Condo, residential tower (mixed-use, multi-family elevator) [derived]
2576 BROADWAY
MANHATTAN · BIN 1075313
💬 Discuss this project
1901Year Built
7Stories
RMBuilding Class
R9AZoning
72,520 sfGross Floor Area
61Units
LL97 CoveredRent Stabilized72 Open Violations ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 229 WEST 97 OWNERS CORP · 15,876 sf lot · 4.57 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingGeneralOther
Permit Issued — active, not yet Signed-off
Roof6p · 2 filings · 20 docs
Floor 7Under Construction5p · 1 filing · 7 docs
Floor 6Under Construction8p · 1 filing · 10 docs
Floor 5
Floor 47p · 2 filings · 11 docs
Floor 3
Floor 2Under Construction9p · 1 filing · 4 docs
Floor 12p · 1 filing · 17 docs
CellarUnder Construction5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
VERITAS PROPERTY MANANGEMENT1307/08/2026
KINGS GROUP NY404/09/2026
SHOSHANA MARGOLIN APT 1C103/22/2026
OWNER OF 229 WEST 97 STRE103/22/2026
229 OWNERS2403/22/2026
OWNER OF 2576 BROADWAY203/22/2026
LAWRENCE PROPERTIES203/22/2026
LEVITES REALTY203/22/2026
752 END RUN RLTY CORP103/22/2026
LEVITES REALTY MANAGEM303/22/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JACK JAFFA & ASSOCIATES803/21/2026
KMA DESIGNS LLC203/21/2026
PS ENGINEERS203/21/2026
N Y SIGN ART403/21/2026
ARINNITY NYC203/21/2026
DESIGN42 ARCHITECTURE203/21/2026
PROPERTY INTERVENTION CONSULTANTS403/21/2026
YOUN DESIGN CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AJ CONSTR & DESIGN GROUPGeneral Contractor1107/08/2026
CREATIVE PLUMBING INPlumbing407/08/2026
DEGA CONSTRUCTION CORPGeneral Contractor403/21/2026
PRESHER WINDOWS LLCGeneral Contractor303/21/2026
NIKA CONTRACTING GROUP COGeneral Contractor303/21/2026
HS CONTRACTING NYC SV LLCGeneral Contractor307/08/2026
N Y SIGN ARTScaffold207/08/2026
COUSINS PAINTING CORPGeneral Contractor204/09/2026
BENT MECHANICAL CORPPlumbing207/08/2026
ZFM INCPlumbing207/08/2026
MIKHAIL RABINOVICHElectrical103/22/2026
PAC ELECTRIC CORP.Electrical103/22/2026
PETER LIElectrical103/21/2026
WORD OF LIGHT ELECT LLCElectrical103/22/2026
ZBIGNIEW RYBICKIElectrical103/21/2026
AC PENGUIN PRESTIGE CORPGeneral Contractor107/08/2026
JONG HYUN KIMElectrical103/22/2026
ART DECO ENTERPRISES INCGeneral Contractor104/09/2026
AMOR ELECTRIC CORPElectrical103/22/2026
JOE MIDDLETONElectrical103/21/2026
ESSENTIAL CONTRACTINGGeneral Contractor107/08/2026
GEC DESIGN GROUP LTDGeneral Contractor107/08/2026
HOWARD ZAMKOFFElectrical103/21/2026
KINGS GROUP NY CORPGeneral Contractor104/09/2026
ERROL GLANVILLEElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROBERT F. GERMAIN JR. PE5100108/27/2026
BIZ DESIGNS LLC6312402/10/2026
BUILDTECH ENGINEERING6369111/14/2025
AK CONSULTING SERVICES, I6198601/22/2025
NY RESTORATION TECHNOLOGY6187210/18/2024
ARNOLD MONTAG ARCHITECT,4599503/01/2023
RYAN SPECIAL ENGINEERING2018102/07/2023
CROSSCHECK INSPECTION SER544109/14/2022
JT ENGINEERING, PC7840206/21/2022
YAO W GUO ARCHITECT P.C.1754104/13/2021
Building Lifecycle
All (245)Filed (39)Permit Issued (38)Signed Off (18)Facade (FISP) (12)Violation (60)Inspection (26)Objection (22)Special Inspection (30)
09/15/2026
Permit issued — Plumbing
M01433324-S1-PL
09/15/2026
Permit issued — Boiler Equipment
M01433324-S2-BE
09/04/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/27/2026
Filed — Alteration
REPLACEMENT (1) NEW COMBINATION GAS/OIL BURNER ON (1) EXISTING LOW PRESSURE BOILER. NO CHANGE IN MEANS OF ERGRESS USE GROUP OR OCCUPANCY.
