| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01470985 | 530 GRAND STREET MANHATTAN | Alteration | Filed — no permit on record | 10/13/2026 | — | Design WISKUP ARCHITECTURE PLLC Owner AKAM ASSOCIATES, INC. | — |
| Q01469205 ↗ | 64-04 68TH AVENUE QUEENS | Alteration | Filed — no permit on record | 10/06/2026 | — | Design DARRICK BOROWSKI | — |
| M01433195 ↗ | 150 DUANE STREET MANHATTAN | Alteration | Permit Issued | 08/06/2026 | 09/25/2026 | Design R.J. MCGEE ENGINEERING, PLLC Owner ABC MANAGEMENT Contractor BLUEBERRY BUILDERS LLC | INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE AT THE 1ST FLOOR LEVEL, INCLUDING THE REMOVAL AND INSTALLATION OF NON-LOAD BEARING WALLS… |
| B01455824 ↗ | 68 74TH STREET BROOKLYN | Alteration | Filed — no permit on record | 09/04/2026 | — | — | — |
| M01433444 ↗ | 380 BROOME STREET MANHATTAN | Alteration | Permit Issued | 08/04/2026 | 09/02/2026 | Design BRUNSWICK ENGINEERING LLC Owner DALAN REAL ESTATE, LLC Contractor SPEEDWAY PLUMBING CORP | INSTALLATION OF PLUMBING FIXTURES WITHIN FIRST FLOOR RETAIL SPACE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01428991 ↗ | 43 EAST 10TH STREET MANHATTAN | Alteration | Permit Issued | 08/11/2026 | 09/01/2026 | Design IKRA CONSULTING LLC Owner TEMERARIO Contractor 24/7 QUALITY SERVICES INC | RESPECTFULLY REQUEST MINOR INTERIOR RENOVATION AS PER PLANS - RELOCATED EXISTING KITCHEN, REMOVED EXISTING CLOSET, PROPOSED NEW MILLWORK (KI… |
| Person | Filings | Most recent |
|---|---|---|
| ABRAHAM TAWIL | 124 | 10/07/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| Collectif Engineering | 19 | 03/06/2026 |
| Wiskup Architecture | 15 | 10/13/2026 |
| Darrick Borowski | 9 | 10/06/2026 |
| Esnyc Consulting | 4 | 01/06/2026 |
| ELECSYS Engineering Group | 3 | 04/09/2026 |
| Vasilios Artemiou PE | 3 | 01/08/2026 |
| AA Ma Studio | 2 | 06/23/2023 |
| Brunswick Engineering | 2 | 08/28/2026 |
| Derman Engineering | 2 | 09/03/2026 |
| John Yurchyk Architect | 2 | 03/17/2026 |
| Nikolai Katz Architect | 2 | 08/18/2025 |
| A Degree of Freedom Structural Engineering | 1 | 03/22/2023 |
| As Engineering Services | 1 | 05/21/2026 |
| Bendix Engineering | 1 | 10/31/2023 |
| Black Box Engineering | 1 | 07/09/2024 |
| BristowMather Architects | 1 | 12/01/2025 |
| David Keane P.E | 1 | 04/09/2023 |
| Ikra Consulting | 1 | 08/11/2026 |
| Jack Green Associates | 1 | 06/01/2020 |
| JFG Architects | 1 | 10/31/2023 |
| Juan Sebastian Jofre | 1 | 10/10/2023 |
| JWM Group | 1 | 08/06/2024 |
| Leandro Nils Dickson Architect | 1 | 01/08/2026 |
| Lester Katz, Ncarb | 1 | 05/21/2026 |
| MHG Architects | 1 | 09/19/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| Lanzo Construction & Home | 9 | 12/23/2025 |
| Super Cool HVAC | 7 | 03/06/2026 |
| AB Builders NY | 3 | 01/08/2026 |
| Amok | 3 | 01/08/2026 |
| Ecosystem Energy Services | 3 | 04/09/2026 |
| AMC Plumbing, Heating & CLNG | 2 | 03/06/2026 |
