| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| B00522759 ↗ | 912 EAST 15 STREET BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 05/18/2021 | 06/09/2026 | Design THOMAS C. TUNG, P.E. Contractor SMBT LLC | 1.CONVERT FROM (1) FAMILY TO (2) FAMILY DWELLING WITH VERTICAL & HORIZONTAL ENLARGEMENT.2.OBTAIN A NEW CERTIFICATE OF OCCUPANCY. |
| X00490244 ↗ | 2400 BRONX PARK EAST BRONX | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 03/24/2021 | 02/23/2026 | Design ARC CONSULTING ENGINEERS Owner BROOKLYN GRID Contractor LLNY GROUP,LLC | SUBSEQUENT FILING STRUCTURAL PLANS IN CONJUNCTION WITH ALT-CO JOB # X00490244-L1 |
| X00561039 ↗ | 2265 DAVIDSON AVENUE BRONX | Alteration | Permit Issued | 07/27/2021 | 08/14/2025 | Design ANURAG UPADHYAY P.E. Owner CRAB KING FOOD INC. Contractor DOVAL PLBG & HTG CORP Filer WM ARCH CORP | EXISTING RESTAURANT INTERIOR RENOVATION ON PLUMBING OF FIRST FLOOR ONLY ON THIS APPLICATION. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY. |
| M00655162 ↗ | 1461 1 AVENUE MANHATTAN | Alteration | Permit Issued | 01/02/2022 | 02/26/2025 | Design THOMAS C. TUNG, P.E. Contractor T & T PLUMBING INC Filer ANKAR DESIGN | Minor interior plumbing work to existing apartment #9B. No change to use, egress or occupancy. |
| B00573840 ↗ | 417 TOMPKINS AVENUE BROOKLYN | Alteration | Permit Issued | 08/13/2021 | 02/18/2025 | Design CQ&J CORPORATION Contractor H & K RENOVATION INC Filer BROOKLYNROOTDESIGN | SUBSEQUENT FILING OF GC APPLICATION JOB#B00573840-I1: INSTALL 10' HEIGHT TEMPORARY CONSTRUCTION FENCE. |
| Q00485635 ↗ | 162-19 78 AVENUE QUEENS | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 03/22/2021 | 07/16/2024 | Design THOMAS C. TUNG, P.E. Contractor CTI CONSTRUCTION INC Filer WM ARCH CORP | PROPOSED STRUCTURE DRAWING FILED RELATED TO ALT1-CO FILING JOB#Q00485635. |
| Name | Jobs together | Most recent |
|---|---|---|
| THOMAS C. TUNG, P.E. | 30 | 08/25/2025 |
| ANURAG UPADHYAY P.E. | 15 | 12/12/2022 |
| CQ&J CORPORATION | 8 | 06/10/2025 |
| TWIG CONSULTING ENGINEERS PC | 6 | 06/10/2025 |
| HARDIE & ASSOCIATES CONSULTING ENG. | 3 | 12/17/2021 |
| NEW PRACTICE STUDIO LLC | 3 | 02/04/2022 |
| GMH ARCHITECTURE PLLC | 2 | 04/15/2024 |
| MARIANNE MADIGAN | 2 | 01/24/2023 |
| OLA CONSULTING ENGINEERS, PC | 2 | 03/12/2020 |
| PATRICK E ALLEN ARCHITECT PC | 2 | 09/27/2022 |
| 1+1 DESIGN STUDIO LLC | 1 | 04/12/2023 |
| ALBERTO ROMAN | 1 | 09/02/2022 |
| ARC CONSULTING ENGINEERS | 1 | 05/16/2026 |
| BAYSIDE ENGINEERING PC | 1 | 05/16/2026 |
| BEYER BLINDER BELLE | 1 | 05/04/2022 |
| CG CONSULTING ENGINEERING PLLC | 1 | 05/11/2021 |
| CL ENGINEERING P.C. | 1 | 01/13/2022 |
| DEMO ARCHITECTURE, PLLC | 1 | 01/26/2022 |
| GERALD CALIENDO ARCHITECTS | 1 | 12/28/2021 |
| HITE STUDIO ARCHITECTURE PC | 1 | 03/03/2022 |
| INDUS ENGINEERING PC | 1 | 03/25/2023 |
| JUST CONSULTING ENGINEERING | 1 | 04/15/2022 |
| KIEFER & SCHUSTER ENGINEERING PLLC | 1 | 02/21/2023 |
| L & C ASSOCIATES | 1 | 08/22/2022 |
| NY BUILDING ASSOCIATES INC | 1 | 09/02/2022 |
| Name | Jobs together | Most recent |
|---|---|---|
| TRISTAR DEVELOPING INC | 9 | 12/12/2022 |
| TRI CITY MECHANICAL GROUP | 6 | 04/15/2024 |
| SUPER POWER CONSTRUCTION | 5 | 02/21/2023 |
| DW PLUMBING INC | 4 | 02/02/2022 |
| HUA HONG BUILDER CORP | 4 | 02/28/2023 |
| LION JOINT VENTURES LLC | 4 | 04/18/2023 |
| PIPESTYLISTS, INC | 4 | 04/15/2024 |
| AMC PLBG, HTG & CLNG, INC | 3 | 05/03/2023 |
| GLOBAL TEAM NY INC | 3 | 04/12/2023 |
| H & K RENOVATION INC | 3 | 06/10/2025 |
| ACTION 1 MAINT CONT INC | 2 | 03/25/2023 |
| CATMAN PLUMBING INC | 2 | 09/26/2022 |
| CTI CONSTRUCTION INC | 2 | 08/25/2025 |
| AAA TOTAL PLUMBING, INC | 1 | 02/01/2022 |
| ALKHATIB CONSTRUCTION COM | 1 | 09/27/2022 |
| AMERICAN STANDARD P&H COR | 1 | 09/02/2022 |
| ARIANA CONTRACTING INC | 1 | 02/14/2022 |
| ARK DESIGN & BUILD LLC | 1 | 02/01/2022 |
| BENCHMARK DESIGN BUILDERS | 1 | 06/16/2022 |
| BOND CONSTRUCTION INC | 1 | 06/19/2021 |
| BUILD TECH CONSTRUCTION C | 1 | 10/18/2022 |
| CDC HOUSING INC | 1 | 12/17/2021 |
| CENTA PLUMBING & HEATING | 1 | 12/28/2021 |
| CENTRAL DEVELOPMENT CORP | 1 | 02/23/2021 |
| CK COOLING & HEATING INC | 1 | 06/08/2022 |
| Name | Jobs together | Most recent |
|---|---|---|
| BROOKLYN GRID | 3 | 05/16/2026 |
| CHUN KIEN REALTY CORP | 2 | 04/15/2024 |
| CLINY | 2 | 02/21/2023 |
| NYDC GROUP LLC | 2 | 03/13/2023 |
