💬 Discuss this project
1972Year Built
34Stories
D6Building Class
C1-9Zoning
387,761 sfGross Floor Area
272Units
LL97 CoveredRent Stabilized6 Active Violations 5 unresolved · 1 paperwork only 2 old, status unconfirmed ▸FISP: SAFE
Elevator apt, fireproof with stores · Owner of record: Asn Murray Hill · 22,178 sf lot · 17.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofCentral Const Management4p · 4 filings · 19 docs
Floor 2Goddard School18p · 6 filings · 17 docs
Floor 1
Cellar1p · 1 filing · 3 docs
Site & exteriorCentral Const Management23p · 3 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Equity Residential8110/20/2026
40th Realty903/21/2026
17th and 10th Associates203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Saghari Architectural Services P203/21/2026
Municipal Building Consultants803/21/2026
CH Building Consultants803/21/2026
Socotec203/21/2026
Robert S Schnitzer203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Central Construction ManagementScaffold507/08/2026
Ridge ConstructionGeneral Contractor403/21/2026
Bindela ConstructionGeneral Contractor404/09/2026
FirequestFire Protection307/08/2026
Method ElectricElectrical203/21/2026
Central Construction ManagementGeneral Contractor203/21/2026
Access PlumbingPlumbing207/08/2026
Par Fire ProtectionFire Protection207/08/2026
Structural Preserv SystemGeneral Contractor110/04/2026
American Ventilation Servicespecialty_contractor107/08/2026
Castle Electric GroupElectrical103/22/2026
SNB Electrical ContngElectrical103/21/2026
CMY ElectricalElectrical103/21/2026
Nee ElectricalElectrical103/22/2026
Walton Electrical ConstructionElectrical103/21/2026
Henry Paul ElectricElectrical103/21/2026
Kramer ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MG New York Architects, P3444104/16/2025
Amka & Associates8239109/11/2023
Twin Peaks317111/03/2021
NY Restoration Technology6187108/24/2021
Ventrop Engineering Consulting450103/01/2021
Joseph Martines PE1428610/07/2019
Building Lifecycle
All (191)Filed (20)Permit Issued (19)Signed Off (9)Facade (FISP) (13)Violation (60)Objection (40)Special Inspection (30)
10/19/2026
Signed off — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01411075-I1
10/16/2026
Permit issued — Suspended Scaffold
M01411075-I1-SC
09/15/2026
Objection resolved — Resolved
09/11/2026
Objection raised — Scope
08/19/2026
Filed — Alteration
Installation of two cooling only split-system air conditioning units in the elevator machine room and decommissioning of the existing system.
M01443943-I1
08/18/2026
Special inspection requirement — Tenant Protection Plan Compliance
08/11/2026
Special inspection requirement — Mechanical Systems
08/11/2026
Special inspection requirement — Final
07/06/2026
Signed off — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01400392-I1
06/19/2026
Filed — Alteration
Facade Inspection
M01408030-I1
06/12/2026
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01411075-I1
06/03/2026
Permit issued — Suspended Scaffold
M01400392-I1-SC
06/02/2026
Objection raised — Other
06/02/2026
Objection resolved — Addressed
06/02/2026
Special inspection requirement — Post-installed anchors in masonry
Michael Lombardo
05/21/2026
Filed — Alteration
Application for the installation and use of suspended scaffold as per plans filed herein. No change in egress, use, or occupancy.
M01400392-I1
05/21/2026
Special inspection requirement — Post-installed anchors in masonry
Michael Lombardo
03/30/2026
Signed off — Alteration
Installation of ADA ramp on main roof level, no change to use occupancy or egress.
M01203319-I1
02/03/2026
Permit issued — General Construction
M01203319-I1-GC
10/22/2025
Violation issued (HPD, open)
B
10/22/2025
Violation issued (HPD, closed)
A
10/22/2025
Violation issued (HPD, closed)
A
10/22/2025
Violation issued (HPD, open)
B
09/30/2025
Violation issued (HPD, open)
C
09/09/2025
Violation issued (ECB, closed)
Unknown
09/09/2025
Violation issued (ECB, closed)
Construction
09/09/2025
Violation issued (ECB, open)
Construction
05/01/2025
Permit issued — General Construction
M01203319-I1-GC
04/16/2025
Filed — Alteration
Installation of ADA ramp on main roof level, no change to use occupancy or egress.
