| Owner | Filings | Most Recent |
|---|---|---|
| 1801 Second Ave Realty L P | 22 | 03/21/2026 |
| 245 East 93rd Street Retail | 9 | 03/21/2026 |
| Astor Terrace | 5 | 03/21/2026 |
| Rainbow Group | 4 | 03/21/2026 |
| Gorillas Technologies | 3 | 03/22/2026 |
| 245 E 93 St Owners | 2 | 03/21/2026 |
| Ret LP by Yorkvil 93 | 2 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| Fang Architect | 4 | 10/16/2026 |
| HT Associates | 1 | 08/12/2026 |
| Farhad Bassiri-Tehrani | 1 | 06/17/2026 |
| Arnold Montag Architect AM/PM Desi | 8 | 04/30/2026 |
| Lee Alto Design | 1 | 03/23/2026 |
| Guardia Architects | 2 | 01/26/2026 |
| HC Engineering | 3 | 11/15/2025 |
| Uni-D | 1 | 12/11/2024 |
| Exd Architecture | 3 | 07/26/2024 |
| Ashraf | 1 | 05/08/2024 |
| Joel Phagoo P.E | 5 | 04/30/2024 |
| John A Wasilewski RA | 1 | 11/13/2023 |
| MSM Engineering Services | 1 | 10/12/2023 |
| Robert Germain Jr. PE | 10 | 05/16/2023 |
| Avcon Engineering | 4 | 01/20/2023 |
| Paul Denis Associates | 3 | 12/08/2022 |
| David Turner Architect | 1 | 08/19/2022 |
| Seth P. Roye Architect | 2 | 06/24/2022 |
| Niza Works of Architecture | 1 | 06/17/2022 |
| Enthink Engineers | 5 | 05/31/2022 |
| Laurence G. Jones Architects | 1 | 11/11/2021 |
| Mark Proicou Architect | 1 | 08/17/2021 |
| Michael Zenreich Architect | 4 | 08/12/2021 |
| Paul Perdek, Prof. Engineering | 1 | 07/02/2021 |
| Catapano Engineering | 2 | 04/26/2021 |
| JAN+AGNES Diamond, Architects | 1 | 04/28/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| Rigging Consultants | 2 | 03/21/2026 |
| William Vitacco Associates | 3 | 03/21/2026 |
| KNS Building Restoration | 4 | 03/21/2026 |
| Metropolis Group | 2 | 03/21/2026 |
| Zen Construction Consulting | 3 | 03/21/2026 |
| AE Design Solution | 4 | 03/21/2026 |
| City Wide Expediting | 12 | 03/21/2026 |
| A1 Expediting Service | 10 | 03/21/2026 |
| Kma Designs | 2 | 03/21/2026 |
| Paul Fusco Consulting | 2 | 03/21/2026 |
| Catapano Engineering | 4 | 03/21/2026 |
| Socotec | 8 | 03/21/2026 |
| Clarke Construction Consultants | 1 | 03/21/2026 |
| Niza Works of Architecture | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| Andamio Scaffolding | Scaffold | 13 | 07/08/2026 |
| KNS Building Restoration | Scaffold | 8 | 07/08/2026 |
| Kings Group NY | Scaffold | 6 | 03/21/2026 |
| Everest Scaffolding | Scaffold | 4 | 07/08/2026 |
| Kel-Mar Interiors | General Contractor | 4 | 07/08/2026 |
| Norbert Kocan | General Contractor | 4 | 07/08/2026 |
| Francisco Sosa | General Contractor | 3 | 03/21/2026 |
| BHD Group | General Contractor | 3 | 03/21/2026 |
| Capital Builders NYC | General Contractor | 3 | 03/21/2026 |
| Vintage Homes | General Contractor | 2 | 07/08/2026 |
| Polcon Construction and R | General Contractor | 2 | 07/08/2026 |
| Zaim Contractor | General Contractor | 2 | 03/21/2026 |
| Empire Lic Electrical Contractors | Electrical | 2 | 03/22/2026 |
| Gabe Construction and Development | Scaffold | 2 | 03/21/2026 |
| Gabe Construction and Development | General Contractor | 2 | 03/21/2026 |
| CC Controlled Plumbing Co | Plumbing | 2 | 07/08/2026 |
| CK Plumbing & Mechanical | Plumbing | 2 | 07/08/2026 |
| Hydrokinetic Plumbing & Heating I | Plumbing | 2 | 07/08/2026 |
| Metrotech Mechanical | Plumbing | 2 | 07/08/2026 |
| American Standard P&H Cororp | Plumbing | 1 | 07/08/2026 |
| American Standard Plumbing | Fire Protection | 1 | 07/08/2026 |
| Aqueduct Mechanical | Plumbing | 1 | 07/08/2026 |
| Bypass Mechanical | Plumbing | 1 | 07/08/2026 |
| LG Elite Plumbing | Plumbing | 1 | 07/08/2026 |
| Borowide Elect'l Contractors | Electrical | 1 | 03/22/2026 |
| Smart Plumbing & Heating | Plumbing | 1 | 07/08/2026 |