| 622 REALTY LLC | 1 | 05/20/2024 |
| ANTIDOTE | 1 | 03/08/2022 |
| BERIK MANAGEMENT | 1 | 11/24/2021 |
| BRICKSTONE GROUP | 1 | 01/26/2023 |
| CENTENNIAL PROPERTIES NY INC. | 1 | 12/18/2019 |
| CRAB KING FOOD INC. | 1 | 07/27/2021 |
| FILLUP COFFEE | 1 | 11/08/2021 |
| LE LUXE BEAUTIQUE LLC | 1 | 12/28/2021 |
| NORTH SIX, INC. | 1 | 03/03/2022 |
| SUNRISE ASSETS HOLDINGS, CO. LTD | 1 | 06/08/2022 |
| THINK WILDER ARCHITECTURE | 1 | 02/23/2021 |
| TRISTAR DEVELOPING INC | 1 | 11/03/2022 |
| Name | Jobs together | Most recent |
|---|---|---|
| WM ARCH CORP | 18 | 05/16/2026 |
| BROOKLYNROOTDESIGN | 9 | 06/10/2025 |
| CRJ BUILDER CORP | 5 | 03/13/2023 |
| SUN | 3 | 03/08/2022 |
| CCA CONSTRUCTION CONSULTING ASSOCIA | 2 | 02/21/2023 |
| ANKAR DESIGN | 1 | 01/02/2022 |
| CNY ENGINEERING PC | 1 | 05/16/2026 |
| DY EXPEDITING INC. | 1 | 02/23/2021 |
| G.PLAN DESIGN & CONSULTING INC. | 1 | 04/12/2023 |
| GERALD J. CALIENDO R.A., P.C. | 1 | 12/28/2021 |
| HIGH QUALITY 338 INC | 1 | 09/02/2022 |
| NEXT STEP BUILDING SOLUTIONS, INC | 1 | 05/16/2026 |
| Job | Address | Type | Status | Filed | Latest permit | On the job | Description |
|---|---|---|---|---|---|---|---|
| B00522759 ↗ | 912 EAST 15 STREET BROOKLYN | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 05/18/2021 | 06/09/2026 | Design THOMAS C. TUNG, P.E. Contractor SMBT LLC | 1.CONVERT FROM (1) FAMILY TO (2) FAMILY DWELLING WITH VERTICAL & HORIZONTAL ENLARGEMENT.2.OBTAIN A NEW CERTIFICATE OF OCCUPANCY. |
| X00490244 ↗ | 2400 BRONX PARK EAST BRONX | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 03/24/2021 | 02/23/2026 | Design ARC CONSULTING ENGINEERS Owner BROOKLYN GRID Contractor LLNY GROUP,LLC | SUBSEQUENT FILING STRUCTURAL PLANS IN CONJUNCTION WITH ALT-CO JOB # X00490244-L1 |
| X00561039 ↗ | 2265 DAVIDSON AVENUE BRONX | Alteration | Permit Issued | 07/27/2021 | 08/14/2025 | Design ANURAG UPADHYAY P.E. Owner CRAB KING FOOD INC. Contractor DOVAL PLBG & HTG CORP Filer WM ARCH CORP | EXISTING RESTAURANT INTERIOR RENOVATION ON PLUMBING OF FIRST FLOOR ONLY ON THIS APPLICATION. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY. |
| M00655162 ↗ | 1461 1 AVENUE MANHATTAN | Alteration | Permit Issued | 01/02/2022 | 02/26/2025 | Design THOMAS C. TUNG, P.E. Contractor T & T PLUMBING INC Filer ANKAR DESIGN | Minor interior plumbing work to existing apartment #9B. No change to use, egress or occupancy. |
| B00573840 ↗ | 417 TOMPKINS AVENUE BROOKLYN | Alteration | Permit Issued | 08/13/2021 | 02/18/2025 | Design CQ&J CORPORATION Contractor H & K RENOVATION INC Filer BROOKLYNROOTDESIGN | SUBSEQUENT FILING OF GC APPLICATION JOB#B00573840-I1: INSTALL 10' HEIGHT TEMPORARY CONSTRUCTION FENCE. |
| Q00485635 ↗ | 162-19 78 AVENUE QUEENS | ALT-CO - New Building with Existing Elements to Remain | Permit Issued | 03/22/2021 | 07/16/2024 | Design THOMAS C. TUNG, P.E. Contractor CTI CONSTRUCTION INC Filer WM ARCH CORP | PROPOSED STRUCTURE DRAWING FILED RELATED TO ALT1-CO FILING JOB#Q00485635. |
| X00577213 ↗ | 3614 EAST TREMONT AVENUE BRONX | Alteration CO | Permit Issued | 08/22/2021 | 06/18/2024 | Design PATRICK E ALLEN ARCHITECT PC Contractor ALKHATIB CONSTRUCTION COM | FILING TO UPDATE EXIST. CERTIFICATE OF OCCUPANCY FOR THE CONVERSION OF BASEMENT TO A DAYCARE CENTER AND THE RENOVATION OF EXIST. STORES AND… |
| Q00728569 ↗ | 254-04 57TH AVENUE QUEENS | New Building | Permit Issued | 05/12/2022 | 10/11/2023 | Design THOMAS C. TUNG, P.E. Contractor HUA HONG BUILDER CORP Filer CRJ BUILDER CORP | PROPOSED NEW TWO STORY - 2 FAMILY HOUSE WITH CELLAR. |
| M00489662 ↗ | 104 BOWERY MANHATTAN | Alteration | Signed-off | 05/24/2021 | 08/10/2023 | Design GMH ARCHITECTURE PLLC Owner CHUN KIEN REALTY CORP Contractor FLAVIO MECHANICAL CORP | Plumbing work filed in conjunction with the Alteration I renovation application |
| M00489643 ↗ | 104 BOWERY MANHATTAN | Alteration CO | Permit Issued | 04/07/2021 | 07/19/2023 | Design GMH ARCHITECTURE PLLC Owner CHUN KIEN REALTY CORP Contractor TRISTAR DEVELOPING INC | Interior renovation for new salon store in cellar and 1st floor. Amend the Cof O to add commercial store use for cellar and first floor as p… |
| M00603809 ↗ | 511 WEST 143 STREET MANHATTAN | Alteration | Permit Issued | 11/17/2021 | 07/13/2023 | Design ANURAG UPADHYAY P.E. Owner BERIK MANAGEMENT Contractor G D BUILDERS & DESIGN INC Filer WM ARCH CORP | EXISTING APARTMENT #23 INTERIOR RENOVATION WITH PARTITION WORK ONLY UNDER THIS APPLICATION. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY I… |
