← Back
Five to six families
243 KINGSLAND AVENUE
BROOKLYN · Greenpoint · BIN 3067127
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R6BZoning
4,875 sfGross Floor Area
6Units
Rent Stabilized19 Open Violations ▸FDNY Report ↗
Five to six families · Owner of record: JMM KINGSLAND LLC · 2,500 sf lot · 1.95 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof1 filing · 18 docs
Floor 13p · 2 filings · 20 docs
Cellar2p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JMM KINGSLAND LLC303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/12/2020$1.6M—243 KINGSLAND AVENUE OWNER LLC → JMM KINGSLAND LLC$332/sf building
10/24/2019$2.5M—KINGSLAND AVENUE PROPERTIES, LLC → 243 KINGSLAND AVENUE OWNER LLC$507/sf building
02/24/2015$1.9M—— → —$379/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SEBASTIAN M D'ALESSANDRO705/14/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SCARPONI&SON PLBG&HTG CORPlumbing607/08/2026
BROOKYLN SOLARWORKS, LLCElectrical203/22/2026
ELPO ELECTRICAL CONTG INCElectrical103/22/2026
EXPRESS RENOVATIONS INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SEBASTIAN M. D'ALESSANDRO1127705/14/2024
Building Lifecycle
All (91)Filed (7)Permit Issued (7)Signed Off (4)Violation (46)Inspection (1)Special Inspection (26)
07/06/2026
Signed off — Alteration
INSTALLATION OF NEW SIX (6) ELECTRIC HOT WATER HEATERS AT CELLAR. ALSO REPLACE EXISTING GAS BOILER WITH NEW AT CELLAR (THE REPLACED BOILER FILED UNDER SEPARATE JOB). NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00814892-I1
07/06/2026
Signed off — Alteration
REPLACE EXISTING GAS BOILER WITH NEW AT CELLAR, AND REGISTER WITH BOILER DIVISION. INSTALLATION OF NEW SIX (6) ELECTRIC HOT WATER HEATERS AT CELLAR TO BE FILED UNDER SEPARATE "PL" APPLICATION. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B08054408-I1
05/05/2026
Violation issued (HPD, closed)
A
06/17/2025
Permit issued — Plumbing
B00814892-I1-PL
06/17/2025
Permit issued — Boiler Equipment
B08054408-I1-BE
05/17/2024
Special inspection requirement — Maintenance information
Sebastian D'Alessandro
05/17/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Sebastian D'Alessandro
05/17/2024
Special inspection requirement — HVAC-R and service water heating equipment
Sebastian D'Alessandro
05/17/2024
Special inspection requirement — HVAC-R and service water heating system controls
Sebastian D'Alessandro
05/17/2024
Special inspection requirement — Heating Systems
Sebastian D'Alessandro
05/17/2024
Special inspection requirement — Tenant Protection Plan Compliance
Sebastian D'Alessandro
05/14/2024
Filed — Alteration
REPLACE EXISTING GAS BOILER WITH NEW AT CELLAR, AND REGISTER WITH BOILER DIVISION. INSTALLATION OF NEW SIX (6) ELECTRIC HOT WATER HEATERS AT CELLAR TO BE FILED UNDER SEPARATE "PL" APPLICATION. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B08054408-P1
05/14/2024
Filed — Alteration
INSTALLATION OF NEW SIX (6) ELECTRIC HOT WATER HEATERS AT CELLAR. ALSO REPLACE EXISTING GAS BOILER WITH NEW AT CELLAR (THE REPLACED BOILER FILED UNDER SEPARATE JOB). NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00814892-P1
04/29/2024
Special inspection requirement — Tenant Protection Plan Compliance
Sebastian D'Alessandro
04/29/2024
Special inspection requirement — Heating Systems
Sebastian D'Alessandro
04/29/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Sebastian D'Alessandro
04/29/2024
Special inspection requirement — Maintenance information
Sebastian D'Alessandro
04/29/2024
Special inspection requirement — HVAC-R and service water heating system controls
Sebastian D'Alessandro
04/29/2024
Special inspection requirement — HVAC-R and service water heating equipment
Sebastian D'Alessandro
04/10/2024
Violation issued (HPD, closed)
A
11/13/2023
Permit issued — Boiler Equipment
B08054408-I1-BE
11/08/2023
Permit issued — Plumbing
B00814892-I1-PL
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/24/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/23/2023
Violation issued (HPD, closed)
A
03/03/2023
Signed off — Alteration
