250 WEST 49TH STREET
MANHATTAN · BIN 1024785
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Active ViolationsFISP: SAFE
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projects2 5 0 W E S T 4 9 A S S O C I A T E S8 filings
RoofTemporary roof protection installation1p · 4 filings · 8 docs
Floor 19Proposed 28 story mixed-use new buildingUnder Construction1 filing · 2 docs
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7Proposed 28 story mixed-use new buildingUnder Construction1 filing · 2 docs
Floor 6Building sprinkler and standpipe demolition1p · 1 filing
Floor 5Building sprinkler and standpipe demolition1p · 1 filing
Floor 4Building sprinkler and standpipe demolition1p · 1 filing
Floor 3Building sprinkler and standpipe demolition2p · 1 filing
Floor 2Building sprinkler and standpipe demolition1p · 1 filing · 3 docs
Floor 1Temporary construction office and shanties3p · 3 filings · 4 docs
CellarTemporary construction office and shanties4p · 2 filings · 7 docs
Site & exterior250 West 49 Asociates7 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
250 West 49 Associate2303/21/2026
Fraternal Clubhouse Partnership1703/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Speedy Expediting4803/21/2026
AE Design Solution4603/21/2026
DOB Expediting103/21/2026
RSL NY Conulting103/21/2026
Domani Consulting203/21/2026
Milrose Consultants303/21/2026
Expedite Dem203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Core Scaffold SystemsScaffold1807/08/2026
City Builders NYCGeneral Contractor1407/08/2026
Xolle DemoGeneral Contractor504/09/2026
Xolle DemoScaffold303/21/2026
Metflow Fire ControlFire Protection307/08/2026
City Builders NYCScaffold303/21/2026
Richmond P & H CoFire Protection107/08/2026
Solas ElectricalElectrical103/22/2026
DM80 SolutionsScaffold103/21/2026
Creative Plumbing inPlumbing107/08/2026
Skyline Electrical ContractingElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Big Apple Group NY A Rma9168308/27/2025
Leo Y Lee Associates2481507/29/2025
Technical Systems Review7409106/22/2022
AR-Tech Engineering6659104/28/2022
Building Lifecycle
All (172)Filed (32)Permit Issued (24)Signed Off (15)Facade (FISP) (9)Violation (60)Inspection (6)Objection (12)Special Inspection (11)Tax Incentive (3)
09/02/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/01/2026
421-a(16) construction completed
05/21/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01225919-I1
05/20/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01199266-I1
05/20/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01226608-I1
05/20/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01223333-I1
05/20/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY SYSTEM & PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01218275-I1
05/20/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01222123-I1
05/20/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01223155-I1
05/15/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/30/2026
Permit issued — Sidewalk Shed
M01199266-I1-SH
01/30/2026
Permit issued — General Construction
M01317213-I1-GC
01/06/2026
Signed off — Alteration
Structural filed in conjunction with NB # M00630979-I1
M00669885-I1
01/02/2026
Signed off — Alteration
APPLICATION FILED HEREWITH FOR A TEMPORARY CONSTRUCTION OFFICE & TEMPORARY SHANTIES. NO CHANGE IN OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION.
M01243891-I1
11/14/2025
Filed — Alteration
This application is filed for a temporary use permit for a sales office including model apartments pursuant to section AC 28-111 and Buildings Bulleting 2010-002.
M01317213-I1
08/27/2025
Filed — Alteration
Structural filed in conjunction with NB # M00630979-I1
M00669885-P2
08/20/2025
Permit issued — Structural
M00669885-I1-ST
08/19/2025
Permit issued — General Construction
M01243891-I1-GC
08/15/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SYSTEM & PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01218275-P1
07/29/2025
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01225919-P1
07/29/2025
Filed — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01223155-P1
07/09/2025
Filed — Alteration
APPLICATION FILED HEREWITH FOR A TEMPORARY CONSTRUCTION OFFICE & TEMPORARY SHANTIES. NO CHANGE IN OCCUPANCY USE OR EGRESS UNDER THIS APPLICATION.