| Q00690709 ↗ | 32-40 43 STREET QUEENS | Alteration | Permit Issued | 03/09/2022 | 04/24/2023 | Design CQ&J CORPORATION Contractor H & K RENOVATION INC Filer BROOKLYNROOTDESIGN | Interior renovation, direct replacement of existing faucets and other plumbing fixtures as per plan. There is no change of egress, use and … |
| Q00534698 ↗ | 37 AVENUE QUEENS | New Building | Permit Issued | 06/26/2021 | 03/17/2023 | Design THOMAS C. TUNG, P.E. Owner NYDC GROUP LLC Contractor HUA HONG BUILDER CORP Filer CRJ BUILDER CORP | NEW THREE-STORY, THREE FAMILIES HOUSE WITH A CELLAR. |
| M00724954 ↗ | 75 EAST 95 STREET MANHATTAN | Alteration | Signed-off | 05/04/2022 | 02/24/2023 | Owner CLINY Contractor SUPER POWER CONSTRUCTION | STRUCTURAL FRAMING FOR ELEVATOR SHAFT AND CONVENIENCE STAIR BETWEEN CELLAR AND 1ST FLOOR RETAIL SPACE. NO CHANGE IN USE, EGRESS OR OCCUPANCY… |
| B00695723 ↗ | 360 QUINCY STREET BROOKLYN | Alteration | Signed-off | 04/04/2022 | 02/14/2023 | Design THOMAS C. TUNG, P.E. Owner BRICKSTONE GROUP Contractor STELLAR INDUSTRIES INC Filer WM ARCH CORP | EXSITING ONE FAMILY BRICK HOUSE WITH PLUMBING WORK AT CELLAR, 1 ST &2ND FLOOR. JOB FILED TO RELATED TO ALTI APPLICATION # B00695723-I1. NO C… |
| Q00636466 ↗ | 162-19 78 AVENUE QUEENS | New Building | Permit Issued | 01/05/2022 | 02/11/2023 | Design THOMAS C. TUNG, P.E. Contractor CTI CONSTRUCTION INC Filer WM ARCH CORP | NEW CMU CONCRETE BLOCK GARAGE AS PER PLAN, OBTAIN NEW CERTIFICATE OF OCCUPANCY. |
| Q00655608 ↗ | 37 AVENUE QUEENS | Alteration | Signed-off | 01/01/2022 | 12/27/2022 | Design THOMAS C. TUNG, P.E. Owner NYDC GROUP LLC Contractor AMC PLBG, HTG & CLNG, INC Filer CRJ BUILDER CORP | FILE PLUMBING & SPRINKLER WORKS ASSOCIATED WITH NB #:Q00534698. |
| Q00537889 ↗ | 72-02 AUSTIN STREET QUEENS | Alteration CO | Permit Issued | 06/27/2021 | 09/08/2022 | Design NY BUILDING ASSOCIATES INC Contractor AMERICAN STANDARD P&H CORORP. Filer WM ARCH CORP | PROPOSED TO CONVERT 2ND FL FROM COMMERCIAL SPACE TO 1 RESIDENTIAL UNIT. 1ST FL COMMERCIAL SPACE REMAINED . REMOVE BL #84558 AND REPLACE WITH… |
| X00600697 ↗ | 3614 EAST TREMONT AVENUE BRONX | Alteration | Signed-off | 02/14/2022 | 08/22/2022 | Design PATRICK E ALLEN ARCHITECT PC Contractor ARIANA CONTRACTING INC | FILING TO RELOCATE EXIST. PLUMBING FIXTURES AND INSTALL NEW PLUMBING FIXTURESIN CONJUNCTION WITH ALT-CO DOBNOW JOB #X00577213-I1 |
| B00492564 ↗ | 257 19 STREET BROOKLYN | Alteration | Signed-off | 04/02/2021 | 08/08/2022 | Design ANURAG UPADHYAY P.E. Contractor TRISTAR DEVELOPING INC Filer WM ARCH CORP | Existing two-family renovation with partition & mechanical work at basement, 1st & 2nd floor and open space as per plan under this applicati… |
| X00486634 ↗ | 1348 COLLEGE AVENUE BRONX | Alteration | Permit Issued | 03/17/2021 | 08/03/2022 | Owner BROOKLYN GRID Contractor BUILD TECH CONSTRUCTION C | THIS APPLICATION IS FILED TO REPLACED FIRE DAMAGED JOISTS AT ROOF AND ADDRESSED VIOLATIONS # 030117CNEDR01, V061820EGNCY14519 |
| B00708024 ↗ | 30 HENRY STREET BROOKLYN | Alteration | Signed-off | 04/27/2022 | 08/02/2022 | Design MARIANNE MADIGAN Contractor PH CUSTOM HOME IMPROVEMEN | APPLICATION TO ADD A NEW BAR SINK FOR ENTERTAINMENT. WORK WILL INCLUDE ADDING A NEW DW, CAPPING AND REMOVING FIXTURES FROM AN EXISTING BATHR… |
| B00708036 ↗ | 30 HENRY STREET BROOKLYN | Alteration | Signed-off | 04/27/2022 | 07/26/2022 | Design MARIANNE MADIGAN Contractor SIMPLE CHOICE PLBG AND HT | APPLICATION TO ADD A NEW BAR SINK FOR ENTERAINMENT. WORK WILL INCLUDE ADDING A DISHWASHER, BAR SINK, FUNNEL F.D. AND CAPPING AND REMOVING FI… |
| Q00478037 ↗ | 264-35 60 ROAD QUEENS | Alteration CO | Permit Issued | 03/29/2021 | 06/22/2022 | Design THOMAS C. TUNG, P.E. Contractor HUA HONG BUILDER CORP Filer CRJ BUILDER CORP | PROPOSED VERTICAL ENLARGEMENT OF EXIST'G SINGLE FAMILY HOUSE AND OBTAIN NEW C OF O. |
| M00724890 ↗ | 75 EAST 95 STREET MANHATTAN | Alteration | Signed-off | 05/04/2022 | 06/14/2022 | Design BEYER BLINDER BELLE Owner CLINY Contractor SUPER POWER CONSTRUCTION | APPLICATION FOR NEW HYDRAULIC ELEVATOR SHAFT AND CONVENIENCE STAIR BETWEEN CELLAR AND 1ST FLOOR RETAIL STORE. NO CHANGE IN USE, EGRESS OR OC… |
