| Owner | Filings | Most Recent |
|---|---|---|
| ALLIED PARTNERS RESIDENTIAL MGMT | 3 | 09/18/2026 |
| KINGS GROUP NY | 18 | 07/08/2026 |
| PLATINUM SERVICES NY | 11 | 07/08/2026 |
| WHOLE FOODS MARKET | 15 | 04/09/2026 |
| MATLA LLC | 5 | 03/22/2026 |
| VEMA GROUP | 11 | 03/22/2026 |
| 460 SEVENTH AVE ASSOCIATE | 3 | 03/22/2026 |
| CHELSEA MERCANTILE CONDOMINIUM | 66 | 03/22/2026 |
| CHELSEA SEVENTH GARAGE CO | 4 | 03/22/2026 |
| CHELSEA 23 ST CORP | 1 | 03/22/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| KLABER DESIGN ARCHITECTURE PLLC | 5 | 08/12/2026 |
| PATTI & ANTHES CONSULTING ENGINEERS | 4 | 08/06/2026 |
| SIMPLE ARCHITECTURE PC | 2 | 07/10/2026 |
| P.A. COLLINS PE | 2 | 04/17/2026 |
| DURUSOY-PAPA ARCHITECTURE, DPC. | 1 | 04/08/2026 |
| BUILT ENGINEERS, P. C. | 2 | 04/01/2026 |
| HNY CONSULTING ENGINEERS LLC | 2 | 11/04/2025 |
| ANDREW MAASS | 2 | 10/07/2025 |
| CES ENGINEERING LLC | 2 | 05/09/2025 |
| ERIK OHRMAN ARCHITECT | 1 | 05/09/2025 |
| KIEFER & SCHUSTER ENGINEERING PLLC | 3 | 04/10/2025 |
| WILLIAM LEEDS ARCHITECT PC | 1 | 04/01/2025 |
| ANDREW KATZ ENGINEERS | 2 | 03/06/2025 |
| CUSHING TERRELL | 1 | 09/09/2024 |
| EDG | 2 | 08/13/2024 |
| JAMES BARTHOLOMEW | 1 | 05/07/2024 |
| FRANK BOSTELMANN ARCHITECTURE P.C. | 1 | 04/25/2024 |
| ASHRAF CORP | 2 | 12/05/2023 |
| M.ARCH ARCHITECTS | 1 | 08/07/2023 |
| WW ENGINEERING PLLC | 2 | 06/28/2023 |
| GNE ARCHITECTURE | 2 | 03/22/2023 |
| PVE ENGINEERING | 1 | 03/22/2023 |
| MICHAEL MCCAFFERY ARCHITECT PC | 4 | 02/07/2023 |
| 3 HUB ARCHITECTURE PLLC | 3 | 09/26/2022 |
| ENGINEERING PROFESSIONAL SERVICE P. | 2 | 08/08/2022 |
| Representative | Filings | Most Recent |
|---|---|---|
| CONSTRUCTION PERMIT SERVICES | 14 | 03/21/2026 |
| RPO | 8 | 03/21/2026 |
| DINGS ENGINEERING PC | 6 | 03/21/2026 |
| BMB BUILDING CONSULTING | 4 | 03/21/2026 |
| CJS EXPEDITING | 2 | 03/21/2026 |
| MODERN BUILDING CONSULTANT | 2 | 03/21/2026 |
| MUNICIPAL EXPEDITING | 6 | 03/21/2026 |
| SATO CONSTRUCTION | 4 | 03/21/2026 |
| MUNICIPAL BUILDING CONSULTANTS | 1 | 03/21/2026 |
| LMS-ACE SERVICES | 2 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| STRUCTURECRAFT CONTRACTIN | General Contractor | 7 | 04/09/2026 |
| TOWN & GARDENS LTD | General Contractor | 7 | 07/08/2026 |
| KINGS GROUP NY CORP | General Contractor | 5 | 07/08/2026 |
| NEW YORK RENOVATORS INTER | General Contractor | 5 | 07/08/2026 |
| GARCIA QUALITY REMODELING | General Contractor | 4 | 07/08/2026 |
| NICK VILLANI AND CO., INC | General Contractor | 4 | 07/08/2026 |
| LAKE CONTRACTING LLC | General Contractor | 3 | 03/21/2026 |
| AATZ CONTRACTING INC | General Contractor | 3 | 03/21/2026 |
| SATO CONSTRUCTION CO.INC | General Contractor | 3 | 07/08/2026 |
| PLATINUM SERVICES NY LLC | General Contractor | 3 | 04/09/2026 |
| CARMINE LIPPOLIS | Electrical | 2 | 03/21/2026 |
| S&E BRIDGE & SCAFFOLD LLC. | General Contractor | 2 | 07/08/2026 |
| PALMER ENTERPRISES OF ROCKLAND | General Contractor | 2 | 03/21/2026 |
| PREMIER FLOW PLBG AND HTG | Plumbing | 2 | 07/08/2026 |
| SCORDIO CONSTRUCTION INC | General Contractor | 2 | 07/08/2026 |
| CJ RENOVATIONS INC | General Contractor | 2 | 03/21/2026 |
| GALLERY RESTORATION LTD | General Contractor | 1 | 07/08/2026 |
| GOTHAM LUXURY.GROUP LLC | General Contractor | 1 | 04/09/2026 |
