← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
Greenpoint Mcguinness Condominium
253 MCGUINNESS BOULEVARD · BIN 3064770
💬 Discuss this project
1930Year Built
5Stories
RMBuilding Class
R6AZoning
8,950 sfGross Floor Area
11Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 193 GREENPOINT AVE LLC · 2,500 sf lot · 3.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof4p · 2 filings · 20 docs
Bulkhead3p · 1 filing · 20 docs
Floor 54p · 2 filings · 20 docs
Floor 44p · 2 filings · 20 docs
Floor 34p · 1 filing · 20 docs
Floor 22p · 2 filings · 20 docs
Floor 13p · 2 filings · 20 docs
Cellar6p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
BRUKLYN BUILDERS4307/08/2026
WATERFRONT PROPERTY MANAGEMENT303/21/2026
193 GREENPOINT LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES1603/21/2026
BMG GROUP USA503/21/2026
AE DESIGN SOLUTION1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JSB WORKS INCGeneral Contractor1607/08/2026
CENTRAL SCAFFOLD & HOISTGeneral Contractor707/08/2026
NY BUILDING ASSOCIATESGeneral Contractor203/22/2026
WATERFRONT PROPERTY MGMTGeneral Contractor107/08/2026
NARESH K MAHANGUElectrical103/21/2026
MPI PLUMBING CORPPlumbing107/08/2026
S&R ELECTRICAL & MECHANICElectrical103/22/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161307/27/2022
Building Lifecycle
All (28)Filed (18)Signed Off (10)
10/07/2022
Signed off — Alteration
MH APPLICATION FILED IN CONJUNCTION WITH ALT1 APPLICATION #321598464
B00500354-I1
10/06/2022
Signed off — Alteration
B00500262-I1
09/12/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00722721-I1
09/12/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00733844-I1
09/12/2022
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00736160-I1
09/09/2022
Signed off — Alteration
PL & SP plans filed in conjunction with Alt1 application #321598464
B00533576-I1
08/10/2022
Signed off — Alteration
MH APPLICATION FILED IN CONJUNCTION WITH ALT1 APPLICATION #321598464
B00500354-S4
08/08/2022
Signed off — Alteration
SOE application filed in conjunction with Alt1 #321598464
B00545725-I1
07/29/2022
Signed off — Alteration
B00562940-I1
07/29/2022
Signed off — Alteration
MH APPLICATION FILED IN CONJUNCTION WITH ALT1 APPLICATION #321598464
B00500354-S2
07/29/2022
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00736160-P1
07/27/2022
Filed — Alteration
PL & SP plans filed in conjunction with Alt1 application #321598464
B00533576-P2
06/23/2022
Filed — Alteration
MH APPLICATION FILED IN CONJUNCTION WITH ALT1 APPLICATION #321598464
B00500354-P4
06/22/2022
Filed — Alteration
MH APPLICATION FILED IN CONJUNCTION WITH ALT1 APPLICATION #321598464
B00500354-P5
05/31/2022
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00736160-I1
05/25/2022
Filed — Alteration
PL & SP plans filed in conjunction with Alt1 application #321598464
B00533576-P1
05/10/2022
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY
B00733844-I1
05/06/2022
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00722721-P1
05/04/2022
Filed — Alteration
MH APPLICATION FILED IN CONJUNCTION WITH ALT1 APPLICATION #321598464
B00500354-P2
04/20/2022
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00722721-I1
04/14/2022
Filed — Alteration
MH APPLICATION FILED IN CONJUNCTION WITH ALT1 APPLICATION #321598464
B00500354-P3
08/12/2021
Filed — Alteration
MH APPLICATION FILED IN CONJUNCTION WITH ALT1 APPLICATION #321598464
B00500354-S4
08/09/2021
Filed — Alteration
B00562940-I1
07/23/2021
Filed — Alteration
SOE application filed in conjunction with Alt1 #321598464
B00545725-I1
06/23/2021
Filed — Alteration
PL & SP plans filed in conjunction with Alt1 application #321598464
B00533576-I1
06/15/2021
Filed — Alteration
MH APPLICATION FILED IN CONJUNCTION WITH ALT1 APPLICATION #321598464
B00500354-S2
04/14/2021
Filed — Alteration
MH APPLICATION FILED IN CONJUNCTION WITH ALT1 APPLICATION #321598464
B00500354-I1
04/14/2021
Filed — Alteration
B00500262-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offJSB WORKS INC06/29/2022
DOB NOWSupported ScaffoldSigned-offCENTRAL SCAFFOLD & HOIST06/01/2022
DOB NOWProtection and Mechanical MethodsSigned-offCENTRAL SCAFFOLD & HOIST05/11/2022
DOB NOWFoundationSigned-offJSB WORKS INC04/26/2022
DOB NOWSidewalk ShedSigned-offCENTRAL SCAFFOLD & HOIST04/21/2022
DOB NOWStructuralSigned-offJSB WORKS INC04/13/2022
DOB NOWPlumbingSigned-offA M B MECHANICAL INC04/06/2022
DOB NOWPlumbingSigned-offYG SERVICES INC04/06/2022
DOB NOWEarth WorkSigned-offJSB WORKS INC03/10/2022
DOB NOWConstruction FenceSigned-offJSB WORKS INC03/03/2022
