← Back
Three families
2554 CROPSEY AVENUE
BROOKLYN · Gravesend (West) · BIN 3187664
💬 Discuss this project
1970Year Built
3Stories
C0Building Class
R6Zoning
3,391 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Three families · Owner of record: HUNTOPIA LLC · 2,432 sf lot · 1.39 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HUNTOPIA LLC303/22/2026
ACER CONSTRUCTION103/22/2026
SD DESIGN STUDIO103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/20/2025$1.5M—— → —$436/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
YANG ENGINEERING LLC411/13/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SD DESIGN STUDIO803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.C. MORGAN ELECTRICElectrical103/22/2026
ACER CONSTRUCTION INCGeneral Contractor104/09/2026
AMERICAN STANDARD P&H CORORP.Plumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
YANG ENGINEERING LLC8376411/13/2025
Building Lifecycle
All (30)Filed (4)Permit Issued (2)Signed Off (2)Violation (3)Inspection (7)Objection (6)Special Inspection (6)
12/29/2025
Signed off — Alteration
PROPOSE INTERIOR RENOVATION ON 1ST THUR. 3RD FLOOR. PLUMBING & GAS WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B01241515-S1
12/23/2025
Signed off — Alteration
PROPOSE INTERIOR RENOVATION ON 1ST THUR. 3RD FLOOR. PLUMBING & GAS WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B01241515-I1
12/05/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/18/2025
Objection raised — Cost
11/18/2025
Objection resolved — Addressed
11/17/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
11/17/2025
Objection raised — Cost
11/17/2025
Objection resolved — Addressed
11/13/2025
Filed — Alteration
PROPOSE INTERIOR RENOVATION ON 1ST THUR. 3RD FLOOR. PLUMBING & GAS WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B01241515-P2
11/07/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
10/03/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jian Yang
08/21/2025
Special inspection requirement — Energy Code Compliance Inspections
Jian Yang
08/21/2025
Special inspection requirement — HVAC-R and service water heating equipment
Jian Yang
08/21/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Jian Yang
08/21/2025
Special inspection requirement — Maintenance information
Jian Yang
08/21/2025
Special inspection requirement — HVAC-R and service water heating system controls
Jian Yang
08/19/2025
Filed — Alteration
PROPOSE INTERIOR RENOVATION ON 1ST THUR. 3RD FLOOR. PLUMBING & GAS WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B01241515-P1
08/14/2025
Violation issued (ECB, closed)
Construction
06/27/2025
Permit issued — Plumbing
B01241515-S1-PL
06/26/2025
Violation issued (ECB, closed)
Construction
06/26/2025
Violation issued (ECB, closed)
Construction
06/25/2025
Permit issued — General Construction
B01241515-I1-GC
06/23/2025
Filed — Alteration
PROPOSE INTERIOR RENOVATION ON 1ST THUR. 3RD FLOOR. PLUMBING & GAS WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B01241515-S1
06/18/2025
Objection raised — Cost
06/18/2025
Objection resolved — Addressed
06/16/2025
Filed — Alteration
PROPOSE INTERIOR RENOVATION ON 1ST THUR. 3RD FLOOR. PLUMBING & GAS WORKS AS PER PLAN. NO CHANGE IN USE, BULK, EGRESS OR OCCUPANCY.
B01241515-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.06/27/2025
DOB NOWGeneral ConstructionSigned-offACER CONSTRUCTION INC06/25/2025
2 projects · most recent 11/17/2025
General Wiring
FiledStatusContractorScope
11/17/2025CompleteA.C. MORGAN ELECTRICGeneral Wiring
07/01/2025CompleteA.C. MORGAN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
12/05/2025Pass-Final General Construction Non-Directive 14PassView ↗
12/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/17/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
11/07/2025Fail-Final General Construction Non-Directive 14FailView ↗
10/03/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/21/2025Fire-Resistant Penetrations and JointsJian Yangspecial
08/21/2025Energy Code Compliance InspectionsJian Yangprogress
08/21/2025HVAC-R and service water heating equipmentJian Yangenergy_progress
08/21/2025HVAC-R and service water piping design and insulationJian Yangenergy_progress
08/21/2025Maintenance informationJian Yangenergy_progress
08/21/2025HVAC-R and service water heating system controlsJian Yangenergy_progress
▾Documents — 15 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/20/2026B01241515-P1Request digital key ↗
08/20/2026B01241515-S1Request digital key ↗
08/20/2026B01241515-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/20/2026B01241515-P1Open ↗
08/20/2026B01241515-I1Open ↗
08/20/2026B01241515-S1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature2
10/01/2026B01241515-S1Open ↗
10/01/2026B01241515-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
10/01/2026B01241515-S1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/20/2026B01241515-P1Open ↗
08/20/2026B01241515-S1Open ↗
08/20/2026B01241515-P2Open ↗
Showing 3 of 4 on file for this type