← Back
One story retail building
2580 NOSTRAND AVENUE
BROOKLYN · BIN 3209563
💬 Discuss this project
1958Year Built
1Stories
K1Building Class
R4Zoning
3,250 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: J KIM REALTY LIC · 6,300 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
Floor 1Under Construction14p · 1 filing · 20 docs
CellarUnder Construction10p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WOOK INC103/22/2026
WOOK INC DBA MONACO CLEAN103/22/2026
J KIM REALTY403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BLACK OAK ARCHITECTURE, PC908/24/2026
MDG DESIGN GROUP212/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M-DIS DESIGN GROUP503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
LEE & COMPANY OF NY, INCGeneral Contractor204/09/2026
PASQUALE QUARATINO INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BLACK OAK ARCHITECTURE, P9912308/24/2026
SEAD ENGINEERING PC2665808/24/2026
Building Lifecycle
All (88)Filed (11)Permit Issued (5)Violation (15)Inspection (2)Objection (26)Special Inspection (29)
08/27/2026
Special inspection requirement — HVAC-R and service water heating equipment
INHWAN CHANG
08/27/2026
Special inspection requirement — Heating Systems
INHWAN CHANG
08/27/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
INHWAN CHANG
08/27/2026
Special inspection requirement — HVAC-R and service water heating system controls
INHWAN CHANG
08/24/2026
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. DRY CLEANING STORE. WORK INCLUDES REPLACE DRY CLEANING MACHINE, NEW FLOOR COVERING, NEW PAINT THROUGH-OUT SPACE, NEW NON-LOAD BEARING PARTITION WALL, AND AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B01160515-P9
08/24/2026
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. DRY CLEANING STORE. WORK INCLUDES REPLACE DRY CLEANING MACHINE, NEW FLOOR COVERING, NEW PAINT THROUGH-OUT SPACE, NEW NON-LOAD BEARING PARTITION WALL, AND AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B01160515-A1
08/21/2026
Special inspection requirement — Heating Systems
INHWAN CHANG
08/21/2026
Special inspection requirement — HVAC-R and service water heating equipment
INHWAN CHANG
08/21/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
INHWAN CHANG
08/21/2026
Special inspection requirement — HVAC-R and service water heating system controls
INHWAN CHANG
08/21/2026
Special inspection requirement — Heating Systems
Jin Lee
07/24/2026
Objection resolved — Addressed
07/24/2026
Objection resolved — Addressed
07/24/2026
Objection resolved — Addressed
07/24/2026
Objection resolved — Addressed
07/24/2026
Objection resolved — Addressed
07/24/2026
Objection resolved — Addressed
07/24/2026
Objection resolved — Addressed
07/23/2026
Objection raised — Scope
07/23/2026
Objection raised — Fire_Protection
07/23/2026
Objection raised — Fire_Protection
07/23/2026
Objection raised — Scope
07/23/2026
Objection raised — Scope
07/23/2026
Objection raised — Energy
07/23/2026
Objection raised — Mechanical
07/14/2026
Special inspection requirement — Heating Systems
Jin Lee
07/13/2026
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. DRY CLEANING STORE. WORK INCLUDES REPLACE DRY CLEANING MACHINE, NEW FLOOR COVERING, NEW PAINT THROUGH-OUT SPACE, NEW NON-LOAD BEARING PARTITION WALL, AND AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B01160515-P8
07/13/2026
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. DRY CLEANING STORE. WORK INCLUDES REPLACE DRY CLEANING MACHINE, NEW FLOOR COVERING, NEW PAINT THROUGH-OUT SPACE, NEW NON-LOAD BEARING PARTITION WALL, AND AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B01160515-P6
07/06/2026
Special inspection requirement — Heating Systems
Jin Lee
06/18/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/20/2026
Permit issued — Boiler Equipment
B01160515-S3-BE
05/07/2026
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. DRY CLEANING STORE. WORK INCLUDES REPLACE DRY CLEANING MACHINE, NEW FLOOR COVERING, NEW PAINT THROUGH-OUT SPACE, NEW NON-LOAD BEARING PARTITION WALL, AND AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B01160515-P5
05/07/2026
