| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01238795 ↗ | 521 WEST STREET MANHATTAN | Alteration | Permit Issued | 06/17/2025 | 08/11/2026 | Design RAAD Filer JAM CONSULTANTS, INC. | STRUCTURAL WORK ASSOCIATED WITH APARTMENT RENOVATION. |
| M01411252 ↗ | 354 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 06/08/2026 | 08/11/2026 | Design RAAD | INSTALLATION OF MECHANICAL SYSTEMS AS PER PLANS FILED HEREIN |
| M01410205 ↗ | 200 LAFAYETTE STREET MANHATTAN | Alteration | Signed-off | 06/10/2026 | 06/16/2026 | Design JACK GREEN ASSOCIATES Owner CUSHMAN & WAKEFIELD | Remove existing and Install new AC units and associated components, as per plans filed herewith. No change to use. egress or occupancy. |
| M01327906 ↗ | 200 LAFAYETTE STREET MANHATTAN | Alteration | Signed-off | 12/22/2025 | 02/18/2026 | Design MG ENGINEERING D.P.C. Owner CUSHMAN & WAKEFIELD Filer RIZZO GROUP | Mechanical modifications taking place within the existing roof bulkhead as indicated on the drawings. |
| M01338598 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 02/09/2026 | 02/18/2026 | Architectural modifications taking place on the 5th floor as per plans filed herewith. No change in use, egress or occupancy. | |
| M01346995 ↗ | 249 WEST 17 STREET MANHATTAN | Alteration | Signed-off | 01/28/2026 | 02/06/2026 | Design Projekt Collectiv Filer RIZZO GROUP | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 3RD FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Name | Projects together | Most recent |
|---|---|---|
| MG ENGINEERING D.P.C. | 21 | 03/13/2026 |
| JOHN F. GIUSEFFI, ARCHITECT, PC | 20 | 03/13/2026 |
| JAROS BAUM & BOLLES | 9 | 11/06/2023 |
| ROBERT DERECTOR ASSOCIATES | 7 | 07/14/2026 |
| CONCESSI ENGINEERING, P.C. | 4 | 08/17/2026 |
| GOLDMAN COPELAND ASSOCIATES | 4 | 11/05/2025 |
| SCHRIMMER DESIGN GROUP | 4 | 08/01/2022 |
| THORNTON TOMASETTI | 4 | 06/14/2024 |
| VINCENT J. LIOTTA P.E. | 4 | 05/30/2025 |
| VOCON | 4 | 04/30/2024 |
| FIFIELD PIAKER ELMAN ARCHITECTS | 3 | 04/23/2026 |
| MONTROY DEMARCO ARCHITECTURE, LLP | 3 | 05/31/2024 |
| ABS ENGINEERING, PLLC | 2 | 04/08/2024 |
| B+W ARCHITECTURE DPC | 2 | 08/17/2026 |
| GANNETT FLEMING | 2 | 05/06/2022 |
| JACK GREEN ASSOCIATES | 2 | 06/10/2026 |
| Projekt Collectiv | 2 | 01/28/2026 |
| RAAD | 2 | 06/08/2026 |
| ROSINI ENGINEERING, PC | 2 | 11/28/2023 |
| WYS DESIGN PARTNERSHIP ARCHITECTS | 2 | 11/05/2025 |
| ALLEN + KILLCOYNE ARCHITECTS LLP | 1 | 11/25/2025 |
| AMA CONSULTING ENGINEERS, PC | 1 | 06/10/2024 |
| ARRA ARCHITECTURE | 1 | 05/03/2023 |
| BALA CONSULTING ENGINEERS | 1 | 10/23/2019 |
| BAZINI ENGINEERING, P.C. | 1 | 06/17/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| HYDRONIC CONCEPTS NY P&H | 4 | 08/17/2026 |
| HYDRONIC CONCEPTS NY PLBG | 3 | 08/17/2026 |
| FIVE BOROUGH NYC LLC | 1 | 04/08/2024 |
| RELIABLE PLBG & HTG CORP | 1 | 04/08/2024 |
| SOUND REFRIGERATION & AIR | 1 | 06/17/2026 |
| VERSATILE SERVICES LLC | 1 | 11/15/2023 |
| Name | Projects together | Most recent |
|---|---|---|
| DIVCO WEST REAL ESTATE SERVICES | 23 | 06/14/2024 |
| DIVCOWEST | 9 | 03/13/2026 |
| 100 WALL INVESTMENTS, LLC | 7 | 10/28/2021 |
| CUSHMAN & WAKEFIELD | 4 | 06/10/2026 |
| ESRT | 4 | 04/23/2026 |
| ST. BERNARD'S SCHOOL | 4 | 05/30/2025 |
| 59 MAIDEN LANE ASSOCIATES, LLC | 2 | 08/17/2026 |
| HAHN KOOK CENTER USA INC. | 2 | 07/20/2022 |
| PPF OFF TWO PARK AVENUE OWNER LLC | 2 | 04/08/2024 |
| RXR REALTY | 2 | 12/14/2023 |
| 125 WEST 31 STREET ASSOCIATES LLC | 1 | 09/15/2023 |
| 225 PARK AVENUE SOUTH | 1 | 10/29/2021 |
| 810 RIVER PARTNERS LLC | 1 | 02/17/2023 |
| AMTAD LLC | 1 | 03/22/2021 |
| EMPIRE STATE REALTY TRUST | 1 | 10/30/2023 |
| HERITAGE REALTY SERVICES LLC. | 1 | 01/18/2024 |
| HYATT CORPORATION AS AGENT OF PH NE | 1 | 12/14/2022 |