M01433324-S1
08/27/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Robert Germain Jr.
07/21/2026
Special inspection requirement — Tenant Protection Plan Compliance
Robert Germain Jr.
07/06/2026
Signed off — Alteration
NEW PLUMBING WORK APT #5B INCONJUNCTION WITH # M01312767-I1
M01312767-I1
06/30/2026
Violation issued (HPD, open)
A
06/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/22/2026
Violation issued (HPD, open)
B
06/22/2026
Violation issued (HPD, open)
A
06/22/2026
Violation issued (HPD, open)
B
06/22/2026
Violation issued (HPD, open)
C
06/22/2026
Violation issued (HPD, open)
A
06/22/2026
Violation issued (HPD, open)
C
06/22/2026
Violation issued (HPD, open)
A
06/22/2026
Violation issued (HPD, open)
B
06/22/2026
Violation issued (HPD, open)
A
06/16/2026
Signed off — Alteration
M01272357-I1
06/16/2026
Signed off — Alteration
Installation , relocation, replacement and removal of plumbing fixtures as shown on plans filed herewith.
M01272379-I1
06/04/2026
Violation issued (ECB, closed)
Elevators
05/14/2026
Permit issued — General Construction
M01372682-I1-GC
05/13/2026
Signed off — Alteration
REMOVE AND INSTALL PLUMBING FIXTURES IN APARTMENT 6D IN CONJUNCTION WITH CONSTRUCTION APPLICATION M10142215.
M01064461-S2
05/13/2026
Permit issued — General Construction
M01284839-I1-GC
04/21/2026
Signed off — Alteration
REMOVE AND INSTALL PLUMBING FIXTURES IN APARTMENT 6D IN CONJUNCTION WITH CONSTRUCTION APPLICATION M10142215.
M01064461-I1
04/21/2026
Signed off — Alteration
REMOVE AND INSTALL PLUMBING FIXTURES IN APARTMENT 6D IN CONJUNCTION WITH CONSTRUCTION APPLICATION M10142215.
M01064461-S1
04/10/2026
Objection resolved — Resolved
04/10/2026
Objection resolved — Resolved
04/10/2026
Objection resolved — Resolved
04/10/2026
Objection resolved — Resolved
04/10/2026
Objection resolved — Resolved
04/10/2026
Objection resolved — Resolved
04/03/2026
Objection raised — Scope
04/03/2026
Objection raised — Scope
04/03/2026
Objection raised — Scope
04/03/2026
Objection raised — Admin
04/03/2026
Objection raised — Scope
04/03/2026
Objection raised — Scope
03/23/2026
Signed off — Alteration
INSTALLATION OF HEAVY DUTY SIDEWALK SHED. NO CHANGE IN USE, OCCUPANCY OR EGRESS. WORK SHALL COMPLY WITH CHAPTER 33 OF NYCBC
M01225980-I1
03/23/2026
Filed — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION TO EXISTING APARTMENT. NO CHANGE TO USE OCCUPANCY OR EGRESS.