DOB NOWSupport of ExcavationSigned-offJSB WORKS INC03/03/2022
DOB NOWConstruction FenceSigned-offWATERFRONT PROPERTY MGMT11/26/2021
BIS—ISSUEDJSB WORKS INC06/28/2022
BIS—ISSUEDJSB WORKS INC03/23/2022
2 projects · most recent 07/05/2022
General Wiring
FiledStatusContractorScope
07/05/2022CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
04/22/2022CompleteV. VASS ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
10/05/2022Pass-Final Fence Non-Directive 14PassView ↗
08/19/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/02/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/01/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
07/01/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
07/01/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/01/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/15/2022Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 54
DateRequirementInspectorRole
07/29/2022FinalPaul Perdekprogress
07/29/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/29/2022Sprinkler SystemsFAHAD FATEHspecial
07/29/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
07/29/2022HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
07/29/2022HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
07/29/2022HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
07/29/2022Maintenance informationFAHAD FATEHenergy_progress
07/05/2022Maintenance informationFAHAD FATEHenergy_progress
07/05/2022HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
07/05/2022Energy Code Compliance InspectionsFAHAD FATEHprogress
07/05/2022Sprinkler SystemsFAHAD FATEHspecial
07/05/2022Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/05/2022HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
07/05/2022HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
06/30/2022Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
06/30/2022Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
06/30/2022Structural Cold-Formed SteelFAHAD FATEHspecial
06/30/2022Post-installed AnchorsFAHAD FATEHspecial
06/30/2022Structural Steel - DetailsFAHAD FATEHspecial
06/30/2022FinalFAHAD FATEHprogress
06/30/2022Concrete - Cast-In-PlaceFAHAD FATEHspecial
06/30/2022MasonryFAHAD FATEHspecial
06/30/2022FinalFAHAD FATEHprogress
06/30/2022Footing and FoundationFAHAD FATEHprogress
Latest 25 of 54.
▾Documents — 235 on file (BIS + DOB NOW)
▸Plans & Drawings18
▸DOB NOWPlans/Sketch18
09/01/2026B00500262-I1Request digital key ↗
09/01/2026B00500354-P3Request digital key ↗
09/01/2026B00500354-P5Request digital key ↗
Showing 3 of 18 on file for this type
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION23
09/15/2022321598464Open ↗
07/01/2022321598464Open ↗
06/30/2022321598464Open ↗
Showing 3 of 23 on file for this type
▸BISWORK PERMIT APPLICATION3
03/30/2022321598464Open ↗
03/30/2022321598464Open ↗
03/23/2022321598464Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
06/15/2022340802689Open ↗
02/18/2021340802689Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
05/18/2022322102906Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISZONING DIAGRAM2
07/12/2022321598464Open ↗
09/09/2021321598464Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
05/20/2022322102906Open ↗
09/09/2021321598464Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION2
05/20/2022322102906Open ↗
09/09/2021321598464Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
05/20/2022322102906Open ↗
▸BISVERIFY TAX LOT1
08/17/2022321598464Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
08/01/2022321598464Open ↗
▸Seals & Professional Certifications54
▸DOB NOWDPL-1: Design Professional Seal & Signature18
09/01/2026B00500354-P5Open ↗
09/01/2026B00500354-P4Open ↗
09/01/2026B00500354-P3Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature18
09/01/2026B00500354-S2Open ↗
09/01/2026B00500354-S2Open ↗
09/01/2026B00500354-P2Open ↗
Showing 3 of 18 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
09/23/2026B00733844-I1Open ↗
09/01/2026B00722721-I1Open ↗
09/01/2026B00736160-I1Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
03/25/2022321598464Open ↗
03/25/2022321598464Open ↗
03/25/2022321598464Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
02/18/2021340802689Open ↗
▸Trade Schedules & Equipment1
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
10/21/2022321598464Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST4
06/15/2022340802689Open ↗
09/09/2021321598464Open ↗
05/20/2021321598464Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE SIGNOFF2