| JLL | 1 | 11/28/2023 |
| JW MARRIOTT ESSEX HOUSE | 1 | 06/01/2023 |
| Lafayette White Group | 1 | 03/25/2025 |
| RELATED HUDSON YARDS | 1 | 08/30/2023 |
| RJ CAPITAL CONSTRUCTION LTD | 1 | 10/22/2024 |
| ROYALTON | 1 | 10/23/2019 |
| ROZA 14W | 1 | 04/01/2020 |
| RUDIN MANAGEMENT CO INC | 1 | 07/01/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| RIZZO GROUP | 54 | 04/23/2026 |
| ARCHETYPE CONSULTANTS, INC. | 8 | 07/14/2026 |
| EMPIRE CITY CONSULTANTS, INC. | 4 | 01/15/2026 |
| METROPOLIS GROUP INC | 4 | 03/24/2025 |
| A1 EXPEDITING SERVICE CORP. | 2 | 01/22/2024 |
| JAM CONSULTANTS, INC. | 2 | 11/25/2025 |
| WHIDDEN SILVER INC. | 2 | 08/17/2026 |
| AM Buildiing Consulatants, Inc. | 1 | 06/10/2026 |
| BURNHAM NATIONWIDE INC | 1 | 04/08/2024 |
| GREEN LIGHT EXPEDITING LLC | 1 | 07/01/2024 |
| JENNY FLORES EXPEDITING | 1 | 12/14/2022 |
| JM ZONING, LLC. | 1 | 08/30/2023 |
| LMS-ACE SERVICES | 1 | 06/01/2023 |
| MP DESIGN AND CONSTRUCTION | 1 | 02/02/2023 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01238795 ↗ | 521 WEST STREET MANHATTAN | Alteration | Permit Issued | 06/17/2025 | 08/11/2026 | Design RAAD Filer JAM CONSULTANTS, INC. | STRUCTURAL WORK ASSOCIATED WITH APARTMENT RENOVATION. |
| M01411252 ↗ | 354 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 06/08/2026 | 08/11/2026 | Design RAAD | INSTALLATION OF MECHANICAL SYSTEMS AS PER PLANS FILED HEREIN |
| M01410205 ↗ | 200 LAFAYETTE STREET MANHATTAN | Alteration | Signed-off | 06/10/2026 | 06/16/2026 | Design JACK GREEN ASSOCIATES Owner CUSHMAN & WAKEFIELD | Remove existing and Install new AC units and associated components, as per plans filed herewith. No change to use. egress or occupancy. |
| M01327906 ↗ | 200 LAFAYETTE STREET MANHATTAN | Alteration | Signed-off | 12/22/2025 | 02/18/2026 | Design MG ENGINEERING D.P.C. Owner CUSHMAN & WAKEFIELD Filer RIZZO GROUP | Mechanical modifications taking place within the existing roof bulkhead as indicated on the drawings. |
| M01338598 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 02/09/2026 | 02/18/2026 | Architectural modifications taking place on the 5th floor as per plans filed herewith. No change in use, egress or occupancy. | |
| M01346995 ↗ | 249 WEST 17 STREET MANHATTAN | Alteration | Signed-off | 01/28/2026 | 02/06/2026 | Design Projekt Collectiv Filer RIZZO GROUP | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 3RD FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01339142 ↗ | 1440 BROADWAY MANHATTAN | Alteration | Permit Issued | 01/15/2026 | 01/30/2026 | Design Projekt Collectiv | Interior modification. Modifying the existing entrance door to install a push-button-actuated assembly for accessibility to the building. |
| M01329045 ↗ | 320 PARK AVENUE MANHATTAN | Alteration | Signed-off | 12/05/2025 | 01/21/2026 | Design HUE Architects PLLC | PROPOSE A VERY MINOR PARTITION CHANGE AS PER PLANS FILED HEREWITH. NO CHANGE TO ZONING, USE, EGRESS OR OCCUPANCY |
| M01295741 ↗ | 354 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 10/23/2025 | 01/06/2026 | Design CONCESSI ENGINEERING, P.C. Filer WHIDDEN SILVER INC. | Modify plumbing system to add connection for coffee maker on 5th floor Board Room and replace restroom fixtures on the 6th floor. Modificat… |
| M01302531 ↗ | 1350 BROADWAY MANHATTAN | Alteration | Signed-off | 11/05/2025 | 11/13/2025 | Filer RIZZO GROUP | GENERAL CONSTRUCTION TAKING PLACE ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01302601 ↗ | 1350 BROADWAY MANHATTAN | Alteration | Signed-off | 11/05/2025 | 11/12/2025 | Design GOLDMAN COPELAND ASSOCIATES Filer RIZZO GROUP | MECHANICAL WORK TAKING PLACE ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01211412 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 05/16/2025 | 10/15/2025 | Owner DIVCOWEST Filer RIZZO GROUP | Architectural modifications taking place on 13C/14M floor as per plans filed herewith. No change in use, egress or occupancy. |
