← Back
Building
249 18 STREET
BIN 3430434
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
2 Open Violations ▸FDNY Report ↗
Locations of Work
ArchitectureStructural
Permit Issued — active, not yet Signed-off
RoofUnder Construction20p · 1 filing · 20 docs
Floor 5Under Construction19p · 1 filing · 20 docs
Floor 4Under Construction18p · 1 filing · 20 docs
Floor 3Under Construction19p · 1 filing · 20 docs
Floor 2Under Construction19p · 1 filing · 20 docs
Floor 1Under Construction18p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
247 18 STREET104/10/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Z ARCHITECTURE PLLC907/07/2026
LEVIN ENGINEERING PLLC611/06/2025
STRUCTURAL ENGINEERING TECHNOLOGIES406/25/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
V.A.N. CONSTRUCTION CORPGeneral Contractor104/10/2026
AMOK INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PROFESSIONAL SOLUTIONS GR17561807/07/2026
Building Lifecycle
All (182)Filed (18)Permit Issued (10)Signed Off (7)Violation (30)Inspection (7)Objection (80)Special Inspection (30)
09/16/2026
Signed off — New Building
INSTALLATION OF MECHANICAL SYSTEM IN SUBSEQUENT TO NEW BUILDING APPLICATION # B00803280. NO CHANGE IN USE, EGRESS OR OCCUPANCY .
B00803280-I1
07/31/2026
Special inspection requirement — Sprayed fire-resistant materials
SAMER ABOU-GHAIDA
07/31/2026
Special inspection requirement — Concrete - Cast-In-Place
SAMER ABOU-GHAIDA
07/31/2026
Special inspection requirement — Metering
SAMER ABOU-GHAIDA
07/31/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SAMER ABOU-GHAIDA
07/31/2026
Special inspection requirement — Masonry
SAMER ABOU-GHAIDA
07/31/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SAMER ABOU-GHAIDA
07/31/2026
Special inspection requirement — Air barrier - visual inspection
SAMER ABOU-GHAIDA
07/31/2026
Special inspection requirement — Insulation placement and R values
SAMER ABOU-GHAIDA
07/31/2026
Special inspection requirement — Interior lighting power
SAMER ABOU-GHAIDA
07/31/2026
Special inspection requirement — Lighting controls
SAMER ABOU-GHAIDA
07/31/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMER ABOU-GHAIDA
07/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMER ABOU-GHAIDA
07/31/2026
Special inspection requirement — Fenestration air leakage
SAMER ABOU-GHAIDA
07/31/2026
Special inspection requirement — Exterior lighting power
SAMER ABOU-GHAIDA
07/31/2026
Special inspection requirement — Subgrade Inspections
SAMER ABOU-GHAIDA
07/31/2026
Special inspection requirement — Fenestration areas
SAMER ABOU-GHAIDA
07/31/2026
Special inspection requirement — Maintenance information
SAMER ABOU-GHAIDA
07/31/2026
Special inspection requirement — Lighting in dwelling units
SAMER ABOU-GHAIDA
07/07/2026
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEM IN SUBSEQUENT TO NEW BUILDING APPLICATION # B00803280. NO CHANGE IN USE, EGRESS OR OCCUPANCY .
B00803280-A8
07/06/2026
Special inspection requirement — Fenestration air leakage
SAMER ABOU-GHAIDA
07/06/2026
Special inspection requirement — Insulation placement and R values
SAMER ABOU-GHAIDA
07/06/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SAMER ABOU-GHAIDA
07/06/2026
Special inspection requirement — Subgrade Inspections
SAMER ABOU-GHAIDA
07/06/2026
Special inspection requirement — Lighting in dwelling units
SAMER ABOU-GHAIDA
07/06/2026
Special inspection requirement — Metering
SAMER ABOU-GHAIDA
07/06/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SAMER ABOU-GHAIDA
07/06/2026
Special inspection requirement — Concrete - Cast-In-Place
SAMER ABOU-GHAIDA
07/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMER ABOU-GHAIDA
07/06/2026
Special inspection requirement — Masonry
SAMER ABOU-GHAIDA
07/06/2026
Special inspection requirement — Sprayed fire-resistant materials
SAMER ABOU-GHAIDA
07/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SAMER ABOU-GHAIDA
06/25/2026
Signed off — New Building
INSTALLATION OF MECHANICAL SYSTEM IN SUBSEQUENT TO NEW BUILDING APPLICATION # B00803280. NO CHANGE IN USE, EGRESS OR OCCUPANCY .
