← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
255 CABRINI BOULEVARD
MANHATTAN · BIN 1082091
💬 Discuss this project
1937Year Built
8Stories
RMBuilding Class
R7-2Zoning
91,152 sfGross Floor Area
91Units
LL97 CoveredRent Stabilized49 Open Violations 46 unresolved · 3 paperwork only ▸FISP: SWARMPFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 255 CABRINI CONDOMINIUM · 24,357 sf lot · 3.74 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalCivil
Permit Issued — active, not yet Signed-off
RoofUnder Construction16p · 4 filings · 20 docs
Floor 8Under Construction8p · 1 filing · 3 docs
Floor 7
Floor 6
Floor 5
Floor 41p · 1 filing · 4 docs
Floor 3
Floor 2
Floor 110p · 1 filing · 20 docs
1 job · most recent 03/25/2023
Associated Ducts and Piping Others Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/25/2023Permit IssuedACTION 1 MAINT CONT INCAssociated Ducts and Piping, Others, Ventilation Systems
Ventilation
Accurex xmsx-p109-h12-mf 1,280 CFM · Makeup Air ×4
Greenheck 161-LMDG-QD 1,600 CFM · Kitchen Exhaust ×4
Ducts & Piping
N/A n/a Kitchen Exhaust ×4
Other
Trane TRANE-LUU180HHV 18,000 BTU · Split System ×4
TRANE-NTXSKS18A112AA 18,000 BTU · Condensing Unit ×4
1 job · most recent 07/06/2023
Water/Sanitary
FiledStatusContractorScope
07/06/2023Signed-offRITE WAY HEATING CORPWater/Sanitary
25 jobs · most recent 09/28/2026
General Wiring
FiledStatusContractorScope
09/28/2026Permit IssuedJAM ELECTRICAL CORPGeneral Wiring
08/26/2026CompleteTITANIUM ELECTRICAL CORP—
06/19/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
06/04/2026CompleteCRESCO ELECTRICAL CORPGeneral Wiring
05/06/2026Permit IssuedMACINTOSH ELECTRIC CORPGeneral Wiring
05/04/2026CompleteMARTINEZ ELECTRICAL CONTGeneral Wiring
04/08/2026CompletePRUDENT ELECTRIC INC—
04/08/2026CompletePRUDENT ELECTRIC INC—
03/30/2026CompleteROBIN ELECTRICAL CO., INCGeneral Wiring
03/17/2026Permit IssuedPRUDENT ELECTRIC INCGeneral Wiring
01/08/2024CompleteEPC ELECTRICAL CORP.General Wiring
09/14/2023CompleteKINGS ELECTRIC CO., INC.—
06/20/2023CompleteLEIGH ELECTRICAL INCGeneral Wiring
03/08/2022CompleteA+ ELECTRIC OF GREATER NYGeneral Wiring
02/28/2022CompleteKVA ELECTRICAL CO. INCGeneral Wiring
1 job · most recent 01/02/2024
Concrete
FiledStatusContractorScope
01/02/2024——Concrete
1 job · most recent 04/14/2026
FiledStatusContractorScope
04/14/2026Permit IssuedSTRUCTURAL PRESERVATION S—
Building Lifecycle
All (215)Filed (23)Permit Issued (25)Signed Off (10)Facade (FISP) (17)Violation (60)Inspection (10)Objection (40)Special Inspection (30)
09/17/2026
Permit issued — Sidewalk Shed
M01419084-I1-SH
08/10/2026
Signed off — Alteration
M01369834-I1
07/08/2026
Permit issued — General Construction
M01353659-I1-GC
07/06/2026
Signed off — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01385685-I1
06/23/2026
Permit issued — Sidewalk Shed
M01419084-I1-SH
06/19/2026
Filed — Alteration
M01419084-I1
06/04/2026
Objection resolved — Addressed
06/04/2026
Objection resolved — Addressed
06/04/2026
Objection resolved — Addressed
06/04/2026
Objection resolved — Addressed
05/26/2026
Permit issued — Mechanical Systems
M01369834-I1-MS
05/26/2026
Objection raised — Scope
05/26/2026
Objection raised — Other
05/26/2026
Objection raised — Other
05/26/2026
Objection raised — Scope
05/18/2026
Filed — Alteration
Filing interior renovation at apartment 8A as per plans. No change in use, egress, or occupancy under this application.
