← Back
Two family frame
254-04 57TH AVENUE
QUEENS · Douglaston-Little Neck · BIN 4172868
💬 Discuss this project
2022Year Built
2.25Stories
B2Building Class
R3XZoning
4,801 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family frame · 7,010 sf lot · 0.68 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalPlumbingFire ProtectionGeneral
Attic6p · 1 filing · 20 docs
Floor 216p · 2 filings · 20 docs
Floor 116p · 2 filings · 20 docs
Cellar16p · 2 filings · 20 docs
Site & exterior9p · 2 filings · 14 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THOMAS C. TUNG, P.E.710/11/2023
A & T ENGINEERING, P.C.102/10/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CRJ BUILDER1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HUA HONG BUILDER CORPGeneral Contractor607/08/2026
VIP FIRE SPRINKLER INCFire Protection107/08/2026
AMC PLBG, HTG & CLNG, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC5613610/11/2023
DY SPECIAL INSPECTION LLC7210108/01/2022
Building Lifecycle
All (84)Filed (8)Permit Issued (6)Signed Off (2)Violation (1)Inspection (9)Objection (28)Special Inspection (30)
07/30/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/29/2024
Signed off — Alteration
FILE PLUMBING & SPRINKLER WORKS ASSOCIATED WITH NB #: Q00728569.
Q00765315-I1
02/26/2024
Signed off — Alteration
Q00678356-I1
02/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/11/2023
Filed — Alteration
FILE PLUMBING & SPRINKLER WORKS ASSOCIATED WITH NB #: Q00728569.
Q00765315-P3
10/11/2023
Permit issued — Foundation
Q00728569-I1-GC-CX
10/02/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/26/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/25/2023
Permit issued — Sprinklers
Q00765315-I1-EW-SP
08/23/2023
Filed — Alteration
FILE PLUMBING & SPRINKLER WORKS ASSOCIATED WITH NB #: Q00728569.
Q00765315-P2
08/23/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Fran Huang
08/23/2023
Special inspection requirement — Sprinkler Systems
Fran Huang
03/31/2023
Permit issued — Construction Fence
Q00678356-I1-FN
12/09/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/09/2022
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
12/09/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
12/09/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/09/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/30/2022
Permit issued — Sprinklers
Q00765315-I1-PL
11/23/2022
Special inspection requirement — Electric vehicle service equipment requirements
Fran Huang
11/23/2022
Special inspection requirement — Structural Steel - High Strength Bolting
Fran Huang
11/23/2022
Special inspection requirement — Masonry
Fran Huang
11/23/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Fran Huang
11/23/2022
Special inspection requirement — Mechanical Systems
Fran Huang
11/23/2022
Special inspection requirement — Structural Steel - Details
Fran Huang
11/23/2022
Special inspection requirement — Concrete - Cast-In-Place
Fran Huang
11/23/2022
Special inspection requirement — Subgrade Inspections
Fran Huang
11/23/2022
Special inspection requirement — Footing and Foundation
Fran Huang
11/23/2022
Special inspection requirement — Final
Fran Huang
11/23/2022
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
11/23/2022
Special inspection requirement — Permanent certificate
Fran Huang
11/23/2022
Special inspection requirement — Interior lighting power
Fran Huang
11/23/2022
Special inspection requirement — Ventilation and air distribution system
Fran Huang
11/23/2022
Special inspection requirement — Insulation placement and R values
Fran Huang
11/23/2022
Special inspection requirement — Air barrier - visual inspection
Fran Huang
11/23/2022
Special inspection requirement — Maintenance information
Fran Huang
11/23/2022
Special inspection requirement — Fenestration air leakage
Fran Huang
11/23/2022
Special inspection requirement — Fenestration areas
Fran Huang
11/23/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Fran Huang
11/23/2022
Special inspection requirement — Metering
Fran Huang
11/23/2022
Special inspection requirement — Protection of exposed foundation insulation
Fran Huang
11/23/2022
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
11/23/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Fran Huang
11/10/2022
Filed — New Building
PROPOSED NEW TWO STORY - 2 FAMILY HOUSE WITH CELLAR.
Q00728569-P2
11/04/2022
Filed — Alteration
FILE PLUMBING & SPRINKLER WORKS ASSOCIATED WITH NB #: Q00728569.
Q00765315-P1
11/04/2022
Special inspection requirement — Masonry
Fran Huang
11/04/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Fran Huang
11/04/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Fran Huang
11/04/2022
Special inspection requirement — Mechanical Systems
Fran Huang
08/16/2022
Objection resolved — Addressed
08/08/2022
Objection raised — Scope
08/01/2022
Filed — New Building
PROPOSED NEW TWO STORY - 2 FAMILY HOUSE WITH CELLAR.