| M01211414 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 05/15/2025 | 10/15/2025 | Design MG ENGINEERING D.P.C. Owner DIVCOWEST Filer RIZZO GROUP | Mechanical modifications taking place on 13C/14M floor as per plans filed herewith. No change in use, egress or occupancy. |
| M01291093 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 09/29/2025 | 10/02/2025 | Design MG ENGINEERING D.P.C. Owner DIVCOWEST Filer RIZZO GROUP | Mechanical modifications taking place on 34th floor Marketing/33rd floor Construction as per plans filed herewith. No change in use, egress … |
| M01291075 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Permit Issued | 09/29/2025 | 10/01/2025 | Owner DIVCOWEST Filer RIZZO GROUP | Architectural modifications taking place on 34th floor Marketing/33rd floor Construction as per plans filed herewith. No change in use, egre… |
| M01237641 ↗ | 50 BROADWAY MANHATTAN | Alteration | Signed-off | 07/09/2025 | 08/11/2025 | Construction work on the 34th floor (UFT fitout) as indicated on drawings. | |
| M01237668 ↗ | 50 BROADWAY MANHATTAN | Alteration | Signed-off | 07/10/2025 | 08/11/2025 | Design ROBERT DERECTOR ASSOCIATES | Mechanical work on the 34th floor (UFT fitout) as indicated on drawings |
| M01188926 ↗ | 67 WEST 47 STREET MANHATTAN | Alteration | Signed-off | 04/11/2025 | 07/14/2025 | Design BAZINI ENGINEERING, P.C. Owner Valley National Bank | REPLACE ONE (1) AC SYSTEM WITH ONE (1) NEW HEAT-PUMP HVAC SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M01164577 ↗ | 441 NINTH AVENUE MANHATTAN | Alteration | Signed-off | 03/24/2025 | 04/28/2025 | Design ROBERT DERECTOR ASSOCIATES Filer METROPOLIS GROUP INC | Removal and installation of ductwork, diffusers, fans and related mechanical piping. No Change to Use, Egress or Occupancy. |
| Q01187713 ↗ | 30-40 48 AVENUE QUEENS | Alteration | Signed-off | 03/25/2025 | 03/31/2025 | Design CHARLES B BREEN Owner Lafayette White Group Filer JAM CONSULTANTS, INC. | Mechanical work related to ac replacement. No change to use, egress, or occupancy. |
| M01116938 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 10/07/2024 | 03/26/2025 | Design MG ENGINEERING D.P.C. Owner DIVCOWEST Filer RIZZO GROUP | Mechanical modifications taking place on 35th floor Construction/36th floor Marketing as per plans filed herewith. No change in use, egress … |
| M01186492 ↗ | 4 EAST 98 STREET MANHATTAN | Alteration | Signed-off | 03/05/2025 | 03/26/2025 | Design VINCENT J. LIOTTA P.E. Owner ST. BERNARD'S SCHOOL | INSTALLATION OF SPLIT HVAC SYSTEM WITH A TOTAL CAPACITY OF 15 TONS ON FLOORS 006 AND ROOF. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. |
| M01164564 ↗ | 441 NINTH AVENUE MANHATTAN | Alteration | Signed-off | 03/13/2025 | 03/25/2025 | Filer METROPOLIS GROUP INC | GENERAL CONSTRUCTION FOR INSTALLATION OF WALLS, DOORS, FLOOR FINISHES AND CEILINGS AS PER PLANS, NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00666536 ↗ | 2 PARK AVENUE MANHATTAN | Alteration | Signed-off | 06/08/2022 | 12/27/2024 | VAULT AND SIDEWALK REPAIRS (33RD STREET) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | |
| M01116929 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 10/07/2024 | 11/07/2024 | Owner DIVCOWEST Filer RIZZO GROUP | Architectural modifications taking place on 35th floor Construction/36th floor Marketing as per plans filed herewith. No change in use, egre… |
| B01099928 ↗ | 459 5 AVENUE BROOKLYN | Alteration | Signed-off | 10/22/2024 | 10/29/2024 | Design B+W ARCHITECTURE DPC Filer WHIDDEN SILVER INC. | REMOVING FURNITURE PARTITIONS AND REPLACING THEM WITH FULL HEIGHT PARTITIONS AND GLASS WALL |
