← Back
Elevator apt, semi-fireproof with stores
251 DOUGLAS STREET
💬 Discuss this project
2024Year Built
15Stories
D7Building Class
M1-4/R7XZoning
250,496 sfGross Floor Area
262Units
1 Open Violation ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: GOWANUS DOUGLASS STREET LLC · 28,500 sf lot · 8.79 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Permit Issued — active, not yet Signed-off
Floor 111p · 1 filing
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Site & exteriorUnder Construction2 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TAVROS1809/01/2026
SKYLINE SCAFFOLDING GROUP1107/08/2026
MEPA REALTY203/21/2026
CHAVEZ DESIGN203/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WILLIAM VITACCO ASSOCIATES2803/21/2026
DVA Advisors1503/21/2026
Rigid Structural Design, LLC1703/21/2026
PROFESSIONAL DESIGN CONSULTANTS LL203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BROADWAY CONSTRUCTION GROGeneral Contractor1407/29/2026
SAFETY FIRE SPRINKLER CORPFire Protection307/08/2026
SKYLINE SCAFFOLDING GROUPGeneral Contractor207/08/2026
CARA PLUMBING GROUP INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA91682806/09/2026
GEOTECHNICAL ENGINEERING7341101/26/2026
ADVANCED ENGINEERING & IN1224106/24/2025
ANCORA ENGINEERING, PLLC6818108/15/2023
Building Lifecycle
All (207)Filed (41)Permit Issued (21)Signed Off (7)Violation (16)Inspection (40)Objection (52)Special Inspection (30)
08/20/2026
Signed off — New Building
Application to be assigned to HUB per Consultation meeting with SPV on 9/29/2021, 25% inclusionary housing. Application filed in order to erect 15 story mixed use new building.
B00621061-Z3
07/28/2026
Permit issued — Foundation
B00621061-Z3-FO
07/16/2026
Signed off — Alteration
B01244685-I1
06/15/2026
Objection resolved — Addressed
06/13/2026
Objection raised — Other
06/09/2026
Filed — New Building
Application to be assigned to HUB per Consultation meeting with SPV on 9/29/2021, 25% inclusionary housing. Application filed in order to erect 15 story mixed use new building.
B00621061-B6
06/01/2026
Special inspection requirement — Duct leakage testing, insulation and design
SOORJBALLY HARILALL
06/01/2026
Special inspection requirement — Final
Soorjbally Harilall
06/01/2026
Special inspection requirement — Exterior lighting power
SOORJBALLY HARILALL
06/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SOORJBALLY HARILALL
06/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
SOORJBALLY HARILALL
06/01/2026
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
06/01/2026
Special inspection requirement — Lighting controls
SOORJBALLY HARILALL
06/01/2026
Special inspection requirement — Shutoff dampers
SOORJBALLY HARILALL
06/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
SOORJBALLY HARILALL
06/01/2026
Special inspection requirement — Interior lighting power
SOORJBALLY HARILALL
06/01/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
06/01/2026
Special inspection requirement — Lighting in dwelling units
SOORJBALLY HARILALL
06/01/2026
Special inspection requirement — Electrical motors and elevators
SOORJBALLY HARILALL
06/01/2026
Special inspection requirement — Metering
SOORJBALLY HARILALL
05/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/18/2026
Signed off — New Building
Application to be assigned to HUB per Consultation meeting with SPV on 9/29/2021, 25% inclusionary housing. Application filed in order to erect 15 story mixed use new building.
B00621061-S2
05/18/2026
Signed off — New Building
Application to be assigned to HUB per Consultation meeting with SPV on 9/29/2021, 25% inclusionary housing. Application filed in order to erect 15 story mixed use new building.
B00621061-Z1
05/18/2026
Signed off — New Building
Application to be assigned to HUB per Consultation meeting with SPV on 9/29/2021, 25% inclusionary housing. Application filed in order to erect 15 story mixed use new building.
B00621061-S1
05/18/2026
Signed off — New Building
Application to be assigned to HUB per Consultation meeting with SPV on 9/29/2021, 25% inclusionary housing. Application filed in order to erect 15 story mixed use new building.
