| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01251756 ↗ | 87-29 69 AVENUE QUEENS | Alteration | Permit Issued | 02/11/2026 | 09/17/2026 | Design BCHEN ARCHITECT PLLC Contractor INFINITI ESC PLUMBING COR | relocate kitchen into dining area, create new room at existing kitchen and create new bathroom. |
| B00741808 ↗ | 1482 FLATBUSH AVENUE BROOKLYN | Alteration | Permit Issued | 05/23/2022 | 09/03/2026 | Design YAO W GUO ARCHITECT, PC Contractor TRI STATE PLBG & HTG INC | INSTALL GAS FIRED EQUIPMENTS ON 1ST FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01446951 ↗ | 119 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 08/24/2026 | 08/27/2026 | Design YAO W GUO ARCHITECT, PC Owner ZAR PROPERTY NY Contractor TOP BUILD CONTRACTORS INC | HEREWITH FILING FOR INTERIOR PARTITIONS REMOVAL OF EXISTING OFFICE SPACES AND INFILL STAIR OPENING AS SHOWN ON PLANS. NO CHANGE TO USE, EGRE… |
| Q01288558 ↗ | 90-44 55 AVENUE QUEENS | Alteration | Permit Issued | 09/25/2025 | 08/27/2026 | Design YAO W GUO ARCHITECT, PC Contractor MKSSKR CONSULTING SERVICE | INSTALL FENCE IN CONJUNCTION Q01288558. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| M01412249 ↗ | 118 WEST 22 STREET MANHATTAN | Alteration | Permit Issued | 08/13/2026 | 08/25/2026 | Design YAO W GUO ARCHITECT, PC Owner ZAR PROPERTY NY Contractor CERTIFIED SERVICES AND | HEREWITH FILING FOR RENOVATION OF EXISTING OFFICE SPACES. WORK TO BE PLUMBING MODIFICATION AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR… |
| M01418631 ↗ | 1133 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 07/08/2026 | 08/19/2026 | Design YAO W GUO ARCHITECT, PC Owner R.E.M. RESIDENTIAL Contractor EAST SIDE DESIGN & BUILD* | MODIFICATION OF PLUMBING FIXTURES AS SHOWN ON PLAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Name | Projects together | Most recent |
|---|---|---|
| YAO W GUO ARCHITECT, PC | 153 | 08/24/2026 |
| BCHEN ARCHITECT PLLC | 12 | 05/20/2026 |
| POLISE CONSULTING ENGINEERS DPC | 6 | 03/30/2026 |
| PACS ARCHITECTURE | 4 | 07/29/2025 |
| NICOLAS BARATTO ARCHITECT P.C. | 3 | 03/30/2026 |
| IVAN DESIGN ENG. ANALYSIS, PLLC | 2 | 05/28/2026 |
| MG ENGINEERING D.P.C. | 2 | 10/29/2020 |
| RJD ENGINEERING LLC | 2 | 04/30/2025 |
| ALLIEDENGINEERING ASSOCIATES | 1 | 09/04/2024 |
| CAMERON ENGINEERING | 1 | 07/11/2023 |
| CORNERSTONE DESIGNS | 1 | 07/01/2022 |
| DOUGLAS MUIR ARCHITECT | 1 | 02/18/2025 |
| GC ENG & ASSOCIATES, PC | 1 | 02/23/2022 |
| GILSANZ MURRAY STEFICEK LLP | 1 | 10/19/2022 |
| H & O ENGINEERING, DPC | 1 | 10/19/2022 |
| HALO ARCHITECTURE PLLC | 1 | 03/23/2026 |
| M C STRUCTURAL ENGINEERING | 1 | 05/23/2025 |
| PRAINITO ARCHITECT P.C. | 1 | 04/13/2021 |
| RICHARD BOYD ARCHITECT | 1 | 06/24/2026 |
| SCHRIMMER DESIGN GROUP | 1 | 02/25/2022 |
| STRUCTURAL ENGINEERING TECHNOLOGIES | 1 | 05/28/2026 |
| WILLIAM F. RYAN, JR. P.E. PC | 1 | 07/23/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| GLOBAL DESIGN CONCEPT COR | 31 | 07/31/2026 |
| QMB PLUMBING & HEATING IN | 18 | 03/23/2026 |
| ASTORIA P & H CORP | 14 | 07/08/2026 |
| EAST SIDE DESIGN & BUILD* | 12 | 07/08/2026 |
| CMP CONTRACTING INC | 8 | 07/29/2025 |
| LEX INTERIORS LTD | 6 | 12/22/2022 |
| MKSSKR CONSULTING SERVICE | 6 | 07/15/2026 |
| ALL PRO PLBG & HTG INC | 5 | 06/24/2026 |
| BENT MECHANICAL CORP | 5 | 07/29/2025 |
| AATZ CONTRACTING INC | 4 | 02/19/2025 |
| BEST PLUMBING & HVAC INC | 4 | 10/01/2025 |
| BILT/DFI INC | 4 | 10/23/2025 |
| G.B. & SON, INC | 4 | 10/23/2025 |
| VMC PLUMBING & HEATING IN | 4 | 07/31/2026 |
| CERTIFIED SVCS & RPRS | 3 | 08/13/2026 |
| EMILIANO CONSTRUCTION COR | 3 | 02/18/2025 |
| IMPACT PLUMBING INC | 3 | 08/07/2023 |
| METRO STAR CONTRACTING C | 3 | 12/12/2023 |
| QMB PLUMBING & HTG INC | 3 | 07/10/2023 |
| ACCURATE MECHANICAL INC | 2 | 10/25/2023 |
| ACS MECHANICS INC | 2 | 04/23/2026 |
| AMC PLBG, HTG & CLNG, INC | 2 | 03/01/2024 |
| BURA CONSTRUCTION CORP | 2 | 08/07/2023 |
| CROSSFIELD PLBG.&HTG | 2 | 04/28/2026 |
| HONOR CONSTRUCTION INC | 2 | 04/28/2026 |
| Name | Projects together | Most recent |
|---|---|---|
| AKAM ASSOCIATES, INC. | 15 | 07/10/2026 |
| 260 APARTMENTS CORP | 7 | 07/21/2025 |
| ZAR PROPERTY NY | 6 | 08/24/2026 |
| ALLIED PARTNERS | 2 | 03/02/2026 |
| ASTOR TERRACE CONDOMINIUM | 2 | 02/25/2022 |
| FirstService Residential | 2 | 02/08/2023 |
| HUDSON EAST NETWORK LLC | 2 | 04/23/2026 |
| STUDIO METAMORPHOSIS | 2 | 07/15/2022 |
| 122 EAST 42ND ST., LLC. | 1 | 01/09/2020 |
| 155 PERRY ST CONDOMINIUM | 1 | 08/10/2023 |
| 41 EAST 11TH STREET LLC | 1 | 01/20/2020 |
| 467 FOREST PROPERTY INC | 1 | 06/24/2024 |
| 60 GUILDERS, LLC | 1 | 08/07/2023 |
| 720-730 FORT WASHINGTON AVE OWNERS | 1 | 04/24/2026 |
| 79TH STREET RESIDENCE CORP. | 1 | 10/23/2025 |
| COURT-WRIGHT GROUP | 1 | 01/28/2022 |
| CPCBB Holding LLC | 1 | 04/30/2025 |
| CUSHMAN & WAKEFIELD | 1 | 02/23/2022 |