B00656599-I1
02/10/2023
Signed off — Alteration
RENOVATE APT. 1R WITH NEW BATHROOM & KITCHEN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00656265-I1
02/10/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Sebastian D'Alessandro
02/10/2023
Special inspection requirement — Lighting in dwelling units
Sebastian D'Alessandro
02/10/2023
Special inspection requirement — HVAC-R and service water heating equipment
Sebastian D'Alessandro
02/10/2023
Special inspection requirement — HVAC-R and service water heating system controls
Sebastian D'Alessandro
02/10/2023
Special inspection requirement — Energy Code Compliance Inspections
Sebastian D'Alessandro
02/10/2023
Special inspection requirement — Final
Sebastian D'Alessandro
02/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sebastian D'Alessandro
02/09/2023
Filed — Alteration
RENOVATE APT. 1R WITH NEW BATHROOM & KITCHEN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00656265-P1
02/07/2023
Permit issued — Plumbing
B00656599-I1-PL
02/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Sebastian D'Alessandro
02/01/2023
Special inspection requirement — Energy Code Compliance Inspections
Sebastian D'Alessandro
02/01/2023
Special inspection requirement — Final
Sebastian D'Alessandro
02/01/2023
Special inspection requirement — Lighting in dwelling units
Sebastian D'Alessandro
02/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
Sebastian D'Alessandro
02/01/2023
Special inspection requirement — HVAC-R and service water heating system controls
Sebastian D'Alessandro
02/01/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Sebastian D'Alessandro
01/23/2023
Filed — Alteration
INSTALLATION OF NEW SIX (6) ELECTRIC HOT WATER HEATERS AT CELLAR. ALSO REPLACE EXISTING GAS BOILER WITH NEW AT CELLAR (THE REPLACED BOILER FILED UNDER SEPARATE JOB). NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00814892-I1
12/14/2022
Filed — Alteration
REPLACE EXISTING GAS BOILER WITH NEW AT CELLAR, AND REGISTER WITH BOILER DIVISION. INSTALLATION OF NEW SIX (6) ELECTRIC HOT WATER HEATERS AT CELLAR TO BE FILED UNDER SEPARATE "PL" APPLICATION. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B08054408-I1
11/10/2022
Violation issued (HPD, closed)
I
02/25/2022
Violation issued (HPD, closed)
A
02/25/2022
Violation issued (HPD, closed)
I
01/31/2022
Permit issued — Plumbing
B00656599-I1-PL
01/12/2022
Permit issued — General Construction
B00656265-I1-GC
01/06/2022
Filed — Alteration
RENOVATE APT. 1R WITH NEW BATHROOM & KITCHEN. NO CHANGE IN EGRESS, USE OR OCCUPANCY.
B00656265-I1
01/05/2022
Filed — Alteration
B00656599-I1
04/09/2021
Violation issued (HPD, closed)
A
10/30/2019
Violation issued (HPD, closed)
I
06/07/2018
Violation issued (HPD, open)
A
06/07/2018
Violation issued (HPD, open)
A
06/07/2018
Violation issued (HPD, open)
A
06/07/2018
Violation issued (HPD, open)
A
06/07/2018
Violation issued (HPD, open)
A
Latest 60 of 91 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSCARPONI&SON PLBG&HTG COR06/17/2025
DOB NOWBoiler EquipmentSigned-offSCARPONI&SON PLBG&HTG COR06/17/2025
DOB NOWBoiler EquipmentSigned-offSCARPONI&SON PLBG&HTG COR11/13/2023
DOB NOWPlumbingSigned-offSCARPONI&SON PLBG&HTG COR11/08/2023
DOB NOWPlumbingSigned-offSCARPONI&SON PLBG&HTG COR02/07/2023
DOB NOWPlumbingSigned-offSCARPONI&SON PLBG&HTG COR01/31/2022
DOB NOWGeneral ConstructionSigned-offEXPRESS RENOVATIONS INC01/12/2022
1 project · most recent 05/14/2024
Gas Water/Sanitary
FiledStatusContractorScope
05/14/2024Signed-offSCARPONI&SON PLBG&HTG CORGas, Water/Sanitary
2 projects · most recent 02/22/2023
General Wiring
FiledStatusContractorScope
02/22/2023Permit IssuedELPO ELECTRICAL CONTG INCGeneral Wiring
06/09/2021CompleteBROOKYLN SOLARWORKS, LLC—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/24/2023Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
05/17/2024Maintenance informationSebastian D'Alessandroenergy_progress
05/17/2024HVAC-R and service water piping design and insulationSebastian D'Alessandroenergy_progress
