← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
250 WEST 88TH STREET
MANHATTAN · BIN 1033227
💬 Discuss this project
1920Year Built
7Stories
RMBuilding Class
C4-6AZoning
52,445 sfGross Floor Area
65Units
LL97 CoveredRent Stabilized8 Active Violations 9 likely answered ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 835 Riverside Drive Condominium · 10,071 sf lot · 5.21 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofAkam Associates, INC.46p · 4 filings · 20 docs
Floor 8Unit 8017p · 1 filing · 8 docs
Floor 7
Floor 6
Floor 5TD Ameritrade1p · 1 filing · 4 docs
Floor 4TD Ameritrade1p · 1 filing · 4 docs
Floor 3TD Ameritrade, Unit 306, Unit 307 +110p · 3 filings · 12 docs
Floor 2TD Ameritrade1p · 1 filing · 4 docs
Floor 1Kist Pizza Ove, TD Ameritrade22p · 5 filings · 20 docs
CellarDemolition and Shelving Project11p · 2 filings · 20 docs
Site & exteriorThe Central Condominium44p · 6 filings · 20 docs
Filed — no permit issuedSalli B Salon2p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Central Condominium3203/21/2026
JZ Villa Realty803/21/2026
Solstice Residential Group507/08/2026
87th Street Optical303/21/2026
E P Venture303/21/2026
Variazioni103/21/2026
2398 Broadway Associates103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Sotir Associates504/24/2026
AG Engineering106/18/2025
Thornton Tomasetti512/05/2024
Ashraf111/17/2023
Enthink Engineers208/22/2023
Navi Structural Engineering206/14/2023
Yao W Guo Architect203/27/2023
MSM Engineering Services103/10/2023
SY Engineering311/21/2022
KL Innovative Design403/18/2022
Studio St Architects201/28/2022
Norman C. Lok, PE104/05/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
C Plus Design Group603/21/2026
KM Associates of New York503/21/2026
Louis Striar403/21/2026
Aca Associates203/21/2026
Synergy Building Consultants203/21/2026
Basic Groups403/21/2026
Azar Associates203/21/2026
K & M Associates503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LemxScaffold1507/08/2026
LemxGeneral Contractor903/21/2026
Global Design ConceptGeneral Contractor507/08/2026
Sterling ElectricElectrical303/21/2026
Sham Construction GroupScaffold303/21/2026
Unlimited RenovationGeneral Contractor303/21/2026
Tidal Plumbing & HeatingPlumbing207/08/2026
Y.S. ElectricElectrical203/21/2026
Allpro General CntrtingGeneral Contractor207/08/2026
Phoenix Sutton STRGeneral Contractor203/21/2026
Orbit Plumbing & HeatingPlumbing207/08/2026
Alef Electrical ContractingElectrical203/21/2026
A&E Electrical Systems CoElectrical103/21/2026
QMB Plumbing & HeatingPlumbing107/08/2026
Sanna ConstructionGeneral Contractor104/09/2026
Sham Construction GroupGeneral Contractor104/08/2026
Antonio Ceriello ElectricElectrical103/22/2026
A Electrical Main ServiceElectrical103/22/2026
A&E Electrical Systems CoElectrical103/22/2026
Active SignsSign hanger107/08/2026
DNA Plumbing ContractorsPlumbing107/08/2026
M & R Electrical Contg and RepElectrical103/21/2026
John Fitzgerald Plumbing & HeatingPlumbing107/08/2026
Katan P & HPlumbing107/08/2026
Judd ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Engineering Consulting SE2050404/24/2026
Mohammad Ahead - Professi9286106/18/2025
Crosscheck Inspection Services544512/05/2024
KZ Engineering4665208/05/2024
Bitopi Consultants7036106/13/2023
SY Engineering5149211/21/2022
KL Innovative Design7225403/18/2022
Chang Park Arch663201/28/2022
Building Lifecycle
All (210)Filed (31)Permit Issued (33)Signed Off (15)Facade (FISP) (15)Violation (60)Inspection (20)Objection (6)Special Inspection (30)
06/04/2026
Special inspection requirement — Tenant Protection Plan Compliance
06/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
06/04/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
06/04/2026
Special inspection requirement — HVAC-R and service water heating equipment
PAUL MARINO
06/04/2026
Special inspection requirement — Mechanical Systems
PAUL MARINO
06/04/2026
Special inspection requirement — Post-installed Anchors
PAUL MARINO
06/04/2026
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
06/04/2026
Special inspection requirement — Final
Hany Demetry
05/21/2026
Objection resolved — Addressed
05/19/2026
Objection raised — Cost
04/24/2026
Filed — Alteration
INTERIOR RENOVATION IN 1ST FLOOR (DELI STORE). NEW COMMERCIAL HOOD . INSTALL NEW ELECTRIC COOKING EQUIPMENT. CONNECT NEW HOOD DUCT TO EXISTING EXHAUST DUCT AT THE ADJACENT STORE UP TO THE ROOF. PLUMBING FILED SEPARATELY.
