| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01368124 ↗ | 400 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 04/20/2026 | 07/30/2026 | Design SEBASTIAN M D'ALESSANDRO Contractor M&M PLUMBING & HEATING IN | PLUMBING WORK BEING REFILED HEREWITH FOR APT. 15P TO SUPERSEDE WORK FILED UNDER JOB # 103782033, WHICH WAS NOT PERMITTED AND EXPIRED BY TIME… |
| B01431573 ↗ | 1673 72 STREET BROOKLYN | Alteration | Permit Issued | 07/21/2026 | 07/29/2026 | Design SEBASTIAN M D'ALESSANDRO | NEW ACCESSORY OPEN SPACE PARKING PAD FOR ONE (1) FAMILY DWELLING IN SIDE LOT RIBBON, FILED IN CONJUNCTION WITH CURB CUT JOB. ALSO REPLACE E… |
| B01425977 ↗ | 341 22 STREET BROOKLYN | Alteration | Permit Issued | 07/09/2026 | 07/27/2026 | Design SEBASTIAN M D'ALESSANDRO Contractor EXPRESS RENOVATIONS INC | GRIND AND RE-POINT MORTAR JOINTS AT EXISTING BRICK FACADE AND RE-PAINT AS REQUIRED. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| B01420864 ↗ | 2302 AVENUE U BROOKLYN | Alteration | Signed-off | 07/01/2026 | 07/07/2026 | Design SEBASTIAN M D'ALESSANDRO Contractor EXPRESS RENOVATIONS INC | DEMOLITION OF INTERIOR NON-LOAD BEARING PARTITIONS, FIXTURES AND FINISHES AS PER PLANS ATTACHED AT 1ST FLOOR AND CELLAR IN PREPARATION FOR N… |
| B01376694 ↗ | 1670 72 STREET BROOKLYN | Alteration | Signed-off | 04/06/2026 | 06/25/2026 | Design SEBASTIAN M D'ALESSANDRO | NEW ACCESSORY OPEN SPACE PARKING PAD FOR ONE (1) FAMILY DWELLING IN SIDE LOT RIBBON, FILED IN CONJUNCTION WITH CURB CUT JOB # B01376782 . A… |
| B01211036 ↗ | 185 HAVEMEYER STREET BROOKLYN | Alteration | Signed-off | 04/24/2025 | 06/01/2026 | Design SEBASTIAN M D'ALESSANDRO Contractor WATERMARK PLUMBING CORP | RELATED PLUMBING WORK TO CONVERT THE ILLEGAL APARTMENT AT 1ST FLOOR BACK TO STORE, COMPLYING WITH C OF O # 3P0010176, AS PER ECB VIOLATIONS … |
| Name | Projects together | Most recent |
|---|---|---|
| SEBASTIAN M D'ALESSANDRO | 74 | 08/20/2026 |
| JAMES H. BAER -ARCHITECT | 21 | 06/01/2026 |
| WILLIAM GREEN ARCHITECTURE | 4 | 04/08/2025 |
| E_SPACE DESIGN | 2 | 07/22/2025 |
| PATTI & ANTHES CONSULTING ENGINEERS | 2 | 10/15/2024 |
| STANISLAV SLUTSKY, PE | 2 | 03/17/2022 |
| ANN FALUTICO ARCHITECT PC | 1 | 12/14/2020 |
| BLACK BOX ENGINEERING | 1 | 12/21/2023 |
| DAVID MCDONALD ARCHITECT | 1 | 12/29/2025 |
| DJOS CO. | 1 | 09/29/2021 |
| P GEORGOPOULOS ARCHITECT PC | 1 | 02/17/2022 |
| RODNEY D. GIBBLE CONSULTING ENGINEE | 1 | 08/05/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| SCARPONI&SON PLBG&HTG COR | 13 | 08/01/2024 |
| EXPRESS RENOVATIONS INC | 12 | 08/20/2026 |
| FOUNTAIN OF TREVI, INC | 3 | 09/26/2022 |
| PLUMBING PLBG & PLBG CORP | 3 | 05/02/2025 |
| RADB CONTRACTING INC | 3 | 06/01/2026 |
| CONTROL PLBG & HTG INC | 2 | 09/15/2020 |
| D & R INTERIORS CORP | 2 | 07/06/2022 |
| DESIGN 2 BUILD NEW YORK I | 2 | 11/17/2025 |
| JNR PLUMBING INC DBA | 2 | 10/22/2024 |
| MADONIA DEVELOPMENT CORP | 2 | 09/05/2023 |
| MERCURY BUILDING ASSO INC | 2 | 07/21/2026 |
| NEW YORK UNIQUE CONTRACTI | 2 | 06/04/2026 |
| PROCOLD INC | 2 | 04/19/2021 |
| QUALITA' ITALIA CONTRACTO | 2 | 09/09/2021 |
| A & J CRANE SERVICE INC | 1 | 03/24/2021 |
| A M B MECHANICAL INC | 1 | 12/01/2022 |
| A.G.M. P & H INC | 1 | 11/30/2020 |
| ACTIVE PLBG & HTG CORP | 1 | 12/14/2020 |
| ALL BORO CLEANING SERVICE | 1 | 03/17/2022 |
| AMERICANA CONTRACTING COR | 1 | 08/21/2024 |
| AQUA PLUMBING & HTNG CORP | 1 | 10/06/2021 |
| ARIANA CONTRACTING INC | 1 | 07/22/2021 |
| BAYSIDE BUILDERS INC | 1 | 11/13/2025 |
| C.I. CONTRACTING CORP | 1 | 08/20/2021 |
| CARA CONSTRUCTION MANAGEM | 1 | 09/29/2021 |
| Name | Projects together | Most recent |
|---|---|---|
| EXPRESS RENOVATIONS INC. | 6 | 05/14/2024 |
| B.C. REALTY OF NY INC | 3 | 09/05/2023 |
| PROPERTY | 3 | 06/26/2025 |
| 1478 LLC | 2 | 07/17/2025 |
| 183 GELSTON AVE LLC | 2 | 04/01/2026 |
| 6812 20TH AVE LLC | 2 | 09/26/2022 |
| ANIBIC | 2 | 03/17/2022 |
| CENTERLAND REALTY LLC | 2 | 10/06/2021 |
| 173-09 JAMAICA AVENUE ASSOCIATES LL | 1 | 12/21/2023 |
| 2315 REALTY CORP. | 1 | 07/07/2023 |
| 3701 BUILDING CORP. | 1 | 09/29/2021 |
| AJ ALLERTON REALTY LLC | 1 | 03/24/2021 |
| BW 450 ST. MARKS, LLC | 1 | 12/29/2025 |
| EDEN II SCHOOL FOR AUTIS | 1 | 12/14/2020 |
| MUSCO FOOD CORP | 1 | 02/27/2020 |
| STEPCAR CORP | 1 | 07/31/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| RELIABLE EXPEDITING | 17 | 05/29/2026 |
| J. CALLAHAN CONSULTING, INC. | 7 | 04/08/2025 |
| D'ALESSANDRO & ASSOCIATES | 1 | 12/21/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01368124 ↗ | 400 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 04/20/2026 | 07/30/2026 | Design SEBASTIAN M D'ALESSANDRO Contractor M&M PLUMBING & HEATING IN | PLUMBING WORK BEING REFILED HEREWITH FOR APT. 15P TO SUPERSEDE WORK FILED UNDER JOB # 103782033, WHICH WAS NOT PERMITTED AND EXPIRED BY TIME… |