B00621061-S3
05/12/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/06/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/06/2026
Inspection — Pass CND-Occupancy Inspection
Pass
View inspection ↗
05/05/2026
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/05/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/29/2026
Permit issued — Plumbing
B00621061-S5-PL
04/27/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/23/2026
Signed off — Alteration
Installation of a temporarily system scaffold and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B01112254-I1
04/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/22/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/22/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/22/2026
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
04/17/2026
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
04/17/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/17/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
04/17/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
04/13/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/08/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/08/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/08/2026
Special inspection requirement — Vestibules
Soorjbally Harilall
04/08/2026
Special inspection requirement — Air barrier continuity plan testing
Soorjbally Harilall
04/08/2026
Special inspection requirement — Air barrier - visual inspection
Soorjbally Harilall
04/08/2026
Special inspection requirement — Insulation placement and R values
Soorjbally Harilall
04/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Soorjbally Harilall
04/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
04/08/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SOORJBALLY HARILALL
04/08/2026
Special inspection requirement — Flood Zone Compliance (attach FEMA elevation/dry floodproofing certificate where applicable)
SOORJBALLY HARILALL
04/08/2026
Special inspection requirement — Masonry
SOORJBALLY HARILALL
04/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
Soorjbally Harilall
04/08/2026
Special inspection requirement — Fenestration air leakage
Soorjbally Harilall
04/08/2026
Special inspection requirement — Lowest Floor Elevation
Soorjbally Harilall
04/08/2026
Special inspection requirement — Protection of exposed foundation insulation
Soorjbally Harilall
04/08/2026
Special inspection requirement — Fenestration areas
Soorjbally Harilall
04/06/2026
Objection raised — Other
04/06/2026
Objection resolved — Addressed
Latest 60 of 207 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationSigned-offBROADWAY CONSTRUCTION GRO07/28/2026
DOB NOWPlumbingPermit IssuedCARA PLUMBING GROUP INC04/29/2026
DOB NOWSuspended ScaffoldSigned-offBIG APPLE RENOVATION & RE02/11/2026
DOB NOWCurb CutSigned-offBROADWAY CONSTRUCTION GRO02/05/2026
DOB NOWMechanical SystemsSigned-offBROADWAY CONSTRUCTION GRO02/04/2026
DOB NOWStructuralSigned-offBROADWAY CONSTRUCTION GRO01/29/2026
DOB NOWFoundationSigned-offBROADWAY CONSTRUCTION GRO01/29/2026
DOB NOWConstruction FencePermit IssuedBROADWAY CONSTRUCTION GRO12/30/2025
DOB NOWGeneral ConstructionPermit IssuedBROADWAY CONSTRUCTION GRO12/19/2025
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP10/24/2025
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP10/23/2025
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP10/23/2025
DOB NOWSupported ScaffoldSigned-offSKYLINE SCAFFOLDING GROUP09/25/2025
DOB NOWSuspended ScaffoldSigned-offBIG APPLE RENOVATION & RE07/08/2025
DOB NOWConstruction FencePermit IssuedBROADWAY CONSTRUCTION GRO05/19/2025
DOB NOWConstruction FencePermit IssuedBROADWAY CONSTRUCTION GRO12/23/2024
DOB NOWGeneral ConstructionPermit IssuedBROADWAY CONSTRUCTION GRO12/23/2024
DOB NOWSupported ScaffoldSigned-offSKYLINE SCAFFOLDING GROUP10/01/2024
DOB NOWConstruction FencePermit IssuedBROADWAY CONSTRUCTION GRO02/07/2024
DOB NOWGeneral ConstructionPermit IssuedBROADWAY CONSTRUCTION GRO12/22/2023
DOB NOWGeneral ConstructionPermit IssuedBROADWAY CONSTRUCTION GRO10/19/2023
BISOTISSUEDCHAVEZ DESIGN, INC09/19/2014
BISEQISSUEDCHAVEZ DESIGN, INC09/19/2014
1 project · most recent 06/09/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
06/09/2026Signed-offBROADWAY CONSTRUCTION GROHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PUHY-EP120YNU-A 10 tons · Vrf Outdoor ×17
PUHY-EP120YNU-A1 135,000 BTU · Vrf Outdoor ×7
PUHY-EP168YNU-A1 188,000 BTU · Vrf Outdoor ×7
PUHY-EP168YNU-A 14 tons · Vrf Outdoor ×18
PUHY-EP144TNU-A1 160,000 BTU · Vrf Outdoor ×5
PUHY-EP144YNU-A 12 tons · Vrf Outdoor ×10
PUHY-EP144YNU-A1 160,000 BTU · Vrf Outdoor ×4
MXZ-SM36NAM2-U1 41,000 BTU · Vrf Outdoor ×3
MXZ-SM48NAM-U1 65,000 BTU · Vrf Outdoor ×2