M01372682-I1
03/16/2026
Special inspection requirement — Final
Aaron Barker
02/18/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/13/2026
Permit issued — Plumbing
M01353146-S1-PL
02/13/2026
Permit issued — General Construction
M01353146-I1-GC
02/12/2026
Permit issued — General Construction
M01284839-I1-GC
02/10/2026
Filed — Alteration
M01353146-S1
02/10/2026
Filed — Alteration
M01353146-I1
02/02/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/29/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/29/2026
Special inspection requirement — Fire-Resistance Rated Construction
Jeff Akerman
01/29/2026
Special inspection requirement — Insulation placement and R values
Jeff Akerman
01/29/2026
Special inspection requirement — Final
Rachel Paskesz
01/29/2026
Special inspection requirement — Lighting in dwelling units
Jeff Akerman
01/29/2026
Special inspection requirement — Energy Code Compliance Inspections
Jeff Akerman
01/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
Jeff Akerman
01/29/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jeff Akerman
01/09/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/06/2026
Permit issued — Plumbing
M01312767-S1-PL
01/06/2026
Permit issued — General Construction
M01312767-I1-GC
12/26/2025
Objection resolved — Addressed
Latest 60 of 245 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBELL FUEL OIL, LLC09/15/2026
DOB NOWBoiler EquipmentPermit IssuedAPPROVED OIL CO OF BKLYN09/15/2026
DOB NOWGeneral ConstructionPermit IssuedESSENTIAL CONTRACTING05/14/2026
DOB NOWGeneral ConstructionPermit IssuedHS CONTRACTING NYC SV LLC05/13/2026
DOB NOWPlumbingPermit IssuedAB PLUMBING INC02/13/2026
DOB NOWGeneral ConstructionPermit IssuedCOUSINS PAINTING02/13/2026
DOB NOWGeneral ConstructionPermit IssuedHS CONTRACTING NYC SV02/12/2026
DOB NOWPlumbingSigned-offNICE PLUMBING CORP01/06/2026
DOB NOWGeneral ConstructionSigned-offART DECO ENTERPRISES INC01/06/2026
DOB NOWPlumbingSigned-offAB PLUMBING INC11/21/2025
DOB NOWGeneral ConstructionPermit IssuedHS CONTRACTING NYC SV09/25/2025
DOB NOWGeneral ConstructionSigned-offCOUSINS PAINTING09/18/2025
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP06/20/2025
DOB NOWPlumbingSigned-offZEFI MECHANICAL INC06/20/2025
DOB NOWGeneral ConstructionPermit IssuedTWO-TONE CONTRACTING CORP06/13/2025
DOB NOWSuspended ScaffoldPermit IssuedTWO-TONE CONTRACTING CORP05/23/2025
DOB NOWMechanical SystemsSigned-offAJ CONSTR & DESIGN GROUP01/22/2025
DOB NOWGeneral ConstructionSigned-offAJ CONSTR & DESIGN GROUP01/22/2025
DOB NOWPlumbingSigned-offZEFI MECHANICAL INC08/06/2024
DOB NOWGeneral ConstructionSigned-offAJ CONSTR & DESIGN GROUP08/05/2024
DOB NOWPlumbingSigned-offTRISTAR PLBG & HTG INC07/29/2024
DOB NOWMechanical SystemsSigned-offAJ CONSTR & DESIGN GROUP07/29/2024
DOB NOWGeneral ConstructionSigned-offAJ CONSTR & DESIGN GROUP01/22/2024
DOB NOWGeneral ConstructionSigned-offAC PENGUIN PRESTIGE CORP03/08/2023
DOB NOWGeneral ConstructionSigned-offDEGA CONSTRUCTION CORP02/07/2023
DOB NOWPlumbingSigned-offL.L.G. PLBG & HTG INC12/09/2022
DOB NOWGeneral ConstructionSigned-offDEGA CONSTRUCTION CORP11/15/2022
DOB NOWPlumbingSigned-offT & T PLUMBING INC10/26/2022
DOB NOWGeneral ConstructionSigned-offPRESHER WINDOWS LLC10/24/2022
DOB NOWPlumbingSigned-offAMOK INC02/28/2022
DOB NOWGeneral ConstructionSigned-offNIKA CONTRACTING GROUP CO10/15/2021