| DNA | 1 | 04/28/2026 |
| EBMG LLC | 1 | 07/18/2023 |
| EMPIRE MANAGEMENT | 1 | 02/19/2021 |
| Ferrane Bakery | 1 | 12/17/2024 |
| GUMLEY HAFT | 1 | 06/24/2026 |
| HORATIO ARMS INC | 1 | 04/12/2023 |
| JMA CONSULTANTS & ENGINEERS, P.C. | 1 | 08/13/2025 |
| Name | Projects together | Most recent |
|---|---|---|
| YAO W GUO ARCHITECT, PC | 8 | 06/24/2026 |
| WILLIAM VITACCO ASSOCIATES | 3 | 04/30/2025 |
| J.A. EXPEDITING, LLC | 2 | 07/23/2025 |
| PROCESS WERKSHOP LLC | 2 | 07/29/2025 |
| PROPERTY INTERVENTION CONSULTANTS, | 2 | 05/12/2021 |
| A1 EXPEDITING SERVICE CORP. | 1 | 10/19/2022 |
| ALPHA HOME DESIGN LLC | 1 | 09/27/2023 |
| ARCHI PRO GROUP | 1 | 10/19/2022 |
| CLARKE CONSTRUCTION CONSULTANTS | 1 | 07/21/2025 |
| GLOBAL DESIGN CONCEPT CORP | 1 | 06/22/2021 |
| NEXT STEP BUILDING SOLUTIONS, INC | 1 | 12/12/2023 |
| RIZZO GROUP | 1 | 02/23/2022 |
| Project | Address | Type | Status | Filed | Latest permit | On the project | Description |
|---|---|---|---|---|---|---|---|
| Q01251756 ↗ | 87-29 69 AVENUE QUEENS | Alteration | Permit Issued | 02/11/2026 | 09/17/2026 | Design BCHEN ARCHITECT PLLC Contractor INFINITI ESC PLUMBING COR | relocate kitchen into dining area, create new room at existing kitchen and create new bathroom. |
| B00741808 ↗ | 1482 FLATBUSH AVENUE BROOKLYN | Alteration | Permit Issued | 05/23/2022 | 09/03/2026 | Design YAO W GUO ARCHITECT, PC Contractor TRI STATE PLBG & HTG INC | INSTALL GAS FIRED EQUIPMENTS ON 1ST FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01446951 ↗ | 119 WEST 57 STREET MANHATTAN | Alteration | Permit Issued | 08/24/2026 | 08/27/2026 | Design YAO W GUO ARCHITECT, PC Owner ZAR PROPERTY NY Contractor TOP BUILD CONTRACTORS INC | HEREWITH FILING FOR INTERIOR PARTITIONS REMOVAL OF EXISTING OFFICE SPACES AND INFILL STAIR OPENING AS SHOWN ON PLANS. NO CHANGE TO USE, EGRE… |
| Q01288558 ↗ | 90-44 55 AVENUE QUEENS | Alteration | Permit Issued | 09/25/2025 | 08/27/2026 | Design YAO W GUO ARCHITECT, PC Contractor MKSSKR CONSULTING SERVICE | INSTALL FENCE IN CONJUNCTION Q01288558. NO CHANGE TO USE, EGRESS OR OCCUPANCY |
| M01412249 ↗ | 118 WEST 22 STREET MANHATTAN | Alteration | Permit Issued | 08/13/2026 | 08/25/2026 | Design YAO W GUO ARCHITECT, PC Owner ZAR PROPERTY NY Contractor CERTIFIED SERVICES AND | HEREWITH FILING FOR RENOVATION OF EXISTING OFFICE SPACES. WORK TO BE PLUMBING MODIFICATION AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR… |
| M01418631 ↗ | 1133 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 07/08/2026 | 08/19/2026 | Design YAO W GUO ARCHITECT, PC Owner R.E.M. RESIDENTIAL Contractor EAST SIDE DESIGN & BUILD* | MODIFICATION OF PLUMBING FIXTURES AS SHOWN ON PLAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q01446686 ↗ | 64-28 METROPOLITAN AVENUE QUEENS | Alteration | Filed — no permit on record | 08/19/2026 | — | Design YAO W GUO ARCHITECT, PC | — |
| M01400700 ↗ | 866 UNITED NATIONS PLAZA MANHATTAN | Alteration | Permit Issued | 06/11/2026 | 08/14/2026 | Design YAO W GUO ARCHITECT, PC Owner ST. TROPEZ CONDOMINIUM Contractor GLOBAL DESIGN CONCEPT COR | HEREWITH FILING FOR PLUMBING FIXTURES MODIFICATION IN APT. 29D AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M01359504 ↗ | 138 EAST 36 STREET MANHATTAN | Alteration | Permit Issued | 03/02/2026 | 08/13/2026 | Design YAO W GUO ARCHITECT, PC Contractor Y.L. AND SONS INC | HEREWITH FILING FOR MODIFICATION OF PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M01097297 ↗ | 165 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 08/19/2024 | 07/31/2026 | Design YAO W GUO ARCHITECT, PC Contractor FULL CIRCLE PLUMBING CORP | MODIFICATION OF EXISTING SPRINKLER SYSTEM ON 1ST FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01439210 ↗ | 353 EAST 72 STREET MANHATTAN | Alteration | Filed — no permit on record | 07/31/2026 | — | Design YAO W GUO ARCHITECT, PC | — |
| B01125048 ↗ | 8871 18 AVENUE BROOKLYN | Alteration | Permit Issued | 10/10/2024 | 07/28/2026 | Design YAO W GUO ARCHITECT, PC Contractor MKSSKR CONSULTING SERVICE Filer YAO W GUO ARCHITECT, PC | HEREWITH FILING FOR STRUCTURAL WORK FOR HORIZONTAL EXTENSION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M01374083 ↗ | 126 EAST 14 STREET MANHATTAN | Alteration | Permit Issued | 03/26/2026 | 07/23/2026 | Owner NEW YORK UNIVERSITY Contractor SPK/LEWIS CONSTRUCTION LL Filer YAO W GUO ARCHITECT, PC | HEREWITH FILING FOR SPRINKLER HEAD MODIFICATION AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| Q01238526 ↗ | 60-33 WOODBINE STREET QUEENS | Alteration | Permit Issued | 06/10/2025 | 07/21/2026 | Design BCHEN ARCHITECT PLLC Contractor HARRY'S CONTRACTING INC | Plumbing filing for an existing 2 family house. Work to include new three (3) piece fixture in cellar connected to the 1st floor unit. remov… |
