← Back
Over six families without stores
242 MONTROSE AVENUE
BROOKLYN · East Williamsburg · BIN 3071259
💬 Discuss this project
1920Year Built
4Stories
C1Building Class
R6Zoning
4,500 sfGross Floor Area
7Units
Rent Stabilized4 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: 242 MONTROSE REALTY LLC · 2,500 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire Protection
Roof7p · 3 filings · 20 docs
Floor 44p · 2 filings · 20 docs
Floor 36p · 2 filings · 20 docs
Floor 22p · 1 filing · 12 docs
Floor 14p · 2 filings · 20 docs
Cellar13p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BLUE SHINE BUILDERS INC DBA BLUE SK1507/08/2026
242 MONTROSE REALTY LLC203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/30/2022$1.8M—— → —$400/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FC CONSULTING ENGINEER, PLLC803/05/2024
AZSK ARCHITECTS PC208/31/2023
HAYYAN DESIGN106/05/2023
FL&M ENGINEERING DESIGN &INSPECTION101/09/2023
THORNTON TOMASETTI104/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC1603/21/2026
DOMINION EXPEDITING103/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YATZIV CORPGeneral Contractor807/08/2026
PRIME PIPING & HEATING INPlumbing507/08/2026
INNOVATIVE CONSTR NYC LLCGeneral Contractor407/08/2026
MANHATTAN D ENTERPRISESGeneral Contractor407/08/2026
OZ CONTRACTING LLCGeneral Contractor107/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
DUNRITE ELECTRICAL CORPElectrical103/22/2026
A M B MECHANICALPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616809/18/2023
DNA CONTROLLED INSPECTION554104/06/2021
THORNTON TOMASETTI, INC.1740104/06/2021
Building Lifecycle
All (137)Filed (13)Permit Issued (12)Signed Off (8)Violation (58)Inspection (4)Objection (12)Special Inspection (30)
11/18/2025
Violation issued (HPD, closed)
I
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/02/2025
Signed off — Alteration
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH APPLICATION #B00854305-I1
B00854305-S2
06/10/2025
Violation issued (HPD, closed)
A
04/09/2025
Signed off — Alteration
Plumbing work related to Fire restoration of a fire damaged building. No change to use, egress or occupancy.
B00532594-S3
12/16/2024
Violation issued (ECB, closed)
Boilers
11/25/2024
Violation issued (HPD, closed)
I
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/11/2024
Violation issued (HPD, closed)
A
03/14/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/05/2024
Filed — Alteration
Plumbing work related to Fire restoration of a fire damaged building. No change to use, egress or occupancy.
B00532594-P1
01/11/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/05/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/04/2024
Signed off — Alteration
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH APPLICATION #B00854305-I1
B00854305-S1
01/04/2024
Signed off — Alteration
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH APPLICATION #B00854305-I1
B00854305-I1
10/27/2023
Permit issued — Sprinklers
B00854305-S2-PL
10/27/2023
Permit issued — Sprinklers
B00854305-S2-EW-SP
10/18/2023
Signed off — Alteration
Plumbing work related to Fire restoration of a fire damaged building. No change to use, egress or occupancy.
B00532594-S2
09/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/25/2023
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
09/25/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
09/25/2023
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
09/25/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
09/25/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/25/2023
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
09/25/2023
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
FAHAD FATEH
09/25/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
FAHAD FATEH
09/25/2023
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
09/19/2023
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
09/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
09/19/2023
Special inspection requirement — Mechanical Systems
FAHAD FATEH
09/19/2023
Special inspection requirement — Final
FAHAD FATEH
09/19/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/19/2023
Special inspection requirement — Shutoff dampers
FAHAD FATEH
09/19/2023
Special inspection requirement — Heating Systems
FAHAD FATEH
09/19/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
09/19/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
09/19/2023
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
09/18/2023
Filed — Alteration
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH APPLICATION #B00854305-I1
B00854305-P3
09/18/2023
Special inspection requirement — Metering
FAHAD FATEH
09/18/2023
Special inspection requirement — Fenestration areas
FAHAD FATEH
09/18/2023
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
09/18/2023
Special inspection requirement — Exterior lighting power
FAHAD FATEH
09/18/2023
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
09/18/2023
Special inspection requirement — Interior lighting power
FAHAD FATEH
09/18/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
09/18/2023
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
09/18/2023
Special inspection requirement — Final
FAHAD FATEH
09/18/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/14/2023
Objection raised — DPL-1
09/14/2023
Objection resolved — Addressed
09/11/2023
Filed — Alteration
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH APPLICATION #B00854305-I1
B00854305-P2
09/06/2023
Objection raised — Other
09/06/2023
Objection resolved — Addressed
08/31/2023
Filed — Alteration
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH APPLICATION #B00854305-I1
B00854305-P1
07/05/2023
Signed off — Alteration
Plumbing work related to Fire restoration of a fire damaged building. No change to use, egress or occupancy.