M01353659-I1
04/27/2026
Permit issued — Suspended Scaffold
M01385685-I1-SC
04/14/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
M01385685-I1
03/12/2026
Filed — Alteration
M01369834-I1
03/11/2026
Special inspection requirement — Tenant Protection Plan Compliance
SOHAIL HUMAYUN
03/11/2026
Special inspection requirement — Maintenance information
SOHAIL HUMAYUN
03/11/2026
Special inspection requirement — Ventilation and air distribution system
SOHAIL HUMAYUN
03/11/2026
Special inspection requirement — Energy Code Compliance Inspections
SOHAIL HUMAYUN
03/11/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SOHAIL HUMAYUN
03/10/2026
Special inspection requirement — Mechanical Systems
SOHAIL HUMAYUN
03/10/2026
Special inspection requirement — Final
SOHAIL HUMAYUN
01/21/2026
Violation issued (FDNY_NOV, closed)
11/18/2025
Violation issued (FDNY_NOV, closed)
11/18/2025
Violation issued (FDNY_ORDER, closed)
11/18/2025
Violation issued (FDNY_ORDER, closed)
11/18/2025
Violation issued (FDNY_NOV, closed)
11/18/2025
Violation issued (FDNY_ORDER, closed)
11/03/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
10/29/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/04/2025
Violation issued (FDNY_NOV, closed)
01/22/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/22/2024
Violation issued (ECB, open)
Construction
10/15/2024
Permit issued — General Construction
M01083173-I1-GC
10/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
Ruslan Solovyev
10/11/2024
Special inspection requirement — Energy Code Compliance Inspections
MOHAMMAD AHEAD
10/11/2024
Special inspection requirement — Preliminary
Michael Notaro
10/11/2024
Special inspection requirement — Final
Michael Notaro
10/11/2024
Special inspection requirement — Insulation placement and R values
MOHAMMAD AHEAD
10/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMAD AHEAD
10/10/2024
Filed — Alteration
Application filed for 1st story commercial roof repairs as per drawings filed herewith.
M01083173-P2
10/10/2024
Special inspection requirement — Insulation placement and R values
MOHAMMAD AHEAD
10/10/2024
Special inspection requirement — Preliminary
Michael Notaro
10/10/2024
Special inspection requirement — Final
Michael Notaro
10/10/2024
Special inspection requirement — Energy Code Compliance Inspections
MOHAMMAD AHEAD
10/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
10/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMMAD AHEAD
09/16/2024
Filed — Alteration
Application filed for 1st story commercial roof repairs as per drawings filed herewith.
M01083173-P1
08/27/2024
Violation issued (FDNY_NOV, closed)
08/06/2024
Filed — Alteration
Application filed for 1st story commercial roof repairs as per drawings filed herewith.
M01083173-I1
06/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
01/12/2024
Objection resolved — Addressed
01/08/2024
Objection raised — Inspections
01/08/2024
Objection raised — Admin
01/08/2024
Objection resolved — Addressed
01/08/2024
Objection resolved — Addressed
Latest 60 of 215 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ACE GROUP NY208/29/2026
BLUE WOODS MANAGEMENT107/10/2026