| M01201086 ↗ | 301 SECOND AVENUE MANHATTAN | Alteration | Permit Issued | 04/30/2025 | 06/30/2026 | Design RJD ENGINEERING LLC Owner CPCBB Holding LLC Contractor V. DISALVO CONTRACTING CO | Modifications to existing sprinkler system. No change in use, egress or occupancy. |
| B01293321 ↗ | 166 7 AVENUE BROOKLYN | Alteration | Permit Issued | 09/29/2025 | 06/29/2026 | Design YAO W GUO ARCHITECT, PC Owner DNA Contractor HONOR CONSTRUCTION INC | INSTALLTION OF SPLIT UNIT AS PER PLAN. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01004559 ↗ | 213 WEST 11 STREET MANHATTAN | Alteration CO | Permit Issued | 02/26/2024 | 06/17/2026 | Contractor PROJEX CONSTRUCTION CORP Filer YAO W GUO ARCHITECT, PC | Underpin rear yard wall as shown on drawing. No change to use, egress or occupancy. |
| M01384615 ↗ | 720 FT WASHINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 04/24/2026 | 06/05/2026 | Design YAO W GUO ARCHITECT, PC Contractor GLOBAL DESIGN CONCEPT COR | INTERIOR RENOVATION OF UNIT 2X INCLUDING REMOVAL AND INSTALLATION OF PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B00767646 ↗ | 8702 3 AVENUE BROOKLYN | Alteration CO | Permit Issued | 07/01/2022 | 06/04/2026 | Design CORNERSTONE DESIGNS Contractor DNP BUILDERS LLC | GENERAL CONSTRUCTION |
| M01387333 ↗ | 525 EAST 86 STREET MANHATTAN | Alteration | Permit Issued | 04/23/2026 | 05/21/2026 | Design YAO W GUO ARCHITECT, PC Owner AKAM ASSOCIATES, INC. Contractor EUROPE PAINT CORP | HEREWITH FILING FOR INTERIOR RENOVATION OF APT. 6A AS PER PLANS FILED HEREWITH. WORK TO BE PLUMBING FIXTURES MODIFICATION. NO CHANGE IN USE,… |
| M01355993 ↗ | 299 WEST 12 STREET MANHATTAN | Alteration | Signed-off | 03/02/2026 | 05/12/2026 | Design YAO W GUO ARCHITECT, PC Owner ALLIED PARTNERS | INSTALLATION OF MECHANICAL UNIT OPENINGS, AND HVAC UNITS AS PER PLANS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| M01329117 ↗ | 34 WEST 76 STREET MANHATTAN | Alteration | Permit Issued | 01/13/2026 | 05/11/2026 | Design YAO W GUO ARCHITECT, PC Contractor PASHA USA CONSTRUCTION IN | HEREWITH FILING FOR INTERIOR RENOVATION OF APT. 5 AS PER PLANS FILED HEREWITH. wORK TO BE INTERIOR PARTITIONS AND FINISHES. NO CHANGE IN USE… |
| M01245865 ↗ | 61 EAST 86 STREET MANHATTAN | Alteration | Permit Issued | 08/22/2025 | 05/07/2026 | Design RICHARD BOYD ARCHITECT Owner GUMLEY HAFT Contractor ALL PRO PLBG & HTG INC Filer YAO W GUO ARCHITECT, PC | REPLACE PLUMBING FIXTURES IN APT 25 AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01334845 ↗ | 1235 PARK AVENUE MANHATTAN | Alteration | Permit Issued | 03/11/2026 | 04/24/2026 | Design YAO W GUO ARCHITECT, PC Contractor ASTORIA P & H CORP | HEREWITH FILING FOR APT 3A INTERIOR RENOVATION. WORK IS TO MODIFY PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY… |
| M00995919 ↗ | 213 WEST 11 STREET MANHATTAN | Alteration | Permit Issued | 02/01/2024 | 04/10/2026 | Design YAO W GUO ARCHITECT, PC Contractor MKSSKR CONSULTING SERVICE | HEREWITH FILING FOR REMOVAL OF INTERIOR NON LOAD BEARING PARTITIONS AND DOORS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS… |
| M01349793 ↗ | 495 3 AVENUE MANHATTAN | Alteration | Permit Issued | 01/26/2026 | 04/02/2026 | Design BCHEN ARCHITECT PLLC Owner MGT PROPERTY MANAGEMENT Contractor NEW YORK PARK PLBG&HTG CO | interior renovation of existing restaurant. Work to include new 5' high low partition wall and new wall service counter and wall finish. |
| M01343741 ↗ | 125 CENTRAL PARK NORTH MANHATTAN | Alteration | Permit Issued | 01/12/2026 | 03/12/2026 | Design YAO W GUO ARCHITECT, PC Contractor GLOBAL DESIGN CONCEPT COR | HEREWITH FILING FOR PLUMBING FIXTURES MODIFICATION ON THE 9TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M01356028 ↗ | 299 WEST 12 STREET MANHATTAN | Alteration | Filed — no permit on record | 02/12/2026 | — | — | — |
| B01347328 ↗ | 310 SCHAEFER STREET BROOKLYN | Alteration | Permit Issued | 01/15/2026 | 02/09/2026 | Design HALO ARCHITECTURE PLLC Contractor NY BUILDING ASSOCIATES IN Filer YAO W GUO ARCHITECT, PC | HEREWITH FILING FOR RENOVATION OF EXISTING 6-FAMILY BUILDING. GENERAL CONSTRUCTION TO INCLUDE INTERIOR PARTITIONS, DOORS, AND MECHANICAL SYS… |
| M01245913 ↗ | 440 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 07/14/2025 | 12/29/2025 | Design PACS ARCHITECTURE Owner AKAM ASSOCIATES, INC. Contractor CMP CONTRACTING Filer J.A. EXPEDITING, LLC | PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 3B ON THE 3RD FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| B01260946 ↗ | 196 LINCOLN ROAD BROOKLYN | Alteration | Signed-off | 07/25/2025 | 12/15/2025 | Design YAO W GUO ARCHITECT, PC Contractor MKSSKR CONSULTING SERVICE | HEREWITH FILING FOR A NEW DECK AND OPENING IN REAR YARD. REPAIR BAY WINDOW AS PER PLANS. NOCHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APP… |