| Q00684144 ↗ | 47-20 30 STREET QUEENS | Alteration | Signed-off | 06/08/2022 | 06/10/2022 | Design ANURAG UPADHYAY P.E. Contractor CK COOLING HEATING Filer WM ARCH CORP | TO OBTAIN CERTIFICATE OF COMPLIANCE FOR 4 MECHANICAL UNITS ON THE ROOF, RELATED TO PREVIOUS JOB #440546198, Q00565300 AND Q00683757. NO CHAN… |
| Q00479164 ↗ | 140-13 34 AVENUE QUEENS | Alteration CO | Permit Issued | 04/20/2021 | 05/20/2022 | Design 1+1 DESIGN STUDIO LLC Contractor GLOBAL TEAM NY INC | ALTERATION USE FOR FIRST FLOOR, CONVERT GARAGE AND RECREATION ROOM TO HEALTH CARE FACILITY. |
| X00448801 ↗ | 1239 EVERGREEN AVENUE BRONX | Alteration | Permit Issued | 01/22/2021 | 05/09/2022 | Design L & C ASSOCIATES Contractor PM MECHANICAL GROUP CORP Filer WM ARCH CORP | FILING OF DEMO SEQUENCE WORK |
| Q00677583 ↗ | 56-06 CLEARVIEW EXPRESSWAY QUEENS | Alteration CO | Filed — no permit on record | 03/25/2022 | — | Design THOMAS C. TUNG, P.E. Filer BROOKLYNROOTDESIGN | — |
| X00691787 ↗ | 2700 BAINBRIDGE AVENUE BRONX | Alteration | Filed — no permit on record | 03/23/2022 | — | Design THOMAS C. TUNG, P.E. Owner BROOKLYN GRID Filer WM ARCH CORP | — |
| B00618499 ↗ | 84 DOVER STREET BROOKLYN | Alteration | Permit Issued | 10/26/2021 | 03/18/2022 | Design THOMAS C. TUNG, P.E. Contractor HUA HONG BUILDER CORP | APPLICATION FILED FOR INTERIOR RENOVATION, NEW MINI SPLIT AC AND WINDOWS AND DOORS REPLACEMENT WORKS OF AN EXISTING SINGLE FAMILY BUILDING O… |
| B00648849 ↗ | 2035 81 STREET BROOKLYN | Alteration | Signed-off | 12/27/2021 | 02/18/2022 | Design CQ&J CORPORATION Contractor LION JOINT VENTURES Filer BROOKLYNROOTDESIGN | Demolish interior non-bearing partition wall, Interior renovation and plumbing work as per plan, there is no change of egress, use and occup… |
| B00328947 ↗ | 270 HENRY STREET BROOKLYN | Alteration | Permit Issued | 03/12/2020 | 02/02/2022 | Design OLA CONSULTING ENGINEERS, PC Contractor PHIL'S AIR CONDITIONING & | INSTALL NEW HVAC SYSTEM AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. OT APPLICATION IS UNDER JOB#340717415. |
| B00555075 ↗ | 66 SOUTH 2 STREET BROOKLYN | Alteration | Signed-off | 07/23/2021 | 01/28/2022 | Design THOMAS C. TUNG, P.E. Owner ANTIDOTE Contractor SUPER POWER CONSTRUCTION Filer SUN | INSTALL NEW NON-LOAD BEARING PATITION ON THE 1ST FLOOR;PLUMBING WORK FILED SEPARATELY IN DOB NOW#B00555085. NO CHANGE IN USE,EGRESS AND OCCU… |
| B00555085 ↗ | 66 SOUTH 2 STREET BROOKLYN | Alteration | Signed-off | 07/23/2021 | 01/28/2022 | Design THOMAS C. TUNG, P.E. Contractor DW PLUMBING INC | RELOCATE PLUMBING FIXTURES ON THE 1ST FLOOR;INTERIOR RENOVATION WORK FILED SEPARATELY IN DOB NOW. NO CHANGE IN USE,EGRESS AND OCCUPANCY. |
| B00652534 ↗ | 863 STERLING PLACE BROOKLYN | Alteration | Signed-off | 01/13/2022 | 01/28/2022 | Design CL ENGINEERING P.C. Contractor TRISTAR DEVELOPING INC | EXISTING 3 STORY MIX USED BUILDING WITH INTERIOR RENOVATION WITH PARTITION WORK ON THE THIRD FLOOR AND REBUILT HATCH DOOR ACCESS TO THE ROOF… |
| B00328921 ↗ | 270 HENRY STREET BROOKLYN | Alteration | Permit Issued | 03/11/2020 | 01/25/2022 | Design OLA CONSULTING ENGINEERS, PC Contractor HENRY MYERS P & H, INC | MINOR PLUMBING WORK AND REPLACED EXISTING SPRINKLER HEADS(</=30 HEADS) AS PER PLANS SUBMITTED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANC… |
| Q00653855 ↗ | 25-73 STEINWAY STREET QUEENS | Alteration | Signed-off | 12/28/2021 | 01/11/2022 | Design GERALD CALIENDO ARCHITECTS Owner LE LUXE BEAUTIQUE LLC Contractor MJ GENERAL MECHANICAL LLC | FILED HEREWITH PLANS AND APPLICATION TO INSTALL TWO (2) NON-RESIDENTIAL SINKS AT GROUND FLOOR OF EXIST. THREE (3) STORY MIXED USE BUILDING A… |
| B00645727 ↗ | 74 2 PLACE BROOKLYN | Alteration | Permit Issued | 12/17/2021 | 01/04/2022 | Contractor CDC HOUSING INC | PROPOSED INTERIOR RENOVATION ON 4TH FLOOR APT # 4A. NO CHANGE IN USE, EGRESS AND OCCUPANCY. |
| B00288489 ↗ | 830 HERKIMER STREET BROOKLYN | Alteration | Signed-off | 12/31/2019 | 12/20/2021 | Design SUCCESS BEST DESIGN, INC Contractor QMB PLUMBING & HTG INC | PROPOSED AUTOMATIC FULLY SPRINKLER IN CONJUNCTION WITH ALTERATION TYPE 1 JOB NUMBER 321421500. |
| M00419334 ↗ | 357 GRAND STREET MANHATTAN | Alteration | Signed-off | 10/27/2020 | 12/17/2021 | Design ANURAG UPADHYAY P.E. Contractor FLAVIO MECHANICAL CORP Filer WM ARCH CORP | 1. JOB FILED WITH PLUMBING WORK ONLY AT PARTIAL 6TH FLOOR APT#M601 AS PER PLAN RELATED TO DOB BIS JOB#140970108.2. NO CHANGE IN USE, MEANS O… |