DOB NOWSignPermit IssuedSKANSKA BUILDING INC06/23/2021
DOB NOWSignPermit IssuedSKANSKA BUILDING INC06/23/2021
DOB NOWPlumbingSigned-offBENT MECHANICAL CORP04/29/2021
DOB NOWPlumbingSigned-offBENT MECHANICAL CORP03/31/2021
DOB NOWGeneral ConstructionSigned-offGEC DESIGN GROUP03/22/2021
DOB NOWPlumbingSigned-offSAMUEL & SONS P & H INC03/22/2021
DOB NOWSignSigned-offNEPTUNE SIGNS&AWNINGS INC02/01/2018
BISOTISSUEDBARRY MALONEY08/12/2021
BISPLISSUEDALL PRO PLBG & HTG INC09/11/2020
+ 48 more permits on file
5 projects · most recent 08/27/2026
Gas Water/Sanitary
FiledStatusContractorScope
08/27/2026Permit IssuedBELL FUEL OIL, LLCGas
11/14/2025Signed-offNICE PLUMBING CORPGas, Water/Sanitary
09/18/2025——Water/Sanitary
08/21/2025Signed-offMETFLOW MECHANICAL LLCGas, Water/Sanitary
03/18/2025Signed-offTRISTAR PLBG & HTG INCGas
25 projects · most recent 09/17/2026
General Wiring Boiler Controls
FiledStatusContractorScope
09/17/2026Permit IssuedMAC ELECT'L CONTR. INC.Boiler Controls
09/04/2026Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
06/10/2026CompleteASCUATECH ELECTRICAL CORP—
06/10/2026Permit IssuedASCUATECH ELECTRICAL CORPGeneral Wiring
06/08/2026CompleteLIVE WIRE ELECTRIC 1 LLCGeneral Wiring
05/17/2026Permit Issued2AK LIGHT ELECTRIC CORPGeneral Wiring
02/22/2026Permit IssuedAMOR ELECTRIC CORPGeneral Wiring
10/10/2025CompleteECNY ELEC'L CONTR'S, INCGeneral Wiring
10/10/2025CompleteECNY ELEC'L CONTR'S, INCGeneral Wiring
10/10/2025CompleteECNY ELEC'L CONTR'S, INCGeneral Wiring
10/10/2025CompleteECNY ELEC'L CONTR'S, INCGeneral Wiring
10/01/2025CompleteOPTIMAL ELECTRIC, INCGeneral Wiring
09/24/2025Permit IssuedECNY ELEC'L CONTR'S, INCGeneral Wiring
07/30/2025CompleteECNY ELEC'L CONTR'S, INCGeneral Wiring
07/28/2025CompleteOPTIMAL ELECTRIC, INCGeneral Wiring
1 project · most recent 09/18/2025
Tenant Protection Plan 72 Hour
FiledStatusContractorScope
09/18/2025Permit IssuedHS CONTRACTING NYC SV LLCTenant Protection Plan 72 Hour
1 project · most recent 05/21/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
05/21/2025Permit IssuedTWO-TONE CONTRACTING CORPSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 26
DateTypeResultReport
09/04/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/18/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/02/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/29/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/09/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/08/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/10/2025Pass-Final General Construction Non-Directive 14PassView ↗
07/15/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/02/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/09/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/05/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/15/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/12/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/05/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
04/10/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/10/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/06/2023Pass-Final General Construction Non-Directive 14PassView ↗
03/01/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/01/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/16/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/16/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
Latest 25 of 26.