M00938106-P2
04/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
PAUL MARINO
04/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
04/23/2026
Special inspection requirement — Post-installed Anchors
PAUL MARINO
04/23/2026
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
04/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
04/23/2026
Special inspection requirement — Mechanical Systems
PAUL MARINO
04/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
04/23/2026
Special inspection requirement — Final
Hany Demetry
11/18/2025
Signed off — Alteration
roof drain replacement
M00888156-I1
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/16/2025
Cycle 10 facade report submitted
10/16/2025
Cycle 10 facade report signed — SWARMP
09/17/2025
Cycle 10 facade inspection completed
09/03/2025
Filed — Alteration
INTERIOR RENOVATION IN 1ST FLOOR (DELI STORE). NEW COMMERCIAL HOOD . INSTALL NEW ELECTRIC COOKING EQUIPMENT. CONNECT NEW HOOD DUCT TO EXISTING EXHAUST DUCT AT THE ADJACENT STORE UP TO THE ROOF. PLUMBING FILED SEPARATELY.
M00938106-P1
08/27/2025
Special inspection requirement — Tenant Protection Plan Compliance
08/15/2025
Signed off — Alteration
RENOVATE EXISTING APT 801. REMOVAL AND INSTALLATION OF INTERIOR PARTITIONS AS PER PLANS. NOCHANGE IN USE, EGRESS, OR OCCUPANCY.
M00849371-I1
07/29/2025
Special inspection requirement — Mechanical Systems
PAUL MARINO
07/29/2025
Special inspection requirement — Post-installed Anchors
PAUL MARINO
07/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PAUL MARINO
07/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
PAUL MARINO
07/29/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
PAUL MARINO
07/29/2025
Special inspection requirement — Final
Hany Demetry
07/29/2025
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
06/18/2025
Filed — Alteration
NON-ILLUMINATED NON-ADVERTISING ACCESSORY ENTRANCE AWNING - SALLI B SALON. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
M01234534-I1
06/17/2025
Signed off — Alteration
Structural work for skylight replacement.
M08011145-S1
06/17/2025
Permit issued — General Construction
M00938106-I1-GC-CX
06/09/2025
Signed off — Alteration
Structural work for skylight replacement.
M08011145-I1
12/16/2024
Special inspection requirement — Structural Steel - High Strength Bolting
EUGENE BIFULCO
12/16/2024
Special inspection requirement — Final
LAUANA LINS RODRIGUES
12/16/2024
Special inspection requirement — Post-installed Anchors
EUGENE BIFULCO
12/16/2024
Special inspection requirement — Insulation placement and R values
LAUANA LINS RODRIGUES
12/16/2024
Special inspection requirement — Air barrier - visual inspection
LAUANA LINS RODRIGUES
12/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
EUGENE BIFULCO
12/05/2024
Filed — Alteration
Structural work for skylight replacement.
M08011145-P3
11/15/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE.LIVE LOAD 300PSF.
M00834162-I1
11/15/2024
Signed off — Alteration
M00962914-I1
11/15/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY SHALL COMPLY WITH CHAPTER#33 OF 2022 THE NYC BUILDING CODE.
M00840526-I1
11/08/2024
Permit issued — Protection and Mechanical Methods
M00962914-I1-PMM
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/15/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
08/09/2024
Permit issued — Suspended Scaffold
M01084752-P1-SC
08/05/2024
Filed — Alteration
Installation of suspended scaffold for facade inspection/repair.
M01084752-P1
07/31/2024
Permit issued — Suspended Scaffold
M01084752-I1-SC
07/31/2024
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
07/29/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/24/2024
Filed — Alteration
Installation of suspended scaffold for facade inspection/repair.