| B01431573 ↗ | 1673 72 STREET BROOKLYN | Alteration | Permit Issued | 07/21/2026 | 07/29/2026 | Design SEBASTIAN M D'ALESSANDRO | NEW ACCESSORY OPEN SPACE PARKING PAD FOR ONE (1) FAMILY DWELLING IN SIDE LOT RIBBON, FILED IN CONJUNCTION WITH CURB CUT JOB. ALSO REPLACE E… |
| B01425977 ↗ | 341 22 STREET BROOKLYN | Alteration | Permit Issued | 07/09/2026 | 07/27/2026 | Design SEBASTIAN M D'ALESSANDRO Contractor EXPRESS RENOVATIONS INC | GRIND AND RE-POINT MORTAR JOINTS AT EXISTING BRICK FACADE AND RE-PAINT AS REQUIRED. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| B01420864 ↗ | 2302 AVENUE U BROOKLYN | Alteration | Signed-off | 07/01/2026 | 07/07/2026 | Design SEBASTIAN M D'ALESSANDRO Contractor EXPRESS RENOVATIONS INC | DEMOLITION OF INTERIOR NON-LOAD BEARING PARTITIONS, FIXTURES AND FINISHES AS PER PLANS ATTACHED AT 1ST FLOOR AND CELLAR IN PREPARATION FOR N… |
| B01376694 ↗ | 1670 72 STREET BROOKLYN | Alteration | Signed-off | 04/06/2026 | 06/25/2026 | Design SEBASTIAN M D'ALESSANDRO | NEW ACCESSORY OPEN SPACE PARKING PAD FOR ONE (1) FAMILY DWELLING IN SIDE LOT RIBBON, FILED IN CONJUNCTION WITH CURB CUT JOB # B01376782 . A… |
| B01211036 ↗ | 185 HAVEMEYER STREET BROOKLYN | Alteration | Signed-off | 04/24/2025 | 06/01/2026 | Design SEBASTIAN M D'ALESSANDRO Contractor WATERMARK PLUMBING CORP | RELATED PLUMBING WORK TO CONVERT THE ILLEGAL APARTMENT AT 1ST FLOOR BACK TO STORE, COMPLYING WITH C OF O # 3P0010176, AS PER ECB VIOLATIONS … |
| B01294670 ↗ | 2135 68 STREET BROOKLYN | Alteration | Permit Issued | 10/21/2025 | 06/01/2026 | Contractor MOKEN HOME IMPROVEMENT | Minor enlargement at rear of existing (1) family house, inclusive of plumbing work. Also replace existing open deck with new at rear, & enl… |
| B01256779 ↗ | 1902 86 STREET BROOKLYN | Alteration | Signed-off | 07/17/2025 | 05/29/2026 | Design SEBASTIAN M D'ALESSANDRO Owner 1478 LLC Contractor JM MECHANICAL HVAC LLC | DIRECT REPLACEMENT OF EXISTING ROOFTOP A/C CONDENSERWITH NEW, ON EXISTING STEEL DUNNAGE. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| B01310732 ↗ | 1618 72 STREET BROOKLYN | Alteration | Signed-off | 11/24/2025 | 05/01/2026 | Design SEBASTIAN M D'ALESSANDRO Contractor NEW YORK UNIQUE CONTRACTING | NEW ACCESSORY OPEN SPACE PARKING PAD FOR TWO (2) FAMILY DWELLING IN SIDE LOT RIBBON, FILED IN CONJUNCTION WITH CURB CUT JOB # B01310652. AL… |
| B01217265 ↗ | 183 GELSTON AVENUE BROOKLYN | Alteration | Permit Issued | 05/02/2025 | 03/11/2026 | Design SEBASTIAN M D'ALESSANDRO Owner 183 GELSTON AVE LLC Contractor LIBERTY NY RESTORATION IN | REPAIRS AT APT. # C3 DUE TO FIRE AS WELL AS WATER DAMAGE REPAIRS AT APTS # D3, # B3, # A1, # A3, AS PER PLANS ATTACHED TO COMPLY WITH DOB VI… |
| B00983464 ↗ | 6638 BERGEN PLACE BROOKLYN | Alteration | Signed-off | 01/19/2024 | 03/04/2026 | Design JAMES H. BAER -ARCHITECT Contractor GBI CONSTRUCTION CORP Filer RELIABLE EXPEDITING | Scope of Work includes select demolition of interior partitions, finishes and fixtures and new partitions, finishes and fixtures. Also reco… |
| B00914711 ↗ | 371 UNION STREET BROOKLYN | Alteration | Signed-off | 02/09/2024 | 02/18/2026 | Contractor EXPRESS RENOVATIONS INC | Replace deficient joists wall reinforcement, and new AC dunnage on roof. No change to use, egress or occupancy. |
| B00976130 ↗ | 119A INDIA STREET BROOKLYN | Alteration CO | Permit Issued | 01/04/2024 | 02/13/2026 | Design JAMES H. BAER -ARCHITECT Contractor RADB SERVICES Filer RELIABLE EXPEDITING | DEMOLITION OF INTERIOR PARTITIONS, FINISHES & FIXTURES + THE INSTALLATION OF NEW PARTITIONS, FINISHES & FIXTURES. WORK INCLUDES OBTAINING A… |
| B01217331 ↗ | 183 GELSTON AVENUE BROOKLYN | Alteration | Signed-off | 05/02/2025 | 01/24/2026 | Design SEBASTIAN M D'ALESSANDRO Owner 183 GELSTON AVE LLC Contractor PLUMBING PLBG & PLBG CORP | PLUMBING WORK. REPAIRS AT APT. # C3 DUE TO FIRE AS WELL AS WATER DAMAGE REPAIRS AT APTS # D3, # B3, # A1, # A3, AS PER PLANS ATTACHED TO CO… |
| B01277832 ↗ | 706 5 AVENUE BROOKLYN | Alteration | Signed-off | 09/24/2025 | 12/03/2025 | Design SEBASTIAN M D'ALESSANDRO Contractor EXPRESS RENOVATIONS INC | GRIND AND RE-POINT MORTAR JOINTS AT EXISTING BRICK FACADE AS PER PLANS. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| B01318608 ↗ | 1770 62 STREET BROOKLYN | Alteration | Filed — no permit on record | 11/17/2025 | — | Design SEBASTIAN M D'ALESSANDRO | — |
| X01278694 ↗ | 6048 RIVERDALE AVENUE BRONX | Alteration | Signed-off | 09/02/2025 | 09/04/2025 | Design DAVID MCDONALD ARCHITECT Owner BW 450 ST. MARKS, LLC Contractor S. TIEGER PLBG. CO., INC Filer RELIABLE EXPEDITING | REPLACE EXISTING METER BAR; NEW GAS PIPING FOR NEW COMMERCIAL OVEN/RANGE. NEW ANSUL VALVE AND NEW (3) COMPARTMENT SINK; NEW GAS PIPING TO … |