M01243891-I1
07/07/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01199266-P2
06/24/2025
Permit issued — Protection and Mechanical Methods
M01225919-I1-PMM
06/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
SOORJBALLY HARILALL
06/19/2025
Special inspection requirement — Final
SOORJBALLY HARILALL
06/16/2025
Objection resolved — Addressed
06/03/2025
Objection raised — Other
05/15/2025
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01225919-I1
05/15/2025
Filed — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01226608-I1
05/15/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01199266-P1
05/15/2025
Permit issued — Protection and Mechanical Methods
M01226608-I1-PMM
05/12/2025
Permit issued — Protection and Mechanical Methods
M01223333-I1-PMM
05/12/2025
Permit issued — Protection and Mechanical Methods
M01223155-I1-PMM
05/09/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01223333-I1
05/09/2025
Filed — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01223155-I1
05/08/2025
Permit issued — Protection and Mechanical Methods
M01222123-I1-PMM
05/07/2025
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01222123-I1
05/02/2025
Permit issued — Supported Scaffold
M01218275-I1-SF
05/01/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SYSTEM & PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01218275-I1
05/01/2025
Permit issued — Structural
M00669885-I1-ST
04/28/2025
Objection raised — Other
04/28/2025
Objection resolved — Addressed
04/21/2025
Objection resolved — Addressed
03/26/2025
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01199266-I1
03/26/2025
Permit issued — Sidewalk Shed
M01199266-I1-SH
01/30/2025
Signed off — Alteration
installation of plywood fence to protect site.
M00686775-I1
01/23/2025
Objection raised — Other
11/08/2024
Permit issued — Construction Fence
M00686775-I1-FN
10/16/2024
Filed — Alteration
Structural filed in conjunction with NB # M00630979-I1
M00669885-P1
10/09/2024
Special inspection requirement — Final
SOORJBALLY HARILALL
10/09/2024
Special inspection requirement — Concrete - Cast-In-Place
SOORJBALLY HARILALL
08/12/2024
421-a(16) registration filed
05/01/2024
Permit issued — Construction Fence
M00686775-I1-FN
01/26/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00662269-I1
01/26/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00661253-I1
01/26/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00711085-I1
01/26/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00635501-I1
01/26/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00661234-I1
01/16/2024
Violation issued (ECB, closed)
Local Law
Latest 60 of 172 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems03/30/2026
DOB NOWGeneral ConstructionPermit IssuedCity Builders NYC01/30/2026
DOB NOWStructuralSigned-offCity Builders NYC08/20/2025
DOB NOWGeneral ConstructionSigned-offCity Builders NYC08/19/2025
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems06/24/2025
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems05/15/2025
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems05/12/2025
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems05/12/2025
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems05/08/2025
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems05/02/2025
DOB NOWStructuralSigned-offCity Builders NYC05/01/2025
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems03/26/2025
DOB NOWConstruction FenceSigned-offDM80 Solutions11/08/2024
DOB NOWConstruction FenceSigned-offXolle Demo05/01/2024
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems11/21/2022
DOB NOWSprinklersPermit IssuedRichmond P & H Co07/04/2022
DOB NOWProtection and Mechanical MethodsPermit IssuedXolle Demo06/23/2022
DOB NOWEarth WorkPermit IssuedXolle Demo06/07/2022
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems04/05/2022
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems03/14/2022
DOB NOWConstruction FenceSigned-offXolle Demo03/07/2022
DOB NOWSupported ScaffoldSigned-offCore Scaffold Systems01/14/2022
DOB NOWProtection and Mechanical MethodsSigned-offCore Scaffold Systems01/14/2022
DOB NOWSidewalk ShedSigned-offCore Scaffold Systems11/23/2021
BIS—ISSUEDXolle Demo09/29/2022
BISEQISSUEDXolle Demo03/08/2022
BIS—ISSUEDXolle Demo03/08/2022
BISEQISSUEDXolle Demo03/08/2022