| M01096199 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 08/27/2024 | 08/30/2024 | Owner DIVCOWEST Filer RIZZO GROUP | Construction modifications taking place on 27th floor Construction/28th floor Marketing as per plans filed herewith. No change in use, egres… |
| M01096216 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 08/27/2024 | 08/30/2024 | Design MG ENGINEERING D.P.C. Owner DIVCOWEST Filer RIZZO GROUP | Mechanical modifications taking place on the 27th floor Construction/28th floor Marketing as per plans filed herewith. No change in use, egr… |
| M01058920 ↗ | 345 PARK AVENUE MANHATTAN | Alteration | Signed-off | 07/01/2024 | 07/15/2024 | Owner RUDIN MANAGEMENT CO INC | FILING FOR REPLACEMENT OF EXISTING HVAC UNIT AS PER PLANS SUBMITTED HEREWITH. |
| M00810381 ↗ | 160 CENTRAL PARK SOUTH MANHATTAN | Alteration | Signed-off | 06/01/2023 | 07/02/2024 | Owner JW MARRIOTT ESSEX HOUSE Filer LMS-ACE SERVICES | DEMOLITION OF EXISTING HOT WATER HEATERS, HOT WATER RETURN PUMPS, AND ASSOCIATED COMPONENTS. INSTALLATION OF NEW HOT WATER HEATERS, RETURN P… |
| M01056504 ↗ | 320 PARK AVENUE MANHATTAN | Alteration | Signed-off | 06/10/2024 | 06/18/2024 | Design LEHMAN SMITH MCLEISH Filer RIZZO GROUP | General construction modifications taking place on the 19, 20, 27,29th construction/20,21,28, 30th marketing floors as per plans filed herew… |
| M00930000 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 06/10/2024 | 06/17/2024 | Design MG ENGINEERING D.P.C. | Modifications to the existing HVAC system: Removal of AC units, branch ductwork, dampers, controls, VAVs, return and supply grilles on the 2… |
| M01056506 ↗ | 320 PARK AVENUE MANHATTAN | Alteration | Signed-off | 06/10/2024 | 06/17/2024 | Design AMA CONSULTING ENGINEERS, PC | Mechanical modifications taking place on 19, 20, 27,29th construction/20,21,28, 30th marketing floors as per plans filed herewith. No change… |
| M01064859 ↗ | 4 EAST 98 STREET MANHATTAN | Alteration | Signed-off | 06/11/2024 | 06/13/2024 | Design VINCENT J. LIOTTA P.E. Owner ST. BERNARD'S SCHOOL | REPLACEMENT OF SPLIT SYSTEM ON FLOOR 006 AND ROOF WITH A TOTAL CAPACITY OF 23000 BTUs. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. |
| M00929382 ↗ | 100 WALL STREET MANHATTAN | Alteration | Signed-off | 05/31/2024 | 06/05/2024 | Owner CUSHMAN & WAKEFIELD Filer RIZZO GROUP | Minor interior demolition: Removal of interior partitions, doors suspended ceilings, flooring and finishes on the 23rd Flrs (CO)/ 24th Flrs … |
| M01034901 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 04/30/2024 | 05/06/2024 | Design MG ENGINEERING D.P.C. Owner DIVCOWEST Filer RIZZO GROUP | Mechanical modifications taking place on the 25th floor as per plans filed herewith. No change in use, egress or occupancy. |
| M01014045 ↗ | 2 PARK AVENUE MANHATTAN | Alteration | Signed-off | 04/02/2024 | 04/09/2024 | Design ABS ENGINEERING, PLLC Filer BURNHAM NATIONWIDE INC | SPRINKLER SYSTEM MODIFICATIONS AND INSTALLATION OF TEMPORARY LOOP SYSTEM FOR 14TH FLOOR COMMERCIAL SPACE AS PER PLANS FILED HEREWITH. |
| M01015808 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 03/19/2024 | 04/01/2024 | Design VOCON | General construction modifications taking place on the 25th floor as per plans filed herewith. No change in use, egress or occupancy. |
| M08045883 ↗ | 157 WEST 57 STREET MANHATTAN | Alteration | Signed-off | 12/14/2022 | 03/25/2024 | Design DYAMI ARCHITECTURE PC Filer JENNY FLORES EXPEDITING | HEREBY FILING FOR THE INSTALLATION OF GAS FIREPLACES ON 6TH, 8TH, 10TH, 12TH, AND 14TH FLOOR. FILED IN CONJUNCTION WITH PL APPLICATION M0801… |
| M00934622 ↗ | 298 MULBERRY STREET MANHATTAN | Alteration CO | Permit Issued | 01/08/2024 | 03/15/2024 | Filer RIZZO GROUP | GENERAL CONSTRUCTION TAKING PLACE ON 1ST FLOOR AS PER PLANS FILED HEREWITH FOR CHANGE OF USE AND POPULATION INCREASE. |
