BuildNYC
Over six families without stores
242 MONTROSE AVENUE
BROOKLYN · BIN 3071259
💬 Discuss this project
1920Year Built
4Stories
C1Building Class
R6Zoning
4,500 sfGross Floor Area
7Units
Rent Stabilized2 Active Violations 1 old, status unconfirmed ▸FDNY Report ↗
Over six families without stores · Owner of record: 242 Montrose Realty · 2,500 sf lot · 1.8 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofTemporary stabilization and shoring34p · 3 filings · 20 docs
Floor 4Temporary stabilization and shoring50p · 3 filings · 20 docs
Floor 3Temporary stabilization and shoring52p · 3 filings · 20 docs
Floor 2Temporary stabilization and shoring48p · 3 filings · 20 docs
Floor 1Temporary stabilization and shoring50p · 3 filings · 20 docs
CellarTemporary stabilization and shoring59p · 3 filings · 20 docs
Site & exteriorProposed sidewalk shed and stair tower relocation12p · 2 filings · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Blue Shine Builders Inc Dba Blue SK1507/08/2026
242 Montrose Realty103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/30/2022$1.8M—Private party → 242 MONTROSE REALTY LLC$400/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FC Consulting Engineering803/05/2024
Azsk Architects208/31/2023
Hayyan Design106/05/2023
FL&M Engineering Design & Inspection101/09/2023
Thornton Tomasetti104/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Express Filing1603/21/2026
Dominion Expediting103/21/2026
Green Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YatzivGeneral Contractor707/08/2026
Prime Piping & Heatingspecialty_contractor607/08/2026
Manhattan D EnterprisesScaffold407/08/2026
Innovative Construction NYCGeneral Contractor407/08/2026
Dunrite ElectricalElectrical103/22/2026
OZ ContractingGeneral Contractor107/08/2026
Amb MechanicalPlumbing103/22/2026
Yatzivspecialty_contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616809/18/2023
DNA Controlled Inspection554104/06/2021
Thornton Tomasetti1740104/06/2021
Building Lifecycle
05/28/2026
Closed: Failure to file 2021 external low pressure inspection
DOB violation · closed on the city's record
05/28/2026
Closed: Failure to file 2020 external low pressure inspection
DOB violation · closed on the city's record
11/18/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
11/14/2025
Failure to file 2024 external low pressure inspection
DOB violation · open
07/02/2025
Signed off — Alteration
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH APPLICATION #B00854305-I1
B00854305-S2
140 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPrime Piping & Heating10/27/2023
DOB NOWSprinklersSigned-offAmb Mechanical10/27/2023
DOB NOWMechanical SystemsSigned-offYatziv06/21/2023
DOB NOWGeneral ConstructionSigned-offYatziv06/16/2023
DOB NOWGeneral ConstructionSigned-offYatziv05/05/2023
DOB NOWFoundationSigned-offYatziv05/05/2023
DOB NOWPlumbingSigned-offPrime Piping & Heating01/19/2023
DOB NOWSidewalk ShedSigned-offManhattan D Enterprises01/09/2023
DOB NOWSupported ScaffoldSigned-offManhattan D Enterprises01/09/2023
DOB NOWGeneral ConstructionSigned-offInnovative Construction NYC09/09/2022
DOB NOWStructuralSigned-offInnovative Construction NYC09/06/2022
DOB NOWStructuralSigned-offOZ Contracting04/21/2021
BISFBISSUEDDaniel Colasanto09/22/1995
1 project · most recent 09/18/2023
Heating and Air Conditioning Systems
FiledStatusContractorScope
09/18/2023Signed-offYatzivHeating and Air Conditioning Systems
1 project · most recent 09/18/2023
FiledStatusContractorScope
09/18/2023Signed-offPrime Piping & Heating—
1 project · most recent 09/18/2023
Water/Sanitary
FiledStatusContractorScope
09/18/2023Signed-offAmb MechanicalWater/Sanitary
2 projects · most recent 03/12/2023
General Wiring
FiledStatusContractorScope
03/12/2023CompleteDunrite ElectricalGeneral Wiring
01/11/2023CompleteSolas Electrical—
1 project · most recent 09/18/2023
Wood
FiledStatusContractorScope
09/18/2023Signed-offAmb MechanicalWood
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
03/14/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/11/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/05/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/27/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
09/25/2023Post-installed AnchorsFAHAD FATEHspecial
09/25/2023Sprinkler SystemsFAHAD FATEHspecial
09/25/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFAHAD FATEHspecial
09/25/2023Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesFAHAD FATEHspecial
09/25/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
09/25/2023Maintenance informationFAHAD FATEHenergy_progress
09/25/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
09/25/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
09/25/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
09/25/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/19/2023Shutoff dampersFAHAD FATEHenergy_progress
09/19/2023Heating SystemsFAHAD FATEHspecial
09/19/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
09/19/2023Mechanical SystemsFAHAD FATEHspecial
09/19/2023FinalFAHAD FATEHprogress
09/19/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
09/19/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
09/19/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
09/19/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
09/19/2023Maintenance informationFAHAD FATEHenergy_progress
09/18/2023Fenestration air leakageFAHAD FATEHenergy_progress
09/18/2023Exterior lighting powerFAHAD FATEHenergy_progress
09/18/2023Lighting in dwelling unitsFAHAD FATEHenergy_progress
09/18/2023Fenestration areasFAHAD FATEHenergy_progress
09/18/2023MeteringFAHAD FATEHenergy_progress
Latest 25 of 68.