← Back
BuildNYC
Elevator apt, fireproof without stores
Brevoort (NYCHA)
254 RALPH AVENUE · BIN 3325169
💬 Discuss this project
1980Year Built
7Stories
D3Building Class
R5Zoning
875,875 sfGross Floor Area
896Units
LL97 Covered12 Active Violations 0 unresolved · 12 paperwork only 1 old, status unconfirmed ▸FISP: No Report FiledFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: NYC Housing Authority · 747,200 sf lot · 1.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFacade Inspection using Industrial Rope Access13p · 2 filings · 20 docs
BulkheadBrevoort Houses Building 7 Roof Waterproofing1p · 1 filing · 20 docs
Floor 1Brevoort Houses Building 7 Roof Waterproofing7p · 1 filing · 20 docs
CellarSteam pipe insulation and louver installation28p · 3 filings · 20 docs
Site & exteriorNYCHA Brevoort Houses pipe scaffold installation18p · 3 filings · 13 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York City Housing Authority4607/08/2026
Zoria Housing303/21/2026
NYC Admin for Child Services103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jenny Flores Expediting603/21/2026
Smep Design & Consultation203/21/2026
AK Consulting Services803/21/2026
Purcell Everett Architects803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Roma ScaffoldingScaffold507/08/2026
Kordun ConstructionGeneral Contractor407/08/2026
R.A. Phillips Electrical ContElectrical403/21/2026
Roma Scaffoldingspecialty_contractor303/21/2026
Kordun ConstructionPlumbing207/08/2026
Polaris Electrical ConstructionElectrical103/22/2026
Arber Electrical Service of NYElectrical103/21/2026
AL Foy ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bureau Veritas Na6902312/02/2025
Alan Margolin & Associates423403/07/2023
Bitopi Consultants7036101/18/2023
Building Lifecycle
All (101)Filed (15)Permit Issued (12)Signed Off (7)Facade (FISP) (10)Violation (19)Inspection (6)Objection (2)Special Inspection (30)
08/20/2026
Violation issued (ECB, open)
Construction
08/11/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/02/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
B01155521-I1
06/30/2026
Permit issued — Suspended Scaffold
B01155521-I1-SC
05/14/2026
Signed off — Alteration
HEREBY FILING FOR THE REPLACEMENT OF HOT WATER HEATERS. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B00472787-I1
04/23/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/26/2026
Signed off — Alteration
INSTALLATION OF STEAM PIING INSULATION, NEW LOUVERS TO EXHAUST FANS AND AIR INTAKES, MOTARIZED DAMPERS FOR AIR INTAKES, NEW EXHAUST FAN. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B00484714-I1
12/12/2025
Special inspection requirement — Shutoff dampers
IBRAHIM MOURAD
12/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
IBRAHIM MOURAD
12/12/2025
Special inspection requirement — HVAC-R and service water heating system controls
IBRAHIM MOURAD
12/12/2025
Special inspection requirement — HVAC-R and service water heating equipment
IBRAHIM MOURAD
12/12/2025
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
12/12/2025
Special inspection requirement — Mechanical Systems
IBRAHIM MOURAD
12/12/2025
Special inspection requirement — Final
IBRAHIM MOURAD
12/12/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
IBRAHIM MOURAD
12/08/2025
Objection resolved — Addressed
12/05/2025
Objection raised — Admin
12/02/2025
Filed — Alteration
INSTALLATION OF STEAM PIING INSULATION, NEW LOUVERS TO EXHAUST FANS AND AIR INTAKES, MOTARIZED DAMPERS FOR AIR INTAKES, NEW EXHAUST FAN. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B00484714-P1
11/26/2025
Filed — Alteration
HEREBY FILING FOR THE REPLACEMENT OF HOT WATER HEATERS. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B00472787-P1
11/24/2025
Violation issued (ECB, open)
Construction
11/17/2025
Signed off — Alteration
B00484664-I1
11/17/2025
Special inspection requirement — HVAC-R and service water heating equipment
IBRAHIM MOURAD
11/17/2025
Special inspection requirement — HVAC-R and service water heating system controls
IBRAHIM MOURAD
11/17/2025
Special inspection requirement — Energy Code Compliance Inspections
IBRAHIM MOURAD
11/17/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
IBRAHIM MOURAD
10/30/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/07/2025
Permit issued — Structural
B00484664-I1-ST
05/07/2025
Permit issued — Plumbing
B00472787-I1-PL
05/07/2025
Permit issued — Mechanical Systems
B00484714-I1-MS
04/28/2025
Violation issued (ECB, closed)
Construction
04/04/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/07/2025
Permit issued — Suspended Scaffold
B01155521-I1-SC
01/31/2025
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODSSEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decola
B01155521-I1
01/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/06/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
05/07/2024
Permit issued — Mechanical Systems
B00484714-I1-MS
05/06/2024
Permit issued — Structural
B00484664-I1-ST
05/06/2024
Permit issued — Plumbing
B00472787-I1-PL
04/11/2024
Violation issued (ECB, open)
Local Law
11/14/2023
Special inspection requirement — Concrete - Cast-In-Place
IBRAHIM MOURAD
11/14/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
IBRAHIM MOURAD
11/14/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
IBRAHIM MOURAD
11/14/2023
Special inspection requirement — Final
IBRAHIM MOURAD
11/14/2023
Special inspection requirement — Sprayed fire-resistant materials
IBRAHIM MOURAD
11/09/2023
