Roma Condominium
25-23 NEWTOWN AVENUE · Astoria (Central) · BIN 4006792
💬 Discuss this project
0Year Built
—Stories
V1Building Class
R6BZoning
0 sfGross Floor Area
0Units
0 Open Violations
Zoned commercial or Manhattan residential · Owner of record: NEWTOWN AVENUE ASSOCIATES, LLC · 9,083 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Roof158p · 4 filings · 20 docs
Floor 7115p · 2 filings · 20 docs
Floor 6114p · 2 filings · 20 docs
Floor 5117p · 2 filings · 20 docs
Floor 4109p · 2 filings · 20 docs
Floor 3110p · 2 filings · 20 docs
Floor 2113p · 2 filings · 20 docs
Floor 1164p · 5 filings · 20 docs
Cellar153p · 2 filings · 20 docs
Site & exterior101p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PARK CONSTRUCTION4407/08/2026
PARKSITE CONSTRUCTION2407/08/2026
NEW AMERICAN CONSTRUCTION INC1204/09/2026
METRO CONTRACTING NY407/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/09/2022$4.8M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GERALD CALIENDO ARCHITECTS1502/26/2026
GEORGE CAMBOURAKIS806/11/2025
MJE PROFESSIONAL SERVICES405/29/2025
ENTHINK ENGINEERS LLC103/30/2023
SOUTH BAY ENGINEERING PLLC101/31/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
GERALD J CALIENDO ARCHITECT3003/21/2026
SNR EXPEDITING DESIGN803/21/2026
CH BUILDING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PARKSITE CONSTRUCTION CORGeneral Contractor1807/08/2026
NEW AMERICAN CONSTRUCTION INCGeneral Contractor304/09/2026
SAFEPIPE PLUMBING INCPlumbing207/08/2026
WATER WORKS PIPING INCPlumbing107/08/2026
PARK CONSTRUCTION CORPGeneral Contractor104/09/2026
METRO CONTRACTING NY, INC.General Contractor107/08/2026
SAFEPIPE PLUMBING INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PROFESSIONAL SOLUTIONS GR17562002/26/2026
GTA ENGINEERING SERVICES2940301/28/2026
Building Lifecycle
All (147)Filed (29)Permit Issued (22)Signed Off (12)Violation (19)Inspection (14)Objection (18)Special Inspection (30)Tax Incentive (3)
05/22/2026
Signed off — New Building
Herewith filing Plumbing Piping and Fixtures for proposed new 7-story residential building with 27 Apartment Units.
Q08037894-S1
05/22/2026
Signed off — New Building
Herewith filing Plumbing Piping and Fixtures for proposed new 7-story residential building with 27 Apartment Units.
Q08037894-S2
05/21/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/12/2026
Special inspection requirement — Electrical motors and elevators
SAMER ABOU-GHAIDA
05/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMER ABOU-GHAIDA
05/12/2026
Special inspection requirement — Maintenance information
SAMER ABOU-GHAIDA
05/12/2026
Special inspection requirement — Interior lighting power
SAMER ABOU-GHAIDA
05/12/2026
Special inspection requirement — Exterior lighting power
SAMER ABOU-GHAIDA
05/12/2026
Special inspection requirement — Final
SAMER ABOU-GHAIDA
05/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMER ABOU-GHAIDA
05/12/2026
Special inspection requirement — Lighting controls
SAMER ABOU-GHAIDA
05/12/2026
Special inspection requirement — Mechanical Systems
SAMER ABOU-GHAIDA
05/12/2026
Special inspection requirement — Metering
SAMER ABOU-GHAIDA
05/12/2026
Special inspection requirement — Duct leakage testing, insulation and design
SAMER ABOU-GHAIDA
05/12/2026
Special inspection requirement — Shutoff dampers
SAMER ABOU-GHAIDA
05/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMER ABOU-GHAIDA
05/01/2026
485-x construction completed
04/29/2026
Signed off — New Building
Herewith filing Plumbing Piping and Fixtures for proposed new 7-story residential building with 27 Apartment Units.
Q08037894-S6
04/11/2026
Objection resolved — Resolved
04/11/2026
Objection resolved — Resolved
04/06/2026
Objection raised — Zoning
04/06/2026
Objection raised — Fire_Protection
03/25/2026
Permit issued — Plumbing
Q56783895-S2-PL
03/06/2026
Signed off — New Building
Herewith filing Plumbing Piping and Fixtures for proposed new 7-story residential building with 27 Apartment Units.
