← Back
BuildNYC
Two family brick
25 CHARLTON STREET
MANHATTAN · BIN 1077775
💬 Discuss this project
1826Year Built
3Stories
B1Building Class
R6Zoning
4,950 sfGross Floor Area
2Units
Two family brick · Owner of record: 25 Charlton · 2,500 sf lot · 1.98 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofLintels, beams, and columns installationUnder Construction37p · 4 filings · 20 docs
Floor 3Lintels, beams, and columns installationUnder Construction34p · 4 filings · 20 docs
Floor 2Unit 2BUnder Construction35p · 4 filings · 20 docs
Floor 1Lintels, beams, and columns installationUnder Construction34p · 4 filings · 20 docs
CellarLintels, beams, and columns installationUnder Construction49p · 4 filings · 20 docs
BasementLintels, beams, and columns installationUnder Construction4p · 2 filings · 20 docs
Sub-BasementLintels, beams, and columns installationUnder Construction34p · 4 filings · 20 docs
Site & exteriorHeavy duty sidewalk shed14p · 2 filings · 6 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/26/2024$8.1M—Private party → 25 CHARLTON, LLC$1,626/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Always Fast Services312/22/2025
Eric Sheffield Architect305/07/2025
Clapper Structural Engineering204/17/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J.A.M. Associates2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Quinn-OnelliGeneral Contractor1004/09/2026
Edmund LewisGeneral Contractor207/08/2026
Park Contracting GroupScaffold204/09/2026
Quinn-Onellispecialty_contractor204/09/2026
J&M Plumbing of WestchesterPlumbing207/08/2026
Lina ElectricElectrical103/22/2026
Edmund Lewisspecialty_contractor110/17/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Metrospec Sia6420306/24/2025
Eric Sheffield Architect2195305/07/2025
SGM Engineering2366204/17/2025
Building Lifecycle
11/06/2026
Signed off — Alteration
M01277069-I1
11/06/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01277076-I1
10/16/2026
Permit renewed — Mechanical Systems
Renewed with changes
M01141954-I1-MS
04/17/2026
Permit renewed — Structural
Renewed with changes
M01133634-I1-ST
04/10/2026
Permit renewed — General Construction
Renewed with changes
M01133593-I1-GC
55 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedEdmund Lewis10/16/2026
DOB NOWStructuralPermit IssuedEdmund Lewis04/17/2026
DOB NOWGeneral ConstructionPermit IssuedEdmund Lewis04/10/2026
DOB NOWPlumbingPermit IssuedJ&M Plumbing of Westchest12/29/2025
DOB NOWStructuralPermit IssuedQuinn-Onelli10/31/2025
DOB NOWGeneral ConstructionPermit IssuedQuinn-Onelli10/31/2025
DOB NOWMechanical SystemsPermit IssuedQuinn-Onelli10/31/2025
DOB NOWSidewalk ShedSigned-offPark Contracting Group08/26/2025
DOB NOWSupported ScaffoldSigned-offPark Contracting Group08/26/2025
DOB NOWGeneral ConstructionPermit IssuedQuinn-Onelli04/01/2025
DOB NOWStructuralPermit IssuedQuinn-Onelli04/01/2025
DOB NOWStructuralPermit IssuedQuinn-Onelli02/06/2025
DOB NOWMechanical SystemsPermit IssuedQuinn-Onelli01/27/2025
DOB NOWGeneral ConstructionPermit IssuedQuinn-Onelli01/27/2025
DOB NOWPlumbingPermit IssuedJ&M Plumbing of Westchest01/27/2025
1 project · most recent 06/24/2025
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
06/24/2025Permit IssuedEdmund LewisAir Conditioning Systems, Ventilation Systems
1 project · most recent 06/24/2025
Gas Water/Sanitary
FiledStatusContractorScope
06/24/2025Permit IssuedJ&M Plumbing of WestchestGas, Water/Sanitary
3 projects · most recent 08/07/2026
General Wiring
FiledStatusContractorScope
08/07/2026Permit IssuedSuper Charged ElectricGeneral Wiring
08/28/2025Permit IssuedRichard Neu—
01/30/2025Permit IssuedLina Electric—
1 project · most recent 12/22/2025
Scaffold
FiledStatusContractorScope
12/22/2025Signed-offPark Contracting GroupScaffold
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
11/20/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/17/2025Mechanical SystemsMichael Risbergsspecial
06/17/2025FinalMichael Risbergsprogress
05/06/2025FinalEric Sheffieldprogress
05/06/2025Structural Stability – Alterations of existing buildingsEric Sheffieldspecial
05/06/2025Maintenance informationEric Sheffieldenergy_progress
05/06/2025Air barrier - visual inspectionEric Sheffieldenergy_progress
04/16/2025FinalEric Sheffieldprogress
04/16/2025Fire-Resistant Penetrations and JointsEric Sheffieldspecial
04/16/2025Fire-Resistance Rated ConstructionEric Sheffieldprogress
64 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account