← Back
BuildNYC
School or academy
245-37 60TH AVENUE
QUEENS · BIN 4171740
💬 Discuss this project
1955Year Built
1Stories
W3Building Class
R3-2Zoning
—Gross Floor Area
0Units
0 Active ViolationsFDNY Report ↗
School or academy · Owner of record: Qsac · 0.21 FAR built · Flood zone X
Locations of Work
ArchitectureMechanical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofQsac1 filing · 3 docs
Floor 1Qsac1 filing · 3 docs
CellarQsac1p · 2 filings · 6 docs
Sub-BasementQsac1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Qsac1210/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Twigcon110/20/2026
Concept Design Group110/01/2026
Rama Tech104/22/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Four Brothers General ContractingGeneral Contractor203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metrospec Sia6420210/20/2026
Building Lifecycle
All (30)Filed (3)Permit Issued (1)Signed Off (1)Violation (9)Special Inspection (16)
10/20/2026
Filed — Alteration
PROPOSE TO REMODEL AND ENLARGE THE EXISTING UTILITY ROOM LOCATED IN THE CELLAR AND BRING THE SPACE INTO COMPLIANCE WITH THE CURRENT NYC BUILDING CODE, AS PER PLANS SUBMITTED HEREWITH.
Q01438828-S1
10/01/2026
Filed — Alteration
PROPOSE TO REMODEL AND ENLARGE THE EXISTING UTILITY ROOM LOCATED IN THE CELLAR AND BRING THE SPACE INTO COMPLIANCE WITH THE CURRENT NYC BUILDING CODE, AS PER PLANS SUBMITTED HEREWITH.
Q01438828-I1
08/04/2026
Special inspection requirement — Lighting controls
JOSEPH YOUNG
08/04/2026
Special inspection requirement — Interior lighting power
JOSEPH YOUNG
08/04/2026
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH YOUNG
08/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH YOUNG
08/04/2026
Special inspection requirement — Final
JOSEPH YOUNG
07/31/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH YOUNG
07/31/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH YOUNG
07/31/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH YOUNG
07/31/2026
Special inspection requirement — Maintenance information
JOSEPH YOUNG
07/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOSEPH YOUNG
07/31/2026
Special inspection requirement — Post-installed Anchors
JOSEPH YOUNG
07/31/2026
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH YOUNG
07/31/2026
Special inspection requirement — Duct leakage testing, insulation and design
JOSEPH YOUNG
07/30/2026
Special inspection requirement — Mechanical Systems
JOSEPH YOUNG
07/30/2026
Special inspection requirement — Final
JOSEPH YOUNG
10/09/2024
Signed off — Alteration
Q01038873-I1
10/07/2024
Permit issued — General Construction
Q01038873-I1-GC
04/22/2024
Filed — Alteration
Q01038873-I1
04/19/2024
Special inspection requirement — Final
RAJESH SHAH
01/28/2021
Violation issued (ECB, closed)
Construction
10/23/2019
Violation issued (ECB, closed)
Construction
11/30/2016
Violation issued (ECB, closed)
Construction
02/25/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/16/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/21/2004
Violation issued (ECB, closed)
Construction
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/24/1994
Violation issued (ECB, closed)
Construction
11/28/1992
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offFour Brothers General Con10/07/2024
BISPLISSUEDRock E Small Plumbing & Heating02/08/2024
BISPLISSUEDPrime Piping & Heating12/07/2016
BISOTISSUEDFour Brothers General Contracting11/22/2016
BISEQISSUEDClark & Wilkins Industries10/22/2004
BISOTISSUEDJB Levine Builders09/28/2004
BISOTISSUEDFour Brothers General Contracting09/22/2004
BISFBISSUEDSkaggs and Walsh03/24/1995
1 project · most recent 10/20/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/20/2026——Air Conditioning Systems
Cooling
Lg MODEL #ZRNU603NCAA 1,750 CFM · Vrf Outdoor ×3
MODEL #ZRUM182BTE6 192,000 BTU · Condensing Unit ×3
MODEL #ZRNU963B8AA 95,900 BTU · Vrf Outdoor ×2
MODEL #ZRUM192BTE6 192,000 BTU · Condensing Unit ×1
MODEL #ZRUM241BTE6 233,000 BTU · Vrf Outdoor ×1
Vrs American Inc. MODEL #AVS065-R-MFCE 6,000 CFM · Ahu ×1
MODEL #AVSO65-R-MFCE 8,000 CFM · Ahu ×1