M01203319-I1
04/15/2025
Special inspection requirement — Air barrier - visual inspection
MICHAEL GADALETA
04/15/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MICHAEL GADALETA
04/15/2025
Special inspection requirement — Energy Code Compliance Inspections
MICHAEL GADALETA
03/31/2025
Special inspection requirement — Final
MICHAEL GADALETA
03/31/2025
Special inspection requirement — Tenant Protection Plan Compliance
MICHAEL GADALETA
12/23/2024
Signed off — Alteration
FILING FOR PLUMBING WORK FOR ADDITIONAL CLASSROOMS AT THE MANAHTTAN GODDARD SCHOOL AS PER PLANS FILED HEREWITH
M00190515-I1
12/18/2024
Signed off — Alteration
SPRINKLER MODIFICATION WORK FOR THE GODDARD SCHOOL GYM CONVERSION AS PER PLANSFILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00190535-I1
12/18/2024
Signed off — Alteration
sprinkler work for gym conversion renovation at the Goddard school.
M00195918-I1
12/18/2024
Signed off — Alteration
filing for plumbing work for the Goddard school gym renovation
M00195926-I1
08/12/2024
Signed off — Alteration
M00931258-I1
05/30/2024
Violation issued (ECB, closed)
Construction
05/30/2024
Violation issued (ECB, closed)
Construction
12/08/2023
Violation issued (ECB, closed)
Unknown
12/08/2023
Violation issued (ECB, closed)
Unknown
09/20/2023
Permit issued — Structural
M00931258-I1-ST
09/11/2023
Filed — Alteration
M00931258-I1
05/26/2023
Violation issued (HPD, closed)
A
05/26/2023
Violation issued (HPD, closed)
B
05/26/2023
Violation issued (HPD, closed)
B
05/26/2023
Violation issued (HPD, closed)
C
05/26/2023
Violation issued (HPD, closed)
B
05/12/2023
Violation issued (HPD, open)
A
05/12/2023
Violation issued (HPD, closed)
A
03/22/2023
Cycle 9 facade report signed — SAFE
02/09/2023
Violation issued (HPD, closed)
B
02/09/2023
Violation issued (HPD, open)
C
02/08/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
02/08/2023
Violation issued (ECB, closed)
Construction
01/20/2023
Signed off — Alteration
M00559520-I1
01/20/2023
Cycle 9 facade report submitted
01/17/2023
Cycle 9 facade inspection completed
Latest 60 of 191 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offSkytrac Access Group10/16/2026
DOB NOWSuspended ScaffoldSigned-offSkytrac Access Group06/03/2026
DOB NOWGeneral ConstructionSigned-offBindela Construction02/03/2026
DOB NOWGeneral ConstructionSigned-offBindela Construction05/01/2025
DOB NOWStructuralSigned-offStructural Preserv System09/20/2023
DOB NOWSprinklersSigned-offFirequest12/03/2022
DOB NOWSidewalk ShedPermit IssuedCentral Construction Management11/02/2022
DOB NOWSupported ScaffoldPermit IssuedCentral Construction Management12/03/2021
DOB NOWSidewalk ShedPermit IssuedCentral Construction Management11/24/2021
DOB NOWGeneral ConstructionSigned-offCentral Construction Management11/09/2021
DOB NOWMechanical SystemsSigned-offAmerican Ventilation Service04/07/2021
DOB NOWSprinklersSigned-offFirequest09/05/2019
DOB NOWSprinklersSigned-offLawrence J. Levine09/05/2019
DOB NOWMechanical SystemsPermit IssuedRidge Construction08/01/2019
DOB NOWMechanical SystemsPermit IssuedRidge Construction08/01/2019
DOB NOWSprinklersSigned-offFirequest07/26/2019
DOB NOWSprinklersSigned-offLawrence J. Levine07/25/2019
DOB NOWPlumbingSigned-offAccess Plumbing07/24/2019
DOB NOWPlumbingSigned-offAccess Plumbing07/24/2019
BISOTISSUEDTalisen Construction04/28/2022
BISMHISSUEDTalisen Construction04/28/2022
BISPLISSUEDWilliam C. Gerakaris P&H09/28/2021
BISOTISSUEDTalisen Construction07/28/2021
BISMHISSUEDTalisen Construction07/28/2021
BISOTISSUEDTalisen Construction03/13/2020
BISMHISSUEDTalisen Construction03/13/2020
BISOTISSUEDTalisen Construction04/24/2019
BISMHISSUEDTalisen Construction04/24/2019
BISMHISSUEDTalisen Construction04/22/2019