MXZ-SM48NAM2-U1 65,000 BTU · Vrf Outdoor ×2
PUZ-A12NKA7 14,000 BTU · Vrf Outdoor ×2
MXZ-SM48NAHMZ2-U1 50,000 BTU · Vrf Outdoor ×1
PUHY-EP144TNU-A 12 tons · Vrf Outdoor ×5
NTXMSM48A182AA 4 tons · Vrf Outdoor ×3
NTXMSM60A182AA 5 tons · Vrf Outdoor ×3
MXZ-SM36-NAM2-U1 36,000 BTU · Vrf Outdoor ×1
PUHY-EP072YNU-A 6 tons · Vrf Outdoor ×1
PUHY-EP096YNU-A 8 tons · Vrf Outdoor ×1
PUHY-EP168TNU-A1 14 tons · Vrf Outdoor ×1
PUHY-EP72TNU-A1 6 tons · Vrf Outdoor ×1
Ventilation
Highmark HE-3XJRTV 1,300 CFM · Erv ×2
HE1.5JRTR 900 CFM · Erv ×2
Captiveaire A5-36D 16,500 CFM · Makeup Air ×2
Trane OABE198A4 1,800 CFM · Erv ×2
1 project · most recent 06/09/2026
Sprinkler System
FiledStatusContractorScope
06/09/2026Signed-offSAFETY FIRE SPRINKLER CORSprinkler System
1 project · most recent 06/09/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/09/2026Permit IssuedCARA PLUMBING GROUP INCGas, Storm, Water/Sanitary
4 projects · most recent 02/19/2026
General Wiring
FiledStatusContractorScope
02/19/2026CompleteLIMONGELLI ELECTRIC CORP—
11/25/2025Permit IssuedTUXEDO ELEC'L CONTR'G INC—
10/29/2025CompleteLIMONGELLI ELECTRIC CORPGeneral Wiring
10/29/2018Permit IssuedMETROPOLIS ELECTRIC CORP1 meters, 1 new_meters
1 project · most recent 06/09/2026
Steel Concrete Masonry
FiledStatusContractorScope
06/09/2026Signed-offBROADWAY CONSTRUCTION GROSteel, Concrete, Masonry
2 projects · most recent 12/26/2025
Scaffold Fence
FiledStatusContractorScope
12/26/2025Signed-offSKYLINE SCAFFOLDING GROUPScaffold
01/18/2024Permit IssuedBROADWAY CONSTRUCTION GROFence
▾Field Inspections (DOB CAP) — 42
DateTypeResultReport
05/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/12/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/06/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/06/2026Pass CND-Occupancy InspectionPassView ↗
05/05/2026Pass-Final Curb Cut Non-Directive 14PassView ↗
05/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/27/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/22/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/22/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/22/2026Fail-Final CND-Occupancy InspectionFailView ↗
04/17/2026Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
04/17/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/17/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
04/17/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
04/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/08/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/08/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/12/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/17/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/06/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/30/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/23/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
12/18/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
Latest 25 of 42.
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
06/01/2026Lighting controlsSOORJBALLY HARILALLenergy_progress
06/01/2026Mechanical SystemsSOORJBALLY HARILALLspecial
06/01/2026Emergency and Standby Power Systems (Generator)—special
06/01/2026FinalSoorjbally Harilallprogress
06/01/2026HVAC-R and service water heating equipmentSOORJBALLY HARILALLenergy_progress
06/01/2026Interior lighting powerSOORJBALLY HARILALLenergy_progress
06/01/2026Shutoff dampersSOORJBALLY HARILALLenergy_progress
06/01/2026Exterior lighting powerSOORJBALLY HARILALLenergy_progress
06/01/2026Lighting in dwelling unitsSOORJBALLY HARILALLenergy_progress
06/01/2026MeteringSOORJBALLY HARILALLenergy_progress
06/01/2026Electrical motors and elevatorsSOORJBALLY HARILALLenergy_progress
06/01/2026HVAC-R and service water piping design and insulationSOORJBALLY HARILALLenergy_progress
06/01/2026HVAC-R and service water heating system controlsSOORJBALLY HARILALLenergy_progress
06/01/2026Duct leakage testing, insulation and designSOORJBALLY HARILALLenergy_progress
04/08/2026Air barrier continuity plan testingSoorjbally Harilallenergy_progress
04/08/2026Protection of exposed foundation insulationSoorjbally Harilallenergy_progress
04/08/2026Fenestration air leakageSoorjbally Harilallenergy_progress
04/08/2026Fenestration and door U-factor and product ratingsSoorjbally Harilallenergy_progress
04/08/2026VestibulesSoorjbally Harilallenergy_progress
04/08/2026Fenestration areasSoorjbally Harilallenergy_progress
04/08/2026Air barrier - visual inspectionSoorjbally Harilallenergy_progress
04/08/2026Insulation placement and R valuesSoorjbally Harilallenergy_progress
04/08/2026Lowest Floor ElevationSoorjbally Harilallprogress
04/08/2026Fire-Resistance Rated ConstructionSoorjbally Harilallprogress
04/08/2026MasonrySOORJBALLY HARILALLspecial
Latest 25 of 150.