Q00728569-P1
07/29/2022
Violation issued (FDNY_NOV, closed)
07/13/2022
Permit issued — Foundation
Q00728569-I1-GC-CX
07/06/2022
Objection raised — Admin
07/06/2022
Objection resolved — Addressed
06/29/2022
Filed — Alteration
FILE PLUMBING & SPRINKLER WORKS ASSOCIATED WITH NB #: Q00728569.
Q00765315-I1
06/17/2022
Objection raised — Admin
06/17/2022
Objection resolved — Addressed
06/17/2022
Objection raised — Structural
Latest 60 of 84 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedHUA HONG BUILDER CORP10/11/2023
DOB NOWSprinklersSigned-offVIP FIRE SPRINKLER INC09/25/2023
DOB NOWConstruction FenceSigned-offHUA HONG BUILDER CORP03/31/2023
DOB NOWSprinklersSigned-offAMC PLBG, HTG & CLNG, INC11/30/2022
DOB NOWFoundationPermit IssuedHUA HONG BUILDER CORP07/13/2022
DOB NOWConstruction FenceSigned-offHUA HONG BUILDER CORP04/29/2022
BISOTISSUEDAMERGY SOLAR INC05/08/2023
BIS—ISSUEDHUA HONG BUILDER CORP05/03/2022
1 project · most recent 11/10/2022
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
11/10/2022Permit IssuedHUA HONG BUILDER CORPAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Mitsubishi Electric MITSUBISHI ELECTRIC MODEL: MXZ-4C36NA3 36,000 BTU · Split System ×3
MSZ-HM 36,000 BTU · Split System ×6
Heating
Weil-Mclain WEIL-MCLAIN MODEL: ULTRA 155 127,000 BTU · Boiler ×2
CGA-5 127,000 BTU · Boiler ×4
Ventilation
Broan ERV100 100 CFM · Erv ×6
2 projects · most recent 02/16/2024
General Wiring
FiledStatusContractorScope
02/16/2024CompleteKJK ELECTRIC INCGeneral Wiring
05/25/2023CompleteI.P. ELECTRIC INC—
1 project · most recent 11/10/2022
Wood
FiledStatusContractorScope
11/10/2022Permit IssuedHUA HONG BUILDER CORPWood
1 project · most recent 11/10/2022
Earthwork
FiledStatusContractorScope
11/10/2022Permit IssuedHUA HONG BUILDER CORPEarthwork
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
07/30/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/02/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/26/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/09/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/09/2022Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
12/09/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/09/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/09/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
08/23/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationFran Huangspecial
08/23/2023Sprinkler SystemsFran Huangspecial
11/23/2022Electric vehicle service equipment requirementsFran Huangenergy_progress
11/23/2022Structural Steel - High Strength BoltingFran Huangspecial
11/23/2022MasonryFran Huangspecial
11/23/2022Excavations - Sheeting, Shoring, and BracingFran Huangspecial
11/23/2022Mechanical SystemsFran Huangspecial
11/23/2022Structural Steel - DetailsFran Huangspecial
11/23/2022Concrete - Cast-In-PlaceFran Huangspecial
11/23/2022Subgrade InspectionsFran Huangspecial
11/23/2022Footing and FoundationFran Huangprogress
11/23/2022FinalFran Huangprogress
11/23/2022HVAC-R and service water heating equipmentFran Huangenergy_progress
11/23/2022Permanent certificateFran Huangenergy_progress
11/23/2022Interior lighting powerFran Huangenergy_progress
11/23/2022Ventilation and air distribution systemFran Huangenergy_progress
11/23/2022Insulation placement and R valuesFran Huangenergy_progress
11/23/2022Air barrier - visual inspectionFran Huangenergy_progress
11/23/2022Maintenance informationFran Huangenergy_progress
11/23/2022Fenestration air leakageFran Huangenergy_progress
11/23/2022Fenestration areasFran Huangenergy_progress
11/23/2022HVAC-R and service water piping design and insulationFran Huangenergy_progress
11/23/2022MeteringFran Huangenergy_progress
11/23/2022Protection of exposed foundation insulationFran Huangenergy_progress
11/23/2022HVAC-R and service water heating system controlsFran Huangenergy_progress
Latest 25 of 52.