B00803280-S3
02/27/2026
Objection resolved — Addressed
02/19/2026
Objection raised — Other
01/23/2026
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEM IN SUBSEQUENT TO NEW BUILDING APPLICATION # B00803280. NO CHANGE IN USE, EGRESS OR OCCUPANCY .
B00803280-A5
01/12/2026
Signed off — New Building
INSTALLATION OF MECHANICAL SYSTEM IN SUBSEQUENT TO NEW BUILDING APPLICATION # B00803280. NO CHANGE IN USE, EGRESS OR OCCUPANCY .
B00803280-S4
12/18/2025
Violation issued (ECB, open)
Construction
12/11/2025
Violation issued (ECB, open)
Unknown
11/19/2025
Objection resolved — Addressed
11/13/2025
Objection raised — Other
11/06/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEM IN SUBSEQUENT TO NEW BUILDING APPLICATION # B00803280. NO CHANGE IN USE, EGRESS OR OCCUPANCY .
B00803280-A4
11/04/2025
Signed off — New Building
INSTALLATION OF MECHANICAL SYSTEM IN SUBSEQUENT TO NEW BUILDING APPLICATION # B00803280. NO CHANGE IN USE, EGRESS OR OCCUPANCY .
B00803280-S5
10/28/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEM IN SUBSEQUENT TO NEW BUILDING APPLICATION # B00803280. NO CHANGE IN USE, EGRESS OR OCCUPANCY .
B00803280-A3
10/08/2025
Signed off — New Building
INSTALLATION OF MECHANICAL SYSTEM IN SUBSEQUENT TO NEW BUILDING APPLICATION # B00803280. NO CHANGE IN USE, EGRESS OR OCCUPANCY .
B00803280-S1
10/08/2025
Signed off — New Building
INSTALLATION OF MECHANICAL SYSTEM IN SUBSEQUENT TO NEW BUILDING APPLICATION # B00803280. NO CHANGE IN USE, EGRESS OR OCCUPANCY .
B00803280-S2
09/30/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/24/2025
Signed off — New Building
INSTALLATION OF MECHANICAL SYSTEM IN SUBSEQUENT TO NEW BUILDING APPLICATION # B00803280. NO CHANGE IN USE, EGRESS OR OCCUPANCY .
B00803280-S6
09/22/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/12/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEM IN SUBSEQUENT TO NEW BUILDING APPLICATION # B00803280. NO CHANGE IN USE, EGRESS OR OCCUPANCY .
B00803280-A1
08/14/2025
Violation issued (ECB, closed)
Unknown
08/04/2025
Violation issued (ECB, closed)
Construction
07/24/2025
Objection resolved — Addressed
06/23/2025
Permit issued — Mechanical Systems
B00803280-S4-MS
06/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/13/2025
Objection raised — Other
05/07/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/05/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/02/2025
Filed — New Building
INSTALLATION OF MECHANICAL SYSTEM IN SUBSEQUENT TO NEW BUILDING APPLICATION # B00803280. NO CHANGE IN USE, EGRESS OR OCCUPANCY .
B00803280-P8
03/31/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 182 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offV.A.N. CONSTRUCTION CORP06/23/2025
DOB NOWGeneral ConstructionPermit IssuedV.A.N. CONSTRUCTION CORP03/25/2025
DOB NOWGeneral ConstructionPermit IssuedV.A.N. CONSTRUCTION CORP10/15/2024
DOB NOWStructuralSigned-offV.A.N. CONSTRUCTION CORP10/09/2024
DOB NOWPlumbingSigned-offAMOK INC07/31/2024
DOB NOWSprinklersSigned-offAMOK INC07/12/2024
DOB NOWStructuralSigned-offV.A.N. CONSTRUCTION CORP07/05/2024
DOB NOWSupport of ExcavationSigned-offV.A.N. CONSTRUCTION CORP05/01/2024
DOB NOWFoundationSigned-offV.A.N. CONSTRUCTION CORP03/14/2024
DOB NOWGeneral ConstructionPermit IssuedV.A.N. CONSTRUCTION CORP03/14/2024
BIS—ISSUEDCDJ CONSTRUCTION CORPORATION11/13/2000
1 project · most recent 07/07/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/07/2026Signed-offV.A.N. CONSTRUCTION CORPAir Conditioning Systems
Cooling
Daikin RXTQ60TBVJUA 5 tons · Vrf Outdoor ×8
RX12AXVJU 1 tons · Condensing Unit ×2
RXTQ60TAVJUA 5 tons · Vrf Outdoor ×2
1 project · most recent 07/07/2026
Storm Water/Sanitary
FiledStatusContractorScope
07/07/2026Signed-offAMOK INCStorm, Water/Sanitary
1 project · most recent 07/02/2025
General Wiring
FiledStatusContractorScope