| B01282564 ↗ | 357 GRAND STREET BROOKLYN | Alteration | Signed-off | 09/09/2025 | 10/22/2025 | Design YAO W GUO ARCHITECT, PC Owner PATOMA INC Contractor G.B. & SON, INC | HEREWITH FILING FOR PLUMBING MODIFICATION IN CELLAR AND 1ST FLOOR AS PER PLANSFILED HEREWITH. NO CHANGE IN USE, OCCUPANCY OR EGRESS. |
| M01254444 ↗ | 415 EAST 52 STREET MANHATTAN | Alteration | Signed-off | 08/01/2025 | 10/21/2025 | Design YAO W GUO ARCHITECT, PC Contractor MKSSKR CONSULTING SERVICE | INSTALLATION OF MECHANICAL UNIT OPENING, AND HVAC UNITS AS PER PLANS. NO CHANGE TO USE, EGRESS, OR OCCUPANCY. |
| Q01291173 ↗ | 15-40 BELL BOULEVARD QUEENS | Alteration | Signed-off | 10/01/2025 | 10/09/2025 | Design BCHEN ARCHITECT PLLC Contractor BEST PLUMBING & HVAC INC | install new washer and gas dryer. No change to use egress or occupancy |
| M01103801 ↗ | 500 WEST 18TH STREET MANHATTAN | Alteration | Signed-off | 08/29/2024 | 09/15/2025 | Design RJD ENGINEERING LLC Owner Miss. Contractor AIR FORCE MECHANICAL Filer YAO W GUO ARCHITECT, PC | HEREWITH FILING FOR MODIFICATION OF PLUMBING FIXTURES AND SPRINKLER HEADS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APP… |
| M01244873 ↗ | 66 OVERLOOK TERRACE MANHATTAN | Alteration | Signed-off | 06/27/2025 | 09/04/2025 | Design YAO W GUO ARCHITECT, PC Owner Rudd Realty Contractor GLOBAL DESIGN CONCEPT COR | RENOVATE EXISTING APT. 1B. WORK TO INCLUDE PARTITION MODIFICATION AND INSTALLATION OF MECHANICAL VENT AS SHOWN ON DRAWINGS. NO CHANGE TO USE… |
| B01196219 ↗ | 404 3 STREET BROOKLYN | Alteration | Signed-off | 05/05/2025 | 08/07/2025 | Design YAO W GUO ARCHITECT, PC Contractor M. SPINELLI PLB & HTG INC | Modification of plumbing fixtures as shown on drawings. No change to use, egress or occupancy. |
| M01024376 ↗ | 22 EAST 29TH STREET MANHATTAN | Alteration | Signed-off | 04/08/2024 | 08/01/2025 | Design YAO W GUO ARCHITECT, PC Contractor BROADWAY CONSTRUCTION GRO | REPLACE CHILLER AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00749963 ↗ | 525 EAST 89 STREET MANHATTAN | Alteration | Signed-off | 07/05/2022 | 07/16/2025 | Design YAO W GUO ARCHITECT, PC Contractor JVR PLBG AND HEATING INC | INSTALL PLUMBING FIXTURES IN APT. 4H AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OROCCUPANCY. |
| Q01180152 ↗ | 60-66 54 PLACE QUEENS | Alteration | Permit Issued | 02/19/2025 | 05/12/2025 | Design BCHEN ARCHITECT PLLC Contractor BEST PLUMBING & HVAC INC | remove and relocate (2) kitchen sink, (2) lavatory, (2) toilet, (2) bathtub and (1) gas stove. Install (1) new gas stove |
| M00988281 ↗ | 297 7 AVENUE MANHATTAN | Alteration | Signed-off | 01/16/2024 | 05/06/2025 | Design BCHEN ARCHITECT PLLC Owner PYRUS MANAGEMENT LLC Contractor INSTYLE HOME RENOVATIONS | remove all existing interior partition walls and renovate for new white box finish for showroom on floor 2 thru 4. no change to use, egress … |
| M01139227 ↗ | 260 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 12/09/2024 | 04/24/2025 | Design YAO W GUO ARCHITECT, PC Owner 260 APARTMENTS CORP Contractor GLOBAL DESIGN CONCEPT COR | PLUMBING FIXTURES IN APT 3B FILED IN CONJUNCTION WITH DOB NOW GC . NO CHANGE TO USE, OCCUPANCY OR EGRESS. |
| M01059189 ↗ | 51 EAST 90 STREET MANHATTAN | Alteration | Permit Issued | 07/12/2024 | 03/31/2025 | Design YAO W GUO ARCHITECT, PC Owner AKAM ASSOCIATES, INC. Contractor EAST SIDE DESIGN & BUILD* | MODIFICATION OF PLUMBING FIXTURES AS SHOWN ON DRAWINGS. NO CHNAGE TO USE, EGRESS OR OCCUPANCY. |
| X01195208 ↗ | 500 EAST 149 STREET BRONX | Alteration | Permit Issued | 03/20/2025 | 03/26/2025 | Design BCHEN ARCHITECT PLLC Contractor SYMMETRICAL CONSTRUC CORP | interior renovation of existing eating and drinking space. work to include new partition and finishes. |
| M01167124 ↗ | 1 5 AVENUE MANHATTAN | Alteration | Signed-off | 01/28/2025 | 02/24/2025 | Design PACS ARCHITECTURE Owner ALLIED PARTNERS Contractor CMP CONTRACTING Filer J.A. EXPEDITING, LLC | PLUMBING WORK RELATED TO THE INTERIOR RENOVATION OF APARTMENT 10BC ON THE 10TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. |
| B00789829 ↗ | 358 TOMPKINS AVENUE BROOKLYN | Alteration CO | Permit Issued | 08/11/2022 | 02/19/2025 | Design YAO W GUO ARCHITECT, PC Owner HUDSON EAST NETWORK LLC Contractor GLOBAL DESIGN CONCEPT COR | HEREWITH FILING FOR MECHANCIAL SYSTEM AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M01086580 ↗ | 345 EAST 56 STREET MANHATTAN | Alteration | Signed-off | 07/29/2024 | 02/13/2025 | Design YAO W GUO ARCHITECT, PC Contractor AQUEDUCT MECHANICAL CORP | HEREWITH FILING FOR PLUMBING FIXTURES MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M08009319 ↗ | 327 WEST 85 STREET MANHATTAN | Alteration | Signed-off | 02/09/2023 | 02/07/2025 | Design YAO W GUO ARCHITECT, PC Contractor CMP CONTRACTING | FILING FOR INTERIOR RENOVATION OF APARTMENT 1B ON 1ST FLOOR. WORK TO INCLUDE SOUNDPROOFING OF 2HR RATED WALL, NEW WINDOWS, NEW LIGHTING, AN… |
