← Back
Two stories - detached, small or mid-size
2500 BRONXWOOD AVENUE
BRONX · Allerton · BIN 2051576
💬 Discuss this project
1935Year Built
2.5Stories
A1Building Class
R5Zoning
2,621 sfGross Floor Area
1Units
Rent Stabilized6 Open Violations ▸
Two stories - detached, small or mid-size · Owner of record: 2500 BRONXWOOD AVE, LLC · 5,000 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Attic49p · 1 filing · 20 docs
Floor 251p · 1 filing · 20 docs
Floor 150p · 1 filing · 20 docs
Basement54p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2500 BRONXWOOD AVE, LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/30/2024$910K—Private party → 2500 BRONXWOOD AVE, LLC$347/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEANDRO NILS DICKSON ARCHITECT, LLC601/08/2026
VASILIOS ARTEMIOU PE307/02/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES803/21/2026
ARCHVISION DESIGN STUDIO103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MABE GROUP INCGeneral Contractor307/08/2026
FRIED ELECTRIC CO.Electrical103/22/2026
AMOK INCFire Protection107/08/2026
GAROFALO PLMBNG & HTG LTDPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616901/08/2026
Building Lifecycle
All (109)Filed (9)Permit Issued (5)Signed Off (2)Violation (12)Inspection (7)Objection (44)Special Inspection (30)
08/05/2026
Violation issued (HPD, open)
A
08/05/2026
Violation issued (HPD, open)
B
08/05/2026
Violation issued (HPD, open)
B
08/05/2026
Violation issued (HPD, open)
C
06/22/2026
Violation issued (HPD, open)
B
06/22/2026
Violation issued (HPD, closed)
B
06/22/2026
Violation issued (HPD, open)
B
01/08/2026
Filed — Alteration CO
PAA FILED HEREWITH TO CORRECT LIST OF REQUIRED TR1 INSPECTIONS ON PLANS TO REMOVE EFIS (EXTERIOR INSULATION FINISH SYSTEMS), TO MATCH TR1 IN DOB NOW SYSTEM. NO CHANGE TO SCOPE OF WORK.
X01097985-P7
01/02/2026
Special inspection requirement — Fenestration areas
FAHAD FATEH
01/02/2026
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/02/2026
Special inspection requirement — Metering
FAHAD FATEH
01/02/2026
Special inspection requirement — Electric vehicle service equipment requirements
FAHAD FATEH
01/02/2026
Special inspection requirement — Interior lighting power
FAHAD FATEH
01/02/2026
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
01/02/2026
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
01/02/2026
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
01/02/2026
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
01/02/2026
Special inspection requirement — Permanent certificate
FAHAD FATEH
01/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/02/2026
Special inspection requirement — Maintenance information
FAHAD FATEH
01/02/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
08/05/2025
Filed — Alteration CO
PAA FILED HEREWITH TO CORRECT LIST OF REQUIRED TR1 INSPECTIONS ON PLANS TO REMOVE EFIS (EXTERIOR INSULATION FINISH SYSTEMS), TO MATCH TR1 IN DOB NOW SYSTEM. NO CHANGE TO SCOPE OF WORK.
X01097985-P6
07/31/2025
Special inspection requirement — Electric vehicle service equipment requirements
FAHAD FATEH
07/31/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
07/31/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
07/31/2025
Special inspection requirement — Metering
FAHAD FATEH
07/31/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
07/31/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
07/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/31/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
07/31/2025
Special inspection requirement — Permanent certificate
FAHAD FATEH
07/31/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
07/31/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
07/31/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
07/31/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
07/29/2025
Signed off — Alteration CO
PAA FILED HEREWITH TO CORRECT LIST OF REQUIRED TR1 INSPECTIONS ON PLANS TO REMOVE EFIS (EXTERIOR INSULATION FINISH SYSTEMS), TO MATCH TR1 IN DOB NOW SYSTEM. NO CHANGE TO SCOPE OF WORK.
X01097985-S2
07/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/02/2025
Filed — Alteration CO
PAA FILED HEREWITH TO CORRECT LIST OF REQUIRED TR1 INSPECTIONS ON PLANS TO REMOVE EFIS (EXTERIOR INSULATION FINISH SYSTEMS), TO MATCH TR1 IN DOB NOW SYSTEM. NO CHANGE TO SCOPE OF WORK.
X01097985-P5
06/19/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
06/19/2025
Special inspection requirement — Sprinkler Systems
FAHAD FATEH
06/19/2025
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
06/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/17/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/12/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/11/2025
Signed off — Alteration CO
PAA FILED HEREWITH TO CORRECT LIST OF REQUIRED TR1 INSPECTIONS ON PLANS TO REMOVE EFIS (EXTERIOR INSULATION FINISH SYSTEMS), TO MATCH TR1 IN DOB NOW SYSTEM. NO CHANGE TO SCOPE OF WORK.
X01097985-S1
06/10/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/06/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/28/2025
Permit issued — Sprinklers
X01097985-S2-EW-SP
05/28/2025
Permit issued — Plumbing
X01097985-S2-PL
05/21/2025
Filed — Alteration CO
PAA FILED HEREWITH TO CORRECT LIST OF REQUIRED TR1 INSPECTIONS ON PLANS TO REMOVE EFIS (EXTERIOR INSULATION FINISH SYSTEMS), TO MATCH TR1 IN DOB NOW SYSTEM. NO CHANGE TO SCOPE OF WORK.
