← Back
BuildNYC
Elevator apt, semi-fireproof with stores
252 EAST 61ST STREET
MANHATTAN · BIN 1078348
💬 Discuss this project
1940Year Built
6Stories
D7Building Class
C2-8Zoning
103,304 sfGross Floor Area
107Units
LL97 CoveredRent Stabilized10 Active Violations ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: SP 1143 Second · 16,066 sf lot · 6.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofSp 1143 Second LLC2p · 2 filings · 6 docs
Floor 6Sp 1143 Second LLC6p · 1 filing · 3 docs
Floor 5Sp 1143 Second LLC6p · 1 filing · 3 docs
Floor 4Sp 1143 Second LLC6p · 1 filing · 3 docs
Floor 3Sp 1143 Second LLC6p · 1 filing · 3 docs
Floor 2Sp 1143 Second LLC6p · 1 filing · 3 docs
Floor 1Mokafe Times SquareUnder Construction10p · 5 filings · 20 docs
CellarSp 1143 Second LLC19p · 3 filings · 20 docs
Site & exteriorThe UPS Store5p · 4 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SP 1143 Second14703/22/2026
KFJ Realty303/21/2026
K & J Realty Associates203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Skypeak106/30/2026
Robert Germain Jr. PE712/29/2025
C3D Architecture106/02/2025
Zenith Home Inspections201/09/2024
Enthink Engineers109/29/2022
Howard L Zimmerman Arch & Engineering108/18/2022
Azimuth Engineering109/10/2020
Rojas Engineering102/08/2020
Alberto Roman310/24/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JD Design Associates603/21/2026
Louis Striar403/21/2026
Hlzae103/21/2026
Metropolis Group203/21/2026
Codegreen203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Emprise ConstructionScaffold303/21/2026
Laura Electrical LightingElectrical203/21/2026
Power Surge ElectricElectrical203/21/2026
Jepol ConstructionGeneral Contractor203/21/2026
Phoenix Sutton STRScaffold203/21/2026
Signstar NYCSign hanger207/08/2026
Bell Fuel OilPlumbing207/08/2026
Approved Oil Company ofGeneral Contractor104/09/2026
JD ArchGeneral Contractor107/08/2026
Branch PlumbingPlumbing107/08/2026
RC3 Electricspecialty_contractor107/08/2026
Urban Construction & DesignGeneral Contractor107/16/2026
Elpo Electrical ContgElectrical103/22/2026
Laura Electrical LightingElectrical103/22/2026
Life Spot ElectricElectrical103/22/2026
Bisantz Electric CoElectrical103/21/2026
Catman PlumbingPlumbing107/08/2026
Fried Electric CoElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Buildtech Engineering6369106/30/2026
Robert F. Germain Jr. PE5100812/29/2025
Howard L Zimmerman Architects1712108/18/2022
Jeremy K McKeon, P.E7263109/10/2020
Rojas Engineering6232102/08/2020
AR-Tech Engineering6659108/12/2019
Building Lifecycle
All (158)Filed (18)Permit Issued (14)Signed Off (11)Facade (FISP) (14)Violation (60)Inspection (3)Objection (8)Special Inspection (30)
07/15/2026
Permit issued — General Construction
M01420531-I1-GC
06/30/2026
Filed — Alteration
FILING FOR MINOR COSMETIC WORK INSIDE EXISTING COMMERCIAL SPACE TO PROPOSE A COFFEE SHOP. WORK WILL INCLUDE INSTALLATION OF COUNTER-TOPS AND INTERIOR FINISHES THROUGHOUT THE SPACE.
M01420531-I1
06/22/2026
Special inspection requirement — Tenant Protection Plan Compliance
Luis Pichardo
06/22/2026
Special inspection requirement — Final
RONALD VILLANO
02/09/2026
Violation issued (HPD, closed)
C
12/30/2025
Signed off — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN. NEW GAS FIRED HOT WATER HEATER & (2) STORAGE TANKS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01122854-S2
12/30/2025
Signed off — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN. NEW GAS FIRED HOT WATER HEATER & (2) STORAGE TANKS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01122854-S1
12/30/2025
Signed off — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN. NEW GAS FIRED HOT WATER HEATER & (2) STORAGE TANKS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01122854-I1
12/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
12/30/2025
Special inspection requirement — Tenant Protection Plan Compliance
Robert Germain Jr.
12/30/2025
Special inspection requirement — Final
Robert Germain Jr.
12/30/2025
Special inspection requirement — Chimneys and vents
Robert Germain Jr.
12/29/2025
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN. NEW GAS FIRED HOT WATER HEATER & (2) STORAGE TANKS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01122854-P4
12/29/2025
Special inspection requirement — Final
Robert Germain Jr.
12/29/2025
Special inspection requirement — Chimneys and vents
Robert Germain Jr.