BLUE WOODS MANAGEMENT GROUP4207/08/2026
R A COHEN ASSOC407/08/2026
MVN ARCHITECTS303/22/2026
255 CABRINI CONDOMINIUM3703/22/2026
MNR GROUP1103/22/2026
CONSTRUCTION INC WKR203/22/2026
ROSE DALE MANAGEMENT103/22/2026
RENNON CONSTRUCTION203/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SOMMA DESIGN CONSULTING1003/21/2026
PS ENGINEERS203/21/2026
JAM CONSULTANTS, INC.603/21/2026
CONVERSANO ASSOCIATES, INC.203/21/2026
CORNERSTONE CONSULTING103/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WKR CONSTRUCTION, INCGeneral Contractor807/08/2026
ACTION 1 MAINT CONT INCGeneral Contractor407/08/2026
HIGHLEVEL GROUP INCGeneral Contractor303/21/2026
CEL TECH ELECTRIC INCGeneral Contractor303/21/2026
L. GLASHOW, INCPlumbing207/08/2026
MNR GROUP INCGeneral Contractor207/08/2026
SAMUEL & SONS P & H INCPlumbing207/08/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
ACE GROUP NY CORPGeneral Contractor106/27/2026
EMPIRE ERECTORS & ELECTRIElectrical103/21/2026
MASTER FIRE MECH CORPGeneral Contractor106/28/2026
RAMA CONSTRUCTION GROUP*General Contractor107/10/2026
SEROY INCGeneral Contractor107/08/2026
TAB RESTORATIONS INCGeneral Contractor104/08/2026
RITE WAY HEATING CORPPlumbing107/08/2026
FREDD & H CONSTRUCION CORGeneral Contractor107/08/2026
INTERSTATE ELECTRIC, LLCElectrical103/22/2026
KJK ELECTRIC INCElectrical103/22/2026
KVA ELECTRICAL CO. INCElectrical103/22/2026
MORALES, WILLIAMElectrical103/21/2026
PAUL CILLIKElectrical103/21/2026
SYED-NAQVI ALTAFElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CROSSCHECK INSPECTION SER544105/18/2026
SOHAIL HUMAYUN P E INC8457103/12/2026
MOHAMMAD AHEAD - PROFESSI9286310/10/2024
STRUCTURAL ENGINEERING BU5883108/06/2024
INNOVATIVE ENGINEERING LA6593201/02/2024
RYAN SPECIAL ENGINEERING2018207/06/2023
JUST CONSULTING ENGINEERI5865103/25/2023
DY SPECIAL INSPECTION LLC7210301/26/2022
O'ROURKE ENGINEERING, LLC5873106/03/2021
LEO Y LEE ASSOCIATES2481111/13/2019
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedDUAL FUEL COMPANY LLC09/17/2026
DOB NOWGeneral ConstructionPermit IssuedRAMA CONSTRUCTION GROUP*07/08/2026
DOB NOWSidewalk ShedPermit IssuedACE GROUP NY CORP06/23/2026
DOB NOWMechanical SystemsSigned-offMASTER FIRE MECH CORP05/26/2026
DOB NOWSuspended ScaffoldPermit IssuedSTRUCTURAL PRESERVATION S04/27/2026
DOB NOWGeneral ConstructionPermit IssuedTAB RESTORATIONS INC10/15/2024
DOB NOWPlumbingSigned-offLS PLUMBING CORP08/21/2023
DOB NOWGeneral ConstructionSigned-offHIGHLEVEL GROUP INC08/11/2023
DOB NOWStructuralSigned-offWKR CONSTRUCTION, INC01/09/2023
DOB NOWPlumbingSigned-offL. GLASHOW, INC02/04/2022
DOB NOWStructuralSigned-offWKR CONSTRUCTION, INC12/28/2021
DOB NOWConstruction FenceSigned-offWKR CONSTRUCTION, INC12/26/2021
DOB NOWPlumbingSigned-offSAMUEL & SONS P & H INC12/03/2021
DOB NOWGeneral ConstructionSigned-offFREDD & H CONSTRUCION COR12/01/2021
DOB NOWMechanical SystemsPermit IssuedACTION 1 MAINT CONT INC11/19/2021
DOB NOWPlumbingSigned-offL. GLASHOW, INC10/20/2021
DOB NOWGeneral ConstructionSigned-offSEROY INC10/05/2021
DOB NOWPlumbingSigned-offSAMUEL & SONS P & H INC09/22/2021
DOB NOWGeneral ConstructionSigned-offACTION 1 MAINT CONT INC08/31/2021