| Biba Construction | 2 | 06/23/2023 |
| New Dimensions Resident | 2 | 08/18/2025 |
| Panili Plumbing & Heating | 2 | 06/09/2026 |
| PR | 2 | 12/19/2023 |
| Skyview Heating & Air Con | 2 | 08/18/2025 |
| 24/7 Quality Services | 1 | 08/11/2026 |
| All Makes Heating & A/C | 1 | 10/10/2023 |
| Aranda Plumbing & Heating | 1 | 12/29/2025 |
| Bedrock Mechanical | 1 | 01/02/2026 |
| Bedrock Plumbing & Heating | 1 | 01/02/2026 |
| Blueberry Builders | 1 | 08/27/2026 |
| BZJ Construction | 1 | 05/14/2025 |
| Cary P O'Brien Design | 1 | 10/28/2024 |
| CJ Heating & Mechanical | 1 | 07/09/2024 |
| Cuan | 1 | 01/02/2026 |
| Dependable Mechanical | 1 | 06/22/2026 |
| Dual Fuel Company | 1 | 08/09/2024 |
| Dual Fuel Plumbing & Heating | 1 | 06/09/2026 |
| Dynamic Plumbing & Sprinkler | 1 | 04/09/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| Blocpower | 2 | 03/18/2024 |
| Collectif Engineering | 2 | 07/09/2024 |
| Hudson View Gardens | 2 | 04/26/2024 |
| Ruppert Housing Co | 2 | 09/19/2024 |
| 37th Street Partners Cafe | 1 | 03/17/2026 |
| 388 Halsey Street HDFC | 1 | 09/02/2025 |
| ABC Management | 1 | 08/27/2026 |
| Akam Associates | 1 | 10/13/2026 |
| Arepiii BR Operator NYC | 1 | 10/28/2024 |
| Assembly Studio | 1 | 11/26/2024 |
| BPP St Owner | 1 | 06/09/2026 |
| Consigli Construction | 1 | 06/22/2026 |
| Crown Acquisitions | 1 | 06/04/2026 |
| Dalan Real Estate | 1 | 08/21/2026 |
| First Service Residential | 1 | 01/06/2026 |
| Museum of Arts Design | 1 | 11/11/2025 |
| PopUp Bagels | 1 | 01/02/2026 |
| Sandcastle Realty Company | 1 | 08/06/2024 |
| Slightly Bigger Adventure | 1 | 12/23/2025 |
| Sugar Warehouse Condo | 1 | 10/10/2023 |
| Temerario | 1 | 08/11/2026 |
| Veralon | 1 | 07/09/2024 |
| Name | Projects together | Most recent |
|---|---|---|
| Shahla Karimi | 1 | 08/27/2026 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| M01470985 | 530 GRAND STREET MANHATTAN | Alteration | Filed — no permit on record | 10/13/2026 | — | Design WISKUP ARCHITECTURE PLLC Owner AKAM ASSOCIATES, INC. | — |
| Q01469205 ↗ | 64-04 68TH AVENUE QUEENS | Alteration | Filed — no permit on record | 10/06/2026 | — | Design DARRICK BOROWSKI | — |
| M01433195 ↗ | 150 DUANE STREET MANHATTAN | Alteration | Permit Issued | 08/06/2026 | 09/25/2026 | Design R.J. MCGEE ENGINEERING, PLLC Owner ABC MANAGEMENT Contractor BLUEBERRY BUILDERS LLC | INTERIOR RENOVATION OF AN EXISTING COMMERCIAL SPACE AT THE 1ST FLOOR LEVEL, INCLUDING THE REMOVAL AND INSTALLATION OF NON-LOAD BEARING WALLS… |
| B01455824 ↗ | 68 74TH STREET BROOKLYN | Alteration | Filed — no permit on record | 09/04/2026 | — | — | — |
| M01433444 ↗ | 380 BROOME STREET MANHATTAN | Alteration | Permit Issued | 08/04/2026 | 09/02/2026 | Design BRUNSWICK ENGINEERING LLC Owner DALAN REAL ESTATE, LLC Contractor SPEEDWAY PLUMBING CORP | INSTALLATION OF PLUMBING FIXTURES WITHIN FIRST FLOOR RETAIL SPACE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01428991 ↗ | 43 EAST 10TH STREET MANHATTAN | Alteration | Permit Issued | 08/11/2026 | 09/01/2026 | Design IKRA CONSULTING LLC Owner TEMERARIO Contractor 24/7 QUALITY SERVICES INC | RESPECTFULLY REQUEST MINOR INTERIOR RENOVATION AS PER PLANS - RELOCATED EXISTING KITCHEN, REMOVED EXISTING CLOSET, PROPOSED NEW MILLWORK (KI… |