09/01/2022340802689Open ↗
08/31/2022321598464Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
02/18/2021340802689Open ↗
▸BISBPP: STREET TREES SITE PLAN1
06/15/2022340802689Open ↗
▸BISSTREET TREES SITE PLAN1
09/07/2022340802689Open ↗
▸Environmental & Asbestos35
▸DOB NOWOER: Notice to Proceed12
09/01/2026B00545725-I1Open ↗
08/13/2026B00500354-P2Open ↗
08/13/2026B00500354-S2Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
09/01/2026B00545725-I1Open ↗
08/13/2026B00500354-S4Open ↗
08/13/2026B00562940-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
09/01/2026B00500354-I1Open ↗
09/01/2026B00533576-I1Open ↗
09/01/2026B00562940-I1Open ↗
Showing 3 of 5 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED3
06/15/2022340802689Open ↗
05/20/2022322102906Open ↗
09/09/2021321598464Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION3
11/30/2022321598464Open ↗
10/24/2022340802689Open ↗
10/24/2022340802689Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM3
03/14/2022321598464Open ↗
02/28/2022321598464Open ↗
02/22/2022321598464Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00545725-I1Open ↗
09/01/2026B00562940-I1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
03/23/2022321598464Open ↗
▸Energy Compliance16
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/23/2022321598464Open ↗
09/09/2021321598464Open ↗
05/20/2021321598464Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00500354-I1Open ↗
08/13/2026B00533576-I1Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
09/15/2022321598464Open ↗
▸BISFENESTRATION AREAS1
09/15/2022321598464Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
08/23/2022321598464Open ↗
▸BISLIGHTING IN DWELLING UNITS1
09/15/2022321598464Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/23/2022321598464Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
09/17/2022321598464Open ↗
▸BISLIGHTING CONTROLS1
09/15/2022321598464Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
03/30/2022321598464Open ↗
▸BISELECTRICAL ENERGY CONSUMPTION1
09/15/2022321598464Open ↗
▸BISEXTERIOR LIGHTING POWER1
09/15/2022321598464Open ↗
▸BISFENESTRATION AIR LEAKAGE1
09/15/2022321598464Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY4
12/02/2022321598464Open ↗
03/23/2022321598464Open ↗
09/09/2021321598464Open ↗
Showing 3 of 4 on file for this type
▸BISMASONRY1
08/23/2022321598464Open ↗
▸BISSOIL REPORT1
09/20/2021321598464Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
03/25/2022321598464Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
08/23/2022321598464Open ↗
▸Approvals, Objections & Sign-offs12
▸BISLETTERS - SUPPORTING DOCUMENTATION8
05/18/2022322102906Open ↗
05/18/2022322102906Open ↗
05/18/2022322102906Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
06/30/2022321598464Open ↗
06/10/2021321598464Open ↗
▸BISHOUSE CONNECTION SIGNOFF1
08/31/2022321598464Open ↗
▸BISCONSTRUCTION (OT) SIGNOFF1
06/15/2022340802689Open ↗
▸Cost, Insurance & Ownership7
▸BISPROJECT-SPECIFIC GL INSURANCE2
03/23/2022321598464Open ↗
03/23/2022321598464Open ↗
▸BISCOST AFFIDAVIT2
12/02/2022321598464Open ↗
09/20/2021321598464Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
03/23/2022321598464Open ↗
03/23/2022321598464Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
08/22/2022321598464Open ↗
▸Filing & Intake Forms9
▸BISADDITIONAL INFORMATION7
12/02/2022321598464Open ↗
09/16/2022321598464Open ↗
07/01/2022321598464Open ↗
Showing 3 of 7 on file for this type
▸BISEFILING COVER SHEET1
06/09/2022322102906Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
02/18/2021340802689Open ↗
▸Other Documents19
▸DOB NOWPlot Diagram5
09/01/2026B00545725-I1Open ↗
08/13/2026B00500354-P5Open ↗
08/13/2026B00500354-S4Open ↗
Showing 3 of 5 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
06/15/2022340802689Open ↗
02/18/2021340802689Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT2
05/20/2022322102906Open ↗
02/18/2021340802689Open ↗
▸DOB NOWAdjoining Owners Notification2
09/01/2026B00545725-I1Open ↗
08/13/2026B00500354-S4Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
03/25/2022321598464Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
06/15/2022340802689Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
08/23/2022321598464Open ↗
▸BISMAINTENANCE INFORMATION1
09/15/2022321598464Open ↗
▸BISVIOLATIONS SEARCH1
10/23/2022321598464Open ↗
▸BISON-SITE STORM WATER DRAIN. DISP. /DETENT INSTALL (DRYWELL)1
09/15/2022321598464Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
06/15/2022340802689Open ↗
▸BISPRELIMINARY1
08/23/2022321598464Open ↗