M01084752-I1
06/20/2024
Signed off — Alteration
TEMPORARY CONSTRUCTION FENCE FOR RENOVATIONS IN 1ST FLOOR COMMERCIAL SPACE FILED UNDER APP #M00938106
M00892667-I1
Latest 60 of 210 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSanna Construction06/17/2025
DOB NOWProtection and Mechanical MethodsSigned-offLemx11/08/2024
DOB NOWSuspended ScaffoldPermit IssuedPhoenix Sutton Structural08/09/2024
DOB NOWSuspended ScaffoldPermit IssuedPhoenix Sutton Structural07/31/2024
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating05/28/2024
DOB NOWStructuralSigned-offLemx04/10/2024
DOB NOWSidewalk ShedSigned-offLemx03/13/2024
DOB NOWProtection and Mechanical MethodsSigned-offLemx03/07/2024
DOB NOWSupported ScaffoldSigned-offLemx03/07/2024
DOB NOWStructuralSigned-offLemx01/16/2024
DOB NOWProtection and Mechanical MethodsSigned-offLemx11/17/2023
DOB NOWPlumbingPermit IssuedKatan P & H10/17/2023
DOB NOWMechanical SystemsPermit IssuedSham Construction Group10/11/2023
DOB NOWConstruction FenceSigned-offSham Construction Group10/02/2023
DOB NOWGeneral ConstructionSigned-offGlobal Design Concept09/28/2023
DOB NOWPlumbingSigned-offOrbit Plumbing & Heating06/21/2023
DOB NOWProtection and Mechanical MethodsSigned-offLemx06/14/2023
DOB NOWGeneral ConstructionSigned-offGlobal Design Concept06/05/2023
DOB NOWStructuralSigned-offLemx04/21/2023
DOB NOWGeneral ConstructionSigned-offPhoenix Sutton STR04/20/2023
DOB NOWPlumbingSigned-offQMB Plumbing & Heating04/11/2023
DOB NOWGeneral ConstructionSigned-offGlobal Design Concept04/03/2023
DOB NOWSidewalk ShedSigned-offLemx03/10/2023
DOB NOWProtection and Mechanical MethodsSigned-offLemx03/10/2023
DOB NOWSidewalk ShedSigned-offLemx03/10/2023
DOB NOWPlumbingSigned-offTidal Plumbing & Heating10/03/2022
DOB NOWPlumbingSigned-offDNA Plumbing Contractors08/01/2022
DOB NOWGeneral ConstructionSigned-offUnlimited Renovation07/06/2022
DOB NOWPlumbingSigned-offJohn Fitzgerald Plumbing & Heating03/07/2022
DOB NOWMechanical SystemsPermit IssuedAllpro General Cntrting01/25/2022
DOB NOWMechanical SystemsSigned-offAllpro General Cntrting01/25/2022
DOB NOWPlumbingSigned-offTidal Plumbing & Heating11/29/2021
DOB NOWSignSigned-offActive Signs05/14/2018
BISPLISSUEDJohnny's P&H Contracting08/31/2022
BISOTISSUEDL & Z Restoration02/18/2021
BISOTISSUEDL & Z Restoration12/11/2020
BISOTISSUEDCattro Consulting Group07/01/2019
BISPLISSUEDL.L.G. Plumbing & Heating07/12/2018
BISEQISSUEDIntersystem S&S07/03/2018
BISOTISSUEDCattro Consulting Group06/26/2018
+ 43 more permits on file
1 project · most recent 04/24/2026
Associated Ducts and Piping Heating and Air Conditioning Systems Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/24/2026Permit IssuedSanna ConstructionAssociated Ducts and Piping, Heating and Air Conditioning Systems, Refrigeration Systems, Ventilation Systems
Heat / Cool
Copeland XFAM 045Z TFC 081 56,000 BTU · Condensing Unit ×4
Daikin RXYQ120XATJA 135,000 BTU · Vrf Outdoor ×4
Ventilation
Dayton 5DVP8 1,816 CFM · Kitchen Exhaust ×2
Greenheck BSQ-240 2,400 CFM · Makeup Air ×3
CUBE UPBLAST 2,400 CFM · Kitchen Exhaust ×1
Refrigeration
Copeland XFAM 045Z TFC 081 56,000 BTU · Refrigeration Unit ×5
XFAM 025Z TFC 081 56,000 BTU · Condensing Unit ×2
Ducts & Piping
N/A N/A Ductwork ×3
2 projects · most recent 09/27/2023
Water/Sanitary Gas
FiledStatusContractorScope
09/27/2023Permit IssuedKatan P & HWater/Sanitary
03/18/2022Signed-offTidal Plumbing & HeatingGas
11 projects · most recent 07/24/2025
General Wiring
FiledStatusContractorScope
07/24/2025CompleteA&E Electrical Systems CoGeneral Wiring
10/05/2023Permit IssuedBorowide Elect'l ContractorsGeneral Wiring
03/13/2023CompleteRichard Neu—
02/21/2022CompleteA Electrical Main Service—
12/02/2020Permit IssuedAntonio Ceriello ElectricGeneral Wiring
01/22/2019CompleteHorsepower ElectricGeneral Wiring
12/03/2018CompleteRobert S. Covello—
12/02/2018CompleteJong Hyun Kim—
10/31/2018CompletePK ElectricGeneral Wiring
10/09/2018CompletePK ElectricGeneral Wiring
03/09/2018Permit IssuedAsko Electric Construction & MaintenanceGeneral Wiring
1 project · most recent 08/05/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
08/05/2024Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 20
DateTypeResultReport
08/15/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/31/2024Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/29/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