| Q00466196 ↗ | 71-04 170 STREET QUEENS | Alteration | Signed-off | 02/17/2021 | 12/13/2021 | Design THOMAS C. TUNG, P.E. Contractor HTC CONSTRUCTION MANAGEME Filer WM ARCH CORP | 1.EXIST'G ONE STORY ONE FAMILY HOUSE W/ CELLAR WITH VERTICAL ENLARGEMENT AS PER PLAN.2.OBTAIN A NEW CERTIFICATE OF OCCUPANCY. |
| B00626029 ↗ | 1461 GREENE AVENUE BROOKLYN | Alteration | Permit Issued | 11/23/2021 | 12/07/2021 | Design THOMAS C. TUNG, P.E. Contractor DW PLUMBING INC Filer SUN | INSTALL NEW (2) TANKLESS COIL BOILERS ON THE CELLAR FLOOR.NO CHANGE IN USE,EGRESS AND OCCUPANCY. |
| B00521075 ↗ | 553 49 STREET BROOKLYN | Alteration | Signed-off | 09/10/2021 | 12/03/2021 | Design THOMAS C. TUNG, P.E. Contractor DW PLUMBING INC | SUPERSEDE LAA APPLICATION#301401178 TO REPLACE HWH/BOILER AND REMOVE 3PC BATHROOM ON THE CELLAR FLOOR;INTERIOR RENOVATION WORK FILED UNDER S… |
| M00547017 ↗ | 255 CABRINI BOULEVARD MANHATTAN | Alteration | Permit Issued | 09/08/2021 | 11/19/2021 | Design INDUS ENGINEERING PC Contractor ACTION 1 MAINT CONT INC Filer BROOKLYNROOTDESIGN | Replace existing ventilation system with new, install new kitchen hood, make up air and fan, install (1) new split AC system. There is no c… |
| Q00575106 ↗ | 71-32 58 AVENUE QUEENS | Alteration | Permit Issued | 08/11/2021 | 11/19/2021 | Design CQ&J CORPORATION Contractor LION JOINT VENTURES Filer BROOKLYNROOTDESIGN | INSTALL NEW HVAC SYSTEM ON CELLAR AND FIRST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY. PLUMBING WORK TYPE IS UNDER JOB#Q00487557, GC WORK… |
| B00622105 ↗ | 84 DOVER STREET BROOKLYN | Alteration | Signed-off | 10/29/2021 | 11/16/2021 | Design THOMAS C. TUNG, P.E. Contractor AMC PLBG, HTG & CLNG, INC Filer CRJ BUILDER CORP | APPLICATION FILED FOR NEW GAS DRYER, NEW GAS BOILER, AND PLUMBING FIXTURES REPLACEMENT WORKS ASSOCIATED WITH ALTERATION JOB # B00618499, NO … |
| B00618532 ↗ | 417 TOMPKINS AVENUE BROOKLYN | Alteration | Signed-off | 10/29/2021 | 11/15/2021 | Design CQ&J CORPORATION Contractor H & K RENOVATION INC Filer BROOKLYNROOTDESIGN | DEMOLISH 2 SIDE OF EXTERIOR WAL, ROOF AND INTERIOR UNBEARING BLOCK WALLS UNDER EMERGENCY WORK ORDER #357243. TO REBUILT AND REPAIR EXTERIOR… |
| Q00511300 ↗ | 46-25 88 STREET QUEENS | Alteration CO | Permit Issued | 05/03/2021 | 10/25/2021 | Design THOMAS C. TUNG, P.E. Owner TRISTAR DEVELOPING INC Contractor FLAVIO MECHANICAL CORP Filer WM ARCH CORP | PROPOSED THREE-FAMILY HOUSE WITH PLUMBING & SPRINKLER WORK AT CELLAR, 1ST, 2ND & 3RD FLOOR AS PER PLAN. SEE DOBNOW JOB#Q00511300-S1 PROVIDED… |
| B00581562 ↗ | 945 LIBERTY AVENUE BROOKLYN | Alteration | Signed-off | 10/06/2021 | 10/18/2021 | Design ANURAG UPADHYAY P.E. Contractor GLOBAL TEAM NY INC Filer WM ARCH CORP | PROPOSED MIX-USE BUILDING INTERIOR RENOVATION WITH PARTITION WORK AT CELLAR, 1ST, 2ND & 3RD FLOOR. PROPOSED REPAIRING AND REPLACEMENT TO RES… |
| Q00581566 ↗ | 1621 SUMMERFIELD STREET QUEENS | Alteration | Signed-off | 09/15/2021 | 10/18/2021 | Design ANURAG UPADHYAY P.E. Contractor GLOBAL TEAM NY INC Filer WM ARCH CORP | PROPOSED TWO FAMILY BRICK HOUSE WITH PLUMBING WORK AT CELLAR, 1ST & 2ND FLOOR. JOB FILED TO RELATED TO ALT1 APPLICATION #Q00581566-I1. NO CH… |
| B00521080 ↗ | 553 49 STREET BROOKLYN | Alteration | Permit Issued | 09/10/2021 | 09/22/2021 | Design THOMAS C. TUNG, P.E. Contractor SUPER POWER CONSTRUCTION Filer SUN | SUPERSEDE LAA APPLICATION#301401178 TO REPLACE HWH/BOILER AND REMOVE 3PC BATHROOM ON THE CELLAR FLOOR;PLUMBING WORK FILED UNDER SEPARATE FIL… |
| Q00431004 ↗ | 85-43 55 AVENUE QUEENS | Alteration | Signed-off | 11/24/2020 | 09/09/2021 | Design THOMAS C. TUNG, P.E. Contractor T & T PLUMBING INC Filer ANKAR DESIGN | FILING FOR PLUMBING WORK AT EXISTING 1-FAMILY DWELLING IN CONJUNCTION WITH DOB APPLICATION #421757101. NO CHANGE TO USE, EGRESS OR OCCUPANCY… |
| M00541117 ↗ | 255 CABRINI BOULEVARD MANHATTAN | Alteration | Signed-off | 07/01/2021 | 08/31/2021 | Design DEMO ARCHITECTURE, PLLC Contractor ACTION 1 MAINT CONT INC | REMOVAL OF NON BEARING INTERIOR PARTITION AND PLUMBING FINISH, INTERIOR RENOVATION AS PER PLAN. THERE IS NO CHANGE IN USE, EGRESS OR OCCUPAN… |