| Joey Electrical Co | Electrical | 1 | 03/21/2026 |
| Stability Electric Enterprises | Electrical | 1 | 03/21/2026 |
| Walliccan Electrical Contracting | Electrical | 1 | 03/21/2026 |
| DNR Electric | Electrical | 1 | 03/22/2026 |
| Electriccity | Electrical | 1 | 03/22/2026 |
| Glendale Electl Contng | Electrical | 1 | 03/22/2026 |
| Atlas Electric Contractors | Electrical | 1 | 03/21/2026 |
| Kraft Electric | Electrical | 1 | 03/22/2026 |
| Pro Max Elect'l Contracting | Electrical | 1 | 03/21/2026 |
| Moller & Moller Inc.d/B/A | Electrical | 1 | 03/21/2026 |
| Centennial Elevator Industries | Electrical | 1 | 03/21/2026 |
| Allstate Electric | Electrical | 1 | 03/21/2026 |
| Stabile Christopher | Electrical | 1 | 03/21/2026 |
| C C Controlled Combustion | General Contractor | 1 | 07/08/2026 |
| Cortlandt Contracting | General Contractor | 1 | 04/09/2026 |
| MGM Design | General Contractor | 1 | 04/09/2026 |
| Zhongshun Jianzhu | General Contractor | 1 | 04/09/2026 |
| Neptune Signs & Awnings | Sign hanger | 1 | 10/03/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| Fang Architect | 5513 | 4 | 10/16/2026 |
| Arnold Montag Architect | 4599 | 5 | 04/30/2026 |
| Eric Alto Architect | 3943 | 1 | 03/23/2026 |
| Guardia Architect | 7188 | 2 | 01/26/2026 |
| Beyond Arch | 3600 | 1 | 06/27/2025 |
| Uni-D | 7898 | 1 | 12/11/2024 |
| Delta Testing Labs | 687 | 2 | 07/26/2024 |
| PCS Engineering | 3745 | 2 | 07/12/2024 |
| Joel Phagoo, PE | 2416 | 5 | 04/30/2024 |
| Robert F. Germain Jr. PE | 5100 | 10 | 05/16/2023 |
| Avcon Engineering | 548 | 2 | 01/06/2023 |
| C.M. Testing Laboratory | 1352 | 1 | 01/06/2023 |
| Paul Denis Associates | 2472 | 3 | 12/08/2022 |
| David Turner Architect | 3829 | 1 | 08/19/2022 |
| Niza Works of Architects | 6101 | 1 | 06/17/2022 |
| Michael Zenreich Architects | 1724 | 3 | 08/11/2021 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Sign | Signed-off | Neptune Signs & Awnings | 10/02/2026 |
| DOB NOW | General Construction | Signed-off | Norbert Kocan | 04/10/2026 |
| DOB NOW | Plumbing | Signed-off | LG Elite Plumbing | 04/08/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | Zhongshun Jianzhu | 03/27/2026 |
| DOB NOW | Plumbing | Signed-off | CK Plumbing & Mechanical | 03/20/2026 |
| DOB NOW | Plumbing | Signed-off | Hydrokinetic Plumbing & Heating I | 01/28/2026 |
| DOB NOW | General Construction | Signed-off | Supreme General Contng Co | 01/26/2026 |
| DOB NOW | General Construction | Permit Issued | MGM Design | 11/12/2025 |
| DOB NOW | Plumbing | Signed-off | CK Plumbing & Mechanical | 11/12/2025 |
| DOB NOW | Plumbing | Signed-off | Hydrokinetic Plumbing & Heating I | 10/14/2025 |
| DOB NOW | General Construction | Signed-off | Supreme General Contng Co | 09/08/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | Andamio Scaffolding | 09/03/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | Kings Group NY | 04/29/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | KNS Building Restoration | 03/14/2025 |
| DOB NOW | Suspended Scaffold | Signed-off | KNS Building Restoration | 03/14/2025 |
| DOB NOW | Supported Scaffold | Signed-off | KNS Building Rest | 02/26/2025 |
| DOB NOW | General Construction | Signed-off | Cortlandt Contracting | 02/18/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | Andamio Scaffolding | 09/10/2024 |
| DOB NOW | Suspended Scaffold | Permit Issued | KNS Building Restoration | 07/22/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | KNS Building Restoration | 07/05/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | Kings Group NY | 05/09/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | KNS Building Restoration | 05/06/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | KNS Building Restoration | 04/01/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | KNS Building Restoration | 02/12/2024 |