Q08037894-S3
03/04/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMER ABOU-GHAIDA
03/04/2026
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
ROBERT DYKSTRA
03/04/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SAMER ABOU-GHAIDA
03/04/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMER ABOU-GHAIDA
03/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMER ABOU-GHAIDA
03/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SAMER ABOU-GHAIDA
03/04/2026
Special inspection requirement — Maintenance information
SAMER ABOU-GHAIDA
03/03/2026
Signed off — Alteration
FILING NEW CURB CUT IN CONJUNCTION W/ NB APPLICATION #Q08037894
Q08046855-I1
02/27/2026
Signed off — New Building
Herewith filing Plumbing Piping and Fixtures for proposed new 7-story residential building with 27 Apartment Units.
Q08037894-S7
02/27/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/26/2026
Filed — New Building
Herewith filing Plumbing Piping and Fixtures for proposed new 7-story residential building with 27 Apartment Units.
Q08037894-A4
02/25/2026
Signed off — New Building
Herewith filing Plumbing Piping and Fixtures for proposed new 7-story residential building with 27 Apartment Units.
Q08037894-S4
02/20/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SAMER ABOU-GHAIDA
02/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
SAMER ABOU-GHAIDA
02/20/2026
Special inspection requirement — Exterior lighting power
SAMER ABOU-GHAIDA
02/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
SAMER ABOU-GHAIDA
02/20/2026
Special inspection requirement — Interior lighting power
SAMER ABOU-GHAIDA
02/20/2026
Special inspection requirement — Electrical motors and elevators
SAMER ABOU-GHAIDA
02/20/2026
Special inspection requirement — Metering
SAMER ABOU-GHAIDA
02/20/2026
Special inspection requirement — Mechanical Systems
SAMER ABOU-GHAIDA
02/20/2026
Special inspection requirement — Final
SAMER ABOU-GHAIDA
02/20/2026
Special inspection requirement — Maintenance information
SAMER ABOU-GHAIDA
02/18/2026
Permit issued — Curb Cut
Q08046855-I1-CC
02/17/2026
Signed off — Alteration
installation of a 8 foot plywood fence
Q00817213-I1
01/28/2026
Signed off — Alteration
Q00847757-I1
01/28/2026
Filed — New Building
Herewith filing Plumbing Piping and Fixtures for proposed new 7-story residential building with 27 Apartment Units.
Q08037894-A2
12/24/2025
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
12/19/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/17/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/22/2025
Objection raised — Admin
11/22/2025
Objection resolved — Addressed
11/18/2025
Objection resolved — Addressed
11/18/2025
Objection resolved — Addressed
11/18/2025
Objection resolved — Addressed
11/18/2025
Objection resolved — Addressed
Latest 60 of 147 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offBELLEROSE PLBG & HTG03/25/2026
DOB NOWCurb CutSigned-offPARKSITE CONSTRUCTION COR02/18/2026
DOB NOWSprinklersSigned-offBELLEROSE PLBG & HEATING09/11/2025
DOB NOWGeneral ConstructionPermit IssuedSIRINA FIRE PROT CORP09/08/2025
DOB NOWPlumbingSigned-offSUPERIOR PIPING&MECH CORP03/05/2025
DOB NOWStructuralSigned-offPARKSITE CONSTRUCTION COR02/21/2025
DOB NOWMechanical SystemsSigned-offPARKSITE CONSTRUCTION COR02/20/2025
DOB NOWConstruction FenceSigned-offPARKSITE CONSTRUCTION COR01/30/2025
DOB NOWSupported ScaffoldSigned-offNEW AMERICAN CONSTRUCTION01/27/2025
DOB NOWProtection and Mechanical MethodsSigned-offNEW AMERICAN CONSTRUCTION01/23/2025
DOB NOWSidewalk ShedSigned-offNEW AMERICAN CONSTRUCTION01/23/2025
DOB NOWPlumbingSigned-offBELLEROSE PLBG & HTG12/17/2024
DOB NOWGeneral ConstructionPermit IssuedPARKSITE CONSTRUCTION COR10/01/2024
DOB NOWFoundationSigned-offPARKSITE CONSTRUCTION COR10/01/2024
DOB NOWEarth WorkPermit IssuedPARKSITE CONSTRUCTION COR04/09/2024
DOB NOWMechanical SystemsSigned-offPARKSITE CONSTRUCTION COR03/21/2024
