← Back
BuildNYC
Elevator apt, fireproof without stores
Linden Plaza
245 WORTMAN AVENUE · BIN 3324016
💬 Discuss this project
1955Year Built
14Stories
D3Building Class
R5Zoning
940,800 sfGross Floor Area
756Units
LL97 CoveredRent Stabilized74 Active Violations ▸FISP: SWARMPFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: Stanley Avenue Preservation · 502,900 sf lot · 1.87 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Whole building & multi-floor projectsSprinkler work and public area renovation, NYCHA dwelling1 filing
RoofSuspended scaffold installation1p · 2 filings
Floor 12NYC Housing Authority1 filing
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exteriorNYC Housing Authority4 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority3103/22/2026
Capital Projects/ Design Depart303/21/2026
Stanley Avenue Preservation103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 Expediting Service403/21/2026
JM Zoning4603/21/2026
Hierarch-E403/21/2026
AE Design Solution203/21/2026
AO Consulting and Drafting203/21/2026
Tarek M. Zeid, P.E203/21/2026
Tarek M Zeid P E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Sap ConstructionGeneral Contractor1207/08/2026
Capone Electrical ContractorsElectrical603/21/2026
Victorian FenceScaffold507/08/2026
Skyline Scaffolding GroupScaffold507/08/2026
M & M Piping and HeatingPlumbing207/08/2026
4Matic ConstructionScaffold207/08/2026
Maximum ElectricElectrical103/21/2026
Capone Electrical ContractorsGeneral Contractor103/22/2026
AMC Plumbing, Heating & CLNGPlumbing107/08/2026
Innovation PlumbingPlumbing107/08/2026
Nationwide MechanicalPlumbing107/08/2026
C.W.C. ElectricElectrical103/21/2026
Nationwide MechanicalFire Protection107/08/2026
Woodside ElectricElectrical103/21/2026
Limongelli ElectricElectrical103/21/2026
Abbey ElectricElectrical103/21/2026
Limongelli ElectricElectrical103/22/2026
Nyeast AssociatesElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Domani Inspection Service8431703/10/2025
Rand Engineering & Architects266407/08/2024
Universal Testing and Ins400204/27/2021
Dewberry Engineers5685104/17/2020
Building Lifecycle
All (191)Filed (31)Permit Issued (27)Signed Off (15)Facade (FISP) (13)Violation (60)Inspection (15)Special Inspection (30)
07/21/2026
Violation issued (HPD, open)
C
07/21/2026
Violation issued (HPD, open)
B
06/30/2026
Violation issued (HPD, open)
A
06/30/2026
Violation issued (HPD, open)
A
05/22/2026
Violation issued (HPD, closed)
C
05/22/2026
Violation issued (HPD, closed)
B
04/29/2026
Violation issued (HPD, open)
B
04/29/2026
Violation issued (HPD, open)
B
04/29/2026
Violation issued (HPD, open)
A
04/29/2026
Violation issued (HPD, open)
B
04/29/2026
Violation issued (HPD, open)
B
04/17/2026
Violation issued (HPD, closed)
A
04/11/2026
Violation issued (HPD, closed)
C
04/11/2026
Violation issued (HPD, closed)
A
04/11/2026
Violation issued (HPD, closed)
B
04/11/2026
Violation issued (HPD, closed)
A
04/11/2026
Violation issued (HPD, closed)
C
04/11/2026
Violation issued (HPD, open)
B
04/11/2026
Violation issued (HPD, closed)
C
04/11/2026
Violation issued (HPD, open)
B
04/11/2026
Violation issued (HPD, closed)
C
03/26/2026
Violation issued (HPD, closed)
C
03/26/2026
Violation issued (HPD, closed)
A
03/26/2026
Violation issued (HPD, closed)
C
02/24/2026
Violation issued (ECB, open)
Elevators
02/16/2026
Violation issued (HPD, closed)
C
02/03/2026
Violation issued (HPD, closed)
C
12/08/2025
Violation issued (HPD, closed)
B
11/19/2025
Violation issued (HPD, closed)
A
11/19/2025
Violation issued (HPD, closed)
C
10/24/2025
Violation issued (HPD, closed)
C
09/09/2025
Violation issued (ECB, closed)
Boilers
08/13/2025
Violation issued (HPD, closed)
C
07/18/2025
Violation issued (HPD, closed)
A
06/29/2025
Violation issued (HPD, closed)
B
06/29/2025
Violation issued (HPD, closed)
A
06/29/2025
Violation issued (HPD, closed)
B
06/29/2025
Violation issued (HPD, closed)
A
06/29/2025
Violation issued (HPD, closed)
C
05/28/2025
Violation issued (HPD, closed)
C
05/28/2025
Violation issued (HPD, closed)
C
05/20/2025
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 14-STORY NYCHA MULTIPLE DWELLING IN PUBLIC AREAS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00478258-S2
05/20/2025