| B01441883 ↗ | 192 EAST 8TH STREET BROOKLYN | Alteration | Filed — no permit on record | 08/28/2026 | — | Design DARRICK BOROWSKI | — |
| B01448592 ↗ | 153 MORGAN AVENUE BROOKLYN | Alteration | Filed — no permit on record | 08/25/2026 | — | Design BRUNSWICK ENGINEERING LLC | — |
| B01412211 ↗ | 22 NORTH 6TH STREET BROOKLYN | Alteration | Permit Issued | 06/09/2026 | 08/21/2026 | Design WISKUP ARCHITECTURE PLLC Contractor ONPOINT CONTRACTING NYC | REMOVAL OF NON-LOAD BEARING PARTITION WING WALL & FULL HEIGHT CASEMENT WITHIN APARTMENT 24J |
| M01448406 ↗ | 1227 BROADWAY MANHATTAN | Alteration | Filed — no permit on record | 08/21/2026 | — | — | — |
| M00966508 ↗ | 320 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 11/24/2023 | 07/08/2026 | Design WISKUP ARCHITECTURE PLLC Contractor S & J INDUSTRIAL CORP | PLUMBING MODIFICATIONS TO GROUND FLOOR COMMERCIAL SPACE. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01277129 ↗ | 108 WOOSTER STREET MANHATTAN | Alteration | Permit Issued | 11/19/2025 | 06/18/2026 | Design COLLECTIF ENGINEERING PLLC Owner FIRST SERVICE RESIDENTIAL Contractor SF CONSTRUCTION EXPERTS | GROUND FLOOR RETAIL UPGRADES FOR ALTERATION TYPE 2. WORK LIMITED TO INSIDE THE DEMISED PREMISES ONLY ON APPROXIMATELY 1,100 GSF OF IMPACTED … |
| B01390145 ↗ | 1 HOYT STREET BROOKLYN | Alteration | Filed — no permit on record | 06/04/2026 | — | Design ZAMBRANO ARCHITECTURAL Owner CROWN ACQUISITIONS | — |
| B01237009 ↗ | 151 JORALEMON STREET BROOKLYN | Alteration | Signed-off | 06/23/2025 | 05/27/2026 | Contractor SUPREME RENOVATION A2Z IN | INTERIOR RENOVATION OF KITCHEN AT APT 16 (REPLACEMENT OFFIXTURE, APPLIANCES & CABINETRY, REMOVAL OF EXISTINGDUMBWAITER WALL, PARTIAL REMOVAL… |
| M01388952 ↗ | 60 EAST 96TH STREET MANHATTAN | Alteration | Permit Issued | 04/23/2026 | 05/26/2026 | Contractor SALAMONE IMPROVEMENTS INC | REMOVAL AND REPLACEMENT OF FINISHES AND SELECTIVE PLUMBING FIXTURES WITHIN EXISTING BATHROOMS AS WELL AS THE RELOCATION OF THE EXISTING WASH… |
| B01108214 ↗ | 1079 HERKIMER STREET BROOKLYN | Alteration | Permit Issued | 09/15/2025 | 05/22/2026 | Design AHT ENGINEERING PLLC Owner CONSIGLI CONSTRUCTION Contractor KELMENDI INTERIORS INC | PLUMBING MODIFICATIONS IN CONJUNCTION WITH GC WORK INCLUDINGRENOVATION OF BATHROOMS ON 2ND FLOOR & NEW WASHER / DRYER. |
| B01400493 ↗ | 68 SOUTH PORTLAND AVENUE BROOKLYN | Alteration CO | Filed — no permit on record | 05/21/2026 | — | Design AS ENGINEERING SERVICES PC | — |