11/20/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/03/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/27/2023Pass-Final General Construction Non-Directive 14PassView ↗
07/19/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/30/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/08/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/05/2022Pass-Final General Construction Non-Directive 14PassView ↗
11/28/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/03/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/01/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/21/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/14/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/10/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/04/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/30/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
12/23/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 87
DateRequirementInspectorRole
06/04/2026Energy Code Compliance InspectionsPAUL MARINOprogress
06/04/2026HVAC-R and service water heating equipmentPAUL MARINOenergy_progress
06/04/2026Post-installed AnchorsPAUL MARINOspecial
06/04/2026Fire-Resistant Penetrations and JointsPAUL MARINOspecial
06/04/2026Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
06/04/2026Mechanical SystemsPAUL MARINOspecial
06/04/2026Tenant Protection Plan Compliance—special
06/04/2026FinalHany Demetryprogress
04/23/2026Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
04/23/2026Mechanical SystemsPAUL MARINOspecial
04/23/2026Fire-Resistant Penetrations and JointsPAUL MARINOspecial
04/23/2026Tenant Protection Plan Compliance—special
04/23/2026HVAC-R and service water heating equipmentPAUL MARINOenergy_progress
04/23/2026Post-installed AnchorsPAUL MARINOspecial
04/23/2026FinalHany Demetryprogress
04/23/2026Energy Code Compliance InspectionsPAUL MARINOprogress
08/27/2025Tenant Protection Plan Compliance—special
07/29/2025Energy Code Compliance InspectionsPAUL MARINOprogress
07/29/2025HVAC-R and service water heating equipmentPAUL MARINOenergy_progress
07/29/2025Fire-Resistant Penetrations and JointsPAUL MARINOspecial
07/29/2025Mechanical SystemsPAUL MARINOspecial
07/29/2025Post-installed AnchorsPAUL MARINOspecial
07/29/2025Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
07/29/2025FinalHany Demetryprogress
12/16/2024Structural Steel - DetailsEUGENE BIFULCOspecial
Latest 25 of 87.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Salli B SalonPersonal services—
Project M01234534 Alteration · Approved · 06/18/2025
Kist Pizza OveRestaurant / Food ServiceFloor 1
Project M00612987 Alteration · Permit Entire · 11/11/2021
TD AmeritradeBank / Financial branchFloors 1–5
Project M00023327 Alteration · LOC Issued · 04/05/2018
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 536 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch31
09/06/2026M00023327-I1Request digital key ↗
09/03/2026M00617151-I1Request digital key ↗
09/03/2026M00612987-P1Request digital key ↗
Showing 3 of 31 on file for this type
▸Applications & Permits105
▸BISWORK PERMIT APPLICATION56
09/01/2022102483527Open ↗
12/11/2020123865139Open ↗
11/02/2020123865139Open ↗
Showing 3 of 56 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION45
05/12/2023123865139Open ↗
09/01/2022102483527Open ↗
08/26/2022102483527Open ↗
Showing 3 of 45 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
07/29/2020123865139Open ↗
07/29/2020123865139Open ↗
07/29/2020123865139Open ↗
▸BISLL114/19 PERMIT RESTRICTION1
12/11/2020123865139Open ↗
▸Seals & Professional Certifications152
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION41
11/02/2020123865139Open ↗
03/13/2020123865139Open ↗
07/29/2019123825389Open ↗
Showing 3 of 41 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature29
09/06/2026M00023327-I1Open ↗
09/03/2026M00617151-I1Open ↗
09/03/2026M00612987-P1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWProgress Inspector Seal & Signature26
10/05/2026M00938106-P2Open ↗
10/05/2026M00938106-P2Open ↗
10/05/2026M00938106-P2Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
10/05/2026M00938106-P2Open ↗
09/27/2026M00666240-I1Open ↗
09/05/2026M00938106-I1Open ↗
Showing 3 of 19 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST11
07/29/2019123825389Open ↗
02/15/2018122702904Open ↗
Showing 2 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT8