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 14-STORY NYCHA MULTIPLE DWELLING IN PUBLIC AREAS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00478258-S3
05/17/2025
Violation issued (HPD, closed)
C
05/09/2025
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH RENOVATION OF 14-STORY NYCHA MULTIPLE DWELLING IN PUBLIC AREAS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
B00478258-S5
05/09/2025
Violation issued (HPD, closed)
C
05/05/2025
Violation issued (HPD, open)
B
05/05/2025
Violation issued (HPD, closed)
C
05/05/2025
Violation issued (HPD, closed)
A
05/05/2025
Violation issued (HPD, closed)
B
05/05/2025
Violation issued (HPD, closed)
B
05/05/2025
Violation issued (HPD, closed)
A
04/28/2025
Violation issued (HPD, closed)
C
04/28/2025
Violation issued (HPD, closed)
B
04/28/2025
Violation issued (HPD, closed)
B
04/28/2025
Violation issued (HPD, closed)
C
04/22/2025
Violation issued (HPD, closed)
B
04/22/2025
Violation issued (HPD, closed)
B
04/22/2025
Violation issued (HPD, closed)
A
04/22/2025
Violation issued (HPD, closed)
C
Latest 60 of 191 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSap Construction02/28/2025
DOB NOWMechanical SystemsSigned-offSap Construction02/27/2025
DOB NOWStructuralSigned-offSap Construction02/10/2025
DOB NOWPlumbingSigned-offM & M Piping and Heating02/05/2025
DOB NOWSprinklersSigned-offNationwide Mechanical01/14/2025
DOB NOWGeneral ConstructionSigned-offSap Construction11/27/2024
DOB NOWPlumbingSigned-offM & M Piping and Heating09/10/2024
DOB NOWSidewalk ShedSigned-offSkyline Scaffolding Group05/10/2024
DOB NOWSuspended ScaffoldSigned-offC.C.C. Renovation04/25/2024
DOB NOWSuspended ScaffoldSigned-offC.C.C. Renovation04/23/2024
DOB NOWGeneral ConstructionSigned-offSap Construction03/25/2024
DOB NOWPlumbingSigned-offNationwide Mechanical03/20/2024
DOB NOWSuspended ScaffoldSigned-offVik XS Services01/26/2024
DOB NOWGeneral ConstructionSigned-offSap Construction12/27/2023
DOB NOWStructuralSigned-offSap Construction08/25/2023
DOB NOWSidewalk ShedSigned-offSkyline Scaffolding Group05/12/2023
DOB NOWConstruction FenceSigned-offVictorian Fence05/12/2023
DOB NOWPlumbingSigned-offInnovation Plumbing05/10/2023
DOB NOWSupported ScaffoldSigned-off4Matic Construction04/18/2023
DOB NOWSupported ScaffoldSigned-off4Matic Construction03/30/2023
DOB NOWGeneral ConstructionSigned-offSap Construction02/07/2023
DOB NOWGeneral ConstructionSigned-offSap Construction01/19/2023
DOB NOWGeneral ConstructionSigned-offSap Construction12/22/2022
DOB NOWSidewalk ShedSigned-offSkyline Scaffolding Group06/08/2022
DOB NOWConstruction FenceSigned-offVictorian Fence06/06/2022
DOB NOWConstruction FenceSigned-offVictorian Fence04/27/2022
DOB NOWPlumbingSigned-offAMC Plumbing, Heating & CLNG05/07/2021
BISOTISSUEDGalvin Brothers09/28/2021
BISOTISSUEDGalvin Brothers02/22/2021
BISOTISSUEDVikrant Contracting & Builder09/08/2017
BISOTISSUEDVikrant Contracting & Builder06/29/2017
BISEQISSUEDVikrant Contracting & Builder05/25/2017
BISEQISSUEDVikrant Contracting & Builder04/13/2017
BISEQISSUEDVikrant Contracting & Builder04/13/2017
BISEQISSUEDSkyworx Contracting03/23/2017
BISEQISSUEDSkyworx Contracting04/04/2016
BISEQISSUEDTalico Construction02/15/2011
BISEQISSUEDMetro. Bridge & Scaf09/22/2010
BISOTISSUEDAshnu International08/04/2010
BISOTISSUEDBiltmore General Contractors03/26/2010
+ 9 more permits on file
13 projects · most recent 08/24/2026
General Wiring
FiledStatusContractorScope
08/24/2026CompleteCapone Electrical ContractorsGeneral Wiring
08/24/2026CompleteCapone Electrical ContractorsGeneral Wiring
07/23/2026CompleteCapone Electrical ContractorsGeneral Wiring
07/23/2026CompleteCapone Electrical ContractorsGeneral Wiring
04/08/2026CompleteCapone Electrical Contractors1 meters
11/25/2025CompleteCapone Electrical ContractorsGeneral Wiring
11/25/2025CompleteCapone Electrical ContractorsGeneral Wiring
11/03/2025CompleteLimongelli ElectricGeneral Wiring
02/19/2025CancelledCapone Electrical ContractorsGeneral Wiring
11/06/2024CompleteCapone Electrical ContractorsGeneral Wiring
09/11/2023CompleteCapone Electrical Contractors—
06/07/2022CompleteR.C.M. Electric—
05/10/2022CompleteTop Shelf Electric—
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
03/21/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/20/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/03/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