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. DRY CLEANING STORE. WORK INCLUDES REPLACE DRY CLEANING MACHINE, NEW FLOOR COVERING, NEW PAINT THROUGH-OUT SPACE, NEW NON-LOAD BEARING PARTITION WALL, AND AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B01160515-S3
04/14/2026
Special inspection requirement — Heating Systems
INHWAN CHANG
04/14/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
INHWAN CHANG
04/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
INHWAN CHANG
04/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
INHWAN CHANG
03/17/2026
Permit issued — General Construction
B01160515-I1-GC-CX
03/11/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/30/2025
Special inspection requirement — Sprinkler Systems
INHWAN CHANG
12/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
12/22/2025
Objection raised — Admin
12/22/2025
Objection resolved — Addressed
12/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
12/22/2025
Special inspection requirement — Lighting controls
INHWAN CHANG
12/22/2025
Special inspection requirement — Final
YUNHO LEE
12/22/2025
Special inspection requirement — Mechanical Systems
INHWAN CHANG
12/22/2025
Special inspection requirement — Interior lighting power
INHWAN CHANG
12/18/2025
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. DRY CLEANING STORE. WORK INCLUDES REPLACE DRY CLEANING MACHINE, NEW FLOOR COVERING, NEW PAINT THROUGH-OUT SPACE, NEW NON-LOAD BEARING PARTITION WALL, AND AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B01160515-P3
12/18/2025
Filed — Alteration
HEREWITH FILE TO RENOVATE EXIST. DRY CLEANING STORE. WORK INCLUDES REPLACE DRY CLEANING MACHINE, NEW FLOOR COVERING, NEW PAINT THROUGH-OUT SPACE, NEW NON-LOAD BEARING PARTITION WALL, AND AND GENERAL CONSTRUCTION. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B01160515-P4
12/02/2025
Permit issued — Plumbing
B01160515-S1-PL
11/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
11/21/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
INHWAN CHANG
11/21/2025
Special inspection requirement — Lighting controls
INHWAN CHANG
11/21/2025
Special inspection requirement — Interior lighting power
INHWAN CHANG
11/21/2025
Special inspection requirement — Final
YUNHO LEE
11/21/2025
Special inspection requirement — Mechanical Systems
INHWAN CHANG
11/21/2025
Special inspection requirement — Sprinkler Systems
INHWAN CHANG
11/20/2025
Permit issued — Boiler Equipment
B01160515-S2-BE
11/19/2025
Permit issued — Mechanical Systems
B01160515-I1-GC-CX
Latest 60 of 88 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offNULITE FUEL OIL CO. LTD05/20/2026
DOB NOWGeneral ConstructionPermit IssuedLEE & COMPANY OF NY, INC03/17/2026
DOB NOWPlumbingPermit IssuedPASQUALE QUARATINO INC12/02/2025
DOB NOWBoiler EquipmentSigned-offPASQUALE QUARATINO INC11/20/2025
DOB NOWMechanical SystemsPermit IssuedLEE & COMPANY OF NY, INC11/19/2025
BISBLISSUEDWASOFF PLBG & UTILITY CO01/18/2017
BISOTISSUEDTS AWNING & SIGN CORP11/23/2009
BISEQISSUEDTHREE STAR CONSTRUCTION C10/08/2009
BIS—ISSUEDBANDO DEVELOPMENT & KARKETING CO10/06/1998
BISBLISSUEDNEAL RUDIKOFF/DUAL FUEL PL.05/14/1996
1 project · most recent 08/24/2026
Others
FiledStatusContractorScopeMake / Model / Capacity
08/24/2026Permit IssuedLEE & COMPANY OF NY, INCOthers
Other
Realstar KM503-K4 42 kW ×2
1 project · most recent 08/24/2026
Sprinkler System
FiledStatusContractorScope
08/24/2026——Sprinkler System
1 project · most recent 08/24/2026
Gas Plumbing-Sprinkler Water/Sanitary
FiledStatusContractorScope
08/24/2026Permit IssuedPASQUALE QUARATINO INCGas, Plumbing-Sprinkler, Water/Sanitary
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/18/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/11/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
08/27/2026HVAC-R and service water heating equipmentINHWAN CHANGenergy_progress
08/27/2026Heating SystemsINHWAN CHANGspecial
08/27/2026HVAC-R and service water piping design and insulationINHWAN CHANGenergy_progress
08/27/2026HVAC-R and service water heating system controlsINHWAN CHANGenergy_progress
08/21/2026Heating SystemsINHWAN CHANGspecial
08/21/2026HVAC-R and service water heating equipmentINHWAN CHANGenergy_progress