| HABITERRA LLC | General Contractor | 1 | 09/18/2026 |
| MUJKO RENOVATION LLC | General Contractor | 1 | 04/09/2026 |
| RADEK SZCZESNY | General Contractor | 1 | 07/01/2026 |
| UNIVERSAL CONSTRUCTION | General Contractor | 1 | 07/08/2026 |
| A&H EXPRESS PLBG&HTG CORP | Plumbing | 1 | 06/28/2026 |
| ALESSANDRO PLUMBING, INC | Plumbing | 1 | 07/08/2026 |
| ALKLEM PLUMBING INC | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| AKS ARCHITECTURAL & ENGIN | 1957 | 5 | 08/12/2026 |
| HRF SERVICES CORP | 5616 | 1 | 07/10/2026 |
| PROJECT TACTICAL SOLUTION | 5859 | 8 | 05/27/2026 |
| P.A.COLLINS INSPECTIONS P | 2168 | 2 | 04/17/2026 |
| SOCOTEC ENGINEERING | 4983 | 1 | 04/08/2026 |
| BUILT ENGINEERS, P.C. | 8962 | 2 | 04/01/2026 |
| CROSSCHECK INSPECTION SER | 544 | 3 | 11/04/2025 |
| SKYLINE ENGINEERING, PLLC | 267 | 1 | 10/07/2025 |
| ALAN MARGOLIN & ASSOC | 423 | 3 | 05/09/2025 |
| SITE SAFETY LLC | 8555 | 2 | 08/13/2024 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Plumbing | Permit Issued | VILLAGE P & H NY INC | 09/17/2026 |
| DOB NOW | General Construction | Permit Issued | HABITERRA LLC | 09/17/2026 |
| DOB NOW | Plumbing | Permit Issued | ORBIT PLBG & HTG INC | 06/01/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | SCORDIO CONSTRUCTION INC | 05/26/2026 |
| DOB NOW | General Construction | Permit Issued | SCORDIO CONSTRUCTION INC | 05/26/2026 |
| DOB NOW | Plumbing | Signed-off | Z.W. PLBG & HTG CORP | 03/05/2026 |
| DOB NOW | General Construction | Signed-off | TOWN & GARDENS LTD | 02/02/2026 |
| DOB NOW | General Construction | Signed-off | RADEK SZCZESNY | 01/29/2026 |
| DOB NOW | Sprinklers | Signed-off | FULL CAPACITY FIRE CORP | 01/26/2026 |
| DOB NOW | Mechanical Systems | Signed-off | STRUCTURECRAFT CONTRACTIN | 01/06/2026 |
| DOB NOW | General Construction | Signed-off | STRUCTURECRAFT CONTRACTIN | 01/05/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | NICK VILLANI AND CO., INC | 12/22/2025 |
| DOB NOW | Plumbing | Permit Issued | MITIE PLUMBING & HTG CORP | 11/13/2025 |
| DOB NOW | General Construction | Permit Issued | NICK VILLANI AND CO., INC | 09/30/2025 |
| DOB NOW | Sidewalk Shed | Signed-off | PLATINUM SERVICES NY LLC | 07/07/2025 |
| DOB NOW | Plumbing | Permit Issued | A&H EXPRESS PLBG&HTG CORP | 05/20/2025 |
| DOB NOW | General Construction | Signed-off | MUJKO RENOVATION LLC | 04/24/2025 |
| DOB NOW | General Construction | Signed-off | GOTHAM LUXURY.GROUP LLC | 04/18/2025 |
| DOB NOW | General Construction | Signed-off | TOWN & GARDENS LTD | 04/11/2025 |
| DOB NOW | Structural | Signed-off | TOWN & GARDENS LTD | 04/10/2025 |
| DOB NOW | Plumbing | Signed-off | ALKLEM PLUMBING INC | 03/18/2025 |
| DOB NOW | Structural | Signed-off | TOWN & GARDENS LTD | 02/28/2025 |
| DOB NOW | General Construction | Signed-off | TOWN & GARDENS LTD | 02/27/2025 |
| DOB NOW | Structural | Signed-off | TOWN & GARDENS LTD | 02/27/2025 |
| DOB NOW | General Construction | Signed-off | TOWN & GARDENS LTD | 01/30/2025 |
| DOB NOW | General Construction | Signed-off | STRUCTURECRAFT CONTRACTIN | 12/10/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | PLATINUM SERVICES NY LLC | 07/09/2024 |
| DOB NOW | General Construction | Signed-off | SATO CONSTRUCTION CO.INC | 06/26/2024 |