| M01227086 ↗ | 5 WEST 65 STREET MANHATTAN | Alteration | Signed-off | 07/22/2025 | 08/29/2025 | Design E_SPACE DESIGN Contractor N AND S PLUMBING INC | INSTALL NEW BATHROOM FIXTURES (WC, LAV. & SHOWER STALL) & RENOVATE KITCHEN WITH REPLACEMENT PLUMBING FIXTURES. |
| B01102103 ↗ | 2957 AVENUE T BROOKLYN | Alteration | Signed-off | 09/20/2024 | 08/22/2025 | Design JAMES H. BAER -ARCHITECT Contractor CONSTRUCTION XPERT INC Filer RELIABLE EXPEDITING | Shallow foundation for 7'4 extension to existing one car garage in rear yard. |
| M01227079 ↗ | 5 WEST 65 STREET MANHATTAN | Alteration | Signed-off | 07/22/2025 | 08/22/2025 | Design E_SPACE DESIGN Contractor GB RENOVATIONS NYC Filer RELIABLE EXPEDITING | PROPOSED WORK AT APARTMENT # 28H. (28TH FLR). REMOVE EXISTING WHIRLPOOL TUB IN BEDROOM #1 AND INSTALL NEW BATHROOM. INSTALL NEW PARTITIONS… |
| B00244107 ↗ | 518 46 STREET BROOKLYN | Alteration | Signed-off | 10/22/2019 | 07/03/2025 | Design SEBASTIAN M D'ALESSANDRO Owner EXPRESS RENOVATIONS INC. Contractor SCARPONI&SON PLBG&HTG COR | REPLACE EXISTING GAS BOILER WITH NEW AT CELLAR, AND REGISTER WITH BOILER DIVISION. ALSO NEW STORAGE TANK (AQUA PRO INDIRECT-FIRED WATER HEA… |
| B01242669 ↗ | 2045 78 STREET BROOKLYN | Alteration | Filed — no permit on record | 06/27/2025 | — | Design SEBASTIAN M D'ALESSANDRO | — |
| B01242642 ↗ | 2045 78 STREET BROOKLYN | Alteration | Filed — no permit on record | 06/26/2025 | — | Design SEBASTIAN M D'ALESSANDRO Owner Property Services | — |
| B00244145 ↗ | 518 46 STREET BROOKLYN | Alteration | Signed-off | 10/22/2019 | 06/20/2025 | Design SEBASTIAN M D'ALESSANDRO Contractor SCARPONI&SON PLBG&HTG COR | REPLACE EXISTING BOILER WITH NEW AT CELLAR, AND REGISTER WITH BOILER DIVISION. NO CHANGE IN EGRESS USE OR OCCUPANCY. |
| B00814892 ↗ | 243 KINGSLAND AVENUE BROOKLYN | Alteration | Signed-off | 01/23/2023 | 06/17/2025 | Design SEBASTIAN M D'ALESSANDRO Owner EXPRESS RENOVATIONS INC. Contractor SCARPONI&SON PLBG&HTG COR | INSTALLATION OF NEW SIX (6) ELECTRIC HOT WATER HEATERS AT CELLAR. ALSO REPLACE EXISTING GAS BOILER WITH NEW AT CELLAR (THE REPLACED BOILER … |
| B08054408 ↗ | 243 KINGSLAND AVENUE BROOKLYN | Alteration | Signed-off | 12/14/2022 | 06/17/2025 | Design SEBASTIAN M D'ALESSANDRO Owner EXPRESS RENOVATIONS INC. Contractor SCARPONI&SON PLBG&HTG COR | REPLACE EXISTING GAS BOILER WITH NEW AT CELLAR, AND REGISTER WITH BOILER DIVISION. INSTALLATION OF NEW SIX (6) ELECTRIC HOT WATER HEATERS A… |
| B01210948 ↗ | 185 HAVEMEYER STREET BROOKLYN | Alteration | Filed — no permit on record | 04/24/2025 | — | Design SEBASTIAN M D'ALESSANDRO | — |
| B01123231 ↗ | 9425 SHORE ROAD BROOKLYN | Alteration | Signed-off | 10/21/2024 | 03/21/2025 | Design SEBASTIAN M D'ALESSANDRO Contractor SUFFOLK CONSTRUCT CO. INC | SEPARATE PREVIOUSLY COMBINED APARTMENTS # 6F AND # 6E AS PER PLANS. RESTORE GAS STOVE AT APT. # 6E. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| B01185000 ↗ | 90 MOFFAT STREET BROOKLYN | Alteration | Filed — no permit on record | 02/26/2025 | — | Design JAMES H. BAER -ARCHITECT | — |
| B01149409 ↗ | 1663 72 STREET BROOKLYN | Alteration | Signed-off | 12/12/2024 | 02/24/2025 | Design SEBASTIAN M D'ALESSANDRO Contractor NEW YORK UNIQUE CONTRACTI | NEW ACCESSORY OPEN SPACE PARKING PAD IN SIDE LOT RIBBON FILED IN CONJUNCTION WITH CURB CUT APPLICATION. NO CHANGE IN EGRESS, USE OR OCCUPANC… |
| B01183185 ↗ | 90 MOFFAT STREET BROOKLYN | Alteration | Filed — no permit on record | 02/24/2025 | — | Design JAMES H. BAER -ARCHITECT | — |
| B08038176 ↗ | 147 STERLING PLACE BROOKLYN | Alteration | Signed-off | 04/20/2023 | 02/04/2025 | Design JAMES H. BAER -ARCHITECT Contractor JOHN HLAD P & H CO., INC Filer RELIABLE EXPEDITING | PLUMBING WORK CONSISTS OF THE REMOVAL OF EXISTING PLUMBING FIXTURES AND ASSOCIATED PIPING AND THE INSTALLATION OF NEW PLUMBING FIXTURES AND … |
| B01123270 ↗ | 9425 SHORE ROAD BROOKLYN | Alteration | Signed-off | 10/22/2024 | 01/15/2025 | Design SEBASTIAN M D'ALESSANDRO Contractor JNR PLUMBING INC DBA | SEPARATE PREVIOUSLY COMBINED APARTMENTS # 6F AND # 6E AS PER PLANS. RESTORE GAS STOVE AT APT. # 6E. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| B08037939 ↗ | 147 STERLING PLACE BROOKLYN | Alteration | Signed-off | 01/18/2023 | 01/13/2025 | Design JAMES H. BAER -ARCHITECT Contractor BAYSIDE BUILDERS INC Filer RELIABLE EXPEDITING | CONSTRUCT NEW 2 STORY REAR YARD ADDITION - WORK TO INCLUDE SELECT DEMOLITION OF INTERIOR PARTITION, FINISHES AND FIXTURES AND THE INSTALLATI… |
| B01127073 ↗ | 31 BAY RIDGE AVENUE BROOKLYN | Alteration | Filed — no permit on record | 10/29/2024 | — | Design SEBASTIAN M D'ALESSANDRO | — |
| B01127231 ↗ | 31 BAY RIDGE AVENUE BROOKLYN | Alteration | Filed — no permit on record | 10/29/2024 | — | Design SEBASTIAN M D'ALESSANDRO | — |