| M01154182 ↗ | 135 WEST 79 STREET MANHATTAN | Alteration | Signed-off | 12/16/2024 | 02/03/2025 | Design YAO W GUO ARCHITECT, PC Contractor BILT/DFI INC | HEREWITH FILING FOR PLUMBING MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B01112233 ↗ | 51 CLARK STREET BROOKLYN | Alteration | Signed-off | 10/01/2024 | 12/26/2024 | Design YAO W GUO ARCHITECT, PC Owner Ferrane Bakery Contractor HONOR CONSTRUCTION INC | HEREWITH FILING TO REMOVE INTERIOR INTERIOR PARTITIONS AND DOORS AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| Q01150114 ↗ | 39-50 65TH PLACE QUEENS | Alteration | Permit Issued | 12/11/2024 | 12/16/2024 | Design BCHEN ARCHITECT PLLC Contractor CULTECH INC | interior renovation of existing second floor unit of a 2 family house. work to include modification of kitchen and bathroom for unit #2. No … |
| M00956547 ↗ | 64 WOOSTER STREET MANHATTAN | Alteration | Permit Issued | 12/12/2023 | 11/21/2024 | Design YAO W GUO ARCHITECT, PC Owner ZAR PROPERTY NY Contractor METRO STAR CONTRACTING C | HEREWITH FILING FOR RENOVATION OF EXISTING OFFICE SPACE ON 4TH FLOOR. WORK TO BE GENERAL CONSTRUCTION OF INTERIOR PARTITIONS AND MECHANICAL … |
| Q01084603 ↗ | 35-13 76 STREET QUEENS | Alteration | Permit Issued | 07/26/2024 | 10/31/2024 | Design YAO W GUO ARCHITECT, PC Contractor EMILIANO CONSTRUCTION COR | HEREWITH FILING FOR PLUMBING FIXTURES MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| B01096705 ↗ | 919 MANHATTAN AVENUE BROOKLYN | Alteration | Permit Issued | 08/15/2024 | 10/03/2024 | Design BCHEN ARCHITECT PLLC Owner UNITED T LLC Contractor DMA CONTRACTING INC | filing for installation of new electric kitchen equipment in cellar and removal of cabinet and non-loading bearing wall on first floor exist… |
| M01099187 ↗ | 799 PARK AVENUE MANHATTAN | Alteration | Signed-off | 08/27/2024 | 10/03/2024 | Design PACS ARCHITECTURE Contractor CMP CONTRACTING Filer PROCESS WERKSHOP LLC | Remove/replace and install new non-load bearing partitions and finishes in apt 7A. No change in occupancy, use or egress. |
| M01106504 ↗ | 1523 2 AVENUE MANHATTAN | Alteration | Signed-off | 09/06/2024 | 09/27/2024 | Design YAO W GUO ARCHITECT, PC Contractor EAST SIDE DESIGN & BUILD* | RENOVATE EXISTING APT. 16K. WORK TO INCLUDE PARTITION MODIFICATION AND DOORS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M01068587 ↗ | 57 BOND STREET MANHATTAN | Alteration | Signed-off | 07/01/2024 | 09/26/2024 | Design PACS ARCHITECTURE Contractor CMP CONTRACTING Filer PROCESS WERKSHOP LLC | Minor plumbing work filed in conjunction with apartment renovation. no change in occupancy use or egress |
| X01088351 ↗ | 330 BEDFORD PARK BLVD BRONX | Alteration | Signed-off | 09/04/2024 | 09/20/2024 | Design ALLIEDENGINEERING ASSOCIATES Contractor OPTIMUS CONSTRUCTION&DEV* | HEREWITH FILING FOR FACADE REPAIR AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| Q00992633 ↗ | 224 BEACH 131 STREET QUEENS | Alteration CO | Permit Issued | 01/22/2024 | 09/13/2024 | Design YAO W GUO ARCHITECT, PC Contractor EXPERT CONSTRUCTION & RE* | SUSEQUENT PLUMBING FILING IN CONJUNCTION WITH ALT 1 APPLICATION # Q00992633. |
| M01093420 ↗ | 363 LEXINGTON AVENUE MANHATTAN | Alteration | Permit Issued | 08/14/2024 | 08/23/2024 | Design BCHEN ARCHITECT PLLC Contractor ALL PRO PLBG & HTG INC | relocate existing commercial kitchen exhaust hood and service counter as per plan |
| M01083592 ↗ | 696 3 AVENUE MANHATTAN | Alteration | Signed-off | 07/22/2024 | 08/16/2024 | Design BCHEN ARCHITECT PLLC Contractor AK PREMIER CONTRACTORS | new interior renovation of existing commercial space for new bagel shop. Work to include new kitchen, restroom, mini-split system and eating… |
| M01050616 ↗ | 260 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 07/29/2024 | 08/08/2024 | Design YAO W GUO ARCHITECT, PC Contractor QMB PLUMBING & HEATING INC | HEREWITH FILING FOR PLUMBING MODIFICATION AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M01057605 ↗ | 342 WEST 72 STREET MANHATTAN | Alteration | Signed-off | 06/10/2024 | 07/12/2024 | Design YAO W GUO ARCHITECT, PC Contractor QMB PLUMBING & HEATING INC | HEREWITH FILING FOR PLUMBING MODIFICATION IN APT. 7S AS PER PLANS. NO CHANGE TOUSE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| S01068078 ↗ | 467 FOREST AVENUE STATEN ISLAND | Alteration | Signed-off | 06/24/2024 | 07/09/2024 | Design YAO W GUO ARCHITECT, PC Owner 467 FOREST PROPERTY INC Contractor GLOBAL DESIGN CONCEPT COR | INSTALLATION OF SPLIT UNITS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B00922126 ↗ | 627 WILSON AVENUE BROOKLYN | Alteration | Signed-off | 08/21/2023 | 06/21/2024 | Design YAO W GUO ARCHITECT, PC Owner YAO W. GUO ARCHITECT, PC Contractor GLOBAL DESIGN CONCEPT COR | RENOVATE EXISTING STORE. GENERAL CONSTRUCTION OF INTERIOR CABINETS AND INSTALLATION OF MECHANICAL SYSTEM, RANGEHOOD AND FAN ON EXISTING DUCT… |