BISPLISSUEDPro Star Plumbing, Heating & Mechanical11/26/2014
BISOTISSUEDEsm Construction11/24/2014
BISOTISSUEDNew Nova Construction02/12/2009
BISEQISSUEDAdvanced Installations12/29/2008
BISOTISSUEDEsm Construction06/30/2004
BISFSISSUEDRockway Fuel Oil12/11/2003
BISMHISSUEDWhalen Construction08/18/2003
BISOTISSUEDVir Construction07/25/2001
BISOTISSUEDAero Tech11/08/2000
BISMHISSUEDB & F Building01/26/2000
BISMHISSUEDCorporate Cooling01/18/2000
BISPLISSUEDVitello P & Mechanical12/21/1999
+ 19 more permits on file
5 projects · most recent 04/17/2025
FiledStatusContractorScope
04/17/2025Permit IssuedSolas Electrical—
04/17/2025CompleteSolas Electrical—
04/08/2025CompleteDenali Electric—
06/06/2022CompleteSolas Electrical—
11/22/2021CompleteV. Vass Electric—
2 projects · most recent 08/15/2025
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/15/2025Signed-offCore Scaffold SystemsScaffold
07/07/2025Signed-offCore Scaffold SystemsSidewalk Shed
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/02/2026Fail-Final General Construction Non-Directive 14FailView ↗
05/15/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/13/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/21/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/18/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/08/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
06/19/2025Fire-Resistance Rated ConstructionSOORJBALLY HARILALLprogress
06/19/2025FinalSOORJBALLY HARILALLprogress
10/09/2024FinalSOORJBALLY HARILALLprogress
10/09/2024Concrete - Cast-In-PlaceSOORJBALLY HARILALLspecial
09/13/2022Structural Stability – Alterations of existing buildingsLeo Leespecial
09/13/2022Post-installed AnchorsLeo Leespecial
08/25/2022Post-installed AnchorsLeo Leespecial
08/25/2022Structural Stability – Alterations of existing buildingsLeo Leespecial
05/18/2022FinalAILANTO DANIEL MINAWIprogress
04/26/2022Post-installed AnchorsALBERTO ROMANspecial
04/26/2022Structural Stability – Alterations of existing buildingsALBERTO ROMANspecial
▾Documents — 272 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch32
09/03/2026M00635501-P1Request digital key ↗
09/03/2026M00635501-I1Request digital key ↗
09/03/2026M00661253-P1Request digital key ↗
Showing 3 of 32 on file for this type
▸Applications & Permits45
▸BISPLAN / WORK APPROVAL APPLICATION35
02/26/2026141026716Open ↗
11/19/2025140810638Open ↗
11/19/2025140810629Open ↗
Showing 3 of 35 on file for this type
▸BISWORK PERMIT APPLICATION7
09/29/2022123907914Open ↗
03/09/2022123907914Open ↗
03/09/2022123907914Open ↗
Showing 3 of 7 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
12/19/2024141026716Open ↗
02/10/2022141007443Open ↗
07/18/2018123336657Open ↗
▸Zoning, Tax Lot & Property Records3
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
01/07/2019121187107Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
01/07/2019121187107Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
01/07/2019121187107Open ↗
▸Seals & Professional Certifications57
▸DOB NOWDPL-1: Design Professional Seal & Signature32
09/03/2026M00635501-I1Open ↗
09/03/2026M00661253-P1Open ↗
09/03/2026M00661253-P2Open ↗
Showing 3 of 32 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/30/2026M00661253-P1Open ↗
08/30/2026M00661253-P1Open ↗
08/28/2026M00661253-P3Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
12/05/2022123907914Open ↗
03/09/2022123907914Open ↗
09/17/2018140281709Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE3
12/19/2024141026716Open ↗
02/10/2022141007443Open ↗
11/30/2018140810638Open ↗
▸DOB NOWProgress Inspector Seal & Signature3
08/28/2026M00740692-I1Open ↗
08/26/2026M01243891-I1Open ↗
08/26/2026M01243891-I1Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
01/29/2009110443486Open ↗
12/29/2008110422490Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
02/10/2022141007443Open ↗
11/14/2014140281709Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
01/29/2009110443486Open ↗
12/29/2008110422490Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
11/14/2014140281709Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/14/2014140281709Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING4
11/16/2018121187107Open ↗
07/11/2018121187107Open ↗
11/14/2014140281709Open ↗
Showing 3 of 4 on file for this type