| B01098156 ↗ | 1751 85 STREET BROOKLYN | Alteration | Signed-off | 08/21/2024 | 10/02/2024 | Design SEBASTIAN M D'ALESSANDRO Owner 1478 LLC Contractor AMERICANA CONTRACTING COR | GRIND AND RE-POINT MORTAR JOINTS AT EXISTING BRICK FACADE AS PER PLANS. ALSO REMOVE AND REPLACE STEEL LINTELS AND REPAIR/ REPLACE WINDOW SI… |
| B00735113 ↗ | 352 DEGRAW STREET BROOKLYN | Alteration CO | Permit Issued | 07/04/2022 | 09/26/2024 | Design JAMES H. BAER -ARCHITECT Contractor RADB CONTRACTING INC | INTERIOR RENOVATION OF BASEMENT, 1ST, FLOOR; WORK TO INCLUDE SELECT DEMOLITION OF INTERIOR PARTITIONS, FIXTURES AND FINISHES AND THE INSTALL… |
| B01104032 ↗ | 730 DECATUR STREET BROOKLYN | Alteration CO | Filed — no permit on record | 09/23/2024 | — | Design JAMES H. BAER -ARCHITECT Filer RELIABLE EXPEDITING | — |
| B01028497 ↗ | 209 24 STREET BROOKLYN | Alteration | Signed-off | 04/15/2024 | 08/26/2024 | Design SEBASTIAN M D'ALESSANDRO Contractor EXPRESS RENOVATIONS INC | REMOVAL OF PLYWOOD BUILT 1 STORY EXTENSION AT REAR OF 1ST FLOOR AS PER ECB VIOLATION # 34015169Z AND RELATED DOB VIOLATION # V 103188C07T1 F… |
| B01081718 ↗ | 9425 SHORE ROAD BROOKLYN | Alteration | Filed — no permit on record | 07/26/2024 | — | Design SEBASTIAN M D'ALESSANDRO | — |
| B01081816 ↗ | 9425 SHORE ROAD BROOKLYN | Alteration | Filed — no permit on record | 07/26/2024 | — | Design SEBASTIAN M D'ALESSANDRO | — |
| B01016310 ↗ | 17 BAY 22 STREET BROOKLYN | Alteration | Signed-off | 03/18/2024 | 05/24/2024 | Design SEBASTIAN M D'ALESSANDRO Owner Property Services Contractor GRAY DAWG CONSTRUCTION | REMOVAL OF ALL APARTMENTS BUILT AT CELLAR WITHOUT A WORK PERMIT INCLUSIVE OF PARTITIONS & PL FIXTURES IN COMPLIANCE WITH ECB VIOLATIONS # 34… |
| B00818427 ↗ | 211 PROSPECT PARK WEST BROOKLYN | Alteration | Signed-off | 07/07/2023 | 05/16/2024 | Design SEBASTIAN M D'ALESSANDRO Owner 2315 REALTY CORP. Contractor PLUMBING PLBG & PLBG CORP | LEGALIZATION OF EXISTING REFRIGERATED WALK-IN BOX, ICE MAKER, UTILITY SINK, AND PARTITION AT EXISTING CELLAR STORAGE SPACE, ACCESSORY TO RES… |
| B01016402 ↗ | 17 BAY 22 STREET BROOKLYN | Alteration | Signed-off | 03/18/2024 | 05/15/2024 | Design SEBASTIAN M D'ALESSANDRO Owner Property Services Contractor PLUMBING PLBG & PLBG CORP | REMOVAL OF ALL APARTMENTS BUILT AT CELLAR LEVEL WITHOUT A WORK PERMIT INCLUSIVE OF PLUMBING FIXTURES IN BATHROOMS & KITCHENS IN COMPLIANCE W… |
| B00818708 ↗ | 211 PROSPECT PARK WEST BROOKLYN | Alteration | Signed-off | 06/12/2023 | 05/01/2024 | Design SEBASTIAN M D'ALESSANDRO | LEGALIZATION OF EXISTING REFRIGERATED WALK-IN BOX, ICE MAKER, UTILITY SINK, AND PARTITION AT EXISTING CELLAR STORAGE SPACE, ACCESSORY TO RES… |
| B00577333 ↗ | 702 5 AVENUE BROOKLYN | Alteration | Signed-off | 09/21/2021 | 04/29/2024 | Design SEBASTIAN M D'ALESSANDRO Contractor SCARPONI&SON PLBG&HTG COR | PLUMBING WORK IN CONNECTION WITH KITCHENS & BATHROOMS RENOVATIONS AT 2ND FL & 3RD FL APARTMENTS. RELOCATE EXISTING BATHROOM AT 1ST FLOOR. … |
| Q00964242 ↗ | 84-01 PARSONS BOULEVARD QUEENS | Alteration | Signed-off | 12/21/2023 | 03/06/2024 | Design BLACK BOX ENGINEERING Contractor RNH CONTRACTING GROUP LLC | CONSTRUCTION OF NEW DUNNAGE STEEL TO SUPPORT NEW MECHANICAL UNITS ON THE ROOFTOP. NO CHANGE TO EGRESS, USE OR OCCUPANCY UNDER THIS APPLICAT… |
| X00840086 ↗ | 7 BRUCKNER BOULEVARD BRONX | Alteration CO | Permit Issued | 07/31/2023 | 03/04/2024 | Design SEBASTIAN M D'ALESSANDRO Owner STEPCAR CORP Contractor SANDHA GENERAL CONTRACTIN | OBTAIN NEW CERTIFICATE OF OCCUPANCY FOR EXISTING COMMERCIAL TWO (2) STORY MASONRY BUILDING. CHANGE OF USE FROM TAXI BASE STATION TO AUTO RE… |
| B00956594 ↗ | 1918 74 STREET BROOKLYN | Alteration | Signed-off | 11/02/2023 | 02/02/2024 | Design SEBASTIAN M D'ALESSANDRO | LEGALIZE ENLARGED PORCH AT FRONT AND REPLACE ENTRY STEPS WITH NEW AS PER ECB VIOLATION # 39097166R FOR EXISTING TWO (2) FAMILY DWELLING. NO … |
| B00886822 ↗ | 195 23 STREET BROOKLYN | Alteration | Signed-off | 10/26/2023 | 01/09/2024 | Design SEBASTIAN M D'ALESSANDRO Owner EXPRESS RENOVATIONS INC. Contractor SCARPONI&SON PLBG&HTG COR | REPLACE EXISTING GAS BOILER WITH NEW AT CELLAR, AND REGISTER WITH BOILER DIVISION. GAS WORK AND INSTALLATION OF NEW EIGHT (8) ELECTRIC HOT … |
| B00886937 ↗ | 195 23 STREET BROOKLYN | Alteration | Signed-off | 10/26/2023 | 01/09/2024 | Design SEBASTIAN M D'ALESSANDRO Owner EXPRESS RENOVATIONS INC. Contractor SCARPONI&SON PLBG&HTG COR | INSTALLATION OF NEW EIGHT (8) ELECTRIC HOT WATER HEATERS AT CELLAR. TWO (2) EXIST GAS HOT WATER HEATERS TO BE REMOVED & GAS LINES CAPPED. … |
| B00914854 ↗ | 371 UNION STREET BROOKLYN | Alteration | Signed-off | 09/27/2023 | 12/15/2023 | Contractor SCARPONI&SON PLBG&HTG COR | Plumbing work associated with renovation and change from two family to single family in existing townhouse. No change to use, egress or occu… |