| DOB NOW | Supported Scaffold | Signed-off | KNS Building Rest | 02/08/2024 |
| DOB NOW | General Construction | Signed-off | Norbert Kocan | 01/16/2024 |
| DOB NOW | Supported Scaffold | Signed-off | Andamio Scaffolding | 10/17/2023 |
| DOB NOW | Sprinklers | Signed-off | American Standard Plumbing | 10/06/2023 |
| DOB NOW | Sidewalk Shed | Signed-off | Andamio Scaffolding | 09/13/2023 |
| DOB NOW | General Construction | Signed-off | Suffolk Construction Co | 07/28/2023 |
| DOB NOW | Supported Scaffold | Signed-off | KNS Building Rest | 06/02/2023 |
| DOB NOW | Supported Scaffold | Signed-off | KNS Building Rest | 05/31/2023 |
| DOB NOW | Mechanical Systems | Signed-off | Polcon Construction and R | 04/13/2023 |
| DOB NOW | Supported Scaffold | Signed-off | KNS Building Rest | 04/03/2023 |
| DOB NOW | Plumbing | Signed-off | Metrotech Mechanical | 02/03/2023 |
| DOB NOW | Supported Scaffold | Signed-off | KNS Building Rest | 01/30/2023 |
| DOB NOW | Plumbing | Signed-off | American Standard P&H Cororp | 01/26/2023 |
| DOB NOW | Boiler Equipment | Signed-off | C C Controlled Combustion | 01/12/2023 |
| DOB NOW | General Construction | Signed-off | Polcon Construction and R | 12/08/2022 |
| DOB NOW | General Construction | Signed-off | Norbert Kocan | 09/20/2022 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 10/16/2026 | Permit Issued | Zhongshun Jianzhu | Air Conditioning Systems, Ventilation Systems |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 01/06/2023 | Signed-off | American Standard Plumbing | 29 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/16/2026 | Signed-off | LG Elite Plumbing | Water/Sanitary |
| 12/02/2025 | Signed-off | Hydrokinetic Plumbing & Heating I | Gas, Water/Sanitary |
| 11/15/2025 | Signed-off | CK Plumbing & Mechanical | Gas, Water/Sanitary |
| 05/16/2023 | Signed-off | CC Controlled Plumbing Co | Gas |
| 01/20/2023 | Signed-off | Cobalt Mechanical | Water/Sanitary |
| 01/06/2023 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 09/28/2026 | Permit Issued | HV Electric | General Wiring |
| 06/24/2026 | Permit Issued | KJK Electric | — |
| 06/03/2026 | Permit Issued | R & T Electrical | General Wiring |
| 05/07/2026 | Permit Issued | Delco Electrical | General Wiring |
| 04/09/2026 | Complete | Ral-Bar Electric | General Wiring |
| 04/08/2026 | Complete | Vma Electrical | — |
| 03/25/2026 | Complete | Ral-Bar Electric | — |
| 01/27/2026 | Complete | Ral-Bar Electric | — |
| 12/01/2025 | Complete | Elpo Electrical Contg | General Wiring |
| 10/06/2025 | Complete | Imr Electrical Contracting | General Wiring |
| 09/12/2025 | Complete | Ral-Bar Electric | — |
| 03/06/2025 | Complete | DNR Electric | General Wiring |
| 10/23/2024 | Complete | Empire Lic Electrical Contractors | — |
| 09/16/2024 | Permit Issued | Electriccity | General Wiring |
| 06/14/2024 | Permit Issued | High Quality Electric of | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 04/26/2021 | Permit Issued | Gabe Construction and Development | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 10/16/2026 | Signed-off | LG Elite Plumbing | Tenant Protection Plan 72 Hour |
| 11/15/2025 | Signed-off | CK Plumbing & Mechanical | Tenant Protection Plan 72 Hour |
| 08/18/2022 | Signed-off | Polcon Construction and R | Tenant Protection Plan 72 Hour |
| Date | Type | Result | Report |
|---|---|---|---|