| M00996112 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 02/16/2024 | 02/27/2024 | Design MG ENGINEERING D.P.C. | Mechanical modifications taking place on the 21st floor as per plans filed herewith. No change in use, egress or occupancy. |
| M00601127 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 02/11/2022 | 01/22/2024 | Design MG ENGINEERING D.P.C. Filer RIZZO GROUP | General Mechanical changes taking place on CEL, 12, 38 and ROF as per plans filed herewith. No change in use, egress or occupancy. |
| M00981217 ↗ | 420 FIFTH AVENUE MANHATTAN | Alteration | Permit Issued | 01/18/2024 | 01/19/2024 | Design ROBERT DERECTOR ASSOCIATES Filer METROPOLIS GROUP INC | Demolish and replace existing cooling towers and provide new ping to new cooling towers as shown on plans. No change to use, egress or occup… |
| M00980852 ↗ | 298 MULBERRY STREET MANHATTAN | Alteration | Signed-off | 12/26/2023 | 01/11/2024 | Filer RIZZO GROUP | GENERAL CONSTRUCTION TAKING PLACE ON 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00973579 ↗ | 298 MULBERRY STREET MANHATTAN | Alteration | Signed-off | 01/04/2024 | 01/10/2024 | Design GOLDMAN COPELAND ASSOCIATES | MECHANICAL MODIFICATIONS TAKING PLACE ON CEL, 1ST, AND 2ND FLOORS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00943531 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 01/04/2024 | 01/09/2024 | Filer RIZZO GROUP | General construction modifications taking place on the 21st floor as per plans filed herewith. No change in use, egress or occupancy. |
| M00601154 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 02/11/2022 | 12/22/2023 | Design THORNTON TOMASETTI Filer RIZZO GROUP | New steel to frame slab openings for access to elevator rope grippers. No change in use, egress or occupancy. |
| M00775690 ↗ | 561 10 AVENUE MANHATTAN | Alteration | Signed-off | 08/16/2022 | 12/22/2023 | Design SLCE ARCHITECTS | Removal and instillation of interior non load bearing partitions and related finishes. No change in use, egress or occupancy. |
| M00950987 ↗ | 77 FRONT STREET MANHATTAN | Alteration | Signed-off | 12/14/2023 | 12/22/2023 | Design RISE PROJECTS Owner RXR REALTY Filer RIZZO GROUP | GENERAL CONSTRUCTION MODIFICATIONS TAKING PLACE ON THE 10TH FLOOR AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00953558 ↗ | 338 5 AVENUE MANHATTAN | Alteration | Signed-off | 12/04/2023 | 12/19/2023 | GENERAL CONSTRUCTION TAKING PLACE ON CELLAR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. | |
| M00941573 ↗ | 1400 BROADWAY MANHATTAN | Alteration | Signed-off | 10/30/2023 | 12/07/2023 | Design THORNTON TOMASETTI Filer RIZZO GROUP | Structural modifications taking place on the 5th floor as per plans filed herewith. No change in use, egress or occupancy |
| M08011064 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 12/02/2022 | 12/05/2023 | Filer RIZZO GROUP | General construction modifications taking place on the 14th and 16th floor as per plans filed herewith. No change in use, egress or occupanc… |
| M08011084 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 12/02/2022 | 12/05/2023 | Design MG ENGINEERING D.P.C. | Mechanical modifications taking place on the 14th and 16th floor as per drawings filed herewith. No change in use, egress or occupancy. |
| M08010962 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 11/16/2023 | 11/28/2023 | Design VOCON | General construction modifications taking place on the 19th floor as per plans filed herewith. No change in use, egress or occupancy. |
