← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
254 EAST 2 STREET
MANHATTAN · East Village · BIN 1079679
💬 Discuss this project
2005Year Built
7Stories
RMBuilding Class
R8BZoning
51,716 sfGross Floor Area
48Units
LL97 CoveredRent Stabilized4 Open Violations 3 unresolved · 1 paperwork only ▸FISP: SAFE
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 254 EAST 2ND ST CONDOMINIUM · 9,382 sf lot · 5.51 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HARRY CONSTRUCTION GROUP603/22/2026
254 EAST 2ND ST CONDOMINI503/22/2026
254 DEVELOPMENT CORP2703/22/2026
AVIAN CONSTRUCTION CORP603/22/2026
MC CHIP ASSOCS.203/22/2026
252 EAST 2ND LLC103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LEON SKVIRSKY PE111/06/2025
MOHAMMAD AHEAD, PE208/08/2022
STRUCTURAL ENGINEERING BURO102/18/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILDING BROTHERS203/21/2026
DALTO CONSULTANTS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HARRY CONSTRUCTION GROUPGeneral Contractor803/21/2026
OSWALD IEN, OElectrical103/21/2026
QUINTANILLA, RAMIROElectrical103/21/2026
Y.R. CONTRACTING LLCElectrical103/21/2026
PAUL SIGNSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STRUCTURAL ENGINEERING BU5883102/18/2021
Building Lifecycle
All (87)Filed (4)Permit Issued (5)Signed Off (3)Facade (FISP) (12)Violation (60)Objection (2)Special Inspection (1)
06/10/2026
Cycle 10 facade report submitted
06/09/2026
Cycle 10 facade report signed — SAFE
05/29/2026
Cycle 10 facade inspection completed
05/08/2026
Violation issued (HPD, closed)
A
12/09/2025
Signed off — Alteration
M01303896-I1
11/20/2025
Permit issued — Sign
M01303896-I1-SG
11/06/2025
Filed — Alteration
M01303896-I1
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/24/2023
Violation issued (ECB, closed)
Construction
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
08/09/2022
Signed off — Alteration
PAA to CHNAGE THE FINAL INSPECTION IN TR-1 FOR SIGNED OFF THE JOB
M00381273-I1
08/09/2022
Special inspection requirement — Final
MOHAMMAD AHEAD
08/08/2022
Filed — Alteration
PAA to CHNAGE THE FINAL INSPECTION IN TR-1 FOR SIGNED OFF THE JOB
M00381273-P1
01/19/2022
Permit issued — Sidewalk Shed
M00381273-I1-SH
01/07/2022
Cycle 9 facade report submitted
01/07/2022
Cycle 9 facade report signed — SAFE
01/04/2022
Signed off — Alteration
LIMITED FACADE REPAIRS INCLUDING REPOINTING OF MORTAR JOINTS, REPLACEMENT OF STEEL LINTELS, AND DETERIORATED BRICKWORK, ALL AS INDICATED IN DRAWINGS SUBMITTED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY
M00469706-I1
12/29/2021
Cycle 9 facade inspection completed
11/24/2021
Violation issued (ECB, closed)
Boilers
04/07/2021
Permit issued — General Construction
M00469706-I1-GC
02/23/2021
Objection raised — Other
02/23/2021
Objection resolved — Addressed
02/18/2021
Filed — Alteration
LIMITED FACADE REPAIRS INCLUDING REPOINTING OF MORTAR JOINTS, REPLACEMENT OF STEEL LINTELS, AND DETERIORATED BRICKWORK, ALL AS INDICATED IN DRAWINGS SUBMITTED HEREWITH. NO CHANGE TO USE EGRESS OR OCCUPANCY
M00469706-I1
01/15/2021
Permit issued — Sidewalk Shed
M00381273-I1-SH
11/12/2020
Permit issued — Sidewalk Shed
M00381273-I1-SH
08/06/2020
Filed — Alteration
PAA to CHNAGE THE FINAL INSPECTION IN TR-1 FOR SIGNED OFF THE JOB
M00381273-I1
08/05/2020
Violation issued (ECB, closed)
Construction
05/28/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/01/2018
Violation issued (HPD, closed)
A
10/01/2018
Violation issued (HPD, closed)
B
10/01/2018
Violation issued (HPD, closed)
A
10/01/2018
Violation issued (HPD, closed)
A
05/18/2018
Violation issued (HPD, closed)
C
05/18/2018