| DOB NOW | General Construction | Signed-off | PALMER ENTERPRISES OF ROCKLAND | 06/18/2024 |
| DOB NOW | General Construction | Signed-off | CREATE RENOVATION & DESIG | 06/17/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | SATO CONSTRUCTION CO. INC | 02/06/2024 |
| DOB NOW | Suspended Scaffold | Signed-off | SATO CONSTRUCTION CO. INC | 01/26/2024 |
| DOB NOW | Structural | Signed-off | LAKE CONTRACTING LLC | 10/17/2023 |
| DOB NOW | General Construction | Signed-off | AATZ CONTRACTING INC | 08/15/2023 |
| DOB NOW | Sidewalk Shed | Signed-off | PLATINUM SERVICES NY LLC | 07/20/2023 |
| DOB NOW | General Construction | Signed-off | SATO CONSTRUCTION CO.INC | 06/23/2023 |
| DOB NOW | General Construction | Signed-off | GARCIA QUALITY REMODELING | 02/15/2023 |
| DOB NOW | General Construction | Signed-off | UNIVERSAL CONSTRUCTION | 01/24/2023 |
| DOB NOW | Plumbing | Signed-off | HYDROKINETIC PLBG & HTG I | 12/15/2022 |
| DOB NOW | General Construction | Signed-off | GALLERY RESTORATION LTD | 11/14/2022 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 05/09/2025 | Permit Issued | NICK VILLANI AND CO., INC | Heating and Air Conditioning Systems | Heat / Cool |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/04/2025 | Signed-off | FULL CAPACITY FIRE CORP | 6 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/12/2026 | Signed-off | Z.W. PLBG & HTG CORP | Gas, Water/Sanitary |
| 08/06/2026 | — | — | Water/Sanitary |
| 07/10/2026 | Permit Issued | PARAMOUNT SERVICES, LLC | Water/Sanitary |
| 05/27/2026 | Signed-off | ALKLEM PLUMBING INC | Water/Sanitary |
| 04/17/2026 | Permit Issued | ORBIT PLBG & HTG INC | Gas, Water/Sanitary |
| 04/01/2026 | Permit Issued | A&H EXPRESS PLBG&HTG CORP | Gas, Water/Sanitary |
| 05/09/2025 | Permit Issued | INNOVATIVE HEATING SOLUTI | Gas, Water/Sanitary |
| 06/25/2021 | — | — | Water/Sanitary |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/30/2026 | Complete | ICON ELECTRIC INC | General Wiring |
| 06/02/2026 | Permit Issued | GLENDALE ELECTL CONTNG IN | General Wiring |
| 04/21/2026 | Complete | LINA ELECTRIC, CORP | General Wiring |
| 03/30/2026 | Complete | KJK ELECTRIC INC | General Wiring |
| 03/13/2026 | Complete | L J ELEC'L SERV. INC. | General Wiring |
| 12/03/2025 | Complete | SUNBIRD ELECTRICAL CONTR | General Wiring |
| 10/01/2025 | Permit Issued | PATERNY ELECTRIC INC | General Wiring |
| 09/21/2025 | Complete | LINA ELECTRIC, CORP | General Wiring |
| 09/16/2025 | Complete | JOSEPH WEINSTEIN ELECTRIC | General Wiring |
| 08/19/2025 | Permit Issued | NEW YORK CITY ELECT SVCS | General Wiring |
| 08/15/2025 | Permit Issued | LINA ELECTRIC, CORP | General Wiring |
| 03/11/2025 | Permit Issued | ACCURATE ELEC'L CONTR'S C | General Wiring |
| 02/21/2025 | Complete | ASCUATECH ELECTRICAL CORP | — |
| 01/21/2025 | Complete | POC ELECTRICAL CONTNG INC | General Wiring |
| 01/17/2025 | Permit Issued | TRANSEL ELEV. & ELEC. INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/27/2026 | Signed-off | TOWN & GARDENS LTD | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 11/04/2019 | Permit Issued | KINGS GROUP NY CORP | Sidewalk Shed |
| 05/21/2018 | Permit Issued | S&E BRIDGE & SCAFFOLD LLC | Sidewalk Shed |
| Date | Type | Result | Report |