| Q00487551 ↗ | 71-32 58 AVENUE QUEENS | Alteration | Permit Issued | 03/19/2021 | 08/24/2021 | Design CQ&J CORPORATION Contractor LION JOINT VENTURES Filer BROOKLYNROOTDESIGN | INTERIOR RENOVATION OF AN EXISTING 2-STORY BUILDING AT CELLAR, 1ST FLOOR AND 2ND FLOOR. MINOR INTERIOR PARTITIONS, PLUMBING WORK AS PER PLAN… |
| M00498148 ↗ | 400 WEST 61ST STREET MANHATTAN | Alteration | Signed-off | 04/27/2021 | 08/18/2021 | Design NEW PRACTICE STUDIO LLC Contractor RALPH W. LANDOLFI JR. Filer WM ARCH CORP | INTERIOR RENOVATION AS PER THIS APPLICATION. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO NEW FLOOR AREA PROPOSED UNDER THIS APPLICATION. |
| M00531203 ↗ | 159 BLEECKER STREET MANHATTAN | Alteration | Signed-off | 06/16/2021 | 08/17/2021 | Design HITE STUDIO ARCHITECTURE PC Owner NORTH SIX, INC. Contractor TECH CONSTRUCTION, LLC Filer BROOKLYNROOTDESIGN | INTERIOR RENOVATION, REMOVALS AND INSTALLATION OF PARTITIONS AND DOORS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M00542308 ↗ | 120 EAST 87 STREET MANHATTAN | Alteration | Signed-off | 06/23/2021 | 08/17/2021 | Design NEW PRACTICE STUDIO LLC Contractor AAA TOTAL PLUMBING, INC Filer WM ARCH CORP | INTERIOR RENOVATIONS AS PER PLANS |
| B00539754 ↗ | 100 BAY 19 STREET BROOKLYN | Alteration | Permit Issued | 06/25/2021 | 07/21/2021 | Design ANURAG UPADHYAY P.E. Contractor TRISTAR DEVELOPING INC Filer WM ARCH CORP | PROPOSED INTERIOR RENOVATION OF EXISTING TWO-FAMILY HOUSE WITH PARTITION WORK ONLY AT CELLAR AS PER PLAN FILED TO REMOVE THE VIOLATION #3493… |
| X00539975 ↗ | 624 EAST 220 STREET BRONX | Alteration | Signed-off | 06/19/2021 | 07/18/2021 | Design ANURAG UPADHYAY P.E. Contractor BOND CONSTRUCTION INC | EXISTING APARTMENTS #1H & #2H INTERIOR RENOVATION WITH PARTITION WORK ONLY. NO CHANGE IN USE, MEANS OF EGRESS, OR OCCUPANCY IN THIS APPLICAT… |
| Q00543452 ↗ | 264-35 60 ROAD QUEENS | Alteration | Signed-off | 06/19/2021 | 07/15/2021 | Design THOMAS C. TUNG, P.E. Contractor AMC PLBG, HTG & CLNG, INC | FILING PLUMBING WORK ASSOCIATE WITH ALT 1 JOB # Q00478037. |
| M00524633 ↗ | 225 WEST 83 STREET MANHATTAN | Alteration | Signed-off | 05/22/2021 | 07/12/2021 | Design TWIG CONSULTING ENGINEERS PC Contractor NGM VISION GROUP INC | RENOVATIONS TO APT 18A, INTERIOR PARTITIONS AND MINOR PLUMBING AS PER PLANS FILED HEREWITH. NO CHANGE ISUSE, EGRESS OR OCCUPANCY. PLUMBING … |
| Q00525376 ↗ | 37-20 PRINCE STREET QUEENS | Alteration | Signed-off | 05/28/2021 | 07/12/2021 | Design THOMAS C. TUNG, P.E. Contractor SUPER POWER CONSTRUCTION | Remove non-load bearing partitions and install new 1hr fire rated partitions for Suite #2G & #2H on 2nd floor. No change in use, egress and … |
| M00544792 ↗ | 2480 BROADWAY MANHATTAN | Alteration | Signed-off | 06/30/2021 | 07/07/2021 | Design ANURAG UPADHYAY P.E. Owner FILLUP COFFEE Contractor TRISTAR DEVELOPING INC Filer WM ARCH CORP | INTERIOR RENOVATION OF EXISTING STORE WITH PARTITION WORK ONLY AT PARTIAL FIRST FLOOR. NO CHANGE IN USE, MEANS OF EGRESS, OR OCCUPANCY. |
| M00527201 ↗ | 453 FDR DRIVE MANHATTAN | Alteration | Signed-off | 06/24/2021 | 07/01/2021 | Design NEW PRACTICE STUDIO LLC Contractor HIGH QUALITY CONSTRUCTION Filer WM ARCH CORP | Interior renovation with partition work as per plan. |
| Q00448721 ↗ | 71-04 170 STREET QUEENS | Alteration | Signed-off | 02/10/2021 | 06/23/2021 | Design THOMAS C. TUNG, P.E. Contractor CATMAN PLUMBING INC Filer WM ARCH CORP | PROPOSED ONE FAMILY HOUSE ENLARGEMENT WITH PLUMBING WORK AT CELLAR, 1ST & 2ND FLOOR. JOB FILED TO RELATED TO ALT1 APPLICATION #Q00466196. |
| B00515320 ↗ | 221 NORTH 9TH STREET BROOKLYN | Alteration | Signed-off | 05/11/2021 | 05/27/2021 | Contractor NY DIAMOND CONSTRUCTION | LOCALLY REPAIR EXISTINGBRICK FACADE WITH NEW BRICKS, MORTARS ANDSTUCCO COVER, INSTALL STEEL CHANNELS IN THEMIDDLE HEIGHT OF WALL, CREATE PAR… |
| B00512413 ↗ | 912 EAST 15 STREET BROOKLYN | Alteration | Filed — no permit on record | 05/04/2021 | — | Design THOMAS C. TUNG, P.E. | — |
| B00486275 ↗ | 140 LAWRENCE STREET BROOKLYN | Alteration | Signed-off | 03/15/2021 | 04/09/2021 | Contractor ST SAFETY CONS. INC | Filing for interior renovation of existing business space for tenant fit out as per plan filed herewith. No change in use, egress, and occup… |
| B00486314 ↗ | 140 LAWRENCE STREET BROOKLYN | Alteration | Signed-off | 03/15/2021 | 04/09/2021 | Contractor WASOFF PLBG & UTILITY CO | Filing for modification of existing plumbing system in existing business space for tenant fit out as per plan filed herewith. Architectural … |
