← Back
Two family brick
25 CHARLTON STREET
MANHATTAN · BIN 1077782
💬 Discuss this project
1826Year Built
3Stories
B1Building Class
R6Zoning
4,950 sfGross Floor Area
2Units
Two family brick · Owner of record: 25 CHARLTON, LLC · 2,500 sf lot · 1.98 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Roof10p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Mezzanine7p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/26/2024$8.1M—— → —$1,626/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A&M CONSULTING401/31/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
QUINN-ONELLI INCGeneral Contractor204/09/2026
J&M PLUMBING OF WESTCHESTERPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METROSPEC SIA6420201/31/2025
Building Lifecycle
All (25)Filed (4)Permit Issued (3)Inspection (4)Special Inspection (14)
10/31/2025
Permit issued — General Construction
M01133474-S3-MS
04/08/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/01/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/19/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Risbergs
02/03/2025
Special inspection requirement — Mechanical Systems
Michael Risbergs
02/03/2025
Special inspection requirement — Heating Systems
Michael Risbergs
02/03/2025
Special inspection requirement — Final
Michael Risbergs
02/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
Michael Risbergs
02/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
Michael Risbergs
02/03/2025
Special inspection requirement — Maintenance information
Michael Risbergs
01/31/2025
Filed — Alteration
PROPOSE TO INSTALL A SPLIT AIR-COOLED AC SYSTEM AT THE ROOF AND MINOR INTERIOR WORK AS PERPLANS SUBMITTED HEREWITH.
M01133474-P1
01/31/2025
Filed — Alteration
PROPOSE TO INSTALL A SPLIT AIR-COOLED AC SYSTEM AT THE ROOF AND MINOR INTERIOR WORK AS PERPLANS SUBMITTED HEREWITH.
M01133474-P2
01/24/2025
Permit issued — General Construction
M01133474-S3-MS
01/24/2025
Special inspection requirement — Heating Systems
Michael Risbergs
01/24/2025
Special inspection requirement — Mechanical Systems
Michael Risbergs
01/24/2025
Special inspection requirement — Final
Michael Risbergs
01/24/2025
Special inspection requirement — HVAC-R and service water heating equipment
Michael Risbergs
01/24/2025
Special inspection requirement — Maintenance information
Michael Risbergs
01/24/2025
Special inspection requirement — HVAC-R and service water heating system controls
Michael Risbergs
01/24/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Michael Risbergs
01/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/06/2024
Permit issued — Plumbing
M01133474-I1-PL
11/26/2024
Filed — Alteration
PROPOSE TO INSTALL A SPLIT AIR-COOLED AC SYSTEM AT THE ROOF AND MINOR INTERIOR WORK AS PERPLANS SUBMITTED HEREWITH.
M01133474-S3
11/25/2024
Filed — Alteration
PROPOSE TO INSTALL A SPLIT AIR-COOLED AC SYSTEM AT THE ROOF AND MINOR INTERIOR WORK AS PERPLANS SUBMITTED HEREWITH.
M01133474-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedQUINN-ONELLI INC10/31/2025
DOB NOWGeneral ConstructionPermit IssuedQUINN-ONELLI INC01/24/2025
DOB NOWPlumbingSigned-offJ&M PLUMBING OF WESTCHEST12/06/2024
1 project · most recent 01/31/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
01/31/2025Permit IssuedQUINN-ONELLI INCAir Conditioning Systems
Cooling
Fujitsu AOU36RLAVM4 36,000 BTU · Condensing Unit ×4
ASUA14TLAV2 14,000 BTU · Fan Coil Indoor ×4
ASUB24TLAV2 24,000 BTU · Fan Coil Indoor ×4
1 project · most recent 01/31/2025
Gas Water/Sanitary
FiledStatusContractorScope
01/31/2025Signed-offJ&M PLUMBING OF WESTCHESTGas, Water/Sanitary
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/08/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/01/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
02/03/2025HVAC-R and service water piping design and insulationMichael Risbergsenergy_progress
02/03/2025Mechanical SystemsMichael Risbergsspecial
02/03/2025Heating SystemsMichael Risbergsspecial
02/03/2025FinalMichael Risbergsprogress
02/03/2025HVAC-R and service water heating equipmentMichael Risbergsenergy_progress
02/03/2025HVAC-R and service water heating system controlsMichael Risbergsenergy_progress
02/03/2025Maintenance informationMichael Risbergsenergy_progress
01/24/2025Heating SystemsMichael Risbergsspecial
01/24/2025Mechanical SystemsMichael Risbergsspecial
01/24/2025FinalMichael Risbergsprogress
01/24/2025HVAC-R and service water heating equipmentMichael Risbergsenergy_progress
01/24/2025Maintenance informationMichael Risbergsenergy_progress
01/24/2025HVAC-R and service water heating system controlsMichael Risbergsenergy_progress
01/24/2025HVAC-R and service water piping design and insulationMichael Risbergsenergy_progress
▾Documents — 30 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/25/2026M01133474-S3Request digital key ↗
08/25/2026M01133474-I1Request digital key ↗
08/25/2026M01133474-P1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
08/13/2026M01133474-I1Open ↗
08/13/2026M01133474-P1Open ↗
08/13/2026M01133474-P2Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature10
08/28/2026M01133474-P2Open ↗
08/28/2026M01133474-P2Open ↗
08/28/2026M01133474-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/25/2026M01133474-S3Open ↗
08/25/2026M01133474-I1Open ↗
08/25/2026M01133474-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/28/2026M01133474-P2Open ↗
08/28/2026M01133474-P2Open ↗
08/23/2026M01133474-S3Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026M01133474-I1Open ↗
08/25/2026M01133474-P2Open ↗
08/25/2026M01133474-P1Open ↗
Showing 3 of 4 on file for this type