| M00937437 ↗ | 299 PARK AVENUE MANHATTAN | Alteration | Signed-off | 11/15/2023 | 11/17/2023 | Filer RIZZO GROUP | MECHANICAL SYSTEMS MODIFICATION ON THE 10TH FLOOR PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00772663 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 11/04/2022 | 11/13/2023 | Design JAROS BAUM & BOLLES Filer RIZZO GROUP | Mechanical Modifications taking place at CEL as per plans filed herewith. No change in use, egress or occupancy. |
| M00894581 ↗ | 561 10 AVENUE MANHATTAN | Alteration | Signed-off | 07/25/2023 | 09/19/2023 | Design GOLDMAN COPELAND ASSOCIATES | Modifications to existing HVAC/Ducts piping systems as per plans filed herewith. No change to use, egress or occupancy. |
| M00866353 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 06/28/2023 | 09/08/2023 | Design JAROS BAUM & BOLLES Filer RIZZO GROUP | Mechanical Modifications on 5th and 6th floors as per plans filed herewith. No change in use, egress or occupancy. |
| M00775984 ↗ | 561 10 AVENUE MANHATTAN | Alteration | Signed-off | 08/25/2022 | 08/17/2023 | Modifications to existing mechanical systems as per plans filled herewith. | |
| M00601108 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 02/11/2022 | 08/07/2023 | Filer RIZZO GROUP | General construction taking place on CEL, 12, 38 and ROF as per plans filed herewith. No change in use, egress or occupancy. |
| M00906622 ↗ | 39 WEST 56 STREET MANHATTAN | Alteration | Signed-off | 07/19/2023 | 08/03/2023 | Design ROSINI ENGINEERING, PC | Replacing old split system. 2 new furnaces and 2 evaporators are being installed on 3rd floor and 1 new evaporator and furnace on 4th floor,… |
| M00866105 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 06/21/2023 | 06/23/2023 | Filer RIZZO GROUP | General construction modifications taking place on the 5th and 6th floors as per plans filed herewith. No change in use, egress or occupancy… |
| M00877331 ↗ | 4 EAST 98 STREET MANHATTAN | Alteration | Signed-off | 06/15/2023 | 06/17/2023 | Design VINCENT J. LIOTTA P.E. Owner ST. BERNARD'S SCHOOL | INSTALLATION OF SPLIT SYSTEMS ON FLOORS 001 THROUGH 005, 003 PLAY ROOF, AND 005 MEZZANINE WITH A TOTAL CAPACITY OF 128000 BTUs/H. NO CHANGE … |
| M00865756 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 06/06/2023 | 06/09/2023 | Filer RIZZO GROUP | General construction taking place on the 6th floor as per plans filed herewith. No change in use, egress or occupancy. |
| M00561218 ↗ | 30 EAST 9 STREET MANHATTAN | Alteration | Signed-off | 12/15/2021 | 05/17/2023 | Owner ESRT Filer RIZZO GROUP | General construction modifications to existing first floor retail space. No change to use, occupancy, or egress. |
| M00862937 ↗ | 103 EAST 125 STREET MANHATTAN | Alteration | Signed-off | 05/03/2023 | 05/09/2023 | Design ARRA ARCHITECTURE | HEREWITH FILING FOR THE INSTALLATION OF DEMISING WALL ON THE 11TH FLOOR. NO CHANGE TO THE USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION. |
| M08000251 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 11/04/2022 | 03/17/2023 | Design JAROS BAUM & BOLLES Filer RIZZO GROUP | Mechanical modifications taking place on the 31st floor as per plans filed herewith. No change in use, egress or occupancy. |
| M00561254 ↗ | 30 EAST 9 STREET MANHATTAN | Alteration | Signed-off | 12/13/2021 | 01/24/2023 | Design GANNETT FLEMING Owner ESRT Filer RIZZO GROUP | Modifications to existing mechanical system in first floor retail space. No change to use, occupancy, or egress. |
| M08025490 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 12/08/2022 | 01/17/2023 | Design JAROS BAUM & BOLLES Filer RIZZO GROUP | MECHANICAL MODIFICATIONS ON THE 17TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M08022672 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 11/22/2022 | 12/05/2022 | Design VOCON Filer RIZZO GROUP | GENERAL CONSTRUCTION ON THE 17TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M08010858 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 11/18/2022 | 11/29/2022 | Design VOCON Filer RIZZO GROUP | Construction modifications taking place on the 31st floor as per plans filed herewith. No change in use, egress or occupancy. |