▾Special Inspection Requirements (DOB NOW) — 87
DateRequirementInspectorRole
08/27/2026Fire-Resistant Penetrations and JointsRobert Germain Jr.special
07/21/2026Tenant Protection Plan ComplianceRobert Germain Jr.special
03/16/2026FinalAaron Barkerprogress
01/29/2026Fire-Resistance Rated ConstructionJeff Akermanprogress
01/29/2026Tenant Protection Plan ComplianceJeff Akermanspecial
01/29/2026Fire-Resistant Penetrations and JointsJeff Akermanspecial
01/29/2026FinalRachel Paskeszprogress
01/29/2026Energy Code Compliance InspectionsJeff Akermanprogress
01/29/2026Insulation placement and R valuesJeff Akermanenergy_progress
01/29/2026Lighting in dwelling unitsJeff Akermanenergy_progress
11/03/2025Lighting in dwelling unitsLuis Pichardoenergy_progress
11/03/2025Fire-Resistant Penetrations and JointsLuis Pichardospecial
11/03/2025FinalRONALD VILLANOprogress
11/03/2025Energy Code Compliance InspectionsRONALD VILLANOprogress
09/10/2025Fire-Resistant Penetrations and Joints—special
09/10/2025FinalLAZAR KESICprogress
08/15/2025Insulation placement and R valuesJeff Akermanenergy_progress
08/15/2025Fire-Resistance Rated ConstructionJeff Akermanprogress
08/15/2025Energy Code Compliance InspectionsJeff Akermanprogress
08/15/2025Tenant Protection Plan ComplianceJeff Akermanspecial
08/15/2025Fire-Resistant Penetrations and JointsJeff Akermanspecial
08/15/2025Tenant Protection Plan ComplianceJeff Akermanspecial
08/15/2025Fire-Resistant Penetrations and JointsJeff Akermanspecial
08/15/2025Lighting in dwelling unitsJeff Akermanenergy_progress
08/15/2025FinalRachel Paskeszprogress
Latest 25 of 87.
▾Documents — 643 on file (BIS + DOB NOW)
▸Plans & Drawings42
▸DOB NOWPlans/Sketch36
09/13/2026M01433324-S2Request digital key ↗
09/13/2026M01433324-S1Request digital key ↗
09/13/2026M01433324-I1Request digital key ↗
Showing 3 of 36 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/04/2026M00475325-I1Request digital key ↗
09/04/2026M00464195-I1Request digital key ↗
08/15/2026M00475325-P1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction2
09/04/2026M00464148-I1Request digital key ↗
09/03/2026M00464820-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing Legalization1
09/03/2026M00465598-I1Request digital key ↗
▸Applications & Permits109
▸BISPLAN / WORK APPROVAL APPLICATION57
10/28/2025120973492Open ↗
10/02/2025120973492Open ↗
08/26/2025120973492Open ↗
Showing 3 of 57 on file for this type
▸BISWORK PERMIT APPLICATION52
10/22/2025120973492Open ↗
08/12/2021140898278Open ↗
08/09/2021140898278Open ↗
Showing 3 of 52 on file for this type
▸Seals & Professional Certifications190
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION50
10/11/2019123558961Open ↗
09/25/2019123480474Open ↗
09/25/2019123480474Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWProgress Inspector Seal & Signature42
09/30/2026M01127410-I1Open ↗
09/30/2026M01127410-I1Open ↗
09/23/2026M01433324-I1Open ↗
Showing 3 of 42 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature40
09/13/2026M01433324-I1Open ↗
09/13/2026M01433324-S2Open ↗
09/13/2026M01433324-S1Open ↗
Showing 3 of 40 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature22
09/30/2026M01127410-I1Open ↗
09/30/2026M01127410-I1Open ↗
09/23/2026M01433324-I1Open ↗
Showing 3 of 22 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST16
11/29/2018123558961Open ↗
09/05/2018123451371Open ↗
07/25/2018122985984Open ↗
Showing 3 of 16 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
11/29/2018123558961Open ↗
10/30/2017123340278Open ↗
Showing 2 of 9 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
04/30/2020140898278Open ↗
▸Trade Schedules & Equipment34
▸BISSCHEDULE B - PLUMBING14
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 14 on file for this type
▸BISSELF-CERT PLUMBING NOTICE12