DOB NOWStructuralSigned-offWKR CONSTRUCTION, INC08/11/2021
DOB NOWStructuralSigned-offMNR GROUP INC05/07/2021
DOB NOWConstruction FenceSigned-offWKR CONSTRUCTION, INC04/21/2021
DOB NOWConstruction FenceSigned-offWKR CONSTRUCTION, INC02/25/2021
DOB NOWStructuralSigned-offMNR GROUP INC11/26/2019
DOB NOWAntennaPermit IssuedCEL TECH ELECTRIC INC05/08/2019
BISOTISSUEDWKR CONSTRUCTION, INC01/07/2026
BISOTISSUEDWKR CONSTRUCTION, INC02/25/2025
BISOTISSUEDWKR CONSTRUCTION, INC12/12/2023
BISOTISSUEDWKR CONSTRUCTION, INC01/09/2023
BISOTISSUEDWKR CONSTRUCTION, INC12/23/2021
BISOTISSUEDWKR CONSTRUCTION, INC04/20/2021
BISEQISSUEDRENNON CONSTRUCTION CORP04/07/2021
BISOTISSUEDWKR CONSTRUCTION, INC03/02/2021
BISOTISSUEDMNR GROUP INC12/16/2020
BISOTISSUEDMNR GROUP INC08/07/2020
BISOTISSUEDMNR GROUP INC05/11/2020
BISOTISSUEDMNR GROUP INC03/16/2020
BISMHISSUEDYX CONSTRUCTION INC09/05/2019
BISOTISSUEDD.S.C.CONSTRUCTION INC06/17/2019
BISPLISSUEDAURA PLUMBING INC03/13/2019
+ 35 more permits on file
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
11/03/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
10/29/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/05/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/26/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/26/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/10/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/06/2021Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/06/2021Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/15/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/15/2021Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
03/11/2026Maintenance informationSOHAIL HUMAYUNenergy_progress
03/11/2026Tenant Protection Plan ComplianceSOHAIL HUMAYUNspecial
03/11/2026Energy Code Compliance InspectionsSOHAIL HUMAYUNprogress
03/11/2026HVAC-R and service water piping design and insulationSOHAIL HUMAYUNenergy_progress
03/11/2026Ventilation and air distribution systemSOHAIL HUMAYUNenergy_progress
03/10/2026Mechanical SystemsSOHAIL HUMAYUNspecial
03/10/2026FinalSOHAIL HUMAYUNprogress
10/11/2024Fire-Resistant Penetrations and JointsMOHAMMAD AHEADspecial
10/11/2024Insulation placement and R valuesMOHAMMAD AHEADenergy_progress
10/11/2024Energy Code Compliance InspectionsMOHAMMAD AHEADprogress
10/11/2024FinalMichael Notaroprogress
10/11/2024PreliminaryMichael Notaroprogress
10/11/2024Tenant Protection Plan ComplianceRuslan Solovyevspecial
10/10/2024Insulation placement and R valuesMOHAMMAD AHEADenergy_progress
10/10/2024Fire-Resistant Penetrations and JointsMOHAMMAD AHEADspecial
10/10/2024Tenant Protection Plan Compliance—special
10/10/2024Energy Code Compliance InspectionsMOHAMMAD AHEADprogress
10/10/2024FinalMichael Notaroprogress
10/10/2024PreliminaryMichael Notaroprogress
01/08/2024Concrete - Cast-In-PlaceAIMAN ELTOHAMYspecial
01/08/2024Post-installed AnchorsAIMAN ELTOHAMYspecial
01/08/2024Prestressed Rock and Soil AnchorsAIMAN ELTOHAMYspecial
01/08/2024PreliminaryMichael Notaroprogress
01/08/2024Prestressed Rock and Soil AnchorsAIMAN ELTOHAMYspecial
12/22/2023Tenant Protection Plan Compliance—special
Latest 25 of 66.