1 project · most recent 10/20/2026
Gas
FiledStatusContractorScope
10/20/2026——Gas
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
08/04/2026Lighting controlsJOSEPH YOUNGenergy_progress
08/04/2026Interior lighting powerJOSEPH YOUNGenergy_progress
08/04/2026Energy Code Compliance InspectionsJOSEPH YOUNGprogress
08/04/2026Fire-Resistant Penetrations and JointsJOSEPH YOUNGspecial
08/04/2026FinalJOSEPH YOUNGprogress
07/31/2026HVAC-R and service water piping design and insulationJOSEPH YOUNGenergy_progress
07/31/2026HVAC-R and service water heating equipmentJOSEPH YOUNGenergy_progress
07/31/2026HVAC-R and service water heating system controlsJOSEPH YOUNGenergy_progress
07/31/2026Maintenance informationJOSEPH YOUNGenergy_progress
07/31/2026Fire-Resistant Penetrations and JointsJOSEPH YOUNGspecial
07/31/2026Post-installed AnchorsJOSEPH YOUNGspecial
07/31/2026Energy Code Compliance InspectionsJOSEPH YOUNGprogress
07/31/2026Duct leakage testing, insulation and designJOSEPH YOUNGenergy_progress
07/30/2026Mechanical SystemsJOSEPH YOUNGspecial
07/30/2026FinalJOSEPH YOUNGprogress
04/19/2024FinalRAJESH SHAHprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
QsacMedical / HealthcareCellar, Sub-basement, Floor 1, Roof
Project Q01438828 Alteration · Pending Plan Examiner Assignment · 10/01/2026
Project Q01038873 Alteration · LOC Issued · 04/22/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
10/04/2026Q01438828-S1Request digital key ↗
10/04/2026Q01438828-I1Request digital key ↗
10/04/2026Q01438828-S3Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits9
▸BISPLAN / WORK APPROVAL APPLICATION5
03/28/2025401966645Open ↗
08/13/2024402000222Open ↗
08/06/2024402000222Open ↗
Showing 3 of 5 on file for this type
▸BISWORK PERMIT APPLICATION4
06/27/2025401966645Open ↗
03/28/2025401966645Open ↗
12/28/2016421399347Open ↗
Showing 3 of 4 on file for this type
▸Zoning, Tax Lot & Property Records1
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
11/15/2016421399347Open ↗
▸Seals & Professional Certifications11
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
04/12/2017421399347Open ↗
11/28/2016421399347Open ↗
11/15/2016421399347Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
11/15/2016421399347Open ↗
04/13/2010420173403Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
10/04/2026Q01438828-I1Open ↗
08/13/2026Q01038873-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/15/2016421399347Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/01/2026Q01038873-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
04/13/2010420173403Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
11/15/2016421399347Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
10/04/2026Q01438828-S1Open ↗
10/04/2026Q01438828-S2Open ↗
10/04/2026Q01438828-I1Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/15/2016421399347Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/13/2010420173403Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/12/2017421399347Open ↗
11/15/2016421399347Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
04/12/2017421399347Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/12/2024402000222Open ↗
08/12/2024402000222Open ↗
▸Approvals, Objections & Sign-offs12
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
10/04/2026Q01438828-I1Open ↗
10/04/2026Q01438828-S1Open ↗
10/04/2026Q01438828-S3Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/20/2024402000222Open ↗
02/14/2024401966645Open ↗
05/08/2017421399347Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
11/17/2016421399347Open ↗
04/13/2010420173403Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/19/2025401966645Open ↗
02/14/2024401966645Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT3
05/08/2017421399347Open ↗
11/15/2016421399347Open ↗
04/13/2010420173403Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/12/2024402000222Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
11/15/2016421399347Open ↗
04/13/2010420173403Open ↗
▸BISADDITIONAL INFORMATION2
08/16/2024402000222Open ↗
08/16/2024402000222Open ↗