07/02/2025CompleteA.L. ELECTRICAL CORP.General Wiring
1 project · most recent 07/07/2026
Concrete
FiledStatusContractorScope
07/07/2026Signed-offV.A.N. CONSTRUCTION CORPConcrete
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/30/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/22/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
05/07/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/05/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/31/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/20/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
07/31/2026Insulation placement and R valuesSAMER ABOU-GHAIDAenergy_progress
07/31/2026Interior lighting powerSAMER ABOU-GHAIDAenergy_progress
07/31/2026MeteringSAMER ABOU-GHAIDAenergy_progress
07/31/2026Concrete - Cast-In-PlaceSAMER ABOU-GHAIDAspecial
07/31/2026Wall Panels, Curtain Walls, and VeneersSAMER ABOU-GHAIDAspecial
07/31/2026Subgrade InspectionsSAMER ABOU-GHAIDAspecial
07/31/2026Exterior Insulation and Finish Systems (EIFS)SAMER ABOU-GHAIDAspecial
07/31/2026Sprayed fire-resistant materialsSAMER ABOU-GHAIDAspecial
07/31/2026Fire-Resistant Penetrations and JointsSAMER ABOU-GHAIDAspecial
07/31/2026MasonrySAMER ABOU-GHAIDAspecial
07/31/2026Lighting controlsSAMER ABOU-GHAIDAenergy_progress
07/31/2026Exterior lighting powerSAMER ABOU-GHAIDAenergy_progress
07/31/2026Fenestration air leakageSAMER ABOU-GHAIDAenergy_progress
07/31/2026Fenestration and door U-factor and product ratingsSAMER ABOU-GHAIDAenergy_progress
07/31/2026Fenestration areasSAMER ABOU-GHAIDAenergy_progress
07/31/2026Air barrier - visual inspectionSAMER ABOU-GHAIDAenergy_progress
07/31/2026Maintenance informationSAMER ABOU-GHAIDAenergy_progress
07/31/2026Lighting in dwelling unitsSAMER ABOU-GHAIDAenergy_progress
07/06/2026Fenestration and door U-factor and product ratingsSAMER ABOU-GHAIDAenergy_progress
07/06/2026Lighting controlsSAMER ABOU-GHAIDAenergy_progress
07/06/2026Maintenance informationSAMER ABOU-GHAIDAenergy_progress
07/06/2026Fenestration areasSAMER ABOU-GHAIDAenergy_progress
07/06/2026Air barrier - visual inspectionSAMER ABOU-GHAIDAenergy_progress
07/06/2026MeteringSAMER ABOU-GHAIDAenergy_progress
07/06/2026Insulation placement and R valuesSAMER ABOU-GHAIDAenergy_progress
Latest 25 of 150.
▾Documents — 256 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/20/2026B00803280-A8Request digital key ↗
08/20/2026B00803280-A3Request digital key ↗
08/20/2026B00803280-A2Request digital key ↗
Showing 3 of 19 on file for this type
▸Zoning, Tax Lot & Property Records19
▸DOB NOWZD1: DOB Zoning Diagram9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWZoning Exhibit form (1-5)9
08/20/2026B00803280-A8Open ↗
Showing 1 of 9 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications178
▸DOB NOWProgress Inspector Seal & Signature95
09/21/2026B00803280-A8Open ↗
09/21/2026B00803280-A8Open ↗
09/21/2026B00803280-A8Open ↗
Showing 3 of 95 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature64
09/01/2026B00803280-I1Open ↗
09/01/2026B00803280-I1Open ↗
09/01/2026B00803280-I1Open ↗
Showing 3 of 64 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/20/2026B00803280-S5Open ↗
08/20/2026B00803280-A8Open ↗
08/20/2026B00803280-A5Open ↗
Showing 3 of 19 on file for this type
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist9
08/20/2026B00803280-A8Open ↗
08/20/2026B00803280-A3Open ↗
08/20/2026B00803280-A2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents20
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸DOB NOWProperty Ownership Certification9
08/20/2026B00803280-A8Open ↗
08/20/2026B00803280-A3Open ↗
08/20/2026B00803280-A2Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSite Survey: Initial1
08/20/2026B00803280-A8Open ↗
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type