▾Documents — 546 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch21
09/03/2026M00522315-I1Request digital key ↗
09/03/2026M00541117-P1Request digital key ↗
09/03/2026M00541117-I1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
09/04/2026M00472917-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/05/2026M00256034-I1Request digital key ↗
▸Applications & Permits82
▸BISWORK PERMIT APPLICATION42
04/07/2021122541062Open ↗
03/02/2021140973150Open ↗
08/07/2020140890917Open ↗
Showing 3 of 42 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION39
08/31/2021140973150Open ↗
11/04/2020140973150Open ↗
04/01/2020140890917Open ↗
Showing 3 of 39 on file for this type
▸BISTEMPORARY FENCE APPLICATION & PERMIT1
03/02/2021140973150Open ↗
▸Seals & Professional Certifications151
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION58
01/07/2020123821258Open ↗
01/07/2020123821258Open ↗
01/07/2020123821258Open ↗
Showing 3 of 58 on file for this type
▸DOB NOWProgress Inspector Seal & Signature39
09/29/2026M00576879-P1Open ↗
09/28/2026M00522315-I1Open ↗
09/02/2026M00541117-I1Open ↗
Showing 3 of 39 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/03/2026M00522382-I1Open ↗
09/03/2026M00541117-I1Open ↗
09/03/2026M00541117-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
09/02/2026M00541117-I1Open ↗
09/01/2026M00547017-I1Open ↗
09/01/2026M00256034-I1Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
05/31/2019123687812Open ↗
08/08/2017122872533Open ↗
Showing 2 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
05/31/2019123687812Open ↗
08/08/2017122872533Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
11/04/2020140973150Open ↗
Showing 1 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE2
11/04/2020140973150Open ↗
04/01/2020140890917Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment14
▸BISSELF-CERT PLUMBING NOTICE6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
10/23/2017123171557Open ↗
08/08/2017122872533Open ↗
Showing 2 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Safety & Tenant Protection12
▸BISTenant Protection Plan and Notes11
11/09/2020140973150Open ↗
04/01/2020140890917Open ↗
06/26/2019123821258Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00256034-I1Open ↗
▸Environmental & Asbestos43
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
09/03/2026M00541117-P1Open ↗
09/03/2026M00541117-I1Open ↗
09/03/2026M00576879-P1Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)15
09/10/2021140973150Open ↗
11/04/2020140973150Open ↗
07/26/2019123821258Open ↗
Showing 3 of 15 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
08/07/2020140890917Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/26/2026M01083173-I1Open ↗
▸Energy Compliance64
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS33
01/07/2020123821258Open ↗
01/07/2020123821258Open ↗
01/07/2020123821258Open ↗
Showing 3 of 33 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS13
01/07/2020123821258Open ↗
09/25/2019122678423Open ↗
09/09/2019122678423Open ↗
Showing 3 of 13 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY8
12/02/2021122609971Open ↗
12/01/2021140890917Open ↗
12/01/2021140890917Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS3
11/04/2020140973150Open ↗
Showing 1 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
12/02/2021122609971Open ↗
12/01/2021140890917Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/14/2026M00522382-I1Open ↗
08/13/2026M00541117-I1Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
03/02/2021140973150Open ↗
▸BISTR8: Energy Code Progress Inspections1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports15
▸BISTECHNICAL REPORT: RESPONSIBILITY10
12/02/2021122609971Open ↗
12/02/2021122609971Open ↗
12/01/2021140890917Open ↗
Showing 3 of 10 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
03/02/2021140973150Open ↗
▸BISMASONRY1
03/02/2021140973150Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
03/02/2021140973150Open ↗
▸BISDOB FINAL INSPECTION REQUIRED1
03/14/2023122541062Open ↗
▸BISPOST-INSTALLED ANCHORS1
03/04/2021140973150Open ↗
▸Approvals, Objections & Sign-offs43
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST20
03/14/2023122541062Open ↗
12/08/2021122609971Open ↗
12/08/2021122609971Open ↗
Showing 3 of 20 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION10
07/31/2019122541062Open ↗
07/31/2019122541062Open ↗
01/02/2019123171557Open ↗
Showing 3 of 10 on file for this type
▸BISADMINISTRATIVE OBJECTIONS8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSUPERSEDING LETTER2
11/21/2017122609971Open ↗
08/01/2017122694316Open ↗
▸BISFINAL2
12/08/2021122609971Open ↗
03/02/2021140973150Open ↗
▸BISSHED LETTER1
04/07/2021122541062Open ↗
▸Cost, Insurance & Ownership49
▸BISCOST AFFIDAVIT46
09/17/2021140973150Open ↗
09/10/2021140973150Open ↗
11/04/2020140973150Open ↗
Showing 3 of 46 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW33
11/17/2021140890917Open ↗
11/17/2021122609971Open ↗
03/02/2021140973150Open ↗
▸Filing & Intake Forms47
▸BISEFILING COVER SHEET17
06/26/2019123821258Open ↗
06/26/2019123821258Open ↗
05/31/2019123687812Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM16
04/07/2021122541062Open ↗
01/07/2020123821258Open ↗
09/25/2019122678423Open ↗
Showing 3 of 16 on file for this type
▸BISADDITIONAL INFORMATION10
09/10/2021140973150Open ↗
09/10/2021140973150Open ↗
11/09/2020140973150Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
11/04/2020140973150Open ↗
04/01/2020140890917Open ↗
Showing 2 of 4 on file for this type
▸Other Documents3
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPRELIMINARY1
03/02/2021140973150Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01385685-I1Open ↗