Violation issued (HPD, closed)
A
05/18/2018
Violation issued (HPD, closed)
B
05/18/2018
Violation issued (HPD, closed)
A
05/18/2018
Violation issued (HPD, closed)
C
05/18/2018
Violation issued (HPD, closed)
A
05/18/2018
Violation issued (HPD, closed)
A
05/09/2018
Violation issued (HPD, closed)
B
05/09/2018
Violation issued (HPD, closed)
A
05/09/2018
Violation issued (HPD, closed)
B
05/09/2018
Violation issued (HPD, closed)
B
05/09/2018
Violation issued (HPD, closed)
C
05/09/2018
Violation issued (HPD, closed)
B
05/09/2018
Violation issued (HPD, closed)
A
03/06/2018
Violation issued (ECB, closed)
Elevators
10/26/2017
Violation issued (HPD, closed)
B
10/26/2017
Violation issued (HPD, closed)
C
10/26/2017
Violation issued (HPD, closed)
A
10/26/2017
Violation issued (HPD, closed)
A
10/26/2017
Violation issued (HPD, closed)
A
10/26/2017
Violation issued (HPD, closed)
A
10/26/2017
Violation issued (HPD, closed)
A
10/25/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/16/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/23/2017
Violation issued (HPD, closed)
A
08/23/2017
Violation issued (HPD, closed)
B
08/23/2017
Violation issued (HPD, closed)
A
08/23/2017
Violation issued (HPD, closed)
B
Latest 60 of 87 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offPAUL SIGNS, INC11/20/2025
DOB NOWSidewalk ShedSigned-offHARRY CONSTRUCTION GROUP01/19/2022
DOB NOWGeneral ConstructionSigned-offHARRY CONSTRUCTION GROUP04/07/2021
DOB NOWSidewalk ShedSigned-offHARRY CONSTRUCTION GROUP01/15/2021
DOB NOWSidewalk ShedSigned-offHARRY CONSTRUCTION GROUP11/12/2020
BISMHISSUEDGOOD-WILL MECHANICAL CORP.03/28/2006
BISEQISSUEDADVANCED INSTALLATIONS INC01/13/2006
BIS—ISSUEDCALLELO CONSTRUCTION CORP01/03/2006
BISEQISSUEDCALLELO CONSTRUCTION CORP.01/03/2006
BISEQRE-ISSUEDADVANCE INSTALL.01/04/2005
BISEQRE-ISSUEDCALLELO CONSTRUCTION CORP.12/30/2004
BISSPISSUEDS & J INDUSTRIAL CORP08/23/2004
BIS—ISSUEDCALLELO CONSTRUCTION CORP04/14/2004
BISEQISSUEDCALLELO CONSTRUCTION CORP.04/03/2004
BISOTISSUEDCALLELO CONSTRUCTION CORP02/25/2004
BISOTISSUEDCALLELO CONSTRUCTION CORP02/18/2004
BIS—ISSUEDGB COSTR. LLC11/12/2003
BISEQISSUEDSPRING SCAFF04/07/2003
BIS—ISSUEDAVIAN CONSTRUCTION CORP07/11/2002
BISEQISSUEDAVIAN CONSTRUCTION CORP07/11/2002
BISEQISSUEDSPRING SCAFF04/02/2002
BISOTISSUEDCALCEDO CONSTRUCION CORP05/07/1999
BISMHISSUEDCAREFREE AIR & WATER MANAGMENT02/24/1995
BIS—ISSUEDTRUE CONNECTION03/01/1994
BISOTISSUED2 ST PRODUCTION04/12/1991
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
08/09/2022FinalMOHAMMAD AHEADprogress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Sidewalk Shed2
09/04/2026M00381273-I1Request digital key ↗
09/04/2026M00381273-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/21/2026M01303896-I1Request digital key ↗
08/15/2026M00469706-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/15/2026M00469706-I1Request digital key ↗
▸Applications & Permits2
▸BISPLACE OF ASSEMBLY2
03/23/2018104403628Open ↗
03/23/2018104403628Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/04/2026M00381273-I1Open ↗
08/21/2026M01303896-I1Open ↗
08/13/2026M00381273-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/22/2026M00381273-I1Open ↗
▸Safety & Tenant Protection2
▸DOB NOWTenant Protection Plan2
09/04/2026M00381273-I1Open ↗
08/13/2026M00381273-P1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00469706-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00469706-I1Open ↗
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM2
03/23/2018104403628Open ↗
03/23/2018104403628Open ↗
▸Other Documents1
▸DOB NOWDHCR Document1
08/13/2026M00469706-I1Open ↗