| M08010894 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 11/04/2022 | 11/29/2022 | Design JAROS BAUM & BOLLES Filer RIZZO GROUP | Mechanical modifications taking place on the 31st floor as per plans filed herewith. No change in use, egress or occupancy. |
| M00791854 ↗ | 75 9 AVENUE MANHATTAN | Alteration | Signed-off | 10/13/2022 | 10/21/2022 | Design ROSINI ENGINEERING, PC Owner JLL | Replace two air conditioning units on the roof above the 6th floor as indicated on drawings |
| M00790140 ↗ | 77 FRONT STREET MANHATTAN | Alteration | Signed-off | 09/28/2022 | 10/07/2022 | Design ENV ARCHITECTS, DPC Owner RXR REALTY Filer RIZZO GROUP | General construction modifications taking place on the 16th floor (17th floor Marketing) as per drawings filed herewith. No change in use, e… |
| M00790175 ↗ | 77 FRONT STREET MANHATTAN | Alteration | Signed-off | 09/28/2022 | 10/04/2022 | Design CFS ENGINEERING, DPC | MECHANICAL MODIFICATIONS TAKING PLACE ON THE 16TH FLOOR (17TH FLOOR MARKETING) AS PER DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR O… |
| M07997446 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 09/26/2022 | 10/04/2022 | Design JAROS BAUM & BOLLES | Mechanical modifications taking place on the 29th floor as per plans filed herewith. No change in use, egress or occupancy. |
| B00777532 ↗ | 459 5 AVENUE BROOKLYN | Alteration | Signed-off | 09/22/2022 | 09/29/2022 | Design CONCESSI ENGINEERING, P.C. | MINOR INTERIOR RENOVATION TO THE EXISTING BANK SPACE, NON LOAD BEARING PARTITIONS, FLOORING, CEILINGS, MECHANICAL DUCTWORK AND EXHAUST/DIFFU… |
| M08000215 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 09/22/2022 | 09/29/2022 | Filer RIZZO GROUP | General construction modifications taking place on the 31st floor as per drawings filed herewith. No change in use, egress or occupancy. |
| M07997428 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 09/22/2022 | 09/27/2022 | Construction modifications on 29th floor as per plans filed herewith. No change in use, egress or occupancy. | |
| M00562671 ↗ | 500 WEST 33 STREET MANHATTAN | Alteration | Signed-off | 11/01/2021 | 09/23/2022 | Design MG ENGINEERING D.P.C. Filer JM ZONING, LLC. | FILING HEREWITH STRUCTURAL WORK IN CONJUNCTION WITH INTERIOR RENOVATION AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00772644 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 08/30/2022 | 09/22/2022 | Filer RIZZO GROUP | General construction taking place at CEL as per plans filed herewith. No change in use, egress or occupancy. |
| M00789378 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 08/30/2022 | 09/22/2022 | Design THORNTON TOMASETTI Filer RIZZO GROUP | Structural modifications on BAS and 1st floor for stair slab infill as per plans filed herewith. No change in use, egress or occupancy. |
| M00712147 ↗ | 460 PARK AVENUE MANHATTAN | Alteration | Signed-off | 07/20/2022 | 09/19/2022 | Design JAROS BAUM & BOLLES | Filing herewith for minor interior mechanical work within an existing 7th and 17th floor space. No change in use, egress or occupancy. |
| M00740085 ↗ | 460 PARK AVENUE MANHATTAN | Alteration | Signed-off | 07/18/2022 | 09/19/2022 | Design TVS NEW YORK, PC | Filing herewith interior renovations of existing 7th and 17th floor space. No change in use, egress or occupancy |
| M00761307 ↗ | 420 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 08/29/2022 | 09/08/2022 | Design CONCESSI ENGINEERING, P.C. Owner SL GREEN REALTY CORP | MINOR ALTERATIONS TO AN INTERIOR OF A SPACE: NON LOAD BEARING PARTITIONS, ADDITION OF 2 SPLIT AC UNITS, FLOORING, CEILINGS, ETC. NO CHANGE O… |