| B01307440 ↗ | 910 PARK PLACE BROOKLYN | Alteration | Permit Issued | 11/03/2025 | 04/15/2026 | Design WISKUP ARCHITECTURE PLLC Contractor HT PLUMBING & HEATING COR | INTERIOR RENOVATION OF EXISTING APARTMENTS ON THE FIRST FLOOR TO SUPERSEDE AND WITHDRAW WORK DONE UNDER PERMITTED JOB #300765740. NO CHANGE … |
| B00984102 ↗ | 312 5TH AVENUE BROOKLYN | Alteration | Permit Issued | 03/04/2024 | 04/08/2026 | Design COLLECTIF ENGINEERING PLLC Owner BLOCPOWER Contractor SUPER COOL HVAC, LLC | NEW MULTI-SPLIT AIR CONDITIONING UNITS WITHIN AN EXISTING BUILDING. NEW OUTDOOR CONDENSERS IN REAR YARD OF BUILDING. NO CHANGE IN USE OR OCC… |
| M01358107 ↗ | 29 UNION SQUARE WEST MANHATTAN | Alteration | Signed-off | 03/17/2026 | 04/08/2026 | Design John Yurchyk Architect PLLC Contractor S TERRANOVA LLC | INTERIOR RENOVATION OF COMMERCIAL SPACE. NO INCREASE IN THE BULK . NO IMPACT ON ZONING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY |
| B01322488 ↗ | 1754 EAST 7TH STREET BROOKLYN | Alteration | Permit Issued | 12/30/2025 | 04/02/2026 | Design AHT ENGINEERING PLLC Contractor ELITE BUILDERS TEAM LLC | ENLARGEMENT AND INTERIOR RENOVATION OF EXISTING SINGLE FAMILY HOME. IN ORDER TO LEGALIZE VIOLATIONS #39166842J AND #39166832X. NO CHANGE IN … |
| M01304102 ↗ | 330 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 12/24/2025 | 03/19/2026 | Design COLLECTIF ENGINEERING PLLC Contractor SUPER COOL HVAC, LLC | NEW VRF AIR CONDITIONING UNITS WITHIN AN EXISTING BUILDING. NEW OUTDOOR CONDENSERS IN COURTYARD OF BUILDING. NO CHANGE IN USE OR OCCUPANCY. |
| B01368301 ↗ | 920 HOMECREST COURT BROOKLYN | Alteration | Filed — no permit on record | 03/17/2026 | — | Design DERMAN ENGINEERING PLLC | — |
| B01359573 ↗ | 68GAR 74TH STREET BROOKLYN | Full Demolition | Filed — no permit on record | 03/12/2026 | — | — | — |
| M00741080 | 100 WEST 92ND STREET MANHATTAN | Alteration | Signed-off | 05/31/2022 | 02/19/2026 | Design MHG ARCHITECTS PC Owner RUPPERT HOUSING CO INC. Contractor PYRAMID ETC COMPANIES, LL | PAA TO REMOVE 25TH FLOOR FROM SCOPE OF WORK |
| B01281562 ↗ | 1701 ALBEMARLE ROAD BROOKLYN | Alteration | Signed-off | 09/19/2025 | 02/17/2026 | Design ELECSYS Engineering Group Contractor ECOSYSTEM ENERGY SERVICES | INSTALLATION OF NEW DOMESTIC HOT WATER UPGRADES IN CELLAR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01300884 ↗ | 250 WEST 94TH STREET MANHATTAN | Alteration | Permit Issued | 12/29/2025 | 02/13/2026 | Design John Yurchyk Architect PLLC Contractor V & ROGER CNSTRCTN CORP | INTERIOR RENOVATION OF UNIT 5D WITHIN EXISTING MULTI-FAMILY BUILDING. NO INCREASE IN THE BULK . NO IMPACT ON ZONING. NO CHANGE IN USE, EGRES… |
| M01262173 ↗ | 304 CANAL STREET MANHATTAN | Alteration | Signed-off | 12/23/2025 | 02/05/2026 | Design DARRICK BOROWSKI Contractor LANZO CONSTRUCTION & HOME | MINOR INTERIOR RENOVATION OF A SECOND FLOOR RESIDENTIAL CONDO UNIT INCLUDING NEW KITCHEN AND BATHROOM FIXTURES AND FINISHES, AND LIMITED PAR… |
