-offTISHMAN INTERIORS CORP12/16/2022
DOB NOWStructuralSigned-offTISHMAN INTERIORS CORP12/16/2022
DOB NOWGeneral ConstructionSigned-offTISHMAN INTERIORS CORP12/16/2022
DOB NOWStructuralSigned-offJAMES E FITZGERALD INC08/17/2022
DOB NOWMechanical SystemsSigned-offJAMES E FITZGERALD INC08/16/2022
DOB NOWGeneral ConstructionSigned-offTISHMAN INTERIORS CORP08/04/2022
DOB NOWSignSigned-offSIGNSTAR NYC06/04/2022
DOB NOWPlumbingSigned-offMACKLER MASTER FIRE INC08/19/2019
BISMHISSUEDSUGRUE CONTRACTING CORP10/24/2017
BISOTISSUEDJ T & T AIR CONDITIONING01/26/2017
BISFSISSUEDPETER AGLIARDO CONTRACTOR10/09/2015
BISOTISSUEDSUGRUE CONTRACTING CORP04/29/2014
BISMHISSUEDSUGRUE CONTRACTING CORP04/29/2014
BISOTISSUEDSUGRUE CONTRACTING CORP04/29/2014
BISEQISSUEDSUGRUE CONTRACTING CORP04/29/2014
BISOTISSUEDSUGRUE CONTRACTING CORP11/18/2013
+ 30 more permits on file
1 project · most recent 11/07/2024
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
11/07/2024Permit IssuedTISHMAN INTERIORS CORPAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric TPKFYP-015 KM140A 15 BTU · Condensing Unit ×9
NTXMSM48A182BA 48 BTU · Condensing Unit ×3
TPKFYP-008 LM140A 8 BTU · Condensing Unit ×3
NTXMSM36A142BA 36 BTU · Condensing Unit ×2
TPKFYP-006 LM140A 6 BTU · Vrf Indoor ×2
TPKFYP-012 LM140A 12 BTU · Vrf Indoor ×2
TPVFY-P054 AM140A 54 BTU · Condensing Unit ×2
TKKA0A0121HA70A 12 BTU · Condensing Unit ×1
TRUZA0121KA70NA 12 BTU · Vrf Outdoor ×1
TUHYE1203A N40AN 120 BTU · Vrf Outdoor ×1
Climateworx PFD 076 12,000 CFM · Fan Coil Indoor ×4
PFU 076 10,800 CFM ×3
PGR 057 7,000 CFM · Crac Unit ×3
PGR 076 10,800 CFM ×3
PFU 034 5,600 CFM · Fan Coil Indoor ×2
PGR 089 14,700 CFM ×2
PFD 026 3,000 CFM · Fan Coil Indoor ×1
PFU 026 3,000 CFM · Fan Coil Indoor ×1
PGR 065 9,000 CFM · Crac Unit ×1
Heating
Mitsubishi Electric TPKFYP-015 KM140A 17 BTU · Condensing Unit ×9
NTXMSM48A182BA 50 BTU · Condensing Unit ×3
TPKFYP-008 LM140A 9 BTU · Condensing Unit ×3
NTXMSM36A142BA 36 BTU · Condensing Unit ×2
TPKFYP-006 LM140A 7 BTU · Condensing Unit ×2
TPKYP-012 LM250A 14 BTU · Condensing Unit ×2
TPVFY-P054 AM140A 54 BTU · Condensing Unit ×2
TPKA0A0121HA70A 12 BTU · Condensing Unit ×1
TRUZA0121KA70NA 14 BTU · Vrf Outdoor ×1
TUHYE1203A N40AN 135 BTU · Vrf Outdoor ×1
1 project · most recent 11/04/2022
FiledStatusContractorScope
11/04/2022Permit IssuedASHLAR MECHANICAL CORP—
9 projects · most recent 01/21/2026
General Wiring
FiledStatusContractorScope
01/21/2026Permit IssuedPINTO & TEGER ELEC. CORP.General Wiring
01/13/2025Permit IssuedROBERT B SAMUELS, INCGeneral Wiring
10/22/2024Permit IssuedCARUSO & SONS ELECTL CONTGeneral Wiring
06/19/2023Permit IssuedSTANCO SYSTEM ELEC'L CONT—
05/31/2023CompleteDIANE ELECTRIC INC.General Wiring
02/02/2023CompleteCARUSO & SONS ELECTL CONTGeneral Wiring
08/29/2022CompleteJAMES F. VOLPE ELEC'LGeneral Wiring
08/26/2021CompleteJAMES F. VOLPE ELEC'LGeneral Wiring
06/15/2021CompleteHATZEL AND BUEHLER, INCGeneral Wiring
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
07/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/09/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/30/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/30/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/11/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/02/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/28/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/07/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/07/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/07/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 28
DateRequirementInspectorRole
11/04/2024Energy Code Compliance InspectionsEUGENE BIFULCOprogress
11/04/2024Maintenance informationEUGENE BIFULCOenergy_progress
11/04/2024Lighting controlsEUGENE BIFULCOenergy_progress
11/04/2024HVAC-R and service water heating system controlsEUGENE BIFULCOenergy_progress
11/04/2024HVAC-R and service water heating equipmentEUGENE BIFULCOenergy_progress
11/04/2024Interior lighting powerEUGENE BIFULCOenergy_progress
11/04/2024HVAC-R and service water piping design and insulationEUGENE BIFULCOenergy_progress
11/04/2024Exterior lighting powerEUGENE BIFULCOenergy_progress
03/26/2024Mechanical SystemsEUGENE BIFULCOspecial
03/26/2024FinalEUGENE BIFULCOprogress
11/16/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsEUGENE BIFULCOspecial
11/02/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsEUGENE BIFULCOspecial
11/03/2022Post-installed AnchorsEUGENE BIFULCOspecial
11/03/2022MasonryEUGENE BIFULCOspecial
11/03/2022Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
11/03/2022Emergency and Standby Power Systems (Generator)EUGENE BIFULCOspecial
11/03/2022Structural Steel - WeldingEUGENE BIFULCOspecial
11/03/2022Structural Steel - High Strength BoltingEUGENE BIFULCOspecial
11/03/2022Structural Steel - DetailsEUGENE BIFULCOspecial
11/02/2022FinalEUGENE BIFULCOprogress
11/02/2022Mechanical SystemsEUGENE BIFULCOspecial
11/02/2022FinalEUGENE BIFULCOprogress
06/02/2022FinalMOHAMMAD AHEADprogress
11/01/2021Fire-Resistant Penetrations and JointsEUGENE BIFULCOspecial
11/01/2021Structural Steel - High Strength BoltingEUGENE BIFULCOspecial
Latest 25 of 28.