B00532594-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/21/2023
Permit issued — Mechanical Systems
B00854305-S1-MS
06/16/2023
Permit issued — General Construction
B00854305-I1-GC
Latest 60 of 137 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offPRIME PIPING & HEATING IN10/27/2023
DOB NOWSprinklersSigned-offA M B MECHANICAL INC10/27/2023
DOB NOWMechanical SystemsSigned-offYATZIV CORP06/21/2023
DOB NOWGeneral ConstructionSigned-offYATZIV CORP06/16/2023
DOB NOWFoundationSigned-offYATZIV CORP05/05/2023
DOB NOWGeneral ConstructionSigned-offYATZIV CORP05/05/2023
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN01/19/2023
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES01/09/2023
DOB NOWSidewalk ShedSigned-offMANHATTAN D ENTERPRISES01/09/2023
DOB NOWGeneral ConstructionSigned-offINNOVATIVE CONSTR NYC LLC09/09/2022
DOB NOWStructuralSigned-offINNOVATIVE CONSTR NYC LLC09/06/2022
DOB NOWStructuralSigned-offOZ CONTRACTING LLC04/21/2021
BISFBISSUEDDANIEL COLASANTO09/22/1995
1 project · most recent 09/18/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/18/2023Signed-offYATZIV CORPHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-3C30NA3 27,600 BTU · Condensing Unit ×12
MXZ-SM48NAM 48,000 BTU · Condensing Unit ×2
1 project · most recent 09/18/2023
FiledStatusContractorScope
09/18/2023Signed-offPRIME PIPING & HEATING IN—
1 project · most recent 09/18/2023
Water/Sanitary
FiledStatusContractorScope
09/18/2023Signed-offA M B MECHANICAL INCWater/Sanitary
2 projects · most recent 03/12/2023
General Wiring
FiledStatusContractorScope
03/12/2023CompleteDUNRITE ELECTRICAL CORPGeneral Wiring
01/11/2023CompleteSOLAS ELECTRICAL CORP—
1 project · most recent 09/18/2023
Wood
FiledStatusContractorScope
09/18/2023Signed-offA M B MECHANICAL INCWood
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/14/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/11/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/05/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
09/25/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/25/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
09/25/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
09/25/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
09/25/2023Maintenance informationFAHAD FATEHenergy_progress
09/25/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
09/25/2023Post-installed AnchorsFAHAD FATEHspecial
09/25/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesFAHAD FATEHspecial
09/25/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
09/25/2023Sprinkler SystemsFAHAD FATEHspecial
09/19/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
09/19/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/19/2023Mechanical SystemsFAHAD FATEHspecial
09/19/2023FinalFAHAD FATEHprogress
09/19/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
09/19/2023Shutoff dampersFAHAD FATEHenergy_progress
09/19/2023Heating SystemsFAHAD FATEHspecial
09/19/2023Maintenance informationFAHAD FATEHenergy_progress
09/19/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
09/19/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
09/18/2023MeteringFAHAD FATEHenergy_progress
09/18/2023Fenestration areasFAHAD FATEHenergy_progress
09/18/2023Lighting in dwelling unitsFAHAD FATEHenergy_progress
09/18/2023Exterior lighting powerFAHAD FATEHenergy_progress
09/18/2023Fenestration air leakageFAHAD FATEHenergy_progress
Latest 25 of 54.
▾Documents — 47 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
09/01/2026B00498335-I1Request digital key ↗
08/28/2026B00808611-I1Request digital key ↗
08/27/2026B00854305-S1Request digital key ↗
Showing 3 of 13 on file for this type
▸Seals & Professional Certifications25
▸DOB NOWDPL-1: Design Professional Seal & Signature13
09/01/2026B00498335-I1Open ↗
08/28/2026B00808611-I1Open ↗
08/27/2026B00854305-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature8
09/23/2026B00854305-S2Open ↗
09/23/2026B00854305-S2Open ↗
08/30/2026B00854305-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026B00854305-S2Open ↗
08/30/2026B00854305-I1Open ↗
08/25/2026B00854305-S1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
09/01/2026B00498335-I1Open ↗
08/27/2026B00854305-I1Open ↗
08/27/2026B00854305-S2Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00532594-I1Open ↗