12/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
12/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
12/10/2025
Permit issued — Plumbing
M01122854-S1-PL
12/09/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/03/2025
Signed off — Alteration
M01234750-I1
08/05/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
08/05/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/19/2025
Violation issued (HPD, closed)
A
07/19/2025
Violation issued (HPD, closed)
A
06/03/2025
Permit issued — Construction Fence
M01234750-I1-FN
06/02/2025
Filed — Alteration
M01234750-I1
06/01/2025
Violation issued (HPD, closed)
A
05/31/2025
Violation issued (HPD, closed)
C
05/29/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/28/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
Robert Germain Jr.
03/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Germain Jr.
03/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
03/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
Robert Germain Jr.
03/05/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Robert Germain Jr.
03/05/2025
Special inspection requirement — Tenant Protection Plan Compliance
Robert Germain Jr.
03/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
03/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
Robert Germain Jr.
03/04/2025
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN. NEW GAS FIRED HOT WATER HEATER & (2) STORAGE TANKS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01122854-P1
03/04/2025
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN. NEW GAS FIRED HOT WATER HEATER & (2) STORAGE TANKS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01122854-P3
03/04/2025
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN. NEW GAS FIRED HOT WATER HEATER & (2) STORAGE TANKS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01122854-P2
02/28/2025
Special inspection requirement — HVAC-R and service water heating system controls
Robert Germain Jr.
02/28/2025
Special inspection requirement — Chimneys and vents
Robert Germain Jr.
02/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
02/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
02/28/2025
Special inspection requirement — Final
Robert Germain Jr.
02/28/2025
Special inspection requirement — Tenant Protection Plan Compliance
02/28/2025
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Robert Germain Jr.
02/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
02/28/2025
Special inspection requirement — HVAC-R and service water heating equipment
Robert Germain Jr.
02/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Robert Germain Jr.
11/13/2024
Permit issued — General Construction
M01122854-I1-GC
11/12/2024
Permit issued — Boiler Equipment
M01122854-S2-BE
11/06/2024
Permit issued — Plumbing
M01122854-S1-PL
10/29/2024
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN. NEW GAS FIRED HOT WATER HEATER & (2) STORAGE TANKS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01122854-S2
10/29/2024
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN. NEW GAS FIRED HOT WATER HEATER & (2) STORAGE TANKS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01122854-S1
10/29/2024
Filed — Alteration
NEW LOW PRESSURE GAS SERVICE, NEW LOW PRESSURE GAS LINE, NEW GAS METER, NEW GAS TRAIN. NEW GAS FIRED HOT WATER HEATER & (2) STORAGE TANKS. NO CHANGE IN MEANS OF EGRESS USE GROUP OR OCCUPANCY.
M01122854-I1
10/16/2024
Violation issued (HPD, closed)
C
10/16/2024
Violation issued (HPD, closed)
B
10/16/2024
Violation issued (HPD, closed)
B
Latest 60 of 158 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedUrban Construction & Design07/15/2026
DOB NOWPlumbingSigned-offBell Fuel Oil12/10/2025
DOB NOWConstruction FenceSigned-offEmprise Construction06/03/2025
DOB NOWGeneral ConstructionSigned-offApproved Oil Company of11/13/2024
DOB NOWBoiler EquipmentSigned-offApproved Oil Co of Brooklyn11/12/2024
DOB NOWPlumbingSigned-offBell Fuel Oil11/06/2024
DOB NOWSignSigned-offSignstar NYC01/11/2024
DOB NOWSignSigned-offSignstar NYC01/11/2024
DOB NOWGeneral ConstructionSigned-offHudson Meridian Construction GP10/06/2022
DOB NOWSidewalk ShedSigned-offPhoenix Sutton STR09/30/2022
DOB NOWAntennaSigned-offRC3 Electric11/02/2020
DOB NOWPlumbingSigned-offBranch Plumbing02/21/2020
DOB NOWMechanical SystemsSigned-offJD Arch11/13/2019
DOB NOWPlumbingSigned-offCatman Plumbing09/05/2019
BISOTISSUEDSD 201/28/2020
BISOTISSUEDMing's Construction08/29/2019
BISPLISSUEDSuperior Plumbing & Heating05/22/2019
BISOTISSUEDEmprise Construction05/09/2019
BISPLISSUEDVMC Plumbing & Heating04/19/2019
BISOTISSUEDEmprise Construction04/05/2019
BISOTISSUEDEmprise Construction03/22/2019
BISPLISSUEDVMC Plumbing & Heating06/21/2018