▾Documents — 193 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch17
08/24/2026X00681503-I1Request digital key ↗
08/24/2026X00743435-I1Request digital key ↗
08/24/2026X00621245-I1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/26/2026X00207126-I1Request digital key ↗
08/15/2026X00207126-P2Request digital key ↗
08/15/2026X00207126-P1Request digital key ↗
▸Applications & Permits26
▸BISWORK PERMIT APPLICATION14
10/24/2017220621281Open ↗
01/26/2017220560587Open ↗
01/26/2017220560587Open ↗
Showing 3 of 14 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION12
03/05/2019220621281Open ↗
01/03/2019220621281Open ↗
05/18/2018220621281Open ↗
Showing 3 of 12 on file for this type
▸Seals & Professional Certifications64
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION22
07/13/2018220621281Open ↗
10/24/2017220621281Open ↗
10/18/2017220621281Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/26/2026X00207126-I1Open ↗
08/24/2026X00681503-I1Open ↗
08/24/2026X00743435-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/25/2026X08033977-P1Open ↗
09/01/2026X08033977-I1Open ↗
08/28/2026X01025677-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/28/2026X01025677-I1Open ↗
08/28/2026X00743435-I1Open ↗
08/28/2026X01025677-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
10/18/2017220621281Open ↗
07/24/2017220560587Open ↗
11/18/2016220560587Open ↗
Showing 3 of 4 on file for this type
▸BISPC FULL REPORT3
11/29/2007210024524Open ↗
11/29/2007210024524Open ↗
11/27/2007210024542Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
10/18/2017220621281Open ↗
11/18/2016220560587Open ↗
09/29/2015220480771Open ↗
▸Trade Schedules & Equipment6
▸BISEQUIPMENT USE APPLICATION/PERMIT3
02/07/2024220560587Open ↗
01/15/2019220621281Open ↗
09/25/2008210024524Open ↗
▸BISEQUIPMENT USE PERMITS2
01/15/2019220621281Open ↗
09/25/2008210024524Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
09/29/2015220480771Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/26/2026X00207126-I1Open ↗
08/24/2026X00681503-I1Open ↗
08/24/2026X00743435-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form7
08/23/2026X08033244-I1Open ↗
08/23/2026X08033243-I1Open ↗
08/22/2026X08033977-I1Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
11/29/2007210024524Open ↗
11/27/2007210024542Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/19/2017220621281Open ↗
11/18/2016220560587Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
11/15/2013220334671Open ↗
▸Energy Compliance17
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
07/13/2018220621281Open ↗
05/18/2018220621281Open ↗
10/24/2017220621281Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
07/13/2018220621281Open ↗
08/22/2017220560587Open ↗
09/22/2014220334671Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00621246-I1Open ↗
▸Approvals, Objections & Sign-offs13
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST6
07/13/2018220621281Open ↗
08/22/2017220560587Open ↗
12/24/2015220480771Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter3
08/13/2026X00822710-I1Open ↗
08/13/2026X00822710-P1Open ↗
08/13/2026X00893132-I1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
02/07/2024220560587Open ↗
09/22/2014220334671Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
11/27/2007210024524Open ↗
11/27/2007210024542Open ↗
▸Cost, Insurance & Ownership14
▸BISCOST AFFIDAVIT14
07/13/2018220621281Open ↗
10/18/2017220621281Open ↗
08/22/2017220560587Open ↗
Showing 3 of 14 on file for this type
▸Filing & Intake Forms14
▸BISEFILING COVER SHEET7
10/18/2017220621281Open ↗
11/18/2016220560587Open ↗
11/15/2016220559973Open ↗
Showing 3 of 7 on file for this type
▸BISBOROUGH INTAKE FORM4
03/05/2019220621281Open ↗
01/03/2019220621281Open ↗
07/13/2018220621281Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION3
01/11/2019220621281Open ↗
05/18/2018220621281Open ↗
09/08/2014220334671Open ↗