← Back
BuildNYC
Elevator apt, fireproof without stores
243-02 NORTHERN BOULEVARD
QUEENS · BIN 4170072
💬 Discuss this project
1971Year Built
3Stories
D3Building Class
R1-2Zoning
14,586 sfGross Floor Area
12Units
Rent Stabilized3 Active Violations 0 unresolved · 3 paperwork only ▸FDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: BR Northern Partners · 8,023 sf lot · 1.82 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofBrc Management Group58p · 2 filings · 20 docs
BulkheadBrc Management Group2p · 1 filing · 20 docs
Floor 3Brc Management Group62p · 2 filings · 20 docs
Floor 2Brc Management Group61p · 3 filings · 20 docs
Floor 1Brc Management Group56p · 2 filings · 20 docs
CellarBrc Management Group62p · 3 filings · 20 docs
Site & exteriorBrc Management Group5p · 3 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BR Northern Partners303/22/2026
JBFCS103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/14/2020$4.8M—Private party → BR NORTHERN PARTNERS LLC$329/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Basic Groups302/11/2025
Longtin Solutions1203/15/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Basic Groups803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Metro Builders GroupGeneral Contractor507/08/2026
Metro Builders GroupScaffold507/08/2026
B&B Mechanical Plumbing & HeatingPlumbing207/08/2026
Target Piping NYFire Protection207/08/2026
Fort ConstructionGeneral Contractor107/08/2026
Fort ConstructionScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Andrew Goodrich, P.E., PL965202/11/2025
M. International Engineering3129105/03/2023
Longtin Solutions8320703/15/2023
NY Acom Engineering7061508/31/2021
Building Lifecycle
08/05/2026
Elevator Category 1 inspection report filed
12/16/2025
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE BATHROOM LOCATED AT APT 202, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
HPD violation · closed
11/21/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
09/18/2025
VC5: failed to (maintain/produce) records for fire watch at premises. VC5: failed to (maintain/produce) records for elevator(s) equipped with…
FDNY_NOV violation · closed
09/18/2025
Observed in the basement in the laundry room behind washing machines pvc piping installed on waste lines and no air hammer arrestors on quick…
ECB violation · open
120 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMetro Builders Group02/21/2025
DOB NOWMechanical SystemsSigned-offMetro Builders Group05/11/2023
DOB NOWConstruction FenceSigned-offMetro Builders Group11/30/2022
DOB NOWMechanical SystemsSigned-offMetro Builders Group11/30/2022
DOB NOWConstruction FenceSigned-offFort Construction11/21/2022
DOB NOWMechanical SystemsSigned-offFort Construction11/21/2022
DOB NOWPlumbingSigned-offTarget Piping NY07/18/2022
DOB NOWSprinklersSigned-offTarget Piping NY07/18/2022
DOB NOWMechanical SystemsSigned-offMetro Builders Group04/28/2022
DOB NOWConstruction FenceSigned-offMetro Builders Group04/28/2022
DOB NOWPlumbingSigned-offTarget Piping NY07/22/2021
DOB NOWSprinklersSigned-offTarget Piping NY07/22/2021
DOB NOWMechanical SystemsSigned-offMetro Builders Group06/18/2021
DOB NOWConstruction FenceSigned-offMetro Builders Group06/18/2021
BIS—ISSUEDMetro Builders Group11/29/2022
BIS—ISSUEDMetro Builders Group06/23/2022
BISMHISSUEDTristate Maintenance & SE09/02/2014
BISMHISSUEDTristate Maintenance & SE07/11/2014
BISPLISSUEDCam Energy Heating and Me12/07/1998
BISMHISSUEDAjs Construction & Project Management09/08/1998
BISFPISSUEDSentinel Fire Control08/17/1998
BISMHISSUEDRimco Air Conditioning Co01/17/1996
BIS—ISSUEDPride of Judea06/08/1994
BIS—ISSUEDPride of Judea Mental Health CTR10/27/1989
3 projects · most recent 02/23/2023
General Wiring
FiledStatusContractorScope
02/23/2023CompleteBinder Elt'l ServiceGeneral Wiring
06/24/2022CompleteStar Electrical Contractors—
06/13/2021CompleteBinder Elt'l Service—
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
03/27/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/27/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/22/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/21/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/04/2022Fail-Final PL - Up to 9 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
05/03/2023Energy Code Compliance InspectionsANDREW GOODRICHprogress
05/03/2023Emergency and Standby Power Systems (Generator)NANIK MASSANDspecial
05/02/2023Mechanical SystemsANDREW GOODRICHspecial
05/02/2023FinalANDREW GOODRICHprogress
03/16/2023Fire-Resistant Penetrations and JointsTIM TSAIspecial
03/16/2023Sprinkler SystemsTIM TSAIspecial
03/16/2023Energy Code Compliance InspectionsTIM TSAIprogress
03/15/2023Fire-Resistant Penetrations and JointsTIM TSAIspecial
03/15/2023Sprinkler SystemsTIM TSAIspecial
03/15/2023Energy Code Compliance InspectionsTIM TSAIprogress
02/22/2023Sprinkler SystemsTIM TSAIspecial
02/22/2023Fire-Resistant Penetrations and JointsTIM TSAIspecial
02/22/2023Energy Code Compliance InspectionsTIM TSAIprogress
02/20/2023Fire-Resistant Penetrations and JointsTIM TSAIspecial
02/20/2023Energy Code Compliance InspectionsTIM TSAIprogress
02/20/2023Sprinkler SystemsTIM TSAIspecial
11/10/2022Fire-Resistant Penetrations and JointsTIM TSAIspecial
11/10/2022Maintenance informationTIM TSAIenergy_progress
11/10/2022HVAC-R and service water heating equipmentTIM TSAIenergy_progress
11/10/2022Duct leakage testing, insulation and designTIM TSAIenergy_progress
11/10/2022HVAC-R and service water heating system controlsTIM TSAIenergy_progress
11/10/2022HVAC-R and service water piping design and insulationTIM TSAIenergy_progress
11/10/2022FinalTIM TSAIprogress
11/10/2022Energy Code Compliance InspectionsTIM TSAIprogress
11/10/2022Mechanical SystemsTIM TSAIspecial
Latest 25 of 58.
251 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account