DOB NOWStructuralSigned-offPARKSITE CONSTRUCTION COR03/20/2024
DOB NOWSupport of ExcavationSigned-offPARKSITE CONSTRUCTION COR03/14/2024
DOB NOWConstruction FenceSigned-offPARKSITE CONSTRUCTION COR03/01/2024
DOB NOWGeneral ConstructionPermit IssuedPARKSITE CONSTRUCTION COR02/28/2024
DOB NOWSidewalk ShedSigned-offMETRO CONTRACTING NY, INC.03/30/2023
DOB NOWConstruction FenceSigned-offPARK CONSTRUCTION CORP02/02/2023
BISOTISSUEDNEW YORK DUCT07/23/1997
BISEQISSUEDTK EXCAVATING04/17/1997
BIS—RE-ISSUEDTK EXCAVATIONS03/12/1997
1 project · most recent 02/26/2026
Sprinkler System
FiledStatusContractorScope
02/26/2026Signed-offSAFEPIPE PLUMBING INCSprinkler System
1 project · most recent 02/26/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/26/2026Signed-offBELLEROSE PLBG & HTGGas, Storm, Water/Sanitary
5 projects · most recent 02/26/2026
FiledStatusContractorScope
02/26/2026CompleteG. G. ELECTRIC CORP.28 meters, 28 new_meters
07/10/2025CompleteTUXEDO ELEC'L CONTR'G INC—
01/23/2025CompleteRICHARD NEU—
12/25/2023CompleteG. G. ELECTRIC CORP.1 meters, 1 new_meters
03/30/2023CompleteRICHARD NEU—
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
05/21/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/27/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
02/20/2026Pass-Final CND-Occupancy InspectionPassView ↗
12/24/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
12/19/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/17/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
09/25/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
09/25/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
08/01/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/01/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/01/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/29/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/17/2025Pass-Final House ConnectionPassView ↗
12/20/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 114
DateRequirementInspectorRole
05/12/2026Shutoff dampersSAMER ABOU-GHAIDAenergy_progress
05/12/2026MeteringSAMER ABOU-GHAIDAenergy_progress
05/12/2026Exterior lighting powerSAMER ABOU-GHAIDAenergy_progress
05/12/2026Electrical motors and elevatorsSAMER ABOU-GHAIDAenergy_progress
05/12/2026Interior lighting powerSAMER ABOU-GHAIDAenergy_progress
05/12/2026Maintenance informationSAMER ABOU-GHAIDAenergy_progress
05/12/2026Lighting controlsSAMER ABOU-GHAIDAenergy_progress
05/12/2026Duct leakage testing, insulation and designSAMER ABOU-GHAIDAenergy_progress
05/12/2026HVAC-R and service water heating equipmentSAMER ABOU-GHAIDAenergy_progress
05/12/2026Mechanical SystemsSAMER ABOU-GHAIDAspecial
05/12/2026FinalSAMER ABOU-GHAIDAprogress
05/12/2026HVAC-R and service water piping design and insulationSAMER ABOU-GHAIDAenergy_progress
05/12/2026HVAC-R and service water heating system controlsSAMER ABOU-GHAIDAenergy_progress
03/04/2026Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesROBERT DYKSTRAspecial
03/04/2026Fire-Resistant Penetrations and JointsSAMER ABOU-GHAIDAspecial
03/04/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSAMER ABOU-GHAIDAspecial
03/04/2026HVAC-R and service water piping design and insulationSAMER ABOU-GHAIDAenergy_progress
03/04/2026Maintenance informationSAMER ABOU-GHAIDAenergy_progress
03/04/2026HVAC-R and service water heating equipmentSAMER ABOU-GHAIDAenergy_progress
03/04/2026HVAC-R and service water heating system controlsSAMER ABOU-GHAIDAenergy_progress
02/20/2026HVAC-R and service water heating system controlsSAMER ABOU-GHAIDAenergy_progress
02/20/2026Electrical motors and elevatorsSAMER ABOU-GHAIDAenergy_progress
02/20/2026FinalSAMER ABOU-GHAIDAprogress
02/20/2026Duct leakage testing, insulation and designSAMER ABOU-GHAIDAenergy_progress
02/20/2026Lighting controlsSAMER ABOU-GHAIDAenergy_progress
Latest 25 of 114.