| B01318377 ↗ | 550 5TH AVENUE BROOKLYN | Alteration | Permit Issued | 12/01/2025 | 01/28/2026 | Design BristowMather Architects Contractor LANZO CONSTRUCTION & HOME | INTERIOR RENOVATION OF EXISTING 100 SQFT KITCHEN WITHIN UNIT A5. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01323165 ↗ | 51 EAST 7TH STREET MANHATTAN | Alteration | Permit Issued | 01/05/2026 | 01/20/2026 | Design COLLECTIF ENGINEERING PLLC Contractor SUPER COOL HVAC, LLC | ELECTRIFICATION OF A RESIDENTIAL BUILDING. SCOPE OF WORK ON BASEMENT, LEVEL 1, LEVEL 2, LEVEL 3, LEVEL 4, AND ROOF. INSTALLATION OF NEW VRF … |
| M01303848 ↗ | 2 COLUMBUS CIRCLE MANHATTAN | Alteration | Signed-off | 11/11/2025 | 01/05/2026 | Design STRUCTURE STUDIO Owner MUSEUM OF ARTS & DESIGN Contractor ECOSYSTEM ENERGY SERVICES | STRUCTURAL WORK INCLUDING MODIFICATION OF EXISTING DUNNAGE FRAMING FOR HEAT PUMPS AND NEW CONCRETE PAD FOR TRANSFORMER. |
| B01211927 ↗ | 205 PARK PLACE BROOKLYN | Alteration | Signed-off | 05/14/2025 | 12/15/2025 | Design WISKUP ARCHITECTURE PLLC Contractor BZJ CONSTRUCTION LLC | RENOVATION OF EXISTING APARTMENT; NO CHANGE IN EGRESS OR USE |
| M01271608 ↗ | 68 EAST 127TH STREET MANHATTAN | Alteration | Permit Issued | 09/19/2025 | 10/09/2025 | Design COLLECTIF ENGINEERING PLLC Contractor SUPER COOL HVAC, LLC | INTERIOR WORK ONLY- NO EXTERIOR WORK PROPOSED. RENOVATION OF AN EXISTING MULTI-FAMILY BUILDING. SCOPE OF WORK ON CELLAR, BASEMENT, FIRST FLO… |
| Q00981665 ↗ | 58-19 70TH AVENUE QUEENS | Alteration | Signed-off | 04/16/2024 | 10/09/2025 | Design DARRICK BOROWSKI Contractor LANZO CONSTRUCTION & HOME | MINOR EXTERIOR RENOVATION IN REAR YARD INCLUDING REMOVING SHED, REPLACING STAIRS AND NEW LANDING TO 1ST FLR, AND NEW HATCH/BULKHEAD DOORS TO… |
| M00819770 ↗ | 35 JANE STREET MANHATTAN | Alteration | Permit Issued | 03/28/2023 | 10/08/2025 | Design COLLECTIF ENGINEERING PLLC Contractor BIBA CONSTRUCTION INC | STRUCTURAL RENOVATION OF EXISTING WOOD FLOORS & ROOF FRAMED TOWNSHOUSE WITH UNREINFORCED MASONRY WALL. A SKYLIGHT IS TO BE INSTALLED ON THE … |
| M01248553 | 3041 BROADWAY MANHATTAN | Alteration | Signed-off | 08/28/2025 | 10/03/2025 | Design ELECSYS Engineering Group Contractor ECOSYSTEM ENERGY SERVICES | HVAC UPGRADES THROUGHOUT EXISTING BUILDING. NO CHANGES TO USE, EGRESS, OR OCCUPANCY. |
| Q01189302 ↗ | 114-28 145TH STREET QUEENS | Alteration CO | Permit Issued | 03/12/2025 | 09/29/2025 | Contractor TJ CONSTRUCTION SERVICES | The application is filled in conjunction to Q01189302-I1 to address inspector comments and address violation 34750708J.The work is done and … |
| B01273825 ↗ | 388 HALSEY STREET BROOKLYN | Alteration | Permit Issued | 09/02/2025 | 09/25/2025 | Design COLLECTIF ENGINEERING PLLC Owner 388 Halsey Street HDFC Contractor SUPER COOL HVAC, LLC | ELECTRIFICATION OF A RESIDENTIAL BUILDING. SCOPE OF WORK ON LEVEL 1, LEVEL 2, LEVEL 3, LEVEL 4, AND ROOF. INSTALLATION OF NEW VRF EQUIPMENT… |