BISOTISSUEDTalisen Construction04/22/2019
BISSPISSUEDPhoenix Plumbing & Mechanical05/14/2018
BISOTISSUEDExcalibur Group04/12/2018
BISOTISSUEDExcalibur Group04/12/2018
BISMHISSUEDExcalibur Group04/12/2018
BISPLISSUEDZav Plumbing and Heating04/06/2018
BIS—ISSUEDService Sign Erectors Co10/18/2017
BISMHISSUEDExcalibur Group09/11/2017
BIS—ISSUEDSchimenti Construction Co06/26/2017
BISPLISSUEDTristate Plumbing Services04/28/2017
BISOTISSUEDExcalibur Group04/19/2017
+ 29 more permits on file
4 projects · most recent 08/19/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
08/19/2026——Air Conditioning Systems
Cooling
Daikin RKV30AVJU9, DAIKIN POLARA 31,400 BTU · Condensing Unit ×2
03/01/2021Signed-offAmerican Ventilation ServiceAir Conditioning Systems
Cooling
Daikin REYQ120TATJU 120,000 BTU · Vrf Outdoor ×3
REYQ144TATJU 144,000 BTU · Vrf Outdoor ×1
REYQ168TATJU 168,000 BTU · Vrf Outdoor ×1
York TCJD60S43S4AA 60,000 BTU · Condensing Unit ×4
Fujitsu AOU36RLX 36,000 BTU · Condensing Unit ×1
Trane TTA240J300AA 240,000 BTU · Condensing Unit ×1
10/07/2019Permit IssuedRidge ConstructionAir Conditioning Systems
Cooling
Daikin rel120tatju 10 tons · Condensing Unit ×5
10/07/2019Permit IssuedRidge ConstructionAir Conditioning Systems
Cooling
Daikin REL120TATJU 10 tons · Condensing Unit ×2
12 projects · most recent 10/24/2025
General Wiring
FiledStatusContractorScope
10/24/2025CompleteMethod ElectricGeneral Wiring
10/21/2025CancelledMethod ElectricGeneral Wiring
06/24/2025Permit IssuedSNB Electrical ContngGeneral Wiring
11/02/2023Permit IssuedOmd Electrical1 meters, 1 new_meters
01/05/2023CompleteCastle Electric GroupGeneral Wiring
11/03/2021Permit IssuedTop Shelf Electric—
09/22/2021CompleteLimongelli ElectricGeneral Wiring
08/21/2019Permit IssuedNee ElectricalGeneral Wiring
06/03/2019CompleteKva ElectricGeneral Wiring
08/27/2018Permit IssuedPags Electrical ContngGeneral Wiring
08/27/2018CompletePags Electrical Contng—
01/11/2018CancelledHexagon Construction & Electrical Group1 meters, 1 new_meters
2 projects · most recent 06/24/2022
Sidewalk Shed Scaffold
FiledStatusContractorScope
06/24/2022Permit IssuedCentral Construction ManagementSidewalk Shed
11/03/2021Permit IssuedCentral Construction ManagementScaffold
3 projects · most recent 06/19/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
06/19/2026———
06/12/2026Signed-offSkytrac Access GroupSuspended Scaffold (SC)
05/21/2026Signed-offSkytrac Access GroupSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
08/18/2026Tenant Protection Plan Compliance—special
08/11/2026Mechanical Systems—special
08/11/2026Final—progress
06/02/2026Post-installed anchors in masonryMichael Lombardospecial
05/21/2026Post-installed anchors in masonryMichael Lombardospecial
04/15/2025Air barrier - visual inspectionMICHAEL GADALETAenergy_progress
04/15/2025Fenestration and door U-factor and product ratingsMICHAEL GADALETAenergy_progress
04/15/2025Energy Code Compliance InspectionsMICHAEL GADALETAprogress
03/31/2025FinalMICHAEL GADALETAprogress
03/31/2025Tenant Protection Plan ComplianceMICHAEL GADALETAspecial
12/01/2021Post-installed AnchorsMIKHAIL ZEYGMANspecial
02/11/2021Mechanical SystemsWailoon Wongspecial
02/11/2021FinalWailoon Wongprogress
02/08/2021HVAC-R and service water heating equipmentWailoon Wongenergy_progress
02/08/2021Maintenance informationWailoon Wongenergy_progress
02/08/2021HVAC-R and service water heating system controlsWailoon Wongenergy_progress
10/08/2019HVAC insulation and sealingJOSEPH MARTINESenergy_progress
10/08/2019Smoke Control Systems TestingJOSEPH MARTINESspecial
10/08/2019FinalJOSEPH MARTINESprogress
10/08/2019Energy Code Compliance InspectionsJOSEPH MARTINESprogress