02/18/2025Pass-Final PL - More than 10 Requested FloorsPassView ↗
02/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/23/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/27/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/10/2021Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/09/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
06/09/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/03/2021Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/28/2021Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 108
DateRequirementInspectorRole
03/10/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
03/10/2025Sprinkler SystemsJOHN MCMONAGLEspecial
03/05/2025Exterior lighting powerJOHN MCMONAGLEenergy_progress
03/05/2025Lighting in dwelling unitsJOHN MCMONAGLEenergy_progress
03/05/2025VestibulesJOHN MCMONAGLEenergy_progress
03/05/2025Lighting controlsJOHN MCMONAGLEenergy_progress
03/05/2025Interior lighting powerJOHN MCMONAGLEenergy_progress
03/05/2025Fenestration and door U-factor and product ratingsJOHN MCMONAGLEenergy_progress
03/05/2025Fire-Resistance Rated ConstructionJOHN MCMONAGLEprogress
03/05/2025FinalMark Ginsbergprogress
03/05/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
03/05/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
02/25/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
02/25/2025Maintenance informationJOHN MCMONAGLEenergy_progress
02/25/2025HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
02/25/2025Energy Code Compliance InspectionsJOHN MCMONAGLEprogress
02/25/2025HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
02/25/2025HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
02/24/2025FinalJOHN MCMONAGLEprogress
02/24/2025Mechanical SystemsJOHN MCMONAGLEspecial
02/24/2025Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
02/24/2025Maintenance informationJOHN MCMONAGLEenergy_progress
02/24/2025HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
02/24/2025HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
02/24/2025HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
Latest 25 of 108.
▾Documents — 338 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch29
08/29/2026B00698224-I1Request digital key ↗
08/29/2026B00733272-I1Request digital key ↗
08/27/2026B00849928-I1Request digital key ↗
Showing 3 of 29 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/02/2026B00291769-I1Request digital key ↗
08/15/2026B00291769-P2Request digital key ↗
▸Applications & Permits32
▸BISWORK PERMIT APPLICATION17
02/22/2021322014397Open ↗
09/15/2017340500844Open ↗
06/29/2017340500844Open ↗
Showing 3 of 17 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION15
07/02/2025301106014Open ↗
11/29/2019322014397Open ↗
05/24/2017340507231Open ↗
Showing 3 of 15 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B00478258-P7Open ↗
08/13/2026B00478258-I1Open ↗
08/13/2026B00478258-A9Open ↗
▸Seals & Professional Certifications112
▸DOB NOWDPL-1: Design Professional Seal & Signature30
08/27/2026B00849928-I1Open ↗
08/24/2026B00478258-S3Open ↗
08/24/2026B00478258-S2Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWProgress Inspector Seal & Signature24
10/02/2026B00478258-P3Open ↗
10/02/2026B00478258-P3Open ↗
09/01/2026B00478258-S1Open ↗
Showing 3 of 24 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION19
11/29/2019322014397Open ↗
06/26/2018340500844Open ↗
05/17/2018321537208Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
10/02/2026B00478258-P3Open ↗
09/01/2026B00478258-S1Open ↗
09/01/2026B00291769-P2Open ↗
Showing 3 of 18 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
05/24/2017340507231Open ↗
05/05/2017340500844Open ↗
04/24/2017321537208Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
04/24/2017321537208Open ↗
02/17/2011320272833Open ↗
03/18/2010320137080Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
05/24/2017340507231Open ↗
05/05/2017340500844Open ↗
04/12/2017340493228Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
05/24/2017340507231Open ↗
05/05/2017340500844Open ↗
04/12/2017340493228Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
02/17/2011320272833Open ↗
03/18/2010320137080Open ↗
04/28/2009320013668Open ↗
▸BISPC FULL REPORT1
02/01/2008310087508Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