| B01054465 ↗ | 8871 18 AVENUE BROOKLYN | Alteration | Filed — no permit on record | 05/28/2024 | — | Design YAO W GUO ARCHITECT, PC | — |
| M00808541 ↗ | 1230 PARK AVENUE MANHATTAN | Alteration | Signed-off | 01/23/2023 | 05/21/2024 | Design YAO W GUO ARCHITECT, PC Contractor ASTORIA P & H CORP | HEREWITH FILING FOR MODIFICATIN OF PLUMBING FIXTURES AS SHOWN ON DRAWINGS NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00839252 ↗ | 401 WEST 25 STREET MANHATTAN | Alteration | Permit Issued | 07/20/2023 | 05/16/2024 | Design YAO W GUO ARCHITECT, PC Contractor MBW CONSTRUCTION INC | THIS APPLICATION IS FILED TO LEGALIZE VIOLATION # 39073402N FOR MECHANICAL SYSTEM AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANC… |
| M00730649 ↗ | 1 EAST 33 STREET MANHATTAN | Alteration | Signed-off | 05/23/2022 | 05/08/2024 | Design YAO W GUO ARCHITECT, PC Contractor BURA CONSTRUCTION | GENERAL CONSTRUCTION OF INTERIOR PARTITIONS, DOORS, AND CEILING ON 2ND AND 3RD FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUP… |
| M01015641 ↗ | 2280 BROADWAY MANHATTAN | Alteration | Signed-off | 04/29/2024 | 05/02/2024 | Design YAO W GUO ARCHITECT, PC Contractor QMB PLUMBING & HEATING INC | HEREWITH FILING FOR PLUMBING FIXTURES MODIFICATION IN APT. 9A AS PER PLANS. NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION. |
| M00998625 ↗ | 124 EAST 79 STREET MANHATTAN | Alteration | Permit Issued | 02/01/2024 | 04/30/2024 | Design YAO W GUO ARCHITECT, PC Owner AKAM ASSOCIATES Contractor CARBONE CONTRACTING INC | COMBINE APT 2A AND 2B. MODIFY PLUMBING FIXTURES AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00962137 ↗ | 1435 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 12/01/2023 | 02/21/2024 | Design YAO W GUO ARCHITECT, PC Contractor EAST SIDE DESIGN & BUILD* | UPGRADE ELCTRICAL PANEL FOR APT. 6B AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00937601 ↗ | 417 RIVERSIDE DRIVE MANHATTAN | Alteration | Signed-off | 11/22/2023 | 01/19/2024 | Design YAO W GUO ARCHITECT, PC Contractor ASTORIA P & H CORP | RENOVATE EXISTING APT. 6A1. WORK TO BE MODIFICATION OF INTERIOR NON LOAD BEARING PARTITIONS AND DOORS AS SHOWN ON DRAWINGS. NO CHANGE TO USE… |
| Q00978086 ↗ | 13336 37 AVENUE QUEENS | Alteration | Signed-off | 12/20/2023 | 01/12/2024 | Design YAO W GUO ARCHITECT, PC Contractor VAND MECHANICAL INC | INSTALL PLUMBING FIXTURES AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00910132 ↗ | 260 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 10/12/2023 | 12/08/2023 | Design YAO W GUO ARCHITECT, PC Contractor QMB PLUMBING & HEATING INC | RENOVATE EXISTING APT. 14D. WORK TO INCLUDE PARTITION MODIFACTION, DOORS AND MECHANICAL SYSTEM AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRES… |
| M00960536 ↗ | 349 5 AVENUE MANHATTAN | Alteration | Permit Issued | 11/22/2023 | 12/05/2023 | Design YAO W GUO ARCHITECT, PC Owner ZAR PROPERTY NY Contractor METRO STAR CONTRACTING C | RENOVATE EXISTING OFFICE ON 4TH FLOOR. MODIFICATION OF EXISTING PLUMBING SYSTEM AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00945924 ↗ | 233 EAST 18 STREET MANHATTAN | Alteration | Signed-off | 10/18/2023 | 10/30/2023 | Design YAO W GUO ARCHITECT, PC Contractor VISION BLDG AND RESTORAT* | INSTALLATION OF REAR DECK AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B00877087 ↗ | 268 SCHAEFER STREET BROOKLYN | Alteration CO | Permit Issued | 05/24/2023 | 10/24/2023 | Design YAO W GUO ARCHITECT, PC Contractor GLOBAL DESIGN CONCEPT COR | INSTALL PLUMBING FIXTURES AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00730661 ↗ | 1 EAST 33 STREET MANHATTAN | Alteration | Signed-off | 05/23/2022 | 10/16/2023 | Design YAO W GUO ARCHITECT, PC Owner ROSEN, GLUCK & MAY Contractor MORA FIRE PROTECTION LLC | MODIFICATION OF PLUMBING AND SPRINKLER SYSTEM ON 2ND AND 3RD FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00942973 ↗ | 29 SPRING STREET MANHATTAN | Alteration | Permit Issued | 10/10/2023 | 10/16/2023 | Design YAO W GUO ARCHITECT, PC Contractor GLOBAL DESIGN CONCEPT COR | HEREWITH FILING FOR INTERIOR RENOVATION OF EXISTING RETAIL STORE ON FIRST FLOOR AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B00927716 ↗ | 101 DIKEMAN STREET BROOKLYN | Alteration CO | Permit Issued | 09/19/2023 | 10/10/2023 | Design YAO W GUO ARCHITECT, PC Contractor G.B. & SON, INC | PROPOSED TO CONVERT EXISTING 2 FAMILY DWELLING UNIT TO ONE FAMILY DWELLING UNIT. NO CHNAGE TO FLOOR AREA, BULK AND HEIGHT OF BUILDING. OBTA… |
| M00902729 ↗ | 1223 LEXINGTON AVENUE MANHATTAN | Alteration | Signed-off | 09/12/2023 | 10/10/2023 | Design YAO W GUO ARCHITECT, PC Contractor ASTORIA P & H CORP | RENOVATE APT. 14A. WORK TO BE PARTITION REMOVAL AND INSTALL NEW PARTITIONS AND DOORS AS SHOWN ON DRAWINGS. NO CHNAGE TO USE, EGRESS OR OCCUP… |