| B01270776 ↗ | 66 GRAND STREET BROOKLYN | Alteration | Signed-off | 08/14/2025 | 08/22/2025 | Design ESNYC CONSULTING INC Contractor RENOVATION STATION INC | GROUND FLOOR RETAIL UPGRADES FOR ALTERATION TYPE 2. WORK LIMITED TO INSIDE THE DEMISED PREMISES ONLY ON APPROXIMATELY 2200 GSF OF IMPACTED R… |
| B01212014 ↗ | 168 STERLING PLACE BROOKLYN | Alteration | Signed-off | 05/06/2025 | 08/05/2025 | Design DARRICK BOROWSKI Contractor LANZO CONSTRUCTION & HOME | MINOR RENOVATION OF A 1100 SF 2ND FLOOR CONDO UNITIN AN 8-FAMILY / 4 STORY BLDG IN PARK SLOPE BKLN, INCLUDING MINOR PARTITION WORK, NEW WIND… |
| M01198476 ↗ | 20 EAST 16TH STREET MANHATTAN | Alteration | Signed-off | 06/17/2025 | 07/07/2025 | Design ESNYC CONSULTING INC Owner PopUp Bagels Contractor PRISTINE AIR CONDITIONING | PLUMBING & SPRINKLER WORK IN CONJUNCTION WITH GC RENOVATION OF EXISTING COMMERCIAL SPACE ON THE GROUND FLOOR. NO CHANGE TO USE, EGRESS, OR O… |
| X01097985 ↗ | 2500 BRONXWOOD AVENUE BRONX | Alteration CO | Permit Issued | 09/04/2024 | 05/28/2025 | Contractor AB BUILDERS NY | PLUMBING & SPRINKLER WORK IN CONJUNCTION WITH GC WORK & RENOVATION OF EXISTING BUILDING. |
| M00895656 ↗ | 79 LAIGHT STREET MANHATTAN | Alteration | Permit Issued | 10/10/2023 | 05/05/2025 | Design JUAN SEBASTIAN JOFRE Contractor LENNIE CONSTRUCTION | INTERIOR RENOVATION OF UNIT 3A. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| M00884530 ↗ | 35 JANE STREET MANHATTAN | Alteration CO | Permit Issued | 06/23/2023 | 03/14/2025 | Design AA MA STUDIO PLLC Contractor BIBA CONSTRUCTION INC | CHANGE OF OCCUPANCY GROUP FROM MULTIPLE DWELLING TO R-3 IN CONJUNCTION WITH PROPOSED RENOVATIONS UNDER JOB #M00819770 TO COMBINE 3RD & 4TH F… |
| M00284826 ↗ | 635 EAST 14TH STREET MANHATTAN | Alteration | Permit Issued | 07/14/2020 | 02/25/2025 | Design NEW CONCEPT ENGINEERING, PC Owner BPP ST OWNER LLC Contractor DUAL FUEL PLUBING & HTING | REMOVAL OF THREE STEAM BOILIERS, TWO STEAM HEATERS, TWO COMBINED HEATING AND POWER GENERATORS, TWO HEAT RECOVERY STEAM GENERATORS, TO SCRs, … |
| B01081955 ↗ | 80 FRANKLIN STREET BROOKLYN | Alteration | Signed-off | 08/05/2024 | 02/03/2025 | Design JWM GROUP LLC Contractor LANZO CONSTRUCTION & HOME | NEW MEZZANINE LEVEL CATWALK & IT'S SUPPORT |
| X00957480 ↗ | 1744 MONROE AVENUE BRONX | Alteration CO | Permit Issued | 11/06/2023 | 01/06/2025 | Design NIKOLAI KATZ ARCHITECT Contractor AB BUILDERS NY | PROPOSED 3 STORY & BASEMENT RESIDENTIAL USE BUILDING W/ TOTAL OF 10 RESIDENTIAL UNITS & EACH IS PROVIDED WITH DEDICATED AC SPLIT SYSTEM AND … |
| X00957478 ↗ | 1742 MONROE AVENUE BRONX | Alteration CO | Permit Issued | 11/06/2023 | 01/03/2025 | Design NIKOLAI KATZ ARCHITECT Contractor AB BUILDERS NY | PROPOSED INTERIOR RENOVATION & CONVERSION OF RESIDENTIAL BUILDING FROM AN EXISTING 3 FAMILY TO 10 UNIT MULTIPLE DWELLING. NO INCREASE IN FOO… |