|---|---|---|---|
| 05/19/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/14/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/14/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 04/13/2026 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 04/13/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/25/2026 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 03/18/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/13/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 02/10/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 12/31/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 12/31/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/24/2025 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 11/21/2025 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 11/21/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 11/19/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 10/23/2025 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/09/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 09/09/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 07/25/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 07/25/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/25/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 09/13/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 07/26/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/23/2023 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 02/16/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/21/2026 | Fire-Resistant Penetrations and Joints | Joseph Smerina | special |
| 08/11/2026 | Fire-Resistant Penetrations and Joints | Joseph Smerina | special |
| 08/05/2026 | Fire-Resistant Penetrations and Joints | — | special |
| 07/29/2026 | HVAC-R and service water heating equipment | — | energy_progress |
| 07/29/2026 | HVAC-R and service water piping design and insulation | — | energy_progress |
| 07/29/2026 | Energy Code Compliance Inspections | — | progress |
| 07/29/2026 | Tenant Protection Plan Compliance | — | special |
| 07/29/2026 | Mechanical Systems | — | special |
| 07/29/2026 | Post-installed Anchors | — | special |
| 07/29/2026 | High-Pressure Steam Piping (Welding) | — | special |
| 07/29/2026 | Heating Systems | — | special |
| 07/29/2026 | Final | — | progress |
| 07/29/2026 | HVAC-R and service water heating system controls | — | energy_progress |
| 07/29/2026 | Maintenance information | — | energy_progress |
| 06/29/2026 | Energy Code Compliance Inspections | Thomas Klaber | progress |
| 06/29/2026 | Lighting in dwelling units | Thomas Klaber | energy_progress |
| 06/29/2026 | Interior lighting power | Thomas Klaber | energy_progress |
| 06/29/2026 | Lighting controls | Thomas Klaber | energy_progress |
| 06/29/2026 | Fire-Resistance Rated Construction | Thomas Klaber | progress |
| 06/29/2026 | Final | Thomas Klaber | progress |
| 06/29/2026 | Fire-Resistant Penetrations and Joints | Joseph Smerina | special |
| 06/22/2026 | Fire-Resistant Penetrations and Joints | Joseph Smerina | special |
| 06/22/2026 | Energy Code Compliance Inspections | Thomas Klaber | progress |
| 06/22/2026 | Final | Thomas Klaber | progress |
| 06/22/2026 | Fire-Resistance Rated Construction | Thomas Klaber | progress |