| M00479876 ↗ | 415 EAST 37 STREET MANHATTAN | Alteration | Permit Issued | 03/11/2021 | 03/17/2021 | Design TWIG CONSULTING ENGINEERS PC Contractor LION JOINT VENTURES | KITCHEN RENOVATION IN APT#43F, REMOVE MINOR NON-LOAD-BEARING INTERIOR PARTITION WALL, RELOCATE (2) PLUMBING FIXTURES AND REPLACE (1) GAS RAN… |
| M00469045 ↗ | 468 CONVENT AVENUE MANHATTAN | Alteration | Signed-off | 02/23/2021 | 03/12/2021 | Design THINK WILDER LLC Contractor CENTRAL DEVELOPMENT CORP Filer DY EXPEDITING INC. | PROPOSED MINOR INTERIOR RENOVATION AT EXISTING OFFICE SPACE ON 1ST FLOOR. WORK INCLUDE INSTALLING NEW NON-BEARING PARTITION, NEW FINISHES, N… |
| M00426424 ↗ | 333 EAST 46 STREET MANHATTAN | Alteration | Signed-off | 12/08/2020 | 01/07/2021 | Design THOMAS C. TUNG, P.E. Contractor KAPNAG HTG & PLBG CORP. Filer WM ARCH CORP | 1. JOB FILED WITH PLUMBING WORK ONLY AT PARTIAL 16TH FLOOR APT#16A AS PER PLAN RELATED TO DOB BIS JOB#140980188.2. NO CHANGE IN USE, MEANS O… |
| Q00274792 ↗ | 249-23 THEBES AVENUE QUEENS | Alteration | Signed-off | 12/06/2019 | 12/09/2020 | Design THOMAS C. TUNG, P.E. Contractor VILLAGE P & H NY INC Filer WM ARCH CORP | PROPOSED ONE FAMILY HOUSE ENLARGEMENT WITH PLUMBING WORK AT CELLAR, 1ST & 2ND FLOOR. JOB FILED TO RELATED TO ALT1 APPLICATION #421903587. |
| Q00318231 ↗ | 160-13 NORTHERN BOULEVARD QUEENS | Alteration | Signed-off | 02/21/2020 | 11/09/2020 | Design THOMAS C. TUNG, P.E. Contractor DW PLUMBING INC Filer SUN | INSTALL NEW GAS EQUIPMENT @EXISTING KITCHEN ON THE 1ST FLOOR;INTERIOR RENOVATION WORK FILED SEPARATELY UNDER DOB BIS#421942081;NO CHANGE IN … |
| Q00421310 ↗ | 66-15 HULL AVENUE QUEENS | Alteration | Signed-off | 10/30/2020 | 11/04/2020 | Design ANURAG UPADHYAY P.E. Contractor FLAVIO MECHANICAL CORP Filer WM ARCH CORP | 1. JOB FILED WITH PLUMBING WORK ONLY AT CELLAR, 1ST & 2ND FLOOR AS PER PLAN RELATED TO DOB JOB #440641646.2. NO CHANGE IN USE, MEANS OF EGRE… |
| Q00410758 ↗ | 136-20 ROOSEVELT AVENUE QUEENS | Alteration | Permit Issued | 10/21/2020 | 11/02/2020 | Design ANURAG UPADHYAY P.E. Contractor FLAVIO MECHANICAL CORP Filer WM ARCH CORP | INTERIOR RENOVATION WITH PLUMBING WORK OF KITCHEN EQUIPMENTS INSTALLATION ON EXISTING COMMERCIAL SPACE #29 AT CELLAR ONLY. NO CHANGE IN USE,… |
| Q00416619 ↗ | 150-52 BAYSIDE AVENUE QUEENS | Alteration | Filed — no permit on record | 10/26/2020 | — | Design THOMAS C. TUNG, P.E. | — |
| Q00407875 ↗ | 136-20 ROOSEVELT AVENUE QUEENS | Alteration | Signed-off | 10/15/2020 | 10/16/2020 | Design ANURAG UPADHYAY P.E. Contractor TRISTAR DEVELOPING INC Filer WM ARCH CORP | INTERIOR RENOVATION WITH MECHANICAL WORK OF A NEW KITCHEN HOOD INSTALLATION ON EXISTING COMMERCIAL SPACE #29 AT CELLAR ONLY. NO CHANGE IN US… |
| B00278783 ↗ | 622 WASHINGTON AVENUE BROOKLYN | Alteration | Permit Issued | 12/11/2019 | 12/27/2019 | Design TWIG CONSULTING ENGINEERS PC Owner 622 REALTY LLC Contractor NEW YORK CARRIER TRADING Filer BROOKLYNROOTDESIGN | MODIFY EX. KITCHEN EXHAUST SYSTEM: EXTEND EXHAUST DUCT FROM 1ST FL. TO ROOF ALONG REAR FACADE, REPLACE EXHAUST FAN AT ROOF LEVEL. ALL COOKIN… |
| M00258323 ↗ | 120 1 AVENUE MANHATTAN | Alteration | Permit Issued | 11/25/2019 | 11/27/2019 | Design ANURAG UPADHYAY P.E. Contractor T & T PLUMBING INC | PROPOSED PLUMBING WORK IN EXISTING RESTAURANT AT 1ST FLOOR. RELATED TO DOB JOB#122772767. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY ON… |
| B00192066 ↗ | 6314 FT HAMILTON PARKWAY BROOKLYN | Alteration | Signed-off | 07/24/2019 | 09/13/2019 | Design ANURAG UPADHYAY P.E. Contractor TRISTAR DEVELOPING INC | PROPOSED NEW WALK-IN REFRIGERATOR IN EXISTING WAREHOUSE AT 1ST FLOOR. JOB FILED TO LEGALIZE THE WALK-IN REFRIGERATOR TO RESOLVE THE DOB VIO… |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 07/16/2025 | Energy Code Compliance Inspections | 2400 BRONX PARK EAST | THOMAS TUNG | progress |
| 07/16/2025 | Structural Stability – Alterations of existing buildings | 2400 BRONX PARK EAST | THOMAS TUNG | special |
| 07/16/2025 | Fenestration and door U-factor and product ratings | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/16/2025 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | 2400 BRONX PARK EAST | THOMAS TUNG | special |