BISOTISSUEDEmprise Construction10/27/2017
BISPLISSUEDSo Plumbing & Heating07/19/2017
BISOTISSUEDEmprise Construction06/27/2017
BISOTISSUEDSquan Construction Services04/24/2017
BISPLISSUEDSo Plumbing & Heating12/20/2016
BISOTISSUEDEmprise Construction12/05/2016
BISPLISSUEDSo Plumbing & Heating12/01/2016
BISOTISSUEDEmprise Construction10/31/2016
BISPLISSUEDSo Plumbing & Heating07/18/2016
BISOTISSUEDEmprise Construction07/13/2016
BISPLISSUEDSo Plumbing & Heating04/29/2016
BISOTISSUEDEmprise Construction04/15/2016
BISOTISSUEDEmprise Construction03/31/2016
BISPLISSUEDSo Plumbing & Heating03/08/2016
BISOTISSUEDSquan Construction Services02/29/2016
BISOTISSUEDEmprise Construction02/25/2016
BISPLISSUEDSo Plumbing & Heating07/15/2015
BISOTISSUEDEmprise Construction07/13/2015
+ 24 more permits on file
1 project · most recent 02/08/2020
Water/Sanitary
FiledStatusContractorScope
02/08/2020Signed-offBranch PlumbingWater/Sanitary
8 projects · most recent 10/15/2025
General Wiring Boiler Controls
FiledStatusContractorScope
10/15/2025CompleteLaura Electrical LightingBoiler Controls
11/06/2024CompleteLaura Electrical Lighting—
01/14/2024CompleteLife Spot Electric—
01/14/2024CompleteLife Spot Electric—
12/22/2023Permit IssuedRobert Chimenti51 meters, 1 new_meters
09/26/2022CompleteElpo Electrical Contg—
02/24/2020Permit IssuedAscuatech ElectricalGeneral Wiring
09/04/2019CompleteKwong Ming ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/05/2025Pass-Final Boiler Equipment InspectionPassView ↗
08/05/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
06/22/2026Tenant Protection Plan ComplianceLuis Pichardospecial
06/22/2026FinalRONALD VILLANOprogress
12/30/2025Fire-Resistant Penetrations and JointsRobert Germain Jr.special
12/30/2025Tenant Protection Plan ComplianceRobert Germain Jr.special
12/30/2025FinalRobert Germain Jr.progress
12/30/2025Chimneys and ventsRobert Germain Jr.special
12/29/2025FinalRobert Germain Jr.progress
12/29/2025Chimneys and ventsRobert Germain Jr.special
12/29/2025Fire-Resistant Penetrations and JointsRobert Germain Jr.special
12/29/2025Tenant Protection Plan Compliance—special
03/05/2025HVAC-R and service water heating equipmentRobert Germain Jr.energy_progress
03/05/2025HVAC-R and service water piping design and insulationRobert Germain Jr.energy_progress
03/05/2025Fire-Resistant Penetrations and JointsRobert Germain Jr.special
03/05/2025Tenant Protection Plan ComplianceRobert Germain Jr.special
03/05/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsRobert Germain Jr.special
03/05/2025Tenant Protection Plan ComplianceRobert Germain Jr.special
03/05/2025Fire-Resistant Penetrations and JointsRobert Germain Jr.special
03/05/2025HVAC-R and service water heating system controlsRobert Germain Jr.energy_progress
02/28/2025HVAC-R and service water heating system controlsRobert Germain Jr.energy_progress
02/28/2025Chimneys and ventsRobert Germain Jr.special
02/28/2025Fire-Resistant Penetrations and JointsRobert Germain Jr.special
02/28/2025Tenant Protection Plan Compliance—special
02/28/2025FinalRobert Germain Jr.progress
02/28/2025Tenant Protection Plan Compliance—special
02/28/2025Fuel-Oil Storage and Fuel-Oil Piping SystemsRobert Germain Jr.special
Latest 25 of 40.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Mokafe Times SquareRestaurant / Food ServiceFloor 1
Project M01420531 Alteration · Permit Entire · 06/30/2026
The UPS StoreRetail—
Project M00969024 Alteration · LOC Issued · 01/09/2024
Project M00969025 Alteration · LOC Issued · 01/09/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 1,114 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch13
09/02/2026M00783717-I1Request digital key ↗
09/01/2026M08010134-I1Request digital key ↗
08/28/2026M00969024-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00200937-I1Request digital key ↗
09/05/2026M00301226-I1Request digital key ↗
08/15/2026M00200937-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00209404-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
08/14/2026M00393525-I1Request digital key ↗
▸Applications & Permits181
▸BISWORK PERMIT APPLICATION115
01/29/2020123795321Open ↗
08/29/2019123693869Open ↗
05/22/2019140842462Open ↗
Showing 3 of 115 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION66
01/08/2020123795321Open ↗
08/14/2019123693869Open ↗
04/10/2019140842462Open ↗
Showing 3 of 66 on file for this type
▸Seals & Professional Certifications269
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION88
11/14/2019123693869Open ↗
08/15/2019140837414Open ↗
08/14/2019123693869Open ↗
Showing 3 of 88 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM46