09/21/2010310087508Open ↗
▸Safety & Tenant Protection4
▸BISTENANT PROTECTION PLAN AND NOTES4
05/24/2017340507231Open ↗
05/05/2017340500844Open ↗
04/12/2017340493228Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos16
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form8
08/24/2026B00478258-S1Open ↗
08/24/2026B00478258-S6Open ↗
08/24/2026B00478258-S5Open ↗
Showing 3 of 8 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
12/06/2010320137080Open ↗
02/01/2008310087508Open ↗
04/22/2010320138481Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
02/17/2011320272833Open ↗
04/28/2009320013668Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
06/26/2018340500844Open ↗
05/24/2017340507231Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
05/05/2017340500844Open ↗
▸Energy Compliance12
▸DOB NOWEN2: As Built Energy Analysis.5
08/13/2026B00478258-S4Open ↗
08/13/2026B00478258-S6Open ↗
08/13/2026B00478258-I1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/29/2019322014397Open ↗
06/26/2018340500844Open ↗
▸BISNYCECC ANALYSIS1
05/05/2017340500844Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
12/13/2021322014397Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
06/26/2018340500844Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/05/2017340500844Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/05/2017340500844Open ↗
▸Inspections & Test Reports17
▸BISTECHNICAL REPORT: RESPONSIBILITY14
05/18/2022322014397Open ↗
05/18/2022322014397Open ↗
05/17/2022322014397Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSOIL REPORT2
08/13/2026B00291769-P2Open ↗
08/13/2026B00291769-I1Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
07/18/2020322014397Open ↗
▸Approvals, Objections & Sign-offs62
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter30
08/24/2026B00478258-S3Open ↗
08/24/2026B00478258-I1Open ↗
08/24/2026B00478258-A8Open ↗
Showing 3 of 30 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST11
05/19/2022322014397Open ↗
06/26/2018340500844Open ↗
05/17/2018321537208Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP Variance (V5) letter8
08/24/2026B00478258-S4Open ↗
08/24/2026B00478258-I1Open ↗
08/24/2026B00478258-S3Open ↗
Showing 3 of 8 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
02/17/2011320272833Open ↗
04/02/2010320138481Open ↗
03/18/2010320137080Open ↗
Showing 3 of 5 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
10/26/2020322014397Open ↗
08/08/2017340366641Open ↗
06/29/2017340500844Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)2
08/13/2026B00291769-I1Open ↗
08/13/2026B00291769-P2Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026B00291769-I1Open ↗
▸Cost, Insurance & Ownership11
▸BISCOST AFFIDAVIT9
11/18/2021322014397Open ↗
11/29/2019322014397Open ↗
06/26/2018340500844Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026B00478258-I1Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026B00478258-I1Open ↗
▸Filing & Intake Forms18
▸BISEFILING COVER SHEET6
11/29/2019322014397Open ↗
04/26/2017321537208Open ↗
02/17/2011320272833Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
05/24/2017340507231Open ↗
05/05/2017340500844Open ↗
04/12/2017340493228Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION4
09/08/2020322014397Open ↗
02/26/2018340500844Open ↗
07/18/2017321537208Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM4
06/26/2018340500844Open ↗
05/17/2018321537208Open ↗
05/17/2018340493228Open ↗
Showing 3 of 4 on file for this type
▸Other Documents19
▸BISFEE EXEMPTION DOCUMENTATION3
05/24/2017340507231Open ↗
05/05/2017340500844Open ↗
04/12/2017340493228Open ↗
▸DOB NOWManufacturer's Specifications3
08/13/2026B00478258-S8Open ↗
08/13/2026B01037359-I1Open ↗
08/13/2026B00932224-S1Open ↗
▸DOB NOWCalculations3
08/13/2026B01037359-I1Open ↗
08/13/2026B00932224-S1Open ↗
08/13/2026B00478258-S8Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B00478258-I1Open ↗
08/13/2026B00478258-A9Open ↗
08/13/2026B00478258-P7Open ↗
▸DOB NOWPlot Diagram3
08/13/2026B00478258-A9Open ↗
08/13/2026B00478258-I1Open ↗
08/13/2026B00478258-P7Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B00478258-A9Open ↗
08/13/2026B00478258-I1Open ↗
▸DOB NOWWaiver Document1
08/13/2026B00478258-S4Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026B00478258-I1Open ↗