| 07/16/2025 | Fire-Resistant Penetrations and Joints | 2400 BRONX PARK EAST | THOMAS TUNG | special |
| 07/16/2025 | Interior lighting power | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/16/2025 | Protection of exposed foundation insulation | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/16/2025 | Vestibules | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/16/2025 | Exterior lighting power | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/16/2025 | Air barrier - visual inspection | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/16/2025 | Fire-Resistance Rated Construction | 2400 BRONX PARK EAST | THOMAS TUNG | progress |
| 07/16/2025 | Lighting controls | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/16/2025 | Insulation placement and R values | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/16/2025 | Fenestration areas | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/16/2025 | Metering | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/16/2025 | Lighting in dwelling units | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/16/2025 | Fenestration air leakage | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 10/21/2024 | Fenestration and door U-factor and product ratings | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 10/21/2024 | Lighting controls | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 10/21/2024 | Insulation placement and R values | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 10/21/2024 | Fenestration air leakage | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 10/21/2024 | Fenestration areas | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 10/21/2024 | Air barrier - visual inspection | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 10/21/2024 | Vestibules | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 10/21/2024 | Protection of exposed foundation insulation | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 10/21/2024 | Fire-Resistance Rated Construction | 2400 BRONX PARK EAST | THOMAS TUNG | progress |
| 10/21/2024 | Energy Code Compliance Inspections | 2400 BRONX PARK EAST | THOMAS TUNG | progress |
| 10/21/2024 | Structural Stability – Alterations of existing buildings | 2400 BRONX PARK EAST | THOMAS TUNG | special |
| 10/21/2024 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | 2400 BRONX PARK EAST | THOMAS TUNG | special |
| 10/21/2024 | Fire-Resistant Penetrations and Joints | 2400 BRONX PARK EAST | THOMAS TUNG | special |
| 10/21/2024 | Exterior lighting power | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 10/21/2024 | Interior lighting power | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 10/21/2024 | Metering | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 10/21/2024 | Lighting in dwelling units | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/31/2024 | Insulation placement and R values | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/31/2024 | Fenestration areas | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/31/2024 | Lighting in dwelling units | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/31/2024 | Lighting controls | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/31/2024 | Fenestration air leakage | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/31/2024 | Exterior lighting power | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/31/2024 | Vestibules | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/31/2024 | Interior lighting power | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/31/2024 | Fenestration and door U-factor and product ratings | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/31/2024 | Protection of exposed foundation insulation | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/31/2024 | Air barrier - visual inspection | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/31/2024 | Metering | 2400 BRONX PARK EAST | THOMAS TUNG | energy_progress |
| 07/31/2024 | Fire-Resistance Rated Construction | 2400 BRONX PARK EAST | THOMAS TUNG | progress |
| 07/31/2024 | Energy Code Compliance Inspections | 2400 BRONX PARK EAST | THOMAS TUNG | progress |
| 07/31/2024 | Structural Stability – Alterations of existing buildings | 2400 BRONX PARK EAST | THOMAS TUNG | special |
| 07/31/2024 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | 2400 BRONX PARK EAST | THOMAS TUNG | special |