← Back
BuildNYC
Elevator cooperative
244 EAST 30TH STREET
MANHATTAN · BIN 1019931
💬 Discuss this project
1900Year Built
5Stories
D4Building Class
R7BZoning
7,495 sfGross Floor Area
11Units
Rent Stabilized3 Active Violations 2 unresolved · 1 paperwork only 2 likely answered ▸
Elevator cooperative · Owner of record: 240 E Associates · 2,469 sf lot · 3.04 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSandberg ManagementUnder Construction5p · 2 filings · 20 docs
Floor 5Sandberg ManagementUnder Construction4p · 1 filing · 20 docs
Floor 4Sandberg ManagementUnder Construction4p · 1 filing · 20 docs
Floor 3Sandberg ManagementUnder Construction4p · 1 filing · 20 docs
Floor 2Sandberg ManagementUnder Construction4p · 1 filing · 20 docs
Floor 1Sandberg ManagementUnder Construction4p · 1 filing · 20 docs
CellarSandberg ManagementUnder Construction16p · 2 filings · 20 docs
Sub-BasementSandberg Management2p · 1 filing · 4 docs
Site & exteriorSidewalk shed installation11p · 3 filings · 7 docs
Filed — no permit issuedSandberg Management3p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
240 Associate103/22/2026
244 East 30 Street103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Spar Unlimited105/12/2025
New York & Company512/20/2024
Mohammad Ahead, PE103/09/2023
Edward Madocks, Architect109/02/2022
NY Restoration Technology108/25/2022
Merritt Engineering Consultants107/21/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company503/21/2026
Merritt Engineering Consultant203/21/2026
Socotec203/21/2026
Arsenal Building Consultants203/21/2026
Xinos Construction203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Kings Group NYScaffold1007/08/2026
Tristar Plumbing & HeatingPlumbing408/07/2026
5 Boro Construction Service*General Contractor303/21/2026
Illuminous ElectricElectrical103/21/2026
Xinos ConstructionScaffold107/08/2026
Tristar Plumbing & HeatingGeneral Contractor107/08/2026
Grey Stone Restorationspecialty_contractor107/08/2026
Kay Waterproofingspecialty_contractor104/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Spar Unlimited5967105/12/2025
New York Engineering Associates851512/20/2024
Amka & Associates8239109/02/2022
Merritt Engineering Consulting460107/21/2022
Building Lifecycle
All (88)Filed (10)Permit Issued (13)Signed Off (3)Violation (31)Inspection (1)Special Inspection (30)
08/11/2026
Inspection — Fail-Final Boiler Equipment Inspection
Fail
View inspection ↗
08/06/2026
Permit issued — Boiler Equipment
M01104388-I1-BE
08/06/2026
Permit issued — Plumbing
M01104388-S1-PL
06/05/2026
Signed off — Alteration
Removal and repair of existing slab on grade to facilitate plumbing work (under a separate application) and replacement of interior partitions. No change in use, occupancy or means of egress.
M01222071-I1
04/29/2026
Violation issued (HPD, open)
A
11/17/2025
Violation issued (HPD, open)
I
06/04/2025
Violation issued (HPD, closed)
A
06/02/2025
Permit issued — General Construction
M01222071-I1-GC
05/12/2025
Filed — Alteration
Removal and repair of existing slab on grade to facilitate plumbing work (under a separate application) and replacement of interior partitions. No change in use, occupancy or means of egress.
M01222071-I1
05/07/2025
Special inspection requirement — Final
SCOTT PROFETA
05/07/2025
Special inspection requirement — Tenant Protection Plan Compliance
SCOTT PROFETA
05/07/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
SCOTT PROFETA
05/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
SCOTT PROFETA
05/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
SCOTT PROFETA
04/29/2025
Violation issued (ECB, closed)
Elevators
12/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
12/23/2024
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
12/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
12/23/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
12/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
12/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
12/23/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
12/23/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
12/23/2024
Special inspection requirement — Heating Systems
LOUIS ARENA
12/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
12/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
12/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
12/20/2024
Filed — Alteration
GAS BOILER REPLACEMENT.
M01104388-P1
12/20/2024
Filed — Alteration
GAS BOILER REPLACEMENT.
M01104388-P2
11/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
11/12/2024
Special inspection requirement — Heating Systems
LOUIS ARENA
11/12/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
11/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
11/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
11/12/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
11/06/2024
Special inspection requirement — HVAC-R and service water heating system controls
LOUIS ARENA
11/06/2024
Special inspection requirement — Maintenance information
LOUIS ARENA
11/06/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
LOUIS ARENA
11/06/2024
Special inspection requirement — HVAC-R and service water heating equipment
LOUIS ARENA
11/06/2024
Special inspection requirement — Tenant Protection Plan Compliance
LOUIS ARENA
11/06/2024
Special inspection requirement — Energy Code Compliance Inspections
LOUIS ARENA
10/24/2024
Permit issued — General Construction
M01104388-S2-GC
10/24/2024
Permit issued — Plumbing
M01104388-S1-PL
10/22/2024
Permit issued — Boiler Equipment
M01104388-I1-BE
10/15/2024
Filed — Alteration
GAS BOILER REPLACEMENT.