08/21/2026HVAC-R and service water piping design and insulationINHWAN CHANGenergy_progress
08/21/2026HVAC-R and service water heating system controlsINHWAN CHANGenergy_progress
08/21/2026Heating SystemsJin Leespecial
07/14/2026Heating SystemsJin Leespecial
07/06/2026Heating SystemsJin Leespecial
04/14/2026Heating SystemsINHWAN CHANGspecial
04/14/2026HVAC-R and service water piping design and insulationINHWAN CHANGenergy_progress
04/14/2026HVAC-R and service water heating system controlsINHWAN CHANGenergy_progress
04/14/2026HVAC-R and service water heating equipmentINHWAN CHANGenergy_progress
12/30/2025Sprinkler SystemsINHWAN CHANGspecial
12/30/2025Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
12/22/2025Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
12/22/2025Lighting controlsINHWAN CHANGenergy_progress
12/22/2025FinalYUNHO LEEprogress
12/22/2025Mechanical SystemsINHWAN CHANGspecial
12/22/2025Interior lighting powerINHWAN CHANGenergy_progress
11/21/2025Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
11/21/2025Fire-Resistant Penetrations and JointsINHWAN CHANGspecial
11/21/2025Lighting controlsINHWAN CHANGenergy_progress
Latest 25 of 29.
▾Documents — 108 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/23/2026B01160515-A1Request digital key ↗
08/23/2026B01160515-P9Request digital key ↗
08/23/2026B01160515-I1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits7
▸BISWORK PERMIT APPLICATION4
01/12/2017340462715Open ↗
01/12/2017340462715Open ↗
11/24/2009320089060Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION3
01/12/2017340462715Open ↗
11/09/2009320089060Open ↗
09/24/2009320072130Open ↗
▸Seals & Professional Certifications49
▸DOB NOWProgress Inspector Seal & Signature15
09/23/2026B01160515-A1Open ↗
09/23/2026B01160515-A1Open ↗
09/23/2026B01160515-A1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/23/2026B01160515-A1Open ↗
09/23/2026B01160515-P9Open ↗
09/23/2026B01160515-S2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/23/2026B01160515-A1Open ↗
08/23/2026B01160515-P9Open ↗
08/23/2026B01160515-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
02/19/2010320072130Open ↗
09/24/2009320072130Open ↗
09/24/2009320072130Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/12/2017340462715Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/12/2017340462715Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
09/24/2009320072130Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/12/2017340462715Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
09/24/2009320072130Open ↗
▸Trade Schedules & Equipment2
▸BISSIGN HANGER CERTIFICATE1
11/09/2009320089060Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
01/12/2017340462715Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/23/2026B01160515-A1Open ↗
08/23/2026B01160515-P9Open ↗
08/17/2026B01160515-S3Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
11/09/2009320089060Open ↗
09/24/2009320072130Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/12/2017340462715Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
01/12/2017340462715Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
10/31/2017340462715Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
01/12/2017340462715Open ↗
▸BISNYCECC ANALYSIS1
01/12/2017340462715Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
01/12/2017340462715Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
03/14/2018340462715Open ↗
03/02/2018340462715Open ↗
10/31/2017340462715Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
11/09/2009320089060Open ↗
09/24/2009320072130Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/03/2010320089060Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
03/02/2018340462715Open ↗
01/12/2017340462715Open ↗
02/03/2010320089060Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms7
▸BISBOROUGH INTAKE FORM3
03/14/2018340462715Open ↗
03/02/2018340462715Open ↗
10/31/2017340462715Open ↗
▸BISEFILING COVER SHEET2
11/09/2009320089060Open ↗
09/24/2009320072130Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
01/12/2017340462715Open ↗
▸BISADDITIONAL INFORMATION1
09/14/2017340462715Open ↗