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 46 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST43
08/14/2019123693869Open ↗
Showing 1 of 43 on file for this type
▸DOB NOWProgress Inspector Seal & Signature20
09/20/2026M00209404-I1Open ↗
09/20/2026M00209404-I1Open ↗
09/20/2026M00209404-I1Open ↗
Showing 3 of 20 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT18
08/14/2019123693869Open ↗
04/10/2019140842462Open ↗
03/14/2019140837414Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/05/2026M00200937-I1Open ↗
09/05/2026M00200937-P1Open ↗
09/04/2026M00393525-I1Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature17
09/20/2026M00209404-I1Open ↗
09/08/2026M01420531-I1Open ↗
08/27/2026M00301226-I1Open ↗
Showing 3 of 17 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY9
04/10/2019140842462Open ↗
03/14/2019140837414Open ↗
10/24/2017140710078Open ↗
Showing 3 of 9 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION9
04/10/2019140842462Open ↗
03/14/2019140837414Open ↗
10/24/2017140710078Open ↗
Showing 3 of 9 on file for this type
▸BISProfessional and Owner Certification (POC3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment92
▸BISSELF-CERT PLUMBING NOTICE41
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 41 on file for this type
▸BISSCHEDULE B - PLUMBING39
04/10/2019140842462Open ↗
03/14/2019140837414Open ↗
10/24/2017140710078Open ↗
Showing 3 of 39 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE10
09/21/2016140542027Open ↗
Showing 1 of 10 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
04/14/2017123049815Open ↗
03/02/2017122453237Open ↗
▸Safety & Tenant Protection18
▸BISTENANT PROTECTION PLAN AND NOTES13
04/10/2019140842462Open ↗
03/14/2019140837414Open ↗
10/24/2017140710078Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWTenant Protection Plan5
08/14/2026M00393525-I1Open ↗
08/13/2026M00200937-P1Open ↗
08/13/2026M00200937-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos88
▸BISASBESTOS: CERTIFICATION (DEP ACP5)56
01/23/2020123795321Open ↗
01/08/2020123795321Open ↗
08/15/2019140837414Open ↗
Showing 3 of 56 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'18
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 18 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report12
09/02/2026M00783717-I1Open ↗
08/28/2026M00969024-I1Open ↗
08/28/2026M00969025-I1Open ↗
Showing 3 of 12 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Energy Compliance137
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS66
01/08/2020123795321Open ↗
11/14/2019123693869Open ↗
08/15/2019140837414Open ↗
Showing 3 of 66 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS38
11/14/2019123693869Open ↗
08/15/2019140837414Open ↗
07/31/2019140837414Open ↗
Showing 3 of 38 on file for this type
▸BISTECHNICAL REPORT: ENERGY11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS8
04/10/2019140842462Open ↗
03/14/2019140837414Open ↗
10/24/2017140710078Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
04/10/2019140842462Open ↗
03/14/2019140837414Open ↗
10/24/2017140710078Open ↗
Showing 3 of 8 on file for this type
▸BISTR8: Energy Code Progress Inspections5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY9
04/10/2019140842462Open ↗
03/14/2019140837414Open ↗
10/24/2017140710078Open ↗
Showing 3 of 9 on file for this type
▸Approvals, Objections & Sign-offs75
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST44
11/14/2019123693869Open ↗
08/15/2019140837414Open ↗
07/31/2019140837414Open ↗
Showing 3 of 44 on file for this type
▸BISADMINISTRATIVE OBJECTIONS29
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 29 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION2
01/22/2020123795321Open ↗
Showing 1 of 2 on file for this type
▸Cost, Insurance & Ownership150
▸BISCOST AFFIDAVIT92
01/08/2020123795321Open ↗
11/14/2019123693869Open ↗
08/15/2019140837414Open ↗
Showing 3 of 92 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT58
04/10/2019140842462Open ↗
03/14/2019140837414Open ↗
10/24/2017140710078Open ↗
Showing 3 of 58 on file for this type
▸Filing & Intake Forms75
▸BISEFILING COVER SHEET46
01/08/2020123795321Open ↗
08/14/2019123693869Open ↗
03/31/2017123049815Open ↗
Showing 3 of 46 on file for this type
▸BISADDITIONAL INFORMATION10
03/31/2017122453237Open ↗
10/31/2016140542027Open ↗
10/24/2016140542027Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET10
04/10/2019140842462Open ↗
03/14/2019140837414Open ↗
10/24/2017140710078Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM9
11/14/2019123693869Open ↗
08/15/2019140837414Open ↗
07/31/2019140837414Open ↗
Showing 3 of 9 on file for this type
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISECCCNYS ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type