| B00914832 ↗ | 371 UNION STREET BROOKLYN | Alteration | Signed-off | 09/27/2023 | 12/07/2023 | Contractor EXPRESS RENOVATIONS INC | Install HVAC system and ventilation fans throughout one family dwelling. No Change to use, egress or occupancy under this application. |
| B00746829 ↗ | 352 DEGRAW STREET BROOKLYN | Alteration | Permit Issued | 07/04/2022 | 11/28/2023 | Design JAMES H. BAER -ARCHITECT Contractor NOPHIER PLUMBING & HTG IN Filer RELIABLE EXPEDITING | PLUMBING WORK CONSISTS OF THE REMOVAL OF EXIST'G PLUMBING & GAS FIXTURES & ASSOCIATED PIPING & THE INSTALLATION OF NEW PLUMBING & GAS FIXTUR… |
| B00913437 ↗ | 371 UNION STREET BROOKLYN | Alteration CO | Permit Issued | 08/09/2023 | 11/09/2023 | Design WILLIAM GREEN ARCHITECTURE Contractor EXPRESS RENOVATIONS INC | REMOVE EXISTING INTERIOR PARTITIONS, WINDOWS AND PLUMBING FIXTURES. INTERIOR RENOVATION INCLUDING NEW INTERIOR PARTITIONS, WINDOWS AND FINIS… |
| B00926446 ↗ | 1811 CHURCH AVENUE BROOKLYN | Alteration | Signed-off | 09/05/2023 | 09/11/2023 | Design SEBASTIAN M D'ALESSANDRO Owner B.C. REALTY OF NY INC Contractor MADONIA DEVELOPMENT CORP | INTERIOR REMOVAL OF EXISTING GROUND STORE FIXTURES AND NON LOAD BEARING WALLS AND FIRE RATING OF PARTY WALL, AS PER PLANS FILED HEREWITH. N… |
| B00926633 ↗ | 1813 CHURCH AVENUE BROOKLYN | Alteration | Signed-off | 09/05/2023 | 09/11/2023 | Design SEBASTIAN M D'ALESSANDRO Contractor MADONIA DEVELOPMENT CORP | INTERIOR REMOVAL OF EXISTING GROUND STORE FIXTURES AND NON LOAD BEARING WALLS AND FIRE RATING OF PARTY WALL, AS PER PLANS FILED HEREWITH. N… |
| B00514138 ↗ | 119A INDIA STREET BROOKLYN | Alteration | Signed-off | 05/25/2021 | 08/18/2023 | Design JAMES H. BAER -ARCHITECT Contractor RADB CONTRACTING INC Filer RELIABLE EXPEDITING | Interior Renovation of a 2 family house to repair damages caused by fire & resolve Violations 35454477L, 35528406N and 35454478N, including … |
| B00577490 ↗ | 702 5 AVENUE BROOKLYN | Alteration | Signed-off | 03/21/2022 | 08/15/2023 | Design SEBASTIAN M D'ALESSANDRO Contractor SCARPONI&SON PLBG&HTG COR | OBTAIN BOILER PERMIT AND REGISTER SAME WITH BOILER DIVISION. FILED IN CONJUNCTION WITH PLUMBING JOB # B00577333. NO CHANGE IN EGRESS, USE … |
| B08038253 ↗ | 38 SCHERMERHORN STREET BROOKLYN | Alteration | Signed-off | 02/08/2023 | 07/28/2023 | Design JAMES H. BAER -ARCHITECT Contractor MKSSKR CONSULTING SERVICE Filer RELIABLE EXPEDITING | INTERIOR RENOVATION OF THE EXISTING BASEMENT APARTMENT. WORK TO INCLUDE SELECT DEMOLITION OF INTERIOR PARTITIONS, FINISHES AND FIXTURES AND… |
| B00806341 ↗ | 71 16 STREET BROOKLYN | Alteration | Signed-off | 03/01/2023 | 07/15/2023 | Design JAMES H. BAER -ARCHITECT Contractor WATSON'S PLBG, HTG, & BDG Filer RELIABLE EXPEDITING | PLUMBING WORK CONSISTS OF THE REMOVAL OF EXISTING PLUMBING AND GAS FIXTURES AND ASSOCIATED PIPING AND THE INSTALLATION OF NEW PLUMBING AND G… |
| B00806340 ↗ | 71 16 STREET BROOKLYN | Alteration CO | Permit Issued | 01/17/2023 | 05/24/2023 | Design JAMES H. BAER -ARCHITECT Contractor NYEUSI CONSTRUCTION.LLC Filer RELIABLE EXPEDITING | INTERIOR RENOVATION OF EXISTING BUILDING. WORK TO INCLUDE SELECT DEMOLITION OF INTERIOR PARTITIONS, FINISHES AND FIXTURES AND THE INSTALLAT… |
| B00813808 ↗ | 2229 84 STREET BROOKLYN | Alteration | Signed-off | 01/30/2023 | 02/10/2023 | Design SEBASTIAN M D'ALESSANDRO Contractor JNR PLUMBING INC DBA | INSTALLATION OF GAS DRYER AT CELLAR LEVEL. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| B00656599 ↗ | 243 KINGSLAND AVENUE BROOKLYN | Alteration | Signed-off | 01/05/2022 | 02/07/2023 | Design SEBASTIAN M D'ALESSANDRO Contractor SCARPONI&SON PLBG&HTG COR | PLUMBING WORK IN CONNECTION WITH BATHROOM & KITCHEN RENOVATIONS AT APT 1R. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| B00532667 ↗ | 1258 84 STREET BROOKLYN | Alteration | Signed-off | 06/04/2021 | 01/31/2023 | Design SEBASTIAN M D'ALESSANDRO Contractor CLEMENTE ALCANTARA MENDEZ | DAMAGE REPAIRS TO GARAGE ROOF. ALSO RE-CLAD EXISTING PORCH, FRONT ENTRY STEPS, AND FRONT RETAINING WALLS WITH NEW BRICK. ALSO REPLACE EXIS… |
| B00776170 ↗ | 910 ST JOHNS PLACE BROOKLYN | Alteration | Signed-off | 09/29/2022 | 11/29/2022 | Design JAMES H. BAER -ARCHITECT Contractor PRIME PIPING & HEATING IN Filer RELIABLE EXPEDITING | PLUMBING WORK TO EXISTING BASEMENT APARTMENT AS PART OF INTERIOR RENOVATION. THIS JOB IS DONE IN CONJUNCTION WITH: B00776168-I1 |
| B00770224 ↗ | 364 8 STREET BROOKLYN | Alteration CO | Permit Issued | 07/29/2022 | 11/15/2022 | Design WILLIAM GREEN ARCHITECTURE Contractor EXPRESS RENOVATIONS INC | Renovation of existing townhouse and change from 3 family dwelling to one family dwelling. Obtain C of O. |
| B07999860 ↗ | 620 76 STREET BROOKLYN | Alteration | Signed-off | 09/26/2022 | 10/28/2022 | Design SEBASTIAN M D'ALESSANDRO Contractor PAPPALARDI CONSTRUCTION LLC | Modify and legalize rear yard deck as per NYC DOB Request for Corrective Action # 3841553. No change in egress, use, or occupancy. |