| M00928306 ↗ | 150 WEST END AVENUE MANHATTAN | Alteration | Permit Issued | 09/07/2023 | 09/28/2023 | Design YAO W GUO ARCHITECT, PC Owner AKAM ASSOCIATES, INC. Contractor GLOBAL DESIGN CONCEPT COR | COMBINATION OF APARTMENTS # 2P AND 2R UNDER TPPN #3/97. MODIFY PLUMBING WORK AS SHOWN ON PLANS. NO CHANGE TO USE, EGERSS OR OCCUPANCY |
| M00904193 ↗ | 50 WEST 96 STREET MANHATTAN | Alteration | Signed-off | 07/18/2023 | 09/18/2023 | Design YAO W GUO ARCHITECT, PC Owner EBMG, LLC Contractor QMB PLUMBING & HEATING INC | RENOVATE KITCHEN IN APT. 10B. MODIFICATION PLUMBING FIXTURES AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00913298 ↗ | 305 WEST 72 STREET MANHATTAN | Alteration | Signed-off | 08/09/2023 | 09/14/2023 | Design YAO W GUO ARCHITECT, PC Owner 155 PERRY ST CONDOMINIUM Contractor GLOBAL DESIGN CONCEPT COR | RENOVATE EXISTING APT. 1B. WORK TO INCLUDE PARTITIONS MODIFICATION AND DOORS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00883147 ↗ | 310 EAST 70 STREET MANHATTAN | Alteration | Signed-off | 07/31/2023 | 09/12/2023 | Design YAO W GUO ARCHITECT, PC Owner AKAM ASSOCIATES, INC. Contractor ASTORIA P & H CORP | MODIFICATION OF EXISTIN PLUMBING SYSTEM AS SHOWN ON DRAWING. NO CHANGE TO USE, EGRSS OR OCCUPANCY. |
| B00902028 ↗ | 358 TOMPKINS AVENUE BROOKLYN | Alteration | Signed-off | 07/10/2023 | 08/24/2023 | Design YAO W GUO ARCHITECT, PC Owner HUDSON EAST NETWORK LLC Contractor QMB PLUMBING & HEATING INC | INSTALL PLUMBING AND SPRINKLER SYSTEM AS SHONW ON DRAWINGS. NO CHANGE TO USE,EGRESS OR OCCUPANCY. |
| B00891140 ↗ | 268 SCHAEFER STREET BROOKLYN | Alteration | Signed-off | 07/05/2023 | 08/21/2023 | Design YAO W GUO ARCHITECT, PC Contractor VILLAGE P & H NY INC | SEPERATELY FILED SPRINKLER SYSTEM IN CONJUNCTIN WITH APPLICATION # B00877087. NO CHNAGE TO USE, EGRESS OR OCCUPANCY. |
| M00750227 ↗ | 139 EAST 63 STREET MANHATTAN | Alteration | Signed-off | 06/14/2022 | 08/21/2023 | Design YAO W GUO ARCHITECT, PC Contractor ASTORIA P & H CORP | INSTALL PLUMBING FIXTURE IN APT 8B AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| M00769741 ↗ | 260 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 07/11/2022 | 08/03/2023 | Design YAO W GUO ARCHITECT, PC Owner 260 APARTMENTS CORP Contractor QMB PLUMBING & HEATING INC | REMOVE AND INSTALL PLUMBING FIXTURES AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Q00892914 ↗ | 1919 GATES AVENUE QUEENS | Alteration | Signed-off | 06/20/2023 | 07/31/2023 | Design YAO W GUO ARCHITECT, PC Contractor QMB PLUMBING & HEATING INC | REPLACE EXISTING BOILER PER ECB VOILATION # 39088005L AS SHOWN ON DRAWINGS. NO CHNAGE TO USE, EGRESS OR OCCUPANCY. |
| M00876552 ↗ | 396 3 AVENUE MANHATTAN | Alteration | Signed-off | 05/18/2023 | 07/27/2023 | Design BCHEN ARCHITECT PLLC Owner POKPOON REALTY INC. Contractor BEST PLUMBING & HVAC INC Filer ALPHA HOME DESIGN LLC | replace existing gas boiler with new gas boiler and burner |
| M00787996 ↗ | 260 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 08/24/2022 | 07/26/2023 | Design YAO W GUO ARCHITECT, PC Owner 260 APARTMENTS CORP Contractor GLOBAL DESIGN CONCEPT COR | RENOVATE EXISTING APT. 12B. WORK TO INCLUDE PARTITION MODIFICATION AND DOORS. INSTALL MECHANCIAL SYSTEM AS SHOWN ON DRAWINGS. NO CHANGE TO … |
| M00883406 ↗ | 233 EAST 18 STREET MANHATTAN | Alteration | Filed — no permit on record | 07/26/2023 | — | Design YAO W GUO ARCHITECT, PC | — |
| B00903448 ↗ | 312 BLEECKER STREET BROOKLYN | Alteration | Signed-off | 07/13/2023 | 07/18/2023 | Design YAO W GUO ARCHITECT, PC Contractor GLOBAL DESIGN CONCEPT COR | RENOVATE EXISTING APARTMENT ON FIRST FLOOR. WORK TO BE MINOR PARTITONS MODIFICATION AND INSTALL SPLIT SYSTEM AS SHOWN ON DRAWINGS. NO CHANGE… |
| M08023401 ↗ | 92 HORATIO STREET MANHATTAN | Alteration | Permit Issued | 04/07/2023 | 07/18/2023 | Design YAO W GUO ARCHITECT, PC Owner HORATIO ARMS INC Contractor ORCHARD CONSTRUCTION GROU | MODIFICATION OF PLUMBING FIXTURES IN APT. 5C AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| B00897927 ↗ | 9935 SHORE ROAD BROOKLYN | Alteration | Filed — no permit on record | 07/11/2023 | — | Design CAMERON ENGINEERING Filer YAO W GUO ARCHITECT, PC | — |
| M00750206 ↗ | 139 EAST 63 STREET MANHATTAN | Alteration | Signed-off | 06/14/2022 | 07/03/2023 | Design YAO W GUO ARCHITECT, PC Contractor EAST SIDE DESIGN & BUILD* | JOB FILED FOR EXISTING APARTMENT RENOVATION. INTERIOR NON BEARING PARTITION ALTERATIONS AS PER PLAN. NO CHANG OF USE, EGRESS OR OCCUPANCY. |
| Q00818337 ↗ | 87-38 69 AVENUE QUEENS | Alteration | Signed-off | 04/26/2023 | 06/24/2023 | Design YAO W GUO ARCHITECT, PC Contractor EMILIANO CONSTRUCTION COR | Renovate attic with added dormers and access stair to create an occupied 3rd Floor. Replace cellar stair. Renovate kitchen in place. Renovat… |