▾Documents — 247 on file (BIS + DOB NOW)
▸Plans & Drawings29
▸DOB NOWPlans/Sketch29
08/25/2026Q00817213-I1Request digital key ↗
08/25/2026Q00847757-I1Request digital key ↗
08/23/2026Q08046855-I1Request digital key ↗
Showing 3 of 29 on file for this type
▸Applications & Permits8
▸BISPLAN / WORK APPROVAL APPLICATION6
01/07/2026400732980Open ↗
01/07/2026400732999Open ↗
04/18/2024440757780Open ↗
Showing 3 of 6 on file for this type
▸BISWORK PERMIT APPLICATION1
07/12/2023421655220Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
11/29/2022440757780Open ↗
▸Zoning, Tax Lot & Property Records19
▸DOB NOWRestrictive Declaration/Easement 110
08/17/2026Q08037894-S1Open ↗
08/17/2026Q08037894-S6Open ↗
08/13/2026Q08037894-S3Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
08/13/2026Q08037894-P8Open ↗
08/13/2026Q08037894-P1Open ↗
08/13/2026Q08037894-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/13/2026Q08037894-P2Open ↗
08/13/2026Q08037894-P1Open ↗
08/13/2026Q08037894-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q08037894-I1Open ↗
▸Seals & Professional Certifications139
▸DOB NOWProgress Inspector Seal & Signature70
09/02/2026Q08037894-I1Open ↗
09/02/2026Q08037894-I1Open ↗
09/02/2026Q08037894-I1Open ↗
Showing 3 of 70 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature37
09/02/2026Q08037894-S3Open ↗
09/02/2026Q08037894-S3Open ↗
09/02/2026Q08037894-I1Open ↗
Showing 3 of 37 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature29
08/25/2026Q00817213-I1Open ↗
08/25/2026Q00847757-I1Open ↗
08/23/2026Q08046855-P1Open ↗
Showing 3 of 29 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
11/29/2022440757780Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/29/2022440757780Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
07/12/2023421655220Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISGAS CUT-OFF1
07/12/2023421655220Open ↗
▸BISSEWER CUT-OFF1
07/12/2023421655220Open ↗
▸Safety & Tenant Protection12
▸DOB NOWStreet Tree Checklist4
08/13/2026Q08037894-P2Open ↗
08/13/2026Q08037894-P1Open ↗
08/13/2026Q08037894-P8Open ↗
Showing 3 of 4 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
07/12/2023421655220Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
07/12/2023421655220Open ↗
▸BISBPP: STREET TREES SITE PLAN1
04/07/2023440757780Open ↗
▸BISSTREET TREE CHECKLIST1
04/07/2023440757780Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
07/12/2023421655220Open ↗
▸DOB NOWStreet Trees Site Plan1
08/17/2026Q08037894-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/17/2026Q08037894-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos1
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/12/2023421655220Open ↗
▸Energy Compliance2
▸DOB NOWPreliminary Commissioning Report Certification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Inspections & Test Reports1
▸DOB NOWConcrete Testing Exception Report1
08/13/2026Q08037894-S6Open ↗
▸Approvals, Objections & Sign-offs6
▸BISLETTERS - SUPPORTING DOCUMENTATION5
07/12/2023421655220Open ↗
07/12/2023421655220Open ↗
07/12/2023421655220Open ↗
Showing 3 of 5 on file for this type
▸BISDOB APPROVAL FOR NEW CC1
04/07/2023440757780Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE1
07/12/2023421655220Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
07/12/2023421655220Open ↗
▸Filing & Intake Forms7
▸BISBOROUGH INTAKE FORM2
07/12/2023421655220Open ↗
01/31/2023421655220Open ↗
▸BISADDITIONAL INFORMATION2
04/19/2024440757780Open ↗
11/15/2023440757780Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
11/29/2022440757780Open ↗
▸BISEFILING COVER SHEET1
01/31/2023421655220Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/29/2022440757780Open ↗
▸Other Documents15
▸DOB NOWSite Survey: Initial4
08/13/2026Q08037894-P2Open ↗
08/13/2026Q08037894-P8Open ↗
08/13/2026Q08037894-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/17/2026Q08037894-I1Open ↗
08/17/2026Q08037894-P1Open ↗
08/17/2026Q08037894-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q08037894-S5Open ↗
08/13/2026Q08037894-S4Open ↗
▸DOB NOWFinal Survey1
08/17/2026Q08037894-I1Open ↗