| B00776168 ↗ | 910 ST JOHNS PLACE BROOKLYN | Alteration | Signed-off | 09/29/2022 | 10/21/2022 | Design JAMES H. BAER -ARCHITECT Contractor CONSTRUCTION BROOKLYN INC | INTERIOR RENOVATION OF THE EXISTING BASEMENT APARTMENT. WORK TO INCLUDE SELECT DEMOLITION OF INTERIOR PARTITIONS, FINISHES AND FIXTURES AND… |
| B00781387 ↗ | 364 8 STREET BROOKLYN | Alteration | Signed-off | 08/08/2022 | 09/09/2022 | Design WILLIAM GREEN ARCHITECTURE Contractor EXPRESS RENOVATIONS INC | Installation of air conditioning system throughout. No change to use, egress or occupancy under this application. |
| B00774999 ↗ | 364 8 STREET BROOKLYN | Alteration | Signed-off | 07/29/2022 | 09/08/2022 | Design WILLIAM GREEN ARCHITECTURE Contractor SCARPONI&SON PLBG&HTG COR | Plumbing work associated with change of use from 3 family dwelling to single family dwelling. No change to use, egress or occupancy. |
| B00787621 ↗ | 6806 20 AVENUE BROOKLYN | Alteration | Signed-off | 08/09/2022 | 08/12/2022 | Design SEBASTIAN M D'ALESSANDRO Owner 6812 20TH AVE LLC Contractor TREVI PLUMBING INC | REPLACE TWO (2) GAS H. W. HEATERS WITH NEW AT CEL. REPLACE EXIST GAS LINES WITH NEW AT CEL AND FROM CEL TO 2ND FL. INSTALL (3) NEW GAS BOI… |
| B00787796 ↗ | 6806 20 AVENUE BROOKLYN | Alteration | Signed-off | 08/09/2022 | 08/12/2022 | Design SEBASTIAN M D'ALESSANDRO Owner 6812 20TH AVE LLC Contractor TREVI PLUMBING INC | INSTALL THREE (3) NEW GAS BOILERS AT CELLAR, AND REGISTER WITH BOILER DIVISION. FILED IN CONJUNCTION WITH PLUMBING JOB # B00787621. NO CHA… |
| B00675215 ↗ | 344 DEAN STREET BROOKLYN | Alteration | Signed-off | 02/17/2022 | 07/12/2022 | Design P GEORGOPOULOS ARCHITECT PC Contractor FIVE BOROUGH NYC LLC | Sprinkler system in conjunction with application B00624717. No change in use egress and or occupancy, |
| B00577448 ↗ | 702 5 AVENUE BROOKLYN | Alteration | Signed-off | 06/01/2022 | 06/23/2022 | Contractor EXPRESS RENOVATIONS INC | INSTALLATION OF ELECTRIC SPLIT HVAC SYSTEM FILED IN CONJUNCTION WITH GEN CONSTRUCT JOB # B00577228. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| M00670542 ↗ | 104 WEST 70 STREET MANHATTAN | Alteration | Signed-off | 02/09/2022 | 05/04/2022 | Design JAMES H. BAER -ARCHITECT Contractor DESIGN 2 BUILD NEW YORK I | MINOR INTERIOR RENOVATION TO APT. 4C - remove one non-bearing partition and add a new non-bearing partition. |
| B00616709 ↗ | 344 DEAN STREET BROOKLYN | Alteration | Signed-off | 11/19/2021 | 04/06/2022 | Design JAMES H. BAER -ARCHITECT Contractor CROSSFIELD PLBG.&HTG Filer RELIABLE EXPEDITING | PLUMBING WORK: REMOVAL OF EXISTING PLUMBING AND GAS FIXTURES AND ASSOCIATED PIPING AND THE INSTALLATION OF NEW PLUMBING AND GAS FIXTURES AN… |
| B00571824 ↗ | 83 SHEPHERD AVENUE BROOKLYN | Alteration | Signed-off | 09/09/2021 | 04/02/2022 | Design JAMES H. BAER -ARCHITECT Contractor ORBIT PLBG & HTG INC Filer RELIABLE EXPEDITING | INTERIOR RENOVATION OF THE EXISTING PLUMBING FIXTURES AND INSTALLATION OF NEW FIXTURES. NO CHANGE TO OCCUPANCY, USE OR EGRESS |
| B00624717 ↗ | 344 DEAN STREET BROOKLYN | Alteration CO | Permit Issued | 11/12/2021 | 03/30/2022 | Design JAMES H. BAER -ARCHITECT Contractor DESIGN 2 BUILD NEW YORK I Filer RELIABLE EXPEDITING | INTERIOR RENOVATION TO EXISTING THREE FAMILY ROW HOUSE CONVERT TO OCCUPANCY J-3 TWO FAMILY. |
| B00548372 ↗ | 321 92 STREET BROOKLYN | Alteration | Signed-off | 07/22/2021 | 03/25/2022 | Design SEBASTIAN M D'ALESSANDRO Contractor ARIANA CONTRACTING INC | RENOVATE 3 FL FRONT APARTMENT WITH NEW WALL FINISH & RENOVATED BATHROOM & KITCHEN. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| B00548240 ↗ | 321 92 STREET BROOKLYN | Alteration | Signed-off | 07/22/2021 | 03/24/2022 | Design SEBASTIAN M D'ALESSANDRO Contractor D R INTERIORS | RENOVATE 3 FL FRONT APARTMENT WITH NEW WALL FINISH & RENOVATED BATHROOM & KITCHEN. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| B00544161 ↗ | 9215 3 AVENUE BROOKLYN | Alteration | Signed-off | 06/30/2021 | 03/23/2022 | Design SEBASTIAN M D'ALESSANDRO Contractor D R INTERIORS | REPAIRS TO APT 2A DUE TO MINOR FIRE DAMAGE. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| B00543982 ↗ | 9215 3 AVENUE BROOKLYN | Alteration | Signed-off | 07/01/2021 | 03/18/2022 | Design SEBASTIAN M D'ALESSANDRO Contractor KINGS PLAZA P & H INC | REPAIRS TO APT 2A DUE TO MINOR FIRE DAMAGE. RENOVATE BATHROOM & KITCHEN ON EXISTING ROUGHING. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| B00570088 ↗ | 83 SHEPHERD AVENUE BROOKLYN | Alteration | Signed-off | 09/09/2021 | 02/02/2022 | Design JAMES H. BAER -ARCHITECT Contractor RADB CONTRACTING INC | INTERIOR RENOVATION OF THE EXISTING DWELLING. REMOVAL OF EXISTING PARTITIONS - PARTIAL DEMOLITION - AND FINISHES AND THE INSTALLATION OF NE… |