| 09/08/2026 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 07/30/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 05/15/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/28/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 04/06/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/26/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/23/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 02/24/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 02/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 12/31/2025 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 12/17/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/26/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/29/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 12/08/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/23/2023 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 10/17/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 08/04/2023 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 04/19/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 04/10/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/04/2023 | No Access-Final PL - Up to 3 Requested Floors | No Access | View ↗ |
| 02/24/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 02/22/2023 | Pass-Final Boiler Equipment Inspection | Pass | View ↗ |
| 02/21/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/14/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/31/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/25/2026 | Fire-Resistant Penetrations and Joints | DEZHANG FANG | special |
| 09/25/2026 | Tenant Protection Plan Compliance | — | special |
| 09/25/2026 | Interior lighting power | DEZHANG FANG | energy_progress |
| 09/25/2026 | HVAC-R and service water piping design and insulation | DEZHANG FANG | energy_progress |
| 09/25/2026 | Maintenance information | DEZHANG FANG | energy_progress |
| 09/25/2026 | Duct leakage testing, insulation and design | DEZHANG FANG | energy_progress |
| 09/25/2026 | Lighting controls | DEZHANG FANG | energy_progress |
| 09/25/2026 | Fire-Resistance Rated Construction | DEZHANG FANG | progress |
| 09/25/2026 | Final | DEZHANG FANG | progress |
| 09/25/2026 | Energy Code Compliance Inspections | DEZHANG FANG | progress |
| 09/25/2026 | Mechanical Systems | DEZHANG FANG | special |
| 05/08/2026 | Energy Code Compliance Inspections | Arnold Montag | progress |
| 05/08/2026 | Fire-Resistant Penetrations and Joints | Arnold Montag | special |
| 05/08/2026 | HVAC-R and service water piping design and insulation | Arnold Montag | energy_progress |
| 04/09/2026 | HVAC-R and service water piping design and insulation | Arnold Montag | energy_progress |
| 04/09/2026 | Fire-Resistant Penetrations and Joints | Arnold Montag | special |
| 04/09/2026 | Energy Code Compliance Inspections | Arnold Montag | progress |
| 03/19/2026 | Energy Code Compliance Inspections | DEZHANG FANG | progress |
| 03/19/2026 | Final | DEZHANG FANG | progress |
| 03/19/2026 | Tenant Protection Plan Compliance | DEZHANG FANG | special |
| 03/19/2026 | Fire-Resistant Penetrations and Joints | DEZHANG FANG | special |
| 03/19/2026 | Mechanical Systems | DEZHANG FANG | special |
| 03/19/2026 | Interior lighting power | DEZHANG FANG | energy_progress |
| 03/19/2026 | HVAC-R and service water piping design and insulation | DEZHANG FANG | energy_progress |
| 03/19/2026 | Maintenance information | DEZHANG FANG | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Hashi Market | Restaurant / Food Service | Floor 1 | Project M01442754 |
| QQ Nails & Spa | Personal services | — | Project M01408085 |
| Chase Bank | Bank / Financial branch | Floor 1 | Project M01350212 Project M01346660 |
| Gorillas | Retail | Floor 1 | Project M00629169 |