▾Documents — 114 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/26/2026Q00678356-I1Request digital key ↗
08/25/2026Q00765315-P1Request digital key ↗
08/25/2026Q00765315-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION3
05/05/2023440782422Open ↗
06/02/2022440728376Open ↗
04/14/2022421804989Open ↗
▸BISWORK PERMIT APPLICATION2
05/08/2023440782422Open ↗
07/19/2022421804989Open ↗
▸BISBPP-DOT: SIDEWALK/CURB/ROAD WORK PERMITS1
02/29/2024440728376Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
06/02/2022440728376Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q00728569-P2Open ↗
08/13/2026Q00728569-I1Open ↗
08/13/2026Q00728569-P1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
06/02/2022440728376Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
07/20/2022440728376Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026Q00728569-I1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/26/2026Q00678356-I1Open ↗
08/25/2026Q00765315-P1Open ↗
08/25/2026Q00765315-P2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q00765315-P1Open ↗
09/01/2026Q00765315-P1Open ↗
08/31/2026Q00765315-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/30/2026Q00728569-P2Open ↗
08/30/2026Q00728569-P2Open ↗
08/26/2026Q00728569-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
05/05/2023440782422Open ↗
06/02/2022440728376Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
05/05/2023440782422Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
05/05/2023440782422Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
06/02/2022440728376Open ↗
▸Trade Schedules & Equipment5
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026Q00728569-I1Open ↗
08/13/2026Q00728569-P2Open ↗
08/13/2026Q00728569-P1Open ↗
▸BISGAS CUT-OFF1
07/19/2022421804989Open ↗
▸BISSEWER CUT-OFF1
07/19/2022421804989Open ↗
▸Safety & Tenant Protection13
▸DOB NOWStreet Tree Checklist3
08/13/2026Q00728569-P2Open ↗
08/13/2026Q00728569-I1Open ↗
08/13/2026Q00728569-P1Open ↗
▸BISSTREET TREES SITE PLAN1
01/22/2024440728376Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
07/19/2022421804989Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
07/19/2022421804989Open ↗
▸BISSTREET TREE CHECKLIST1
07/20/2022440728376Open ↗
▸BISSTREET TREE SIGNOFF1
01/22/2024440728376Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
07/19/2022421804989Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
05/08/2023440782422Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q00728569-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026Q00728569-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026Q00728569-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
07/19/2022421804989Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
07/27/2023440782422Open ↗
05/05/2023440782422Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
05/05/2023440782422Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
07/27/2023440782422Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
07/27/2023440782422Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/05/2023440782422Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026Q00728569-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
07/27/2023440782422Open ↗
05/05/2023440782422Open ↗
06/02/2022440728376Open ↗
▸BISBPP: FIELD INSPECTION1
02/28/2024440728376Open ↗
▸Approvals, Objections & Sign-offs9
▸BISLETTERS - SUPPORTING DOCUMENTATION5
07/28/2023440782422Open ↗
07/19/2022421804989Open ↗
07/19/2022421804989Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/28/2023440782422Open ↗
▸BISNEW CC APPROVAL1
07/20/2022440728376Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
07/19/2022421804989Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
02/29/2024440728376Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT-SPECIFIC GL INSURANCE1
07/19/2022421804989Open ↗
▸BISCOST AFFIDAVIT1
05/05/2023440782422Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
07/27/2023440782422Open ↗
▸BISDEPT OF FINANCE VERIFICATION1
07/19/2022421804989Open ↗
▸BISBPP: ENGINEERS AFFIDAVIT1
02/28/2024440728376Open ↗
▸Filing & Intake Forms5
▸BISBOROUGH INTAKE FORM2
07/19/2022421804989Open ↗
04/14/2022421804989Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
05/05/2023440782422Open ↗
06/02/2022440728376Open ↗
▸BISEFILING COVER SHEET1
04/14/2022421804989Open ↗
▸Other Documents21
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q00728569-P2Open ↗
08/13/2026Q00728569-I1Open ↗
08/13/2026Q00728569-P1Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026Q00728569-I1Open ↗
08/13/2026Q00728569-P1Open ↗
08/13/2026Q00728569-P2Open ↗
▸DOB NOWProperty Ownership Certification3
08/25/2026Q00728569-P2Open ↗
08/15/2026Q00728569-P1Open ↗
08/15/2026Q00728569-I1Open ↗
▸BISOPPOSITE CORNER PED-RAMP IMPROVEMENT DOT COMPLIANCE1
02/28/2024440728376Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
07/20/2022440728376Open ↗
▸BISBPP-PARKS: PLANT NEW TREE1
02/28/2024440728376Open ↗
▸BISBPP: FINAL AS-BUILT PHOTOGRAPHS1
02/28/2024440728376Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
07/20/2022440728376Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
06/02/2022440728376Open ↗
▸BISBPP: AS-BUILT SIDEWALK SURVEY1
02/28/2024440728376Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
02/28/2024440728376Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
06/02/2022440728376Open ↗
▸BISCURB CUT: PROVIDE EXISTING NUMBER1
07/20/2022440728376Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q00728569-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00728569-I1Open ↗