▾Documents — 366 on file (BIS + DOB NOW)
▸Plans & Drawings42
▸DOB NOWPlans/Sketch42
08/26/2026B00984437-I1Request digital key ↗
08/21/2026B01244685-I1Request digital key ↗
08/19/2026B01112254-P2Request digital key ↗
Showing 3 of 42 on file for this type
▸Applications & Permits10
▸BISPLAN / WORK APPROVAL APPLICATION3
11/02/2022340870105Open ↗
09/20/2014320981693Open ↗
09/17/2014320968583Open ↗
▸BISWORK PERMIT APPLICATION2
09/20/2014320968583Open ↗
09/20/2014320981693Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
08/20/2024340870105Open ↗
11/02/2022340870105Open ↗
▸DOB NOWHPD - Permit Notice2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP Stormwater Construction Permit1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Zoning, Tax Lot & Property Records62
▸DOB NOWRestrictive Declaration/Easement 220
08/16/2026B00621061-B4Open ↗
08/15/2026B00621061-S1Open ↗
08/14/2026B00621061-B6Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWRestrictive Declaration/Easement 120
08/16/2026B00621061-B4Open ↗
08/15/2026B00621061-S1Open ↗
08/14/2026B00621061-B6Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWRestrictive Declaration/Easement 39
08/16/2026B00621061-S3Open ↗
08/16/2026B00621061-S6Open ↗
08/16/2026B00621061-B4Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram6
08/16/2026B00621061-B4Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
08/16/2026B00621061-B4Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications137
▸DOB NOWSpecial Inspector Seal & Signature58
09/13/2026B00621061-S7Open ↗
09/12/2026B00621061-S2Open ↗
09/12/2026B00621061-S2Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature42
08/26/2026B00984437-I1Open ↗
08/19/2026B01112254-P6Open ↗
08/19/2026B01112254-P4Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWProgress Inspector Seal & Signature28
09/02/2026B00621061-S3Open ↗
09/01/2026B00621061-A3Open ↗
09/01/2026B00621061-A3Open ↗
Showing 3 of 28 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
09/20/2014320981693Open ↗
09/17/2014320968583Open ↗
09/17/2014320968583Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/20/2014320981693Open ↗
09/17/2014320968583Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
09/20/2014320981693Open ↗
09/17/2014320968583Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
11/02/2022340870105Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
11/02/2022340870105Open ↗
▸Trade Schedules & Equipment7
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
08/16/2026B00621061-B4Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist6
08/16/2026B00621061-B4Open ↗
08/15/2026B00621061-A6Open ↗
08/15/2026B00621061-P9Open ↗
Showing 3 of 6 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
08/20/2024340870105Open ↗
▸BISSTREET TREE CHECKLIST1
08/21/2024340870105Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos42
▸DOB NOWOER: Notice to Proceed30
08/16/2026B00621061-B4Open ↗
08/15/2026B00621061-S1Open ↗
08/15/2026B00621061-S1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWOER: Notice of Satisfaction11
08/28/2026B00621061-S8Open ↗
08/28/2026B00621061-Z3Open ↗
08/16/2026B00621061-S3Open ↗
Showing 3 of 11 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
11/02/2022340870105Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/17/2014320968583Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports12
▸DOB NOWSOIL REPORT7
08/15/2026B00621061-S1Open ↗
Showing 1 of 7 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWTR5 Test Report1
08/15/2026B00621061-Z3Open ↗
▸DOB NOWTR4 Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs2
▸BISADMINISTRATIVE OBJECTIONS2
09/20/2014320981693Open ↗
09/17/2014320968583Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
09/17/2014320968583Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET2
09/20/2014320981693Open ↗
09/17/2014320968583Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
11/02/2022340870105Open ↗
▸Other Documents37
▸DOB NOWProperty Ownership Certification9
08/16/2026B00621061-B4Open ↗
08/16/2026B00621061-S7Open ↗
08/15/2026B00621061-A6Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSite Survey: Initial6
08/16/2026B00621061-B4Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/16/2026B00621061-B4Open ↗
Showing 1 of 6 on file for this type
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)6
08/28/2026B00621061-S8Open ↗
08/16/2026B00621061-S3Open ↗
08/16/2026B00621061-S4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWAdjoining Owners Notification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP: TOPOGRAPHIC SURVEY1
08/20/2024340870105Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
08/20/2024340870105Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
08/20/2024340870105Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
08/20/2024340870105Open ↗
▸DOB NOWManufacturer's Specifications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWLowest Floor Elevation Plan1
08/16/2026B00621061-S8Open ↗
▸DOB NOWCalculations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type