| B00656265 ↗ | 243 KINGSLAND AVENUE BROOKLYN | Alteration | Signed-off | 01/06/2022 | 01/12/2022 | Design SEBASTIAN M D'ALESSANDRO Owner EXPRESS RENOVATIONS INC. Contractor EXPRESS RENOVATIONS INC | RENOVATE APT. 1R WITH NEW BATHROOM & KITCHEN. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| Q00529661 ↗ | 49-18 QUEENS BOULEVARD QUEENS | Alteration | Signed-off | 09/29/2021 | 12/30/2021 | Design DJOS CO. Owner 3701 BUILDING CORP. Contractor CARA CONSTRUCTION MANAGEM | REMOVAL AND REPLACEMENT IN KIND OF EXISTING ROOF MOUNTED AIR COOLED CONDENSING UNIT. |
| X00465409 ↗ | 400 EAST 167 STREET BRONX | Alteration | Signed-off | 02/04/2021 | 12/14/2021 | Design SEBASTIAN M D'ALESSANDRO Contractor CORJI CONTRACTING | INSTALLATION OF WALL MOUNTED ELECTRIC SPLIT HVAC SYSTEM FILED IN CONJUNCTION WITH ALT 1 JOB # 200846763. NO CHANGE IN EGRESS USE OR OCCUPAN… |
| B00577228 ↗ | 702 5 AVENUE BROOKLYN | Alteration | Signed-off | 09/21/2021 | 11/19/2021 | Design SEBASTIAN M D'ALESSANDRO Contractor EXPRESS RENOVATIONS INC | RENOVATE 2ND & 3RD FL APARTMENTS AND PARTITION CHANGES AS PER PLANS. RELOCATE EXIST BATHROOM & PARTITION CHANGES AT 1ST FL. NEW BOILER ROO… |
| B00589444 ↗ | 2049 67 STREET BROOKLYN | Alteration | Signed-off | 09/09/2021 | 11/16/2021 | Design SEBASTIAN M D'ALESSANDRO Contractor QUALITA' ITALIA CONTRACTO | REMOVE PARTITIONS AT CELLAR LEVEL IN COMPLIANCE WITH ECB VIOLATIONS #35413853P, 35518929N, 35527988H, AND 35530713X. PLUMBING FIXTURES TO B… |
| X00579056 ↗ | 1930 ADEE AVENUE BRONX | Alteration | Signed-off | 08/20/2021 | 10/21/2021 | Design SEBASTIAN M D'ALESSANDRO Owner CENTERLAND REALTY LLC Contractor C.I. CONTRACTING CORP | LEGALIZE REMOVAL OF MEZZANINES/ PARTITIONS AT 1ST FLOOR TO COMPLY WITH ECB VIOLATION # 34868994N. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| B00532825 ↗ | 1114 77 STREET BROOKLYN | Alteration | Signed-off | 06/04/2021 | 09/24/2021 | Design SEBASTIAN M D'ALESSANDRO Contractor QUALITA' ITALIA CONTRACTO | ENLARGE EXISTING OPEN PORCH AND REPLACE ENTRY STEPS WITH NEW. ALSO ADDRESS ECB VIOLATION # 35442062L. NO CHANGE IN EGRESS, USE OR OCCUPANC… |
| X00484011 ↗ | 1000 ALLERTON AVENUE BRONX | Alteration | Signed-off | 03/24/2021 | 09/02/2021 | Design SEBASTIAN M D'ALESSANDRO Owner AJ ALLERTON REALTY LLC Contractor A & J CRANE SERVICE INC | REPLACE EXISTING WATER TOWER WITH NEW AIR COOLED CONDENSING UNITS ON STEEL DUNNAGE AT ROOF. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| Q00323155 ↗ | 63-32 FITCHETT STREET QUEENS | Alteration | Signed-off | 04/30/2020 | 08/23/2021 | Design STANISLAV SLUTSKY, PE Owner ANIBIC Contractor ALL BORO CLEANING SERVICE Filer RELIABLE EXPEDITING | MECHANICAL WORK: TO PROVIDE CONDITIONED AIR IN DWELLING WITH THREE INDOOR SPLIT AC ELECTRIC UNITS @ BASEMENT, LIVING ROOM AND 2ND FLOOR + ON… |
| X00453618 ↗ | 400 EAST 167 STREET BRONX | Alteration | Signed-off | 01/20/2021 | 07/23/2021 | Design SEBASTIAN M D'ALESSANDRO Owner CENTERLAND REALTY LLC Contractor AQUA PLUMBING & HTNG CORP | ADDITIONAL PLUMBING AND GAS WORK FILED IN CONJUNCTION WITH ALT 1 JOB # 200846763. NO CHANGE IN EGRESS USE OR OCCUPANCY. |
| B00453432 ↗ | 2142 86 STREET BROOKLYN | Alteration | Signed-off | 01/14/2021 | 06/16/2021 | Design SEBASTIAN M D'ALESSANDRO Owner B.C. REALTY OF NY INC Contractor CARMINE'S MECHANICAL INC | PLUMBING AND GAS WORK FILED IN CONJUNCTION WITH JOB # 340796614 FOR THE 2ND FLOOR APARTMENT RENOVATION. ALSO NEW GAS WORK AT CELLAR. NO CH… |
| B00507692 ↗ | 253 23 STREET BROOKLYN | Alteration | Signed-off | 04/27/2021 | 06/04/2021 | Design SEBASTIAN M D'ALESSANDRO Contractor SCARPONI&SON PLBG&HTG COR | LEGALIZE BATHROOM AT 2nd FLOOR AS PER ECB VIOLATION # 34754721M. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| B00354850 ↗ | 54 DIVISION PLACE BROOKLYN | Alteration | Signed-off | 06/16/2020 | 05/17/2021 | Design SEBASTIAN M D'ALESSANDRO Contractor CHARRIS CONSTRUCTION CORP | REPLACE ONE (1) ROOFTOP HVAC UNIT WITH NEW ON EXISTING STEEL DUNNAGE. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| B00503659 ↗ | 6214 AVENUE U BROOKLYN | Alteration | Signed-off | 04/19/2021 | 04/28/2021 | Design SEBASTIAN M D'ALESSANDRO Contractor PROCOLD INC | INSTALLATION OF ROOFTOP CONDENSER ON EXISTING STEEL DUNNAGE. NO CHANGE IN EGRESS, USE OR OCCUPANCY. |
| Q00323146 ↗ | 63-32 FITCHETT STREET QUEENS | Alteration | Signed-off | 04/30/2020 | 04/20/2021 | Design STANISLAV SLUTSKY, PE Owner ANIBIC Contractor GOT PIPES INC Filer RELIABLE EXPEDITING | PLUMBING WORK RELATED TO APPLICATION #421945426 |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 08/18/2026 | Fire-Resistant Penetrations and Joints | 400 CENTRAL PARK WEST | Sebastian D'Alessandro | special |
| 08/18/2026 | Final | 2302 AVENUE U | Sebastian D'Alessandro | progress |