M01104388-I1
10/15/2024
Filed — Alteration
GAS BOILER REPLACEMENT.
M01104388-S1
10/15/2024
Filed — Alteration
GAS BOILER REPLACEMENT.
M01104388-S2
08/30/2024
Special inspection requirement — Final
LOUIS ARENA
08/26/2024
Signed off — Alteration
M00791434-I1
08/19/2024
Signed off — Alteration
M00840206-I1
05/10/2024
Permit issued — Structural
M00791434-I1-ST
04/01/2024
Violation issued (HPD, closed)
A
02/12/2024
Permit issued — Supported Scaffold
M00840206-I1-SH
02/08/2024
Permit issued — Supported Scaffold
M00840206-I1-SF
06/21/2023
Permit issued — Structural
M00791434-I1-ST
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/15/2023
Violation issued (HPD, closed)
A
03/09/2023
Filed — Alteration
M00840206-I1
03/09/2023
Permit issued — Supported Scaffold
M00840206-I1-SH
03/09/2023
Permit issued — Supported Scaffold
M00840206-I1-SF
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedTristar Plumbing & Heating08/06/2026
DOB NOWPlumbingPermit IssuedTristar Plumbing & Heating08/06/2026
DOB NOWGeneral ConstructionSigned-offKay Waterproofing06/02/2025
DOB NOWGeneral ConstructionPermit IssuedTristar Plumbing & Heating10/24/2024
DOB NOWPlumbingPermit IssuedTristar Plumbing & Heating10/24/2024
DOB NOWBoiler EquipmentPermit IssuedTristar Plumbing & Heating10/22/2024
DOB NOWStructuralSigned-off5 Boro Construction Service*05/10/2024
DOB NOWSupported ScaffoldSigned-offKings Group NY02/12/2024
DOB NOWSupported ScaffoldSigned-offKings Group NY02/08/2024
DOB NOWStructuralSigned-offGrey Stone Restoration06/21/2023
DOB NOWSupported ScaffoldSigned-offKings Group NY03/09/2023
DOB NOWSupported ScaffoldSigned-offKings Group NY03/09/2023
DOB NOWSupported ScaffoldPermit IssuedXinos Construction08/26/2022
BISEQISSUEDOutdoor Installations06/22/2006
1 project · most recent 12/20/2024
Gas
FiledStatusContractorScope
12/20/2024Permit IssuedTristar Plumbing & HeatingGas
1 project · most recent 01/24/2023
General Wiring
FiledStatusContractorScope
01/24/2023CompleteIlluminous ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
08/11/2026Fail-Final Boiler Equipment InspectionFailView ↗
▾Special Inspection Requirements (DOB NOW) — 36
DateRequirementInspectorRole
05/07/2025FinalSCOTT PROFETAprogress
05/07/2025Tenant Protection Plan ComplianceSCOTT PROFETAspecial
05/07/2025Structural Stability – Alterations of existing buildingsSCOTT PROFETAspecial
05/07/2025Fire-Resistant Penetrations and JointsSCOTT PROFETAspecial
05/07/2025Fire-Resistance Rated ConstructionSCOTT PROFETAprogress
12/23/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
12/23/2024Energy Code Compliance InspectionsLOUIS ARENAprogress
12/23/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
12/23/2024Maintenance informationLOUIS ARENAenergy_progress
12/23/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
12/23/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
12/23/2024Maintenance informationLOUIS ARENAenergy_progress
12/23/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
12/23/2024Heating SystemsLOUIS ARENAspecial
12/23/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
12/23/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
12/23/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
11/12/2024HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
11/12/2024Heating SystemsLOUIS ARENAspecial
11/12/2024Tenant Protection Plan ComplianceLOUIS ARENAspecial
11/12/2024HVAC-R and service water piping design and insulationLOUIS ARENAenergy_progress
11/12/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
11/12/2024Maintenance informationLOUIS ARENAenergy_progress
11/06/2024HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
11/06/2024Maintenance informationLOUIS ARENAenergy_progress
Latest 25 of 36.
▾Documents — 43 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/02/2026M00772457-I1Request digital key ↗
09/01/2026M07993568-I1Request digital key ↗
09/01/2026M00791434-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications26
▸DOB NOWDPL-1: Design Professional Seal & Signature10
09/01/2026M07993568-I1Open ↗
09/01/2026M00791434-I1Open ↗
08/31/2026M00840206-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
10/03/2026M01104388-S2Open ↗
09/28/2026M01222071-I1Open ↗
09/23/2026M01104388-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
10/03/2026M01104388-S2Open ↗
09/28/2026M01222071-I1Open ↗
09/23/2026M01104388-I1Open ↗
Showing 3 of 7 on file for this type
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/26/2026M01104388-S1Open ↗
08/26/2026M01104388-I1Open ↗
08/13/2026M01104388-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
09/01/2026M00791434-I1Open ↗