X01097985-P4
05/01/2025
Filed — Alteration CO
PAA FILED HEREWITH TO CORRECT LIST OF REQUIRED TR1 INSPECTIONS ON PLANS TO REMOVE EFIS (EXTERIOR INSULATION FINISH SYSTEMS), TO MATCH TR1 IN DOB NOW SYSTEM. NO CHANGE TO SCOPE OF WORK.
X01097985-P3
04/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/11/2025
Violation issued (ECB, closed)
Construction
03/11/2025
Violation issued (ECB, closed)
Unknown
02/21/2025
Objection resolved — Addressed
02/05/2025
Permit issued — General Construction
X01097985-I1-GC
01/23/2025
Permit issued — Mechanical Systems
X01097985-S1-MS
01/20/2025
Filed — Alteration CO
PAA FILED HEREWITH TO CORRECT LIST OF REQUIRED TR1 INSPECTIONS ON PLANS TO REMOVE EFIS (EXTERIOR INSULATION FINISH SYSTEMS), TO MATCH TR1 IN DOB NOW SYSTEM. NO CHANGE TO SCOPE OF WORK.
X01097985-P1
01/17/2025
Violation issued (ECB, closed)
Construction
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offAMOK INC05/28/2025
DOB NOWPlumbingSigned-offGAROFALO PLMBNG & HTG LTD05/28/2025
DOB NOWGeneral ConstructionPermit IssuedAB BUILDERS NY02/05/2025
DOB NOWMechanical SystemsSigned-offAB BUILDERS NY01/23/2025
DOB NOWGeneral ConstructionPermit IssuedAB BUILDERS NY01/10/2025
1 project · most recent 01/08/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/08/2026Permit IssuedAB BUILDERS NYHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin RXF18AXVJU 18,000 BTU · Condensing Unit ×6
2MXS18NMVJUA 18,000 BTU · Condensing Unit ×1
3MXS24WMVJU 24,000 BTU · Vrf Outdoor ×1
Ventilation
N/A N/A 100 CFM · Kitchen Exhaust ×16
1 project · most recent 01/08/2026
Sprinkler System
FiledStatusContractorScope
01/08/2026Signed-offAMOK INCSprinkler System
1 project · most recent 01/08/2026
Water/Sanitary
FiledStatusContractorScope
01/08/2026Signed-offNATIONWIDE PLUMBERS NY COWater/Sanitary
2 projects · most recent 05/14/2026
General Wiring
FiledStatusContractorScope
05/14/2026Permit IssuedPOWER DIRECT ELECTRIC INC—
06/13/2025CompleteFRIED ELECTRIC CO.General Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
07/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/17/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/12/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/10/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/06/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/06/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 71
DateRequirementInspectorRole
01/02/2026Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/02/2026Energy Code Compliance InspectionsFAHAD FATEHprogress
01/02/2026Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/02/2026Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
01/02/2026Interior lighting powerFAHAD FATEHenergy_progress
01/02/2026Maintenance informationFAHAD FATEHenergy_progress
01/02/2026Fenestration areasFAHAD FATEHenergy_progress
01/02/2026Electric vehicle service equipment requirementsFAHAD FATEHenergy_progress
01/02/2026Permanent certificateFAHAD FATEHenergy_progress
01/02/2026Fenestration air leakageFAHAD FATEHenergy_progress
01/02/2026MeteringFAHAD FATEHenergy_progress
01/02/2026Insulation placement and R valuesFAHAD FATEHenergy_progress
01/02/2026Air barrier - visual inspectionFAHAD FATEHenergy_progress
07/31/2025Permanent certificateFAHAD FATEHenergy_progress
07/31/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/31/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
07/31/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
07/31/2025Fenestration areasFAHAD FATEHenergy_progress
07/31/2025MeteringFAHAD FATEHenergy_progress
07/31/2025Fenestration air leakageFAHAD FATEHenergy_progress
07/31/2025Interior lighting powerFAHAD FATEHenergy_progress
07/31/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
07/31/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
07/31/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
07/31/2025Maintenance informationFAHAD FATEHenergy_progress
Latest 25 of 71.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/19/2026X01097985-S2Request digital key ↗
08/19/2026X01097985-S1Request digital key ↗
08/19/2026X01097985-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature11
08/31/2026X01097985-P7Open ↗
08/31/2026X01097985-P7Open ↗
08/27/2026X01097985-P6Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/19/2026X01097985-P1Open ↗
08/19/2026X01097985-S2Open ↗
08/19/2026X01097985-S1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/31/2026X01097985-P7Open ↗
08/27/2026X01097985-P6Open ↗
08/26/2026X01097985-P1Open ↗
Showing 3 of 7 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist6
08/13/2026X01097985-I1Open ↗
08/13/2026X01097985-P7Open ↗
08/13/2026X01097985-P6Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/19/2026X01097985-P1Open ↗
08/19/2026X01097985-P7Open ↗
08/19/2026X01097985-S2Open ↗
Showing 3 of 9 on file for this type
▸Other Documents6
▸DOB NOWProperty Ownership Certification6
08/19/2026X01097985-P3Open ↗
08/19/2026X01097985-P1Open ↗
08/19/2026X01097985-I1Open ↗
Showing 3 of 6 on file for this type