Filed — Alteration
B00484664-P1
10/20/2023
Special inspection requirement — Sprayed fire-resistant materials
10/20/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
10/20/2023
Special inspection requirement — Final
IBRAHIM MOURAD
10/20/2023
Special inspection requirement — Concrete - Cast-In-Place
10/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/04/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE AT 254 RALPH AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B08046172-I1
09/04/2023
Signed off — Alteration
INSTALLATION OF PIPE SCAFFOLD AT 254 RALPH AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B00814235-I1
08/31/2023
Signed off — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 254 RALPH AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B08046156-I1
06/12/2023
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED AT 254 RALPH AVENUE, BROOKLYN AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
B08046156-P1
04/28/2023
Violation issued (FDNY_NOV, closed)
04/28/2023
Violation issued (FDNY_NOV, closed)
03/08/2023
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
Young Suh
03/08/2023
Special inspection requirement — Tenant Protection Plan Compliance
Young Suh
03/08/2023
Special inspection requirement — Concrete - Cast-In-Place
Young Suh
03/08/2023
Special inspection requirement — Structural Steel - Details
Young Suh
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System06/30/2026
DOB NOWStructuralSigned-offKordun Construction05/07/2025
DOB NOWPlumbingSigned-offKordun Construction05/07/2025
DOB NOWMechanical SystemsSigned-offKordun Construction05/07/2025
DOB NOWSuspended ScaffoldSigned-offStructural Preservation System02/07/2025
DOB NOWMechanical SystemsSigned-offKordun Construction05/07/2024
DOB NOWStructuralSigned-offKordun Construction05/06/2024
DOB NOWPlumbingSigned-offKordun Construction05/06/2024
DOB NOWGeneral ConstructionSigned-offRoma Scaffolding02/13/2023
DOB NOWSupported ScaffoldSigned-offRoma Scaffolding01/19/2023
DOB NOWConstruction FenceSigned-offRoma Scaffolding12/29/2022
DOB NOWSidewalk ShedSigned-offRoma Scaffolding12/28/2022
BISEQISSUEDVikrant Contracting & Builder05/16/2014
BISEQISSUEDZoria Housing02/20/2014
BISEQISSUEDVikrant Contracting & Builder02/13/2014
BISOTISSUEDZoria Housing01/24/2014
BISPLISSUEDRRP Plumbing10/15/2008
BISFPISSUEDChief Fire Prev. & Mechanical07/09/2008
BISOTISSUEDParadise Construction01/06/1999
BISPLISSUEDForsythe P&H06/02/1998
BISOTISSUEDParadise Construction05/07/1998
BISOTISSUEDD & S PLG09/27/1994
BISOTISSUEDD & S PLG07/25/1994
2 projects · most recent 11/26/2025
Gas Water/Sanitary Storm
FiledStatusContractorScope
11/26/2025Signed-offKordun ConstructionGas, Water/Sanitary
03/07/2023——Storm
7 projects · most recent 12/17/2025
General Wiring
FiledStatusContractorScope
12/17/2025Permit IssuedAccord Power Electric—
01/19/2025CompletePolaris Electrical Construction—
01/19/2025CompletePolaris Electrical Construction—
04/25/2024CompleteA.T.J. Electrical CoGeneral Wiring
01/01/2024CompleteHylan Datacom & Electrical—
01/01/2024CompleteHylan Datacom & Electrical—
06/26/2023Permit IssuedMeco Electric CoGeneral Wiring
1 project · most recent 03/07/2023
Steel Concrete Masonry
FiledStatusContractorScope
03/07/2023Signed-offRoma ScaffoldingSteel, Concrete, Masonry
1 project · most recent 01/31/2025
FiledStatusContractorScope
01/31/2025Signed-offStructural Preservation System—
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/11/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/23/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/30/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/04/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/06/2024Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 53
DateRequirementInspectorRole
12/12/2025Shutoff dampersIBRAHIM MOURADenergy_progress
12/12/2025HVAC-R and service water piping design and insulationIBRAHIM MOURADenergy_progress
12/12/2025HVAC-R and service water heating system controlsIBRAHIM MOURADenergy_progress
12/12/2025HVAC-R and service water heating equipmentIBRAHIM MOURADenergy_progress
12/12/2025Energy Code Compliance InspectionsIBRAHIM MOURADprogress
12/12/2025Mechanical SystemsIBRAHIM MOURADspecial
12/12/2025FinalIBRAHIM MOURADprogress
12/12/2025HVAC-R and service water piping design and insulationIBRAHIM MOURADenergy_progress
11/17/2025HVAC-R and service water heating equipmentIBRAHIM MOURADenergy_progress
11/17/2025HVAC-R and service water heating system controlsIBRAHIM MOURADenergy_progress
11/17/2025Energy Code Compliance InspectionsIBRAHIM MOURADprogress
11/17/2025HVAC-R and service water piping design and insulationIBRAHIM MOURADenergy_progress
11/14/2023Concrete - Cast-In-PlaceIBRAHIM MOURADspecial
11/14/2023Structural Stability – Alterations of existing buildingsIBRAHIM MOURADspecial
11/14/2023Fire-Resistant Penetrations and JointsIBRAHIM MOURADspecial
11/14/2023FinalIBRAHIM MOURADprogress
11/14/2023Sprayed fire-resistant materialsIBRAHIM MOURADspecial
10/20/2023Sprayed fire-resistant materials—special
10/20/2023Structural Stability – Alterations of existing buildings—special
10/20/2023FinalIBRAHIM MOURADprogress
10/20/2023Concrete - Cast-In-Place—special
10/20/2023Fire-Resistant Penetrations and Joints—special
03/08/2023Mastic and Intumescent Fire-resistant CoatingsYoung Suhspecial
03/08/2023Tenant Protection Plan ComplianceYoung Suhspecial
03/08/2023Concrete - Cast-In-PlaceYoung Suhspecial
Latest 25 of 53.