05/17/2024HVAC-R and service water heating equipmentSebastian D'Alessandroenergy_progress
05/17/2024HVAC-R and service water heating system controlsSebastian D'Alessandroenergy_progress
05/17/2024Heating SystemsSebastian D'Alessandrospecial
05/17/2024Tenant Protection Plan ComplianceSebastian D'Alessandrospecial
04/29/2024Tenant Protection Plan ComplianceSebastian D'Alessandrospecial
04/29/2024Heating SystemsSebastian D'Alessandrospecial
04/29/2024HVAC-R and service water piping design and insulationSebastian D'Alessandroenergy_progress
04/29/2024Maintenance informationSebastian D'Alessandroenergy_progress
04/29/2024HVAC-R and service water heating system controlsSebastian D'Alessandroenergy_progress
04/29/2024HVAC-R and service water heating equipmentSebastian D'Alessandroenergy_progress
02/10/2023HVAC-R and service water piping design and insulationSebastian D'Alessandroenergy_progress
02/10/2023Lighting in dwelling unitsSebastian D'Alessandroenergy_progress
02/10/2023HVAC-R and service water heating equipmentSebastian D'Alessandroenergy_progress
02/10/2023HVAC-R and service water heating system controlsSebastian D'Alessandroenergy_progress
02/10/2023Energy Code Compliance InspectionsSebastian D'Alessandroprogress
02/10/2023FinalSebastian D'Alessandroprogress
02/10/2023Fire-Resistant Penetrations and JointsSebastian D'Alessandrospecial
02/01/2023Fire-Resistant Penetrations and JointsSebastian D'Alessandrospecial
02/01/2023Energy Code Compliance InspectionsSebastian D'Alessandroprogress
02/01/2023FinalSebastian D'Alessandroprogress
02/01/2023Lighting in dwelling unitsSebastian D'Alessandroenergy_progress
02/01/2023HVAC-R and service water heating equipmentSebastian D'Alessandroenergy_progress
02/01/2023HVAC-R and service water heating system controlsSebastian D'Alessandroenergy_progress
Latest 25 of 26.
▾Documents — 73 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/31/2026B00656599-I1Request digital key ↗
08/31/2026B00656265-I1Request digital key ↗
08/31/2026B00656265-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
05/18/2021340809218Open ↗
04/19/2021340809218Open ↗
▸BISWORK PERMIT APPLICATION1
06/02/2021340809218Open ↗
▸Seals & Professional Certifications34
▸DOB NOWProgress Inspector Seal & Signature20
09/19/2026B00656265-I1Open ↗
09/19/2026B00656265-I1Open ↗
09/19/2026B00656265-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/31/2026B00656599-I1Open ↗
08/31/2026B00656265-P1Open ↗
08/31/2026B00656265-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/19/2026B00656265-I1Open ↗
08/28/2026B08054408-I1Open ↗
08/28/2026B08054408-I1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/19/2021340809218Open ↗
▸Safety & Tenant Protection3
▸BISTPP1: TENANT PROTECTION PLAN2
07/16/2021340809218Open ↗
05/27/2021340809218Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
04/19/2021340809218Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/31/2026B00656599-I1Open ↗
08/31/2026B00656265-I1Open ↗
08/31/2026B00656265-P1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/19/2021340809218Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/16/2021340809218Open ↗
05/06/2021340809218Open ↗
04/19/2021340809218Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/16/2021340809218Open ↗
▸BISSOLAR TAX ABATEMENT APPLICATION1
07/16/2021340809218Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
04/19/2021340809218Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00656265-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/16/2021340809218Open ↗
05/06/2021340809218Open ↗
04/19/2021340809218Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/16/2021340809218Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
07/16/2021340809218Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/16/2021340809218Open ↗
04/19/2021340809218Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION2
05/27/2021340809218Open ↗
05/06/2021340809218Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
04/19/2021340809218Open ↗
▸Other Documents1
▸BISDHCR DOCUMENT1
04/19/2021340809218Open ↗