| B01074415 ↗ | 64 BERKELEY PLACE BROOKLYN | Alteration | Signed-off | 07/08/2024 | 12/18/2024 | Design DARRICK BOROWSKI Owner Veralon Inc. Contractor LANZO CONSTRUCTION & HOME | STRUCTURAL MODIFICATIONS FOR AN INTERIOR RENOVATION OF A 2-FAMILY TOWNHOUSE. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| B01117952 ↗ | 221 EAST 18TH STREET BROOKLYN | Alteration | Signed-off | 10/03/2024 | 12/10/2024 | Design DARRICK BOROWSKI Owner Assembly Studio Contractor PROFICIENT HOME IMPROVEM* | PAA TO UPDATE LIST OF SPECIAL INSPECTIONS |
| M00982572 ↗ | 406 EAST 73RD STREET MANHATTAN | Alteration | Permit Issued | 01/26/2024 | 11/26/2024 | Design COLLECTIF ENGINEERING PLLC Contractor AMC PLBG, HTG & CLNG, INC | NEW MULTI-SPLIT AIR CONDITIONING UNITS WITHIN AN EXISTING BUILDING. NEW OUTDOOR CONDENSERS ON 2ND FLOOR ROOF. NO CHANGE IN USE OR OCCUPANCY. |
| Q00955868 ↗ | 24-30 CURTIS STREET QUEENS | Alteration | Signed-off | 11/08/2023 | 10/22/2024 | Design COLLECTIF ENGINEERING PLLC Owner COLLECTIF ENGINEERING Contractor JOHN HLAD P & H CO., INC | INTERIOR RENOVATION OF EXISTING DWELLING. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01102759 ↗ | 207 WEST 40TH STREET MANHATTAN | Alteration | Signed-off | 08/30/2024 | 10/09/2024 | Design COLLECTIF ENGINEERING PLLC Contractor CARY P O'BRIEN DESIGN LLC | GROUND FLOOR ALTERATION TYPE 2. WORK LIMITED TO THE TENANT AREA ONLY ON APPROXIMATELY 5,000 GSF OF RETAIL GROUND FLOOR. NO CHANGE OF USE, EG… |
| M01088150 | 100 WEST 92ND STREET MANHATTAN | Alteration | Signed-off | 08/09/2024 | 08/16/2024 | Design COLLECTIF ENGINEERING PLLC Owner RUPPERT HOUSING CO INC. Contractor DUAL FUEL COMPANY LLC | INSTALLATION OF SPLIT UNIT HEAT PUMPS IN ELEVATOR MACHINE ROOM. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01074466 ↗ | 215 BOWERY MANHATTAN | Alteration | Signed-off | 07/18/2024 | 08/12/2024 | Design COLLECTIF ENGINEERING PLLC Contractor TRI-COUNTY MECHANICAL LLC | PAA TO ADD AS-BUILT HVAC UNIT MODEL AND SERIAL NUMBERS |
| B00914470 ↗ | 344 8TH STREET BROOKLYN | Alteration | Signed-off | 08/06/2023 | 05/17/2024 | Design WISKUP ARCHITECTURE PLLC | NEW SIDE LOT LINE REAR YARD FENCES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00884475 ↗ | 231 WEST 21ST STREET MANHATTAN | Alteration | Permit Issued | 06/07/2023 | 04/30/2024 | Design WISKUP ARCHITECTURE PLLC Contractor SCHIM LLC | RENOVATION OF EXISTING APARTMENT 4B. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B00970952 ↗ | 792 EAST 19TH STREET BROOKLYN | Alteration | Permit Issued | 03/18/2024 | 04/11/2024 | Design COLLECTIF ENGINEERING PLLC Owner BLOCPOWER Contractor SUPER COOL HVAC, LLC | NEW MULTI-SPLIT AIR CONDITIONING UNITS WITHIN AN EXISTINGBUILDING. NEW OUTDOOR CONDENSERS IN REAR-SIDE YARD OFBUILDING. NO CHANGE IN USE OR … |