10/08/2019Shutoff dampersJOSEPH MARTINESenergy_progress
10/08/2019Duct leakage testingJOSEPH MARTINESenergy_progress
10/08/2019Mechanical SystemsJOSEPH MARTINESspecial
10/08/2019Electrical motorsJOSEPH MARTINESenergy_progress
10/08/2019HVAC and service water heating system controlsJOSEPH MARTINESenergy_progress
Latest 25 of 54.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Goddard SchoolEducationFloor 2
Project M00190491 Alteration · Permit Entire · 08/01/2019
Project M00195898 Alteration · Permit Entire · 08/01/2019
Project M00190515 Alteration · LOC Issued · 07/24/2019
Project M00190535 Alteration · LOC Issued · 07/23/2019
Project M00195918 Alteration · LOC Issued · 07/23/2019
Project M00195926 Alteration · LOC Issued · 07/23/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 773 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch11
09/03/2026M00559520-I1Request digital key ↗
09/03/2026M00624677-P1Request digital key ↗
09/03/2026M00624677-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸DOB NOWPlans/Sketch - Mechanical Systems5
09/05/2026M00190491-I1Request digital key ↗
09/05/2026M00195898-I1Request digital key ↗
08/15/2026M00466494-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/05/2026M00195926-I1Request digital key ↗
09/05/2026M00190515-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/05/2026M00190535-I1Request digital key ↗
09/05/2026M00195918-I1Request digital key ↗
▸Applications & Permits154
▸BISPLAN / WORK APPROVAL APPLICATION85
12/10/2021123849112Open ↗
09/27/2021141005356Open ↗
10/10/2019123008627Open ↗
Showing 3 of 85 on file for this type
▸BISWORK PERMIT APPLICATION61
09/28/2021123849112Open ↗
05/30/2019123008627Open ↗
04/23/2019123849112Open ↗
Showing 3 of 61 on file for this type
▸BISPLACE OF ASSEMBLY5
11/25/2019123330608Open ↗
10/09/2018123330608Open ↗
Showing 2 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPLACE OF ASSEMBLY APPLICATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWState DEC Permit1
09/05/2026M00190515-I1Open ↗
▸Seals & Professional Certifications196
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION74
11/25/2019123330608Open ↗
05/24/2019123684343Open ↗
05/24/2019123684343Open ↗
Showing 3 of 74 on file for this type
▸DOB NOWProgress Inspector Seal & Signature36
09/02/2026M00466494-I1Open ↗
09/02/2026M00466494-I1Open ↗
08/29/2026M01203319-I1Open ↗
Showing 3 of 36 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST21
05/24/2019123684343Open ↗
Showing 1 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
09/05/2026M00195926-I1Open ↗
09/05/2026M00190515-I1Open ↗
09/05/2026M00190491-P1Open ↗
Showing 3 of 17 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT16
09/27/2021141005356Open ↗
05/24/2019123684343Open ↗
Showing 2 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
10/09/2026M01400392-I1Open ↗
09/02/2026M00466494-I1Open ↗
08/29/2026M01203319-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY5
09/27/2021141005356Open ↗
Showing 1 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
09/27/2021141005356Open ↗
Showing 1 of 3 on file for this type
▸BISPC FULL REPORT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment34
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE20
02/22/2019123849112Open ↗
02/19/2019123140537Open ↗
Showing 2 of 20 on file for this type
▸BISSELF-CERT PLUMBING NOTICE5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE PERMITS2
11/13/2018123140537Open ↗
Showing 1 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
11/13/2018123140537Open ↗
Showing 1 of 2 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
11/12/2024123008627Open ↗
▸Safety & Tenant Protection17
▸DOB NOWTenant Protection Plan8
09/05/2026M00190515-I1Open ↗