▸BISPLUMBING - SUPPORTING DOCUMENTATION1
11/14/2014140281709Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
03/09/2022123907914Open ↗
▸DOB NOWFDNY: Letter of No Objection1
08/13/2026M00726934-I1Open ↗
▸Safety & Tenant Protection19
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE11
09/29/2022123907914Open ↗
09/29/2022123907914Open ↗
09/29/2022123907914Open ↗
Showing 3 of 11 on file for this type
▸BISSTREET TREE CHECKLIST4
12/19/2024141026716Open ↗
12/05/2018121187107Open ↗
09/14/2018123336657Open ↗
Showing 3 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN2
12/20/2024141026716Open ↗
02/10/2022141007443Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
03/09/2022123907914Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
03/09/2022123907914Open ↗
▸Environmental & Asbestos5
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
01/07/2019121187107Open ↗
11/14/2014140281709Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/29/2009110443486Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
12/29/2008110422490Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
03/09/2022123907914Open ↗
▸Inspections & Test Reports20
▸BISTECHNICAL REPORT: RESPONSIBILITY8
01/07/2019121187107Open ↗
01/07/2019121187107Open ↗
01/07/2019121187107Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION3
01/07/2019121187107Open ↗
01/07/2019121187107Open ↗
01/07/2019121187107Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram3
08/13/2026M00630979-S1Open ↗
08/13/2026M00630979-S8Open ↗
08/13/2026M00630979-S4Open ↗
▸DOB NOWSOIL REPORT3
08/13/2026M00630979-P9Open ↗
08/13/2026M00630979-P8Open ↗
08/13/2026M00630979-A2Open ↗
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION2
09/29/2022123907914Open ↗
03/09/2022123907914Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026M00630979-S1Open ↗
▸Approvals, Objections & Sign-offs27
▸BISSCHEDULE A - OCCUPANCY / USE7
02/05/2019121187107Open ↗
01/08/2019121187107Open ↗
01/02/2019121187107Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION7
09/29/2022123907914Open ↗
03/09/2022123907914Open ↗
03/09/2022123907914Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
09/17/2018140281709Open ↗
04/02/2018102215960Open ↗
01/24/2018102215960Open ↗
Showing 3 of 5 on file for this type
▸BISCONSTRUCTION CODE DETERMINATION2
01/20/2022123907914Open ↗
03/01/2016121187107Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
01/29/2009110443486Open ↗
12/29/2008110422490Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
07/18/2018123336657Open ↗
▸BISHOUSE CONNECTION SIGNOFF1
03/09/2022123907914Open ↗
▸BISLANDMARKS APPROVAL1
03/09/2022123907914Open ↗
▸BISBSA/CPC APPROVAL1
01/07/2019121187107Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT4
09/17/2018140281709Open ↗
11/14/2014140281709Open ↗
05/21/2009110443486Open ↗
Showing 3 of 4 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
09/29/2022123907914Open ↗
03/09/2022123907914Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
09/29/2022123907914Open ↗
03/09/2022123907914Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
09/29/2022123907914Open ↗
▸Filing & Intake Forms29
▸BISBOROUGH INTAKE FORM11
12/05/2022123907914Open ↗
09/29/2022123907914Open ↗
03/09/2022123907914Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING COVER SHEET10
08/31/2021123907914Open ↗
08/26/2021123907914Open ↗
10/12/2018121187107Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
12/19/2024141026716Open ↗
02/10/2022141007443Open ↗
11/30/2018140810638Open ↗
Showing 3 of 4 on file for this type
▸BISADDITIONAL INFORMATION2
04/23/2025141026716Open ↗
09/29/2022123907914Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT32
12/19/2024141026716Open ↗
02/10/2022141007443Open ↗
▸Other Documents19
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION11
09/29/2022123907914Open ↗
03/09/2022123907914Open ↗
03/09/2022123907914Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWSite Survey: Initial3
08/14/2026M00630979-B6Open ↗
08/14/2026M00630979-P4Open ↗
08/13/2026M00630979-A9Open ↗
▸DOB NOWProperty Ownership Certification2
08/14/2026M00630979-B6Open ↗
08/14/2026M00630979-P4Open ↗
▸BISPLOT DIAGRAM1
01/07/2019121187107Open ↗
▸DOB NOWPlot Diagram1
08/13/2026M00740692-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026M00740692-I1Open ↗