| M00921418 ↗ | 16 SUTTON PLACE MANHATTAN | Alteration | Signed-off | 09/25/2023 | 01/31/2024 | Design AHT ENGINEERING PLLC Contractor JG HOME IMPROV NYC CORP | RENOVATION OF EXISTING APARTMENT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00941156 ↗ | 147 WEST 13TH STREET MANHATTAN | Alteration | Signed-off | 10/06/2023 | 12/20/2023 | Design WISKUP ARCHITECTURE PLLC Contractor MANHATTAN PROFESSIONAL | RENOVATION TO EXISTING APARTMENT. PLUMBING WORK TO BE FILED AS A SEPARATE LAA APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| Q00899413 ↗ | 58-15 70TH AVENUE QUEENS | Alteration | Signed-off | 07/14/2023 | 11/29/2023 | Design COLLECTIF ENGINEERING PLLC Contractor DW PLUMBING INC | MINOR INTERIOR RENOVATION OF A (2) FAMILY RESIDENTIAL TOWNHOUSE INLCUDING NEW KITCHENS AND BATHROOMS AND LIMITED REMOVAL AND RECONFIGURATION… |
| B00922886 ↗ | 246 DECATUR STREET BROOKLYN | Alteration CO | Filed — no permit on record | 10/17/2023 | — | Design BENDIX ENGINEERING, P.C. | — |
| M00904707 ↗ | 10 WEST 93RD STREET MANHATTAN | Alteration | Signed-off | 07/24/2023 | 10/04/2023 | Design AHT ENGINEERING PLLC Contractor NORTHSHORE INDUSTRIES INC | RENOVATION OF EXISTING APARTMENT. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B00920110 ↗ | 152 DEAN STREET BROOKLYN | Alteration | Signed-off | 08/22/2023 | 09/28/2023 | Design WISKUP ARCHITECTURE PLLC | PARTIAL RENOVATION OF 3RD FLOOR 2 FAMILY HOME. NO CHANGE IN USE, EGRESS OR OCCUPANCY. |
| M00843028 ↗ | 315 EAST 65TH STREET MANHATTAN | Alteration | Signed-off | 04/22/2023 | 09/22/2023 | Design V W ARCHITECTURE, PLLC Contractor TONED PAINTING & CONSTRUC | COMBINATION OF APARTMENTS 6J AND 6K INTO APARTMENT 6JK, IN COMPLIANCE WITH TPPN 3/97 |
| M00859906 ↗ | 110 EAST 36TH STREET MANHATTAN | Alteration | Signed-off | 05/05/2023 | 09/06/2023 | Design WISKUP ARCHITECTURE PLLC | ADJUSTMENT OF A LIMITED NUMBER OF PARTITION WALLS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| Q00861588 ↗ | 60-62 70TH AVENUE QUEENS | Alteration | Signed-off | 05/18/2023 | 06/15/2023 | Design DARRICK BOROWSKI Contractor LANZO CONSTRUCTION & HOME | MINOR EXTERIOR (REAR) RENOVATION OF A TWO (2) FAMILY RESIDENTIAL TOWNHOUSE INCLUDING MINOR CORNICE REPAIR AND NEW STAIR/LANDING FROM PARLOR … |
| M00773787 ↗ | 116 PINEHURST AVENUE MANHATTAN | Alteration | Signed-off | 08/08/2022 | 05/02/2023 | Design COLLECTIF ENGINEERING PLLC Contractor SNS ORGNIZATION LTD | REPLACEMENT OF SUPPLY & RETURN HEATING PIPES WITHIN VAULT, NEW SUPPORTS, BRANCHING, FITTINGS, VALVES, & CONNECTIONS TO EXISTING BUILDINGS. N… |
| M00840830 ↗ | 116 PINEHURST AVENUE MANHATTAN | Alteration | Filed — no permit on record | 03/22/2023 | — | — | |
| M08043860 ↗ | 200 EAST 32ND STREET MANHATTAN | Alteration | Signed-off | 12/21/2022 | 12/29/2022 | Design WISKUP ARCHITECTURE PLLC Contractor ZMG CONSTRUCTION CORPORAT | ADDITION AND ADJUSTMENT OF A LIMITED NUMBER OFPARTITION WALLS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00257353 ↗ | 320 CENTRAL PARK WEST MANHATTAN | Alteration | Permit Issued | 12/13/2019 | 02/04/2020 | Design JACK GREEN ASSOCIATES Contractor HAMILTON AIR COMPANY, INC. | INSTALL THRU WALL AC UNITS IN APT# 20C ON 20TH FLOOR. ALL AS PER PLANS. |