09/05/2026M00195898-I1Open ↗
08/13/2026M00190491-P1Open ↗
Showing 3 of 8 on file for this type
▸BISTenant Protection Plan and Notes6
05/24/2019123684343Open ↗
Showing 1 of 6 on file for this type
▸BISSRO MD ANTI-HARASSMENT CHECKLIST2
05/31/2019123684343Open ↗
10/18/2018140417984Open ↗
▸BISSTREET TREE CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos38
▸BISASBESTOS: CERTIFICATION (DEP ACP5)15
05/24/2019123684343Open ↗
04/23/2019123849112Open ↗
Showing 2 of 15 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/05/2026M00195926-I1Open ↗
09/05/2026M00190515-I1Open ↗
09/05/2026M00190491-I1Open ↗
Showing 3 of 12 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Energy Compliance37
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS26
04/04/2019123849112Open ↗
02/22/2019123849112Open ↗
02/22/2019123849112Open ↗
Showing 3 of 26 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
10/22/2018123140537Open ↗
09/19/2018122216351Open ↗
07/13/2018122216351Open ↗
Showing 3 of 4 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
12/13/2021123849112Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISINTERIOR LIGHTING POWER1
05/17/2022123849112Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/17/2022123849112Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00559520-I1Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY3
12/10/2021123849112Open ↗
Showing 1 of 3 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
11/25/2019123330608Open ↗
08/06/2018123008627Open ↗
▸BISMECHANICAL SYSTEMS1
05/17/2022123849112Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/17/2022123849112Open ↗
▸BISHYDRO FLOW TEST LETTER1
07/09/2018123008627Open ↗
▸Approvals, Objections & Sign-offs98
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST45
05/18/2022123849112Open ↗
12/08/2020123008627Open ↗
09/15/2020123008627Open ↗
Showing 3 of 45 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE29
10/10/2019123008627Open ↗
10/10/2019123008627Open ↗
10/10/2019123008627Open ↗
Showing 3 of 29 on file for this type
▸BISADMINISTRATIVE OBJECTIONS11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
08/08/2019123849112Open ↗
05/30/2019123008627Open ↗
03/14/2019123849112Open ↗
Showing 3 of 7 on file for this type
▸BISSUPERSEDING LETTER5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISFINAL1
05/17/2022123849112Open ↗
▸Cost, Insurance & Ownership42
▸BISCOST AFFIDAVIT41
05/17/2022123849112Open ↗
09/27/2021141005356Open ↗
05/24/2019123684343Open ↗
Showing 3 of 41 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW31
05/17/2022123849112Open ↗
▸Filing & Intake Forms114
▸BISBOROUGH INTAKE FORM55
03/25/2020123008627Open ↗
03/13/2020123008627Open ↗
12/04/2019123008627Open ↗
Showing 3 of 55 on file for this type
▸BISEFILING COVER SHEET28
05/24/2019123684343Open ↗
02/22/2019123849112Open ↗
02/22/2019123849112Open ↗
Showing 3 of 28 on file for this type
▸BISADDITIONAL INFORMATION28
12/13/2021123849112Open ↗
10/10/2019123008627Open ↗
09/05/2019123330608Open ↗
Showing 3 of 28 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
09/27/2021141005356Open ↗
Showing 1 of 3 on file for this type
▸Other Documents13
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWManufacturer's Specifications2
08/16/2026M01411075-I1Open ↗
08/15/2026M01400392-I1Open ↗
▸DOB NOWCalculations2
08/16/2026M01411075-I1Open ↗
08/15/2026M01400392-I1Open ↗
▸BISDHCR DOCUMENT1
09/27/2021141005356Open ↗
▸BISTENANT/OCCUPANT PROTECTION PLAN 2008 CODE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTEMPORARY FLOOD SHIELDS: EMERGENCY FLOOD PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTCO - Supporting Documents1
12/10/2024123008627Open ↗
▸DOB NOWIRA Certification1
08/16/2026M01408030-I1Open ↗