▾Documents — 167 on file (BIS + DOB NOW)
▸Plans & Drawings15
▸DOB NOWPlans/Sketch13
08/28/2026B08046172-I1Request digital key ↗
08/27/2026B00814235-I1Request digital key ↗
08/27/2026B08053446-S2Request digital key ↗
Showing 3 of 13 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/19/2026B00472787-I1Request digital key ↗
08/15/2026B00472787-P1Request digital key ↗
▸Applications & Permits17
▸BISPLAN / WORK APPROVAL APPLICATION12
12/27/2023340682504Open ↗
08/29/2019340682504Open ↗
08/11/2019340668370Open ↗
Showing 3 of 12 on file for this type
▸BISWORK PERMIT APPLICATION5
02/19/2014340120602Open ↗
02/12/2014340119446Open ↗
01/24/2014340112201Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications52
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/27/2026B08053446-S1Open ↗
08/27/2026B08053446-S2Open ↗
08/27/2026B08053446-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026B00484664-I1Open ↗
08/29/2026B00472787-I1Open ↗
08/29/2026B00472787-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/01/2026B00814235-I1Open ↗
09/01/2026B00484664-I1Open ↗
09/01/2026B00484664-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
04/22/2015340112201Open ↗
01/08/2015340119446Open ↗
01/08/2015340120602Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE4
10/03/2019340682504Open ↗
10/02/2019340671712Open ↗
05/30/2019340671712Open ↗
Showing 3 of 4 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
02/19/2014340120602Open ↗
02/12/2014340119446Open ↗
01/24/2014340112201Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
02/19/2014340120602Open ↗
02/12/2014340119446Open ↗
01/24/2014340112201Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
02/19/2014340120602Open ↗
02/12/2014340119446Open ↗
01/24/2014340112201Open ↗
▸Trade Schedules & Equipment3
▸BISSCHEDULE B - PLUMBING2
10/03/2019340682504Open ↗
06/20/2008310161259Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
05/15/2018321675576Open ↗
▸Safety & Tenant Protection3
▸BISTENANT PROTECTION PLAN AND NOTES3
10/03/2019340682504Open ↗
05/30/2019340671712Open ↗
05/02/2019340668370Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/27/2026B08053446-S2Open ↗
08/27/2026B08053446-I1Open ↗
08/26/2026B00484664-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
10/25/2017321675576Open ↗
01/24/2014340112201Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
06/20/2008310161259Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
01/06/2022340668370Open ↗
10/03/2019340682504Open ↗
07/05/2019340668370Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00472787-I1Open ↗
08/13/2026B00484714-I1Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
02/12/2014340119446Open ↗
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: RESPONSIBILITY8
10/12/2022340671712Open ↗
01/06/2022340668370Open ↗
10/03/2019340682504Open ↗
Showing 3 of 8 on file for this type
▸Approvals, Objections & Sign-offs23
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter15
08/26/2026B00484664-I1Open ↗
08/26/2026B00484664-P1Open ↗
08/13/2026B08053446-S2Open ↗
Showing 3 of 15 on file for this type
▸BISCERTIFICATE OF OCCUPANCY - LOC: REQUEST4
01/08/2015340119446Open ↗
01/08/2015340120602Open ↗
05/30/2018321675576Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
04/22/2015340112201Open ↗
01/08/2015340119446Open ↗
01/08/2015340120602Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
06/20/2008310161259Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
10/03/2019340682504Open ↗
05/02/2019340668370Open ↗
05/30/2018321675576Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms23
▸BISADDITIONAL INFORMATION15
08/14/2020340671712Open ↗
05/21/2020340671712Open ↗
10/03/2019340668370Open ↗
Showing 3 of 15 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
08/05/2019340682504Open ↗
05/30/2019340671712Open ↗
05/02/2019340668370Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET1
10/25/2017321675576Open ↗
▸BISBOROUGH INTAKE FORM1
05/30/2018321675576Open ↗
▸Other Documents1
▸DOB NOWIRA Certification1
08/13/2026B01155521-I1Open ↗