| M00769498 ↗ | 260 WEST END AVENUE MANHATTAN | Alteration | Signed-off | 07/11/2022 | 06/15/2023 | Design YAO W GUO ARCHITECT, PC Owner 260 APARTMENTS CORP Contractor GLOBAL DESIGN CONCEPT COR | RENOVATE EXISTING APT. 5D. WORK TO INCLUDE PARTITION MODIFICATION AND DOORS. NO CHANGE TO USE, EGRESS OR OCCUPANCY. |
| Date | Requirement | Building | Inspector | Role |
|---|---|---|---|---|
| 08/24/2026 | Structural Stability – Alterations of existing buildings | 119 WEST 57 STREET | Yao Guo | special |
| 08/24/2026 | Fire-Resistant Penetrations and Joints | 119 WEST 57 STREET | Yao Guo | special |
| 08/17/2026 | Final | 119 WEST 57 STREET | Yao Guo | progress |
| 08/17/2026 | Fire-Resistant Penetrations and Joints | 64-28 METROPOLITAN AVENUE | Yao Guo | special |
| 08/17/2026 | Sprinkler Systems | 64-28 METROPOLITAN AVENUE | Yao Guo | special |
| 07/31/2026 | Lighting in dwelling units | 353 EAST 72 STREET | Yao Guo | energy_progress |
| 07/31/2026 | Fire-Resistant Penetrations and Joints | 353 EAST 72 STREET | Yao Guo | special |
| 07/31/2026 | Final | 353 EAST 72 STREET | Yao Guo | progress |
| 07/31/2026 | Energy Code Compliance Inspections | 353 EAST 72 STREET | Yao Guo | progress |
| 07/16/2026 | Fire-Resistant Penetrations and Joints | 1235 PARK AVENUE | Yao Guo | special |
| 06/17/2026 | Lighting in dwelling units | 1235 PARK AVENUE | Yao Guo | energy_progress |
| 06/17/2026 | Final | 1235 PARK AVENUE | Yao Guo | progress |
| 06/17/2026 | Energy Code Compliance Inspections | 1235 PARK AVENUE | Yao Guo | progress |
| 06/17/2026 | Fire-Resistant Penetrations and Joints | 1235 PARK AVENUE | Yao Guo | special |
| 06/17/2026 | Fire-Resistant Penetrations and Joints | 1133 PARK AVENUE | Yao Guo | special |
| 06/17/2026 | Fire-Resistant Penetrations and Joints | 1235 PARK AVENUE | Yao Guo | special |
| 06/17/2026 | Lighting in dwelling units | 1133 PARK AVENUE | Yao Guo | energy_progress |
| 06/17/2026 | Final | 1133 PARK AVENUE | Yao Guo | progress |
| 06/17/2026 | Energy Code Compliance Inspections | 1133 PARK AVENUE | Yao Guo | progress |
| 06/17/2026 | Fire-Resistant Penetrations and Joints | 1133 PARK AVENUE | Yao Guo | special |
| 05/26/2026 | Tenant Protection Plan Compliance | 495 3 AVENUE | ARIEL GOLSHAN | special |
| 05/26/2026 | Fire-Resistant Penetrations and Joints | 495 3 AVENUE | Yao Guo | special |
| 05/26/2026 | Final | 495 3 AVENUE | billy chen | progress |
| 05/15/2026 | Fire-Resistant Penetrations and Joints | 213 WEST 11 STREET | Yao Guo | special |
| 05/15/2026 | Structural Stability – Alterations of existing buildings | 213 WEST 11 STREET | Yao Guo | special |
| 05/15/2026 | Energy Code Compliance Inspections | 213 WEST 11 STREET | Yao Guo | progress |
| 05/15/2026 | Lighting in dwelling units | 213 WEST 11 STREET | Yao Guo | energy_progress |
| 05/14/2026 | Final | 495 3 AVENUE | billy chen | progress |
| 05/14/2026 | Fire-Resistant Penetrations and Joints | 495 3 AVENUE | Yao Guo | special |
| 05/14/2026 | Tenant Protection Plan Compliance | 495 3 AVENUE | — | special |
| 05/08/2026 | Fire-Resistant Penetrations and Joints | 525 EAST 86 STREET | Yao Guo | special |
| 05/04/2026 | Fenestration and door U-factor and product ratings | 358 TOMPKINS AVENUE | Yao Guo | energy_progress |
| 05/04/2026 | Air barrier - visual inspection | 358 TOMPKINS AVENUE | Yao Guo | energy_progress |
| 05/04/2026 | Insulation placement and R values | 358 TOMPKINS AVENUE | Yao Guo | energy_progress |
| 05/04/2026 | Fenestration areas | 358 TOMPKINS AVENUE | Yao Guo | energy_progress |
| 05/04/2026 | Lighting in dwelling units | 358 TOMPKINS AVENUE | Yao Guo | energy_progress |
| 05/04/2026 | Fenestration air leakage | 358 TOMPKINS AVENUE | Yao Guo | energy_progress |
| 05/04/2026 | Energy Code Compliance Inspections | 358 TOMPKINS AVENUE | Yao Guo | progress |
| 05/04/2026 | Structural Stability – Alterations of existing buildings | 358 TOMPKINS AVENUE | Yao Guo | special |
| 05/04/2026 | Fire-Resistant Penetrations and Joints | 358 TOMPKINS AVENUE | Yao Guo | special |
| 05/04/2026 | Post-installed Anchors | 358 TOMPKINS AVENUE | Yao Guo | special |
| 04/22/2026 | Energy Code Compliance Inspections | 525 EAST 86 STREET | Yao Guo | progress |
| 04/22/2026 | Lighting in dwelling units | 525 EAST 86 STREET | Yao Guo | energy_progress |
| 04/21/2026 | Fenestration air leakage | 358 TOMPKINS AVENUE | Yao Guo | energy_progress |
| 04/21/2026 | Fenestration and door U-factor and product ratings | 358 TOMPKINS AVENUE | Yao Guo | energy_progress |
| 04/21/2026 | Insulation placement and R values | 358 TOMPKINS AVENUE | Yao Guo | energy_progress |
| 04/21/2026 | Air barrier - visual inspection | 358 TOMPKINS AVENUE | Yao Guo | energy_progress |
| 04/21/2026 | Fenestration areas | 358 TOMPKINS AVENUE | Yao Guo | energy_progress |
| 04/21/2026 | Lighting in dwelling units | 358 TOMPKINS AVENUE | Yao Guo | energy_progress |
| 04/21/2026 | Energy Code Compliance Inspections | 358 TOMPKINS AVENUE | Yao Guo | progress |