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 12 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
02/12/2019123557178Open ↗
10/18/2018123480474Open ↗
09/11/2018123545805Open ↗
Showing 3 of 5 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE PERMITS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISEQUIPMENT USE APPLICATION-PERMIT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection18
▸BISTenant Protection Plan and Notes10
02/12/2019123557178Open ↗
11/29/2018123558961Open ↗
10/18/2018123480474Open ↗
Showing 3 of 10 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE5
09/21/2018123451371Open ↗
09/21/2018123451371Open ↗
09/21/2018123451371Open ↗
Showing 3 of 5 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM3
09/21/2018123451371Open ↗
01/11/2017122985984Open ↗
Showing 2 of 3 on file for this type
▸Environmental & Asbestos64
▸DOB NOWDEP ACP-5: Asbestos Assessment Report38
09/13/2026M01433324-S2Open ↗
09/13/2026M01433324-S1Open ↗
09/13/2026M01433324-I1Open ↗
Showing 3 of 38 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)20
04/30/2020140898278Open ↗
02/12/2019123557178Open ↗
11/29/2018123558961Open ↗
Showing 3 of 20 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Energy Compliance50
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS23
10/11/2019123558961Open ↗
09/25/2019123480474Open ↗
07/30/2019123480474Open ↗
Showing 3 of 23 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS11
11/05/2024123545805Open ↗
03/15/2022121579746Open ↗
08/18/2021123557178Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY4
03/15/2022121579746Open ↗
08/18/2021123557178Open ↗
04/30/2020140898278Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.4
09/04/2026M00464148-I1Open ↗
08/13/2026M00475325-I1Open ↗
08/13/2026M00464820-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/18/2021140898278Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNYCECC ANALYSIS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
11/19/2021140898278Open ↗
▸Inspections & Test Reports11
▸BISTECHNICAL REPORT: RESPONSIBILITY10
10/01/2025120973492Open ↗
11/05/2024123545805Open ↗
11/05/2024123545805Open ↗
Showing 3 of 10 on file for this type
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
11/18/2021140898278Open ↗
▸Approvals, Objections & Sign-offs26
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
11/06/2024123545805Open ↗
03/16/2022121579746Open ↗
11/19/2021140898278Open ↗
Showing 3 of 15 on file for this type
▸BISADMINISTRATIVE OBJECTIONS7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
08/27/2025120973492Open ↗
04/30/2019123128613Open ↗
11/29/2017123340278Open ↗
▸BISFINAL1
11/18/2021140898278Open ↗
▸Cost, Insurance & Ownership40
▸BISCOST AFFIDAVIT36
11/05/2024123545805Open ↗
03/15/2022121579746Open ↗
08/18/2021123557178Open ↗
Showing 3 of 36 on file for this type
▸BISCIVIL PENALTY AFFADAVIT/REQUEST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
08/28/2025120973492Open ↗
11/18/2021140898278Open ↗
▸Filing & Intake Forms50
▸BISEFILING COVER SHEET23
02/12/2019123557178Open ↗
11/29/2018123558961Open ↗
10/18/2018123480474Open ↗
Showing 3 of 23 on file for this type
▸BISBOROUGH INTAKE FORM12
08/12/2021140898278Open ↗
08/09/2021140898278Open ↗
10/11/2019123558961Open ↗
Showing 3 of 12 on file for this type
▸BISADDITIONAL INFORMATION12
03/15/2022121579746Open ↗
08/24/2021140898278Open ↗
06/18/2020140898278Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
04/30/2020140898278Open ↗
Showing 1 of 3 on file for this type
▸Other Documents9
▸DOB NOWDHCR Document3
09/04/2026M00464148-I1Open ↗
08/13/2026M00482062-I1Open ↗
08/13/2026M00482014-I1Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWCalculations1
08/13/2026M01224959-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M01224959-I1Open ↗