| M00787039 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 09/01/2022 | 09/08/2022 | Design JAROS BAUM & BOLLES Filer RIZZO GROUP | Mechanical modifications taking place on the 21st floor as per plans filed herewith. No change in use, egress or occupancy. |
| M00787012 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 08/30/2022 | 09/02/2022 | Filer RIZZO GROUP | General construction taking place on the 21st floor as per plans filed herewith. No change in use, egress or occupancy. |
| X00708417 ↗ | 810 RIVER AVENUE BRONX | Alteration | Signed-off | 08/03/2022 | 08/09/2022 | Design ROBERT DERECTOR ASSOCIATES Owner 810 RIVER PARTNERS LLC | Mechanical work on the 1st floor (UFT PN) as indicated on drawings |
| X00708383 ↗ | 810 RIVER AVENUE BRONX | Alteration | Signed-off | 08/01/2022 | 08/08/2022 | Design SCHRIMMER DESIGN GROUP | Construction work on the 1st floor (UFT PN) as indicated on drawings |
| M00765885 ↗ | 10 UNION SQUARE EAST MANHATTAN | Alteration | Signed-off | 07/13/2022 | 07/19/2022 | Owner ESRT Filer RIZZO GROUP | Modification of 1st floor Bathroom per plans filed herewith |
| M00765889 ↗ | 10 UNION SQUARE EAST MANHATTAN | Alteration | Permit Issued | 07/13/2022 | 07/19/2022 | Design GOLDMAN COPELAND ASSOCIATES Owner ESRT Filer RIZZO GROUP | Modification of existing mechanical systems on first floor per plans filed herewith |
| M00723720 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 05/09/2022 | 05/25/2022 | Filer RIZZO GROUP | General Construction modifications taking place on the 19th floor as per plans filed herewith. No change in use, egress or occupancy. |
| M00710897 ↗ | 4 EAST 98 STREET MANHATTAN | Alteration | Signed-off | 05/20/2022 | 05/23/2022 | Design VINCENT J. LIOTTA P.E. Owner ST. BERNARD'S SCHOOL | INSTALLATION OF 2 CONDENSER UNIT AND 4 CASSETTE AIR HANDLER UNITS WITH A TOTAL CAPACITY OF 8 TONS. NO CHANGE TO EGRESS, USE, OR OCCUPANCY. |
| M00701305 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 03/24/2022 | 03/29/2022 | Construction modifications taking place on the 18th floor as per plans filed herewith. No change in use, egress or occupancy. | |
| M00701109 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 03/25/2022 | 03/28/2022 | Design JAROS BAUM & BOLLES | Mechanical modifications taking place on the 18th floor as per plans filed herewith. No change in use, egress or occupancy. |
| M00643769 ↗ | 30 EAST 9 STREET MANHATTAN | Alteration | Permit Issued | 02/08/2022 | 02/23/2022 | Design GANNETT FLEMING | Structural modifications to existing first floor retail space. No change in use, occupancy, or egress. |
| M00627916 ↗ | 311 WEST 127 STREET MANHATTAN | Alteration | Signed-off | 12/20/2021 | 01/14/2022 | Design SCHRIMMER DESIGN GROUP Owner THE BALTON LLC | Construction work on the 1st floor (UFT Providers Network) as indicated on drawings |
| M00390599 ↗ | 589 5 AVENUE MANHATTAN | Alteration | Signed-off | 09/09/2020 | 11/21/2021 | Design MG ENGINEERING D.P.C. Owner CUSHMAN & WAKEFIELD Filer RIZZO GROUP | EMR AC Unit Replacement on the roof as per plans. No change to use, egress or occupancy. |
| M00534200 ↗ | 540 MADISON AVENUE MANHATTAN | Alteration | Signed-off | 06/30/2021 | 11/01/2021 | Design MG ENGINEERING D.P.C. Filer RIZZO GROUP | Mechanical changes taking place on 27th floor as per plans filed herewith. No change in use, egress or occupancy. |
| M00596069 ↗ | 250 PARK AVENUE MANHATTAN | Alteration | Signed-off | 10/29/2021 | 11/01/2021 | Design DPM ARCHITECTURE, P.C. | Minor interior demolition and removal of internal convenience staircase between 13 & 14th floors as per plans. No change to use, egress or o… |