| 08/18/2026 | Fire-Resistant Penetrations and Joints | 2302 AVENUE U | Sebastian D'Alessandro | special |
| 07/20/2026 | Fire-Resistant Penetrations and Joints | 352 DEGRAW STREET | Sebastian D'Alessandro | special |
| 07/02/2026 | Tenant Protection Plan Compliance | 341 22 STREET | Sebastian D'Alessandro | special |
| 07/02/2026 | Final | 341 22 STREET | Sebastian D'Alessandro | progress |
| 06/26/2026 | Energy Code Compliance Inspections | 352 DEGRAW STREET | Sebastian D'Alessandro | progress |
| 06/26/2026 | Final | 352 DEGRAW STREET | Sebastian D'Alessandro | progress |
| 06/26/2026 | Structural Steel - Details | 352 DEGRAW STREET | Vasilios Georgopoulos | special |
| 06/26/2026 | Concrete - Cast-In-Place | 352 DEGRAW STREET | Sebastian D'Alessandro | special |
| 06/26/2026 | Fire-Resistant Penetrations and Joints | 352 DEGRAW STREET | Sebastian D'Alessandro | special |
| 06/26/2026 | Subgrade Inspections | 352 DEGRAW STREET | Sebastian D'Alessandro | special |
| 06/26/2026 | Interior lighting power | 352 DEGRAW STREET | Sebastian D'Alessandro | energy_progress |
| 06/26/2026 | Maintenance information | 352 DEGRAW STREET | Sebastian D'Alessandro | energy_progress |
| 06/26/2026 | Fenestration areas | 352 DEGRAW STREET | Sebastian D'Alessandro | energy_progress |
| 06/26/2026 | Duct leakage testing, insulation and design | 352 DEGRAW STREET | Sebastian D'Alessandro | energy_progress |
| 06/26/2026 | Fenestration air leakage | 352 DEGRAW STREET | Sebastian D'Alessandro | energy_progress |
| 06/26/2026 | Metering | 352 DEGRAW STREET | Sebastian D'Alessandro | energy_progress |
| 06/26/2026 | Exterior lighting power | 352 DEGRAW STREET | Sebastian D'Alessandro | energy_progress |
| 06/26/2026 | Lighting controls | 352 DEGRAW STREET | Sebastian D'Alessandro | energy_progress |
| 06/26/2026 | Fenestration and door U-factor and product ratings | 352 DEGRAW STREET | Sebastian D'Alessandro | energy_progress |
| 06/26/2026 | Insulation placement and R values | 352 DEGRAW STREET | Sebastian D'Alessandro | energy_progress |
| 06/26/2026 | HVAC-R and service water piping design and insulation | 352 DEGRAW STREET | Sebastian D'Alessandro | energy_progress |
| 06/26/2026 | Lighting in dwelling units | 352 DEGRAW STREET | Sebastian D'Alessandro | energy_progress |
| 06/26/2026 | Fire-Resistance Rated Construction | 352 DEGRAW STREET | Sebastian D'Alessandro | progress |
| 06/23/2026 | Final | 2302 AVENUE U | Sebastian D'Alessandro | progress |
| 06/23/2026 | Fire-Resistant Penetrations and Joints | 2302 AVENUE U | Sebastian D'Alessandro | special |
| 06/05/2026 | Concrete - Cast-In-Place | 1618 72 STREET | Sebastian D'Alessandro | special |
| 06/05/2026 | Masonry | 1618 72 STREET | Sebastian D'Alessandro | special |
| 06/05/2026 | Subgrade Inspections | 1618 72 STREET | Sebastian D'Alessandro | special |
| 06/05/2026 | Final | 1618 72 STREET | Sebastian D'Alessandro | progress |
| 06/03/2026 | Concrete - Cast-In-Place | 1618 72 STREET | Sebastian D'Alessandro | special |
| 06/03/2026 | Masonry | 1618 72 STREET | Sebastian D'Alessandro | special |
| 06/03/2026 | Subgrade Inspections | 1618 72 STREET | Sebastian D'Alessandro | special |
| 06/03/2026 | Final | 1618 72 STREET | Sebastian D'Alessandro | progress |
| 05/29/2026 | Concrete - Cast-In-Place | 352 DEGRAW STREET | Sebastian D'Alessandro | special |
| 05/29/2026 | Fire-Resistant Penetrations and Joints | 352 DEGRAW STREET | Sebastian D'Alessandro | special |
| 05/29/2026 | Structural Steel - Details | 352 DEGRAW STREET | Vasilios Georgopoulos | special |
| 05/29/2026 | Subgrade Inspections | 352 DEGRAW STREET | Sebastian D'Alessandro | special |
| 05/29/2026 | Energy Code Compliance Inspections | 352 DEGRAW STREET | Sebastian D'Alessandro | progress |
| 05/29/2026 | Final | 352 DEGRAW STREET | Sebastian D'Alessandro | progress |
| 05/29/2026 | Fire-Resistance Rated Construction | 352 DEGRAW STREET | Sebastian D'Alessandro | progress |
| 05/29/2026 | Fenestration air leakage | 352 DEGRAW STREET | Sebastian D'Alessandro | energy_progress |
| 05/29/2026 | Lighting in dwelling units | 352 DEGRAW STREET | Sebastian D'Alessandro | energy_progress |
| 05/29/2026 | HVAC-R and service water piping design and insulation | 352 DEGRAW STREET | Sebastian D'Alessandro | energy_progress |
| 05/29/2026 | Fenestration and door U-factor and product ratings | 352 DEGRAW STREET | Sebastian D'Alessandro | energy_progress |
| 05/29/2026 | Duct leakage testing, insulation and design | 352 DEGRAW STREET | Sebastian D'Alessandro | energy_progress |
| 05/29/2026 | Maintenance information | 352 DEGRAW STREET | Sebastian D'Alessandro | energy_progress |
| 05/29/2026 | Insulation placement and R values | 352 DEGRAW STREET | Sebastian D'Alessandro | energy_progress |
| 05/29/2026 | Interior lighting power | 352 DEGRAW STREET | Sebastian D'Alessandro | energy_progress |