07/29/2019123825389Open ↗
10/18/2018140813010Open ↗
02/15/2018122702904Open ↗
Showing 3 of 8 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION4
10/18/2018140813010Open ↗
07/06/2017140664902Open ↗
Showing 2 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
10/18/2018140813010Open ↗
07/06/2017140664902Open ↗
Showing 2 of 4 on file for this type
▸Trade Schedules & Equipment25
▸BISSCHEDULE B - PLUMBING11
08/26/2022102483527Open ↗
08/04/2022102483527Open ↗
08/04/2022102483527Open ↗
Showing 3 of 11 on file for this type
▸BISSELF-CERT PLUMBING NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
07/30/2018122892897Open ↗
05/03/2018122702904Open ↗
03/30/2018123413378Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection9
▸BISTenant Protection Plan and Notes8
03/13/2020123865139Open ↗
07/29/2019123825389Open ↗
03/30/2018123413378Open ↗
Showing 3 of 8 on file for this type
▸BISST-1: Street Tree Checklist1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos40
▸DOB NOWDEP ACP-5: Asbestos Assessment Report22
09/06/2026M00023327-I1Open ↗
09/03/2026M00617151-I1Open ↗
09/03/2026M00612987-I1Open ↗
Showing 3 of 22 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
03/13/2020123865139Open ↗
03/30/2018123413378Open ↗
02/15/2018122702904Open ↗
Showing 3 of 10 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/31/2026M08011145-S1Open ↗
▸Energy Compliance29
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS13
03/13/2020123865139Open ↗
08/17/2018122702904Open ↗
06/26/2018123413378Open ↗
Showing 3 of 13 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS6
06/22/2021122992645Open ↗
06/22/2021122992645Open ↗
05/26/2021122992645Open ↗
Showing 3 of 6 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
06/22/2021122992645Open ↗
01/26/2021122675462Open ↗
01/26/2021122675462Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.3
08/13/2026M00617151-I1Open ↗
08/13/2026M00612987-I1Open ↗
08/13/2026M00663580-I1Open ↗
▸BISNYCECC ANALYSIS1
10/18/2018140813010Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
10/18/2018140813010Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/13/2023123865139Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY11
03/09/2023123865139Open ↗
09/24/2021123865139Open ↗
06/22/2021122992645Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
10/29/2020123865139Open ↗
10/19/2020123865139Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
09/24/2021123865139Open ↗
11/02/2020123865139Open ↗
▸BIS* FINAL INSPECTION DIRECTIVE 14 OF 19752
09/15/2022102483527Open ↗
06/01/2022102483527Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
05/15/2023123865139Open ↗
▸Approvals, Objections & Sign-offs38
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST16
05/15/2023123865139Open ↗
09/16/2022102483527Open ↗
06/22/2021122992645Open ↗
Showing 3 of 16 on file for this type
▸BISADMINISTRATIVE OBJECTIONS9
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 9 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION9
09/01/2022102483527Open ↗
09/01/2022102483527Open ↗
07/03/2018140664902Open ↗
Showing 3 of 9 on file for this type
▸BISSHED LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUPERSEDING LETTER1
12/01/2017122992645Open ↗
▸BISCONSTRUCTION CODE DETERMINATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership43
▸BISCOST AFFIDAVIT41
09/15/2022102483527Open ↗
06/22/2021122992645Open ↗
06/22/2021122992645Open ↗
Showing 3 of 41 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST1
07/10/2017140664902Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
05/13/2023123865139Open ↗
▸Filing & Intake Forms41
▸BISEFILING COVER SHEET19
03/13/2020123865139Open ↗
07/29/2019123825389Open ↗
03/30/2018123413378Open ↗
Showing 3 of 19 on file for this type
▸BISBOROUGH INTAKE FORM11
09/01/2022102483527Open ↗
11/02/2020123865139Open ↗
09/04/2018140664902Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
10/18/2018140813010Open ↗
07/06/2017140664902Open ↗
Showing 2 of 6 on file for this type
▸BISADDITIONAL INFORMATION5
08/05/2022102483527Open ↗
08/31/2018122992645Open ↗
08/02/2018122892897Open ↗
Showing 3 of 5 on file for this type
▸Other Documents5
▸DOB NOWManufacturer's Specifications2
08/26/2026M01084752-I1Open ↗
08/13/2026M01084752-P1Open ↗
▸DOB NOWCalculations2
08/26/2026M01084752-I1Open ↗
08/